ENE AL NOTES

N
1. ALL DIMENSION SHOWN HERE ARE IN MILLIMETERS
UNLESS OTHERWISE NOTED.
2. ALL DIMENSION TO BE VERIFIED AT SITE.
3. ALL MATERIALS AND CALCULATION SHOULD BE
APPROVED BY THE ARCHITECT.
4. ALL STEEL CONNECTION AND MEP REQUIREMENTS
SHOULD BE COORDINATED BY OTHER TRADE
CONTRACTOR.
B8 B18 B7 B6 B5 B4 B2 B1 5. ALL SHOPDRAWINGS, SAMPLES, CATALOG TO BE
APPROVED BY THE ARCHITECT BEFORE THE FINAL
EXECUTION.
910mm WATERFALL 1A 910mm WATERFALL 1B 910mm WIDE WATERFALL 1C 910mm WIDE WATERFALL 1D
6. ALL MATERIALS TO BE USED ON SITE SHOULD BE
+638.950 19382
GF FFL APPROVED BY THE ARCHITECT.
+638.650
110 520 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 551
TOP OF COPING
+638.550 (Revised)
2A OVERFLOW GUTTER WL
80
ELE1101

62103 626962

+637.950
F03
830

120

B5
62
20

5
2160

1000
620

5
20

62 120 62 185 62 66
52
600

2B
150 20

ELE1101

5010250 207 50 216 50 215 50 215 202 50 238 50 214 50 215 50 215 50 208 50 286 50 215 50 215 50 215 50 197 50 215 50 217 50 215 5075
5038 50 185 50 242 50 251 50 215 50 214 50 215 50 215 50 215 50 215 50 215 50 214 50 215 50 172 50 259 50 214 50 190 50 289 50 159 50 197 50 225 50 270 50 50 207 50 198 50 227 50 203 50 215 50 188 50 218 50 216 50 214 50 217 50 261 50 169 50 215 50 216 50 215 50 214 50 215 50 207 50 210 50 210 50 198 50 224 50 260 50 133 50 233 50 215 50 215 50 215 50 215 50 213 50 215 50
6000

HRH Suite Combined undercut with Pin System for


L01-MBLC-SAPL-D03-TRN-021163 Stone Cladding Pin System

L01 – 02 - 02 – Private Area / HRH Suite Master Bed


F03 90-130mm WHITE RIYADH STONE L01-MBLC-SAPL-D03-TRN-021402 Room Combined Undercut with Pin System with
SHS Steel Box
NATURAL FACE SANDBLASTED

F03 40mm THK WHITE RIYADH STONE


NATURAL FACE SANDBLSTED

SEE DRAWING NO. ELE1104 FOR SEE DRAWING NO. ELE1104 FOR
3655

INTERNAL PART INTERNAL PART FINISHES LEGEND


F01 WHITE RIYADH STONE ANTIQUE SANDBLASTED ST-98

F02 WHITE RIYADH STONE SMOOTH FINISH ST-98A (SANDBLASTED)

WHITE RIYADH STONE SPLIT FACE


F03 ST-98B (NATURAL FACE SANDBLASTED)

+632.650
L01-MBLC-D04-FAD-DWG-07PZ100-ZZ-ELE101-R00 ELEVATION 02
BS-FFL
L01-MBLC-D04-FAD-DWG-07PZ100-ZZ-ELE102-R00 ELEVATION 03

L01-MBLC-D04-FAD-DWG-07PZ100- ZZ-ELE601_R00 GYM ELEVATION

L01-MBLC-D04-FAD-DWG-07PZ100- ZZ-ELE602_R00 GYM ELEVATION

GYM-DET 401-405 STEEL

2 STONE ELEVATION
REVISIONS:
ELE1101 SCALE 1:25m

01 18-10-2023 ISSUED FOR APPROVAL MG


00 26-07-2023 ISSUED FOR APPROVAL MG
B8 B18 B7 B6 B5 B4 Corner details
B2 and interfaces
B1 with all NO. DATE DESCRIPTION APPROVED

other trades to be submitted


130
KEY PLAN:
100 840

comprehensively.
B17

Recess in top of beam for Waterfall Sump


848

2
ELE1100
100
130

75 152 257 235 292 301 265 265 265 265 265 265 265 265 265 265 265 265 221 309 265 239 339 209 247 275 320 252 256 248 277 253 265 238 288 265 265 265 265 265 265 311 219 265 265 265 265 265 265 265 265 265 265 272 260 310 336 183 265 265 265 247 283 265 265 265 265 265 265 265 265 265 125

2A SECTIONAL PLAN 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910 910
ELE1101 SCALE 1:25m WATERFALL 1A WATERFALL 1B WATERFALL 1C WATERFALL 1D
PROJECT MANAGEMENT CONSULTANT:
1820mm (920 X 2 UNITS) WIDE WATERFALL 1A and 1B HDG BRACKET (SPECTRA) 910mm WIDE WATERFALL 910mm WIDE WATERFALL
PANEL ANCHOR BOLT (FZP II CARBON) F03 90-130mm WHITE RIYADH STONE
NATURAL FACE SANDBLASTED

MAIN CONTRACTOR:

SUB CONTRACTOR:
B8 B18 B7 B6 B5 B4 B2 B1
B17

PROJECT TITLE:

L01-HRH
Riyadh - Saudi Arabia

525 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 600 5 450 5 660
DRAWING TITLE:

2B SECTIONAL PLAN L BRACKET L-50/60 T4 HRH BUILDING


ELE1101 SCALE 1:25m GYM AT BASEMENT GL B1-B8 / B17
F03 40mm THK WHITE RIYADH STONE
NATURAL FACE SANDBLSTED ELEVATION-2, PLAN, SECTION
JOB NO. ACTUAL SIZE DRAWN CHECKED
A0 JCO -
L01
SCALE DESIGNED APPROVED
DRAWING NO. AS SHOWN R01 MG
L01-MBLC-D05-FAD-DWG-07PZ100-ZZ-ELE1101
STATUS DATE REVISION

SHOPDRAWING APPROVAL 18-10-2023 R01