You are on page 1of 1

NO.

NOTES
1. All Engineer's drawings shall be read in
conjunction with the Architect's drawings. Any
discrepancies should be reported
2700 3000 3000 3000 3000 3000 3000 3000 3000 2700 2. These drawings shall be read in conjunction
with Standard & Particular Specifications.

3. All dimensions are in mm unless otherwise


stated.
114.3 x 5mm CHS Horizontal Members 114.3 x 5mm CHS Horizontal Members 114.3 x 5mm CHS Horizontal Members
4. Foundations shall be constructed on firm
natural ground. Blinding shall not be placed
without Engineer's approval.

1350 1350 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1350 1350 5. Concrete shall be of grade C25, medium
slump (75) & maximum aggregate size
20mm.Minimum cement conent 325kg/m3 &
maximum w/c ratio shall be 0.55
6. Cover to reinforcement shall be
50mm-foundations and rc walls,
25mm-columns, 25mm-beams & 25mm-slabs.
RACK DETAILS (SCALE: 1:50)
7. Masonry units shall have a minimum
compressive strength of 2.8N/mm2 and
1.52 mortar designation (ii).

1.6

X
1.52 Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings
8. Ground supported slabs shall be reinforced
with a square mesh A142

1.50 2700 3000 3000 3000 3000 3000 3000 3000 3000 2700 1.6 9. Fill material shall be approved by the
engineer prior to use.

1.51 114.3 x 5mm CHS Horizontal Members 114.3 x 5mm CHS Horizontal Members
Detail 'Q' for Triangular Bracings
114.3 x 5mm CHS Horizontal Members 1.5 10. Approved fill shall be placed and spread in
1.5 layers of 150mm to 250mm,OMC
achieved and compacted to 95% MDD
114.3 x 5mm CHS Existing Vertical Members
1000

(Modified AASHTO)
114.3 x 5mm CHS Members 11. Reinforced concrete design and workmanship

1.05 1500
to BS8110 Pt. 1 & 2
1000 1350 1350 1500
1.08
1500 1500 1500 1500 1500 1500
1.05 Connection
1500 1500 1500 1.05 1500 1500
1.05 1500 1500
1.05 1500 1350
1.08 1350 1000
1.1 1.08 1.05 1.05 1.05
12. Timber shall be of SG grade and to BS 5268.

1.05
'N'
1.1 Connection detail "C"
1.05 1.05 1.08

X
13. Structural steelwork to BS 5950. See

1.15 1.08 1.05 RACK1.1 1.1 1.15 1.14


standard steelwork notes.

1.15Steel column 1.05


DETAILS (SCALE: 1:50)
1.1 1.25
1.06Steel column 1.07 1.08 Steel column 1.1 1.1 1.18
Revision Notes

1.2 Detail "J" Steel column Steel column 1.15 1.13


1.07 1.07 1.07 Rev Date. Orig. Revision Description

RC RAMP 002/1 03.10.22 MAY.2022 Provided for a timber

1000
Detail "K" /STR 05 plank for the middle
RC RAMP 114.3 x 5mm CHS Vertical Members
GROUND LEVEL rack.
GROUND LEVEL 002/2 03.10.22 MAY.2022 Provided for a section
TYPICAL SECTION THROUGH INSPECTION FACILITY - 50 mm Oil Interceptors (SCALE: 1:50) /STR 05 through the racks.
Steel column 003/2 07.06.23 MAY.2022 Provided for oil
Steel column
8000 1000 /STR 05 stoppers and
RC step intermediate bracings
RC step T10 DETAIL 'Q' TRIANGULAR BRACINGS FOR THE RACKS (SCALE: 1:25) for the racks.
Detail 'A' Detail 'A' 313
T10 445
RC Ramp
RC Ramp

50
100 x 60mm Timber Plank
100

50
150
T10 dowel steel bar at 150 spacing c/c

150
100 x 100 x 6mm Thick MS Plate
anchored into existing concrete floor @1.5m spacing
T10 dowel steel bar at 150 spacing c/c
1000

with suitable bonding chemical


900

114.3 x 5mm CHS Vertical Members DETAIL "J" (SCALE: 1:10)


anchored into existing concrete floor
with suitable bonding chemical DETAIL "K" (SCALE: 1:10)

114 x 5mm CHS Vertical Member

SECTION X-X THROUGH THE RACKS (SCALE: 1:25) PROJECT :

Detail 'Q' for Triangular Bracings


Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings Position of Triangular Bracings DETAIL 'A' (SCALE: 1:10) PROPOSED VOGU WORKSHOP
2700 3000 3000 3000 3000 3000 3000 3000 3000 2700
AND YARD CONSTRUCTION AT
TILENGA DRILLING AND WELLS
DEVELOPMENT LAKE ALBERT
114.3 x 5mm CHS Horizontal Members
BASIN UGANDA
114.3 x 5mm CHS Horizontal Members 114.3 x 5mm CHS Horizontal Members
114.3 x 5mm CHS Members CLIENT:

VALLOUREC OIL & GAS


UGANDA (VOGU)
1350 1350 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1350 1350 Plot 14, HANNINGTON ROAD,
SM Chambers Building
Kampala
16mm Rawl Dia. Bolts
200 x 150 x 10mm Thick Plate

ARCHITECT & PROJECT MANAGER

175
PLAN LAYOUT OF THE RACK DETAILS (SCALE: 1:50)
SYMBION UGANDA
STUDIO HOUSE
Plot 5, Bandali Rise,Bugolobi.
P.O Box 7671
Tel: +256(41)251142/349065
DETAIL 'N' (SCALE: 1:10) Email: symbionuganda@symbion-
6200 6200 6200 6200

A
int.com
25 150 25
5 4 150 x 50 x 2mm ZED-PURLIN
3 2 1 200 x 200mm RC Capping Beam
CIVIL / STRUCTURAL CONSULTANT

75
18mm Dia Holes To Take 150 x 200 x 10mm Thick Plate ARMSTRONG CONSULTING

150
75 x 75 x 6mm RSA 16mm Dia. Bolts 114.3 x 5mm CHS Members ENGINEERS
WIND BRACING MEMBER

75
Plot 13-14 Kataza Close,
Maria House, 3rd Floor,Bugolobi
200 P.O Box 22409, Kampala, Uganda
Tel: +256-414-505621
CONNECTION DETAIL 'N' (SCALE: 1:10) Email:armstrong@armstrong.co.ug
QUANTITY SURVEYOR

TURNER AND TOWNSEND LTD

2000
Plot 21 Yusuf Lule Road,
UB 254 x 146 x 31Kg/m EAVES BEAM 200 x 200mm RC Columns at 2m c/c Course View Towers, 3rd Floor,
50 x 50 x 3mm SHS MEMBERS
Kampala, Uganda
50 x 50 x 3mm SHS BOTTOM CHORD 50 x 50 x 3mm SHS BOTTOM CHORD 50 x 50 x 3mm SHS BOTTOM CHORD 50 x 50 x 3mm SHS BOTTOM CHORD Tel:+256(0)392778211
1083 1000 1000 1000 1000 1117 1083 1000 1000 1000 1000 1117 1083 1000 1000 1000 1000 1117 1083 1000 1000 1000 1000 1117 www.turnerandtownsend.com

MECHANICAL AND ELECRICAL CONSULTANT


UB 305 x 165 x 46 Kg/m

UB 305 x 165 x 46 Kg/m

UB 305 x 165 x 46 Kg/m

UB 305 x 165 x 46 Kg/m

UB 305 x 165 x 46 Kg/m


3199

MULTI-KONSULTS Ltd

Plot 29 Clement Hill Road,


P.O Box 5390, Kampala, Uganda
Tel: +256-414-341321
Ground floor

175
www.multikonsults.com

30 x 30 x 2mm SHS Vertical 200 x 200mm RC Capping Beam 200 x 200mm RC Capping Beam 200 x 200mm RC Capping Beam 200 x 200mm RC Capping Beam 2000
Members @ 450mm c/c Project status & Sheet Name
3201

200 x 200mm RC Columns at 2m c/c 2m HIGH BLOCK WALL AT EAVES END ELEVATION (SCALE: 1:25)
RACKS DETAILS & SECTION

30 x 30 x 2mm SHS Horizontal


Members @ 450mm c/c 75 x 75 x 6mm RSA RAFTER 75 x 75 x 6mm RSA RAFTER 10mm Ø Ms Rods at every alternating course
WIND BRACING MEMBERS EAVES END ELEVATION (SCALE: 1:100)
WIND BRACING MEMBERS Hoop Iron Strips at every
alternate course Drawn by Checked by
MJ KM
500
Issue Date Scale
JUNE 2023 1:50,25,10
200

200

200
Sheet No.
Revision
005 STR 05A
500
305 x 165 x 46 Kg/m
UB Portal Column Job Number
21-307