You are on page 1of 1

COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING

OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECTS


N
03 03
300 TS= 2400 200 2550 200 TS= 2400 300 Q CLIENT :

1200 1200 1200 1200

TSW= 90 TSW= 90 TSW= 90 TSW= 90 300 TS= 2400 200 2550 200 TS= 2400 300
(110) 30 1060 1060 30 (110) (110) 30 1060 1060 30 (110)
1200 1200 1200 1200
110 TK= 1900 110 110 TK= 1900 110
200 300
450 150 2100 150 2100 150
450
GENERAL NOTES

1. ALL STRUCTURAL, MEP, CIVIL AND LANDSCAPING QUERIES ARE TO BE


REFERRED TO THE RELEVANT CONSULTANT DRAWINGS, SPECIFICATIONS AND
DETAILS

400

400

400

400
2. ALL DESIGN AND CONSTRUCTION TO COMPLY WITH APPLICABLE REGULATIONS AND
400

400

400

400
LOCAL AUTHORITY REQUIREMENTS
3. CONTRACTORS AND SUBCONTRACTORS ARE TO CHECK ALL DIMENSIONS AND
LEVELS ON THE BUILDING SITE BEFORE COMMENCING WITH ANY WORK

(348)

(348)
SF= 328

SF= 328
4. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS ARE TO BE
(348)

(348)
SF= 328

SF= 328
BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO ANY WORK
NWPE 03 NWPE 04

510

510
BEING PUT IN HAND
5. ONLY FIGURED DIMENSIONS TO BE FOLLOWED - SCALED DIMENSIONS OF

62

62
DRAWINGS WILL NOT BE PERMITTED
630

630

630

630
6. FOR GENERAL NOTES REFER TO SHEET NUMBER AR-GEN-0-002-00, AR-GEN-0-003-00
62

62

1100

1100
LOP
LOP
1100

1300

1300
COP

COP
250

250

250

250
KEY PLAN:
1300

1300

1300
70

70

70

70
50

50

50

50
Refuge Space

Refuge Space
600x500x800

600x500x800
3,29 m2

3,29 m2
SARI STREET
AKV=

AKV=
M
Rough Opening= 1340

Rough Opening= 1340


M
Door (BT) = 1200

Door (BT) = 1200

Door (BT) = 1200

Door (BT) = 1200

BKS= 1780

BKS= 1780
Wooden Board

Wooden Board
Rough Opening= 1670

Rough Opening= 1670

BS=2700

BS=2700
BKS= 1780

BKS= 1780

1580

1580
BK= 1700

BK= 1700

2700
BS=2700

BS=2700
NWPE 03
NWPE 04
A B

1600

1600

CORNICHE SIDE
1600

1400

1400
OKR

OKR
50

350 50

350 50

50
70

70
1400

1400

1400
250

250

250

250
COP

COP
400

400

62

62
F14
62

62

610

610
730

730
Controller cabinet

Controller cabinet
500x700x2100

500x700x2100
203 190

203 190
Working area

Working area
400

400
BEK

BEK

C D

SG= 278

SG= 278
(298)

(298)
SG= 278

SG= 278
(298)

(298)

600

600

600

600
600

600

600

600
RESIDENTIAL
ELEV. LOBBY
LIFT LOBBY
BG=1000 BG=1000
BGS=1044 BGS=1044
BGS=1044 BGS=1044

FFL +95.625 6. MCB Switch Box / Hole 1200 1200 1200 1200
1200 1200 TOC +95.575 1200 1200
near to LDU
300 TS= 2400 200 2550 200 TS= 2400 300 not by Schindler 300 TS= 2400 200 2550 200 TS= 2400 300

Scaffolding Plan 1:30


Shaft and Car Plan 1:30
Controller Cabinet Location 03
@ Top Floor (Level 22)
300 TS= 2400 200 2550 200 TS= 2400 300

1200 1200 1200 1200

03

not by schindler
not by schindler

shaft light
450

shaft light
300 TS= 2400 200 2550 200 TS= 2400 300

1200 1200 1200 1200

TSW= 90 TSW= 90 TSW= 90 TSW= 90

400

400

400

400
(110) 30 1060 1060 30 (110) (110) 30 1060 1060 30 (110)

110 TK= 1900 110 110 TK= 1900 110

VF55 PF1

VF55 PF1
(348)

(348)
SF= 328

SF= 328
200 300
ARCHITECTURAL DRAWING REFERENCE:

not by schindler
shaft light
d1

d1
450 * 20105-AR-HOT-04-031-01-Rev.04

62

62
acc to local regulation code
Check space for AESD
OL35M

OL35M
1100

1100
1300

1300
160 200 200 160
NWPE 03 NWPE 04
400

400

400

400

M
BKS= 1780

BKS= 1780
3-Nos Hoisting Hook
d1

d1
(348)

(348)

AESD

AESD
SF= 328

SF= 328

3-Nos Hoisting Hook


BS=2700

BS=2700
provide additional room external
2700

30kN Capacity
30kN Capacity

If required add a rebate or

by schindler
Check space for inverter.
by schindler
630

630

630

630
62

62
LOP
LOP

LOP

LOP

provide additional room external


1100

COP

COP
250

250

250

250

If required add a rebate or


1300

1300

1300

Check space for inverter.


to lift shaft.
70

70

70

70
50

50

50

50
Refuge Space

Refuge Space
600x500x800

600x500x800

1600

1600
3,29 m2

3,29 m2

1400

1400
AKV=

AKV=
Rough Opening= 1340

Rough Opening= 1340

Rough Opening= 1340

Rough Opening= 1340

to lift shaft.
M
Door (BT) = 1200

Door (BT) = 1200

Door (BT) = 1200

Door (BT) = 1200

62

62
BKS= 1780

BKS= 1780

d1

d1
BK= 1700

BK= 1700
BS=2700

BS=2700

NWPE 03
NWPE 04
SG= 278

SG= 278
(298)

(298)
600

600

600

600
1600

OKR

OKR
50

50

50

50
70

70

70

70
1400

1400

1400
250

250

250

250
COP

COP
62

62
730

730

730

730
203 190

203 190
BEK

BEK

BGS=1044 FFL +99.425 BGS=1044


SG= 278

SG= 278
(298)

(298)

TOC +99.135
600

600

600

600

1200 1200 1200 1200

300 TS= 2400 200 2550 200 TS= 2400 300

ELEV. LOBBY

BG=1000 BG=1000
Level 10 to Level 21
BGS=1044 BGS=1044
Note:
FFL +50.025 FFL +91.825 Headroom Plan 1:30 Ventillation Location
1200 1200 TOC +49.735 TOC +91.775 1200 1200

Hoisting Hook Location See Vertical Shaft Section


2
300 TS= 2400 200 2550 200 TS= 2400 300
refer to sheet 4/4
Shaft and Car Plan 1:30
Entrances : L10, L11, L12, L13, L14, L15, L16,
L17, L18 L19, L20, L21
03
300 TS= 2400 200 2550 200 TS= 2400 300

03 1200 1200 1200 1200


300 TS= 2400 200 2550 200 TS= 2400 300
Note: Note:
1200 1200 1200 1200 450
Pit Water Proofing Pit Water Proofing
TSW= 90 TSW= 90 TSW= 90 TSW= 90 not in schindler scope not in schindler scope
(110) 30 1060 1060 30 (110) (110) 30 1060 1060 30 (110)

110 TK= 1900 110 110 TK= 1900 110


400

400

400

400
200 300

RESIDENTIAL
(348)

(348)
450
SF= 328

SF= 328
LIFT LOBBY
not by schindler

not by schindler
Pit Socket and

Pit Socket and


not by schindler

not by schindler
safety outlet

safety outlet
Sump Pit

Sump Pit
shaft light

shaft light
F11

F11
62

62
1100

1100
1300

1300
400

400

400

400

NWPE 03 NWPE 04
(348)

(348)
SF= 328

SF= 328

Gradual slope to drain (1%)

Gradual slope to drain (1%)


M
1000x600x500

1000x600x500
Refuge Space

Refuge Space
BKS= 1780

BKS= 1780
630

630

630

BS=2700

BS=2700
62

62
LOP

F9

9F
LOP

LOP

2700
1100

COP

COP
250

250

250

250
1300

1300

1300
70

70

70
50

50

50
Refuge Space

Refuge Space
600x500x800

600x500x800

TOC
3,29 m2

3,29 m2

+5.325
AKV=

AKV=

TOC
Rough Opening= 1340

Rough Opening= 1340

Rough Opening= 1340

1600

1600
M
Door (BT) = 1200

Door (BT) = 1200

Door (BT) = 1200

+5.325
1400

1400
BKS= 1780

BKS= 1780
BK= 1700

BK= 1700
BS=2700

BS=2700

62

62
F13

F13
F14

F14
F10

F10

NWPE 03
NWPE 04
1600

OKR

OKR
50

50

50
70

70

70
1400

1400

1400

SG= 278

SG= 278
(298)

(298)
250

250

250

250
COP

COP

600

600

600

600
62

62
730

730

730
203 190

203 190
BEK

BEK

RESIDENTIAL
LIFT LOBBY
SG= 278

SG= 278
(298)

(298)
600

600

600

600

BGS=1044 BGS=1044

1200 1200 1200 1200

300 TS= 2400 200 2550 200 TS= 2400 300


BG=1000
Level 2 to Level 9 BG=1000
BGS=1044 BGS=1044
FFL +11.825 FFL +46.225
TOC +11.725 TOC +46.175
1200 1200 1200 1200
Shaft Pit Plan 1:30
300 TS= 2400 200 2550 200 TS= 2400 300

Shaft and Car Plan 1:30 03


300 TS= 2400 200 2550 200 TS= 2400 300
Entrances : L2, L3, L5, L6, L7, L8, L9
1200 1200 1200 1200

03 TSW= 90
(110) 30 1060 1060 30
TSW= 90
(110)
TSW= 90
(110) 30 1060 1060 30
TSW= 90
(110)
300 TS= 2400 200 2550 200 TS= 2400 300
110 TK= 1900 110 110 TK= 1900 110
200 300
1200 1200 1200 1200
RESIDENTIAL
TSW= 90 TSW= 90 TSW= 90 TSW= 90 450
(110) (110) (110) (110)
LIFT LOBBY
30 1060 1060 30 30 1060 1060 30

110 TK= 1900 110 110 TK= 1900 110


200 300
400

400

400

400

450
(348)

(348)
SF= 328

SF= 328
630
62

62
400

400

400

400

LOP
1100

COP

COP
250

250

250

250
1300

1300

1300
70
(348)

(348)

50
SF= 328

SF= 328

Refuge Space

Refuge Space
600x500x800

600x500x800
3,29 m2

3,29 m2
AKV=

AKV=
630

630

630

Rough Opening= 1340


62

62

M
Door (BT) = 1200
LOP
LOP
1100

1100

BKS= 1780

BKS= 1780
COP

COP

BK= 1700

BK= 1700
250

250

250

250

BS=2700

BS=2700
1300

1300
70

70
50

50
Refuge Space

Refuge Space
600x500x800

600x500x800
3,29 m2

3,29 m2

NWPE 03
AKV=

AKV=
Rough Opening= 1340

Rough Opening= 1340

NWPE 04
M
Door (BT) = 1200

Door (BT) = 1200


BKS= 1780

BKS= 1780
BK= 1700

BK= 1700
BS=2700

BS=2700

1600

OKR

OKR
50
2700

70
1400

1400

1400
250

250

250

250

NWPE 03
COP

COP

NWPE 04
62

62
730
203 190

203 190
1600

1600

ARCHITECT OF RECORD / STRUCTURAL & MEP CONSULTANT:


OKR

OKR

JANITORS
BEK

BEK
50

50
70

70
1400

1400

STORE
250

250

250

250
COP

COP

101-318
SG= 278

SG= 278
(298)

(298)
62

62
730

730

730

600

600

600

600
203 190

203 190
BEK

BEK
SG= 278

SG= 278
(298)

(298)

LEAD CONSULTANT / ARCHITECTURAL CONSULTANT:

FFL +21.325
600

600

600

600

BG=1000 BG=1000
TOC +21.225
BGS=1044 BGS=1044

1200 1200 1200 1200


RESIDENTIAL
LIFT LOBBY 300 TS= 2400 200 2550 200 TS= 2400 300
BG=1000 BG=1000
BGS=1044 BGS=1044

FFL +8.325 Shaft and Car Plan 1:30


1200 1200 TOC +8.225 1200 1200 Entrances : L4
DRAWN BY :
300 TS= 2400 200 2550 200 TS= 2400 300 F
CHECKED AND APPROVED BY :
ELEVATOR CONTRACTOR
DRAWN BY :
E
CHECKED AND APPROVED BY :
Shaft and Car Plan 1:30
DRAWN BY :
Entrances : L1 D
CHECKED AND APPROVED BY :

Schindler Olayan Elevator Co. Ltd.


DRAWN BY :
C
CHECKED AND APPROVED BY :
Note: DRAWN BY :
B
Level 04 (L04) for Door Opening Refer to : CHECKED AND APPROVED BY : PROJECT:

22Nov2021 Revised drawing update as per comment Combine LIP+LOP DRAWN BY : Nap FOUR SEASONS MIXED-USE
IFC Drawing A
NWPE03 @ Level 04 opening only @ rear wall as per IFC Rev.04 CHECKED AND APPROVED BY : Arif RESIDENTIAL HOTEL
20105-AR-HOT-04-031-01-Rev.04 NWPE04 @ Level 04 no stops / opening as per IFC Rev.04 DRAWN BY :
cutout for LIP_LOP, Fire Modul @ NWPE03 Only CHECKED AND APPROVED BY : SITE:

23Jan2021 First Version DRAWN BY : Nap PLOT NO: 261, 262, 263 & 264, AL SHATEA
0 JEDDAH, KINGDOM OF SAUDI ARABIA
CHECKED AND APPROVED BY : Arif

R DATE DESCRIPTION REVISION NAME DRAWING DESCRIPTION:

LAYOUT AND BUILDERS WORK DRAWING Contract No. : 809487057 ELEVATOR SHAFT AND CAR PLAN
Basic according EN 81-20 SHAFT PIT PLAN, HEADROOM, SCAFFOLDING
Additional norms SASO Passenger Lift NWPE 3_4
Capacity (kg) 1600 SCALE: SHEET SIZE: CURRENT REVISION DATE: DRAWN BY: CHECK BY:

As Shown A0 22/11/2021
Speed (m/s) 2.50 Drawing No. :

Schindler Olayan Elevator Co. Ltd.


Schindler

21-FSHP-SCH-SD-VT-400_500-02
Item: 400 & 500
Scale Project:
1:20
FOUR SEASON HOTEL Rev. Sheet No. Drawn BY: CHECKED BY:
LEAD ENGINEER
CHECKED BY:
DESIGN CO-ORDINATOR

1:50 11602514
Town: JEDDAH Drawing No. : 11602515 A 2/5 NAPOLEON ANTIFONA MUHAMMAD ARIF KHALED MOSELHY
DATE: SCH DATE: SCH DATE: SCH

JED-FQE-AE-T003 Version 00, Dated: Feb' 2020