You are on page 1of 1

ABDURRAHMAN FAQUIYH STR

RAMP
IT/AV
FFL +8.325 TR.1.3/1.4
TOC +8.225
FFL / TOC
+8.225
FFL / TOC
+8.225
FLL
VESTIBULE
STAIR-H +8.297
UP FFL +8.325 FFL +8.325
TOC +8.225 TOC +7.560
ELEC. RM.
18.18 m²
STAIR-B3
STORE
FFL +8.325 RESIDENTIAL
TOC +8.225 LOBBY
FFL +8.325
TOC +8.225
TRANSFORMER FFL / TOC
ROOM
132.19 m² +8.225
FFL / TOC
+8.225
DOUBLE
HEIGHT AREA

PLOT BOUNDARY LINE


ELEC. RM.
44.12 m²
RESIDENTIAL
TOILET
EFR LIFT LOBBY
9.35 m²
FFL +8.325 TOILET
TOC +8.225
RECEIVING HOLDING HOLDING DE-BOX &
OFFICE FREEZER CHILLER FFL +8.325 SANITIZE ENTRANCE
TOC +8.225 ROOM PRESSURE BREAK MANHOLE
FT
FT STORE IT/AV TR.1.5 FFL +8.325
SESE 01 SESE 02 SESE 03 SEPE 01 SEPE 02 SESE 04 MAIL ROOM 6.56 m² 9.12 m² TOC +7.560
GULLY TRAP
FT

SCANNING BOH
BOH MANHOLE
CORRIDOR
LOADING / FFL +8.325 ZONE CORRIDOR
FFL +8.325
TOC +8.225
UNLOADING
AREA
TOC +8.225 FFL +8.325
TOC +8.225
STAIR-I
UP FIC
TRANSFORMER
ROOM
ELEC. RM. 50.92 m²
6.11 m²
KEY WATCHER
GREASE FLL +8.325
ROOM TOC +8.225 RAMP TO BASEMENT FROM GROUND FLOOR RAMP
LOADING CCTV
SECURITY SLOPE 1:7.1 (14%) SLOPE 1:14.3 (7%)
DOCK MONITORS
SERVICE ROOM
SLOPE 1:12.0 (8.3%)

FFL +7.500
TOC +6.850 DIRECTOR OF
SECURITY
RAMP

SECURE
STORAGE
VOID UNDER
STAIR
GAR. STAIR-K
STAFF UP
LIFTING GENERATOR
ENTRANCE
PLATFORM ROOM
185.96 m²
UP
STAIR-J
FLL +7.850 FFL / TOC
TOC +6.850 +6.850 FFL +8.325
GAS ROOM TOC +8.225
UP
5.63 m²
GENERAL SHEET NOTES
1. REFER TO PART PLANS FOR ADDITIONAL INFORMATION
GENERAL SHEET NOTES

1.
REFER TO PART PLANS FOR ADDITIONAL INFORMATION

You might also like