MATCH LINE 1. All dimensions in millimeters unless otherwise stated.

CH 40.000

CH 50.000

CH 60.000

MATCH LINE
2. All levels in meters.

3. All temporary works by Contractor.

4. All drainage measures by Contractor.


Bottom of Sweet Soil Top of Tensar Modular Block Wall Bottom of Sweet Soil
Top of Tensar Modular Block Wall Soil Cover 150mm Soil Cover 150mm Top of Tensar Modular Block Wall 5. Setting out by Contractor.
96.110 96.110

6. This Drawing forms Part of the Design Submission


95.510 95.510 95.510 95.510 O-57957-DS-05_AV Rev-00 dtd 27-11-2023.
95.110 95.110 95.110 95.110

94.710 94.710 94.710 94.710


LEGEND
94.310 94.310 94.310 94.310
TENSAR GEOGRID - BLUE
94.000 94.000 94.000
93.910 93.910 93.910 93.910

93.510 93.510 93.510 93.510


93.310 93.310 93.310
MGL = MINIMUM GEOGRID LENGTH
Mass Concrete Levelling Strip Finished Ground Level
SEC = DESIGN HEIGHT
Finished Ground Level Bottom of Tensar Modular Block Wall
450mm x 150mm Finished Ground Level
Mass Concrete Levelling Strip
450mm x 150mm
Sec = 2.80m, MGL =2.50m

Developed Elevation MSE10 (From Point 3 to 4)


2 Scale - 1:50

External Corner

External Corner
Internal Corner
CH 70.000

CH 80.000
MATCH LINE

90° Degree

90° Degree

90° Degree
MATCH LINE
FOR APPROVAL
Top of Tensar Modular Block Wall Top of Tensar Modular Block Wall Bottom of Sweet Soil
Soil Cover 150mm Bottom of Sweet Soil Soil Cover 150mm Top of Tensar Modular Block Wall
95.910

95.510 95.510
95.310
95.110 95.110 95.110 95.110 95.110
94.910
94.710 94.710 94.710 94.710
94.510
94.310 94.310 94.310 94.310
94.110
94.000 94.000 94.000 94.000 94.000
93.910 93.910 93.910 93.910
93.710
93.510 93.510 93.510 93.510 93.510
93.310 93.310

Finished Ground Level Mass Concrete Levelling Strip Finished Ground Level Bottom of Tensar Modular Block Wall
450mm x 150mm End of MSE Wall 10
8200 1800 4000 1200
Sec = 2.80m, MGL =2.50m Sec = 2.80m, MGL =2.50m

Developed Elevation MSE10 (From Point 3 to 4)


2 Scale - 1:50 2
EARTH WORKS PACKAGE FOR
KHORFAKKAN UNIVERSITY ACCOMMODATION
AND RECREATINAL FACILITIES
External Corner

Geogrid to be buried and


90° Degree
MATCH LINE

prevented from exposure at the


termination point.

4
Top of Tensar Modular Block Wall

95.310
95.110
against as per site
To be terminated

94.710

94.310
94.110
condition

94.000 94.000
93.910

93.510 93.510
93.310

Connecting to
MSE Wall 11
End of MSE Wall 10
4000 1200
Sec = 2.80m, MGL =2.50m

Developed Elevation MSE10 (From Point 3 to 4)


2 Scale - 1:50