You are on page 1of 1

TS OW NER.

00 04
JD540 WA-345225 04 of Q 11312033.01
-
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN
METERS UNLESS OTHERWISE SPECIFIED.

2.HEIGHEST ELEVATION ON ASPHALT ROAD NEAREST TO 380KV


F1

TTEN CONSENT OF I
11 12 E1 13 AREA OF THE SUBSTATION YARD IS 52.554. ACCORDINGLY THE
11 - 13
- CROWN ELEVATION OF THE SUBSTATION YARD IS 53.554 i.e.
1575 5225 6800 (52.554+1.0=53.554). SIMILARLY, HIGHEST ELEVATION ON THE
ASPHALT ROAD NEAREST TO THE 110/13.8KV AREA OF THE
300mm THK CONCRETE
SUBSTATION YARD IS 48.084. ACCORDINGLY THE HIGHEST
UPSTAND
(-)0.475 (-)0.475 ELEVATION OF 110/13.8KV AREA OF THE SUBSTATION IS 49.084
(TOP) (TOP) i.e.(48.084+1.0=49.084). WHICH IS 4.470m LOWER THAN CROWN
ELEVATION (53.554=+0.000).
-
3. THE MINIMUM COMPRESSIVE CYLINDER STRENGTH OF CONCRETE
AT 28 DAYS SHALL BE 34.5MPA
4-{16
4-{20
2-{12 4. MINIMUM YIELD STRESS OF STEEL SHALL BE fy= 420 MPa.

THOUT THE W RI
2-{12 2-{50 PVC
SRB-07 4-{16
4-{20 SLEEVES 5. HANDRAILS SHALL BE HOT DIP GALVANIZED IN ACCORDANCE
(-)1.370 (400X600) (-)1.370
WITH ASTM A386, CLASS A OR B, WITH MINIMUM ZINC COATING
(TOB) (TOB)
THICKNESS OF 610g/m2. HANDRAILS SHALL BE PAINTED WITH
ZINC YELLOW EPOXY ENAMEL PAINT.

6.
THE PAINT COLOR OF THE HANDRAIL SYSTEM SHALL BE
SRB-07 AS PER TES-H-107.01
(400X600) SRB-08 600 100 SRB-08

S DOCUMENT W I
(400X600) (400X600)
50 {10@125 C/C 50 50 {10@175 C/C 50
50 {10@200C/C 50

ELEVATION OF BEAM SRB-05 ALONG GRID (C)


SCALE 1:25 ELEVATION OF BEAM SRB-06 ALONG GRID (D)
SCALE 1:25

THI NED FROM


D C
D C
D C
3400
3400 3400
H1
150mm THK

N PART SHALL BE OBTAI


G1 - 150mm THK
PARAPET WALL
- PARAPET WALL
(TYP) 150 300
(TYP) 300mm THK
(-)0.475
(-)0.475 (TOP) UPSTAND WALL
(-)0.475 (TOP)
(TYP)
(TOP) {12@150 C/C

300mm THK CONCRETE {12@200


300mm THK CONCRETE UPSTAND {10@200 C/C
4-{20 LEGEND
4-{16 UPSTAND SRB-06 2-{12 {12@200 250mm THK
SRB-06 2-{12 (400X600) 1200 RC SLAB (TYP) TOB - TOP OF BEAM
4-{20 {12@200
(400X600) 4-{16 (-)1.370 TOP - TOP OF PARAPET
(-)1.370 (-)1.370 (TOC) {10@200
(-)1.370 (TOC) (-)1.370 (TOB) C/C - CENTER TO CENTER
(TOCAN)
(TOB)
SRB - STAIR ROOF BEAM
{12@150C/C
SRB-05
SRB-05 TOUPS - TOP OF UPSTAND

N FULL OR I
{12@150C/C (400X600)
SRB-05 (400X600) RC - REINFORCED CONCRETE
(400X600) {12@150C/C
SB - STAIR BEAM
(T&B)
SRB-06 TYP - TYPICAL
SRB-07
50 {10@175 C/C 50 (400X600) RC COLUMN
RC COLUMN (400X600) THK - THICKNESS
50 {10@175 C/C 50
TOCAN - TOP OF CANOPY

I ON
REPRODUCTI
ELEVATION OF BEAM SRB-08 ALONG GRID (13)
ELEVATION OF BEAM SRB-07 ALONG GRID (11) SCALE 1:25 F SECTION
SCALE 1:25 SH-3 SCALE 1:25

REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WE-342334

SCOPE OF WORK & TECHNICAL SPECIFICATIONS PTS-12WN367

CO.
GENERAL NOTES FOR CIVIL WORKS WA-345231

OVERALL ELECTRICAL LAYOUT-PLAN WA-345000

CITY
ELECTRICAL LAYOUT PLAN & SECTIONS 13.8KV SWITCHGEAR WA-345006

SAUDIELECTRI
BASEMENT PLAN WA-345303

BUILDING SECTIONS WA-345306

BUILDING ELEVATIONS WA-345307

LAYOUT AND DETAILS OF STAIRS WA-345309

REBAR DETAILS OF RAFT FOUNDATION & BASMENT WALL WA-345219

OF
GRAPHIC SCALE:

ARE THE SOLE PROPERTY


0 0.5 1 1.5 2 2.5m

SCALE : 1 : 25

GRAPHIC SCALE:
300
150mm THK RC 150 150 150 0 0.1 0.5 1m

PARAPET WALL
(-)0.475 (-)0.475 (-)0.475 (-)0.475 SCALE : 1 : 10
(TOUPS) (TOP) (TOP) (TOP)
150mm THK RC 150mm THK RC
PARAPET WALL PARAPET WALL AS-BUILT BY DATE

300mm THK CONCRETE


UPSTAND

{12@150C/C {12@150C/C {12@150C/C

N
HEREI
{10@200C/C {10@200C/C {10@200C/C
00 05.08.15 DAR ISSUED FOR APPROVAL M.SB A.TA A.NA

{12@200

NED
REV. DATE BY CHKD. CERT. APPD.
DESCRIPTION
NO.

CONTAI
{10@200

(-)1.370 (-)1.370 (-)1.370 (-)1.370

ON
(TOB) (TOB) (TOB) (TOB)

NFORMATI
4-{20 4-{16 4-{16 4-{20
250

250
250

250

MAR ASSEM AS SHOWN


DRAWN BY CHECKED BY SCALE:
600

600
600

600

AGU. 2015

THE I
DATE STARTED DATE COMPLETED
2-{12 2-{12 2-{12 2-{12

OPR’G. DEPT. ENG. DEPT.


350

350
350

350

{10@175C/C {10@200C/C {10@175 C/C {10@175 C/C

DAR ENGINEERING THIS DRAWING IS NOT TO BE USED FOR CERTIFIED


APPROVAL/CERTIFICATION INFORMATION

AND
ENGINEERS & DESIGNERS
CONSTRUCTION OR FOR ORDERING
4-{20 4-{16 4-{16 4-{20
MATERIAL UNTIL CERTIFIED AND DATED BY
DDC NO. REV. NO.
DATE
DRAWING/DOCUMENT ISSUED FOR

NG
BASE DESIGN
STAIR REBAR DETAILS

DRAW I
400 400 400 400 APPROVAL

INFORMATION ONLY 13.8KV SWITCHGEAR BUILDING


CONSTRUCTION
AL SAMIR 380/110/13.8kV BSP
DATE 05.08.15 BY ASSEM
E1 SECTION F1 SECTION G1 SECTION H1 SECTION

S
JEDDAH SAUDI ARABIA

THI
- SCALE 1:10 - SCALE 1:10 - SCALE 1:10 - SCALE 1:10
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

-
11312033.01 Q JD540 WA-345225 04 of 04 00
SEC-A (2004/10)

DMS VECTOR SECA00