You are on page 1of 1

NOTES :

1. ALL DIMENSIONS ARE IN METERS UNLESS


CL STATED OTHERWISE NOTED.
24.40 2. CROSS SECTION DRAWINGS SHOULD BE
READ IN CONJUNCTION WITH ROADWAY

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


CORRIDOR
12.20 12.20 LAYOUT,UTILITIES LAYOUT AND
LANDSCAPING DRAWINGS.
4.20 2.00 2.50 7.00 2.50 2.00 4.20
3. FOR CROSS SECTION MARKER, REFER
FOOTHPATH / SIDEWALK PARALLEL CARRIAGEWAY PARALLEL SIDEWALK FOOTHPATH /
3.50 3.50 TO DRAWING NO. 301-TD-500-01
GRADED VERGE PARKING PARKING GRADED VERGE
LANE LANE 4. FOR PRECAST CONCRETE INTERLOCKING
7.85 6.85
TILES BLOCK PATTERN, REFER TO
6.85 5.85 LANDSCAPING DRAWINGS.
5.50 5.05 5. FOR CROSS SECTION SLOPE, REFER
4.15 4.15 TO ROADS PROFILE DRAWING.
2.60 2.60
1.80 1.80
0.90 0.90
0.50 0.50

2%
2% 2%

0.90

0.400.80

0.80
1.00

0.90

0.400.80

0.90
0.80
1.50

1.00
0.90
1.20

1.50
1.50

1.20
1.50
1.20 0.30
0.600.70 1.00 2.00 1.15 1.00 1.00 1.00 1.00 0.60 1.20 1.25 1.00 0.700.60

LEGEND

ETIC-Du

ETIC-Du
IRRIGATION

SEWERAGE M.H.
DEWA(LV)
DEWA(WD)

DEWA(HV)

STREET LIGHTING

DEWA(HV)

DEWA(WD)
DEWA(LV)
MANHOLE
SEWERAGE (H.C)

S.W.D.

SEWERAGE (H.C)
ETISALAT

ETISALAT
ELECTRICAL

WATER

ETISALAT & Du

FIRE FIGHTING
TYPICAL SERVICES RESERVATION CROSS SECTION DRAINAGE
FOR CORRIDOR WIDTH OF 24.40m
SEWERAGE

IRRIGATION
CL
STREET LIGHTING
24.40

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


CORRIDOR
8.55 7.30 8.55 PROPOSED GROUND
PGL
LEVEL
EX. GRADED AREA EX. CARRIAGEWAY EX. GRADED AREA
EXISTING PAVEMENT
( NOT INCLUDING THE TOP
AC WEARING COURSE )
6.55 8.25
PROPOSED AC WEARING
5.55 5.55 COURSE
1.80 1.80
PROPOSED INTERLOCK TILES
( PARKING & SIDEWALK )

Status:
TENDER DRAWINGS
ISSUE BOX

FOUNDATION

FIRE FIGHTING
EX. SEWERAGE

EX. DRAINAGE
EX. IRRIGATION &
EX. STREET LIGHTING
EX. SEWERAGE (H.C)

EX. SEWERAGE (H.C)


X:\Projects\232-001 FCW Eastern Residences-North\4. Drawings\4.4 Tender Drawings\Rev. 2\4.4.2 South\4.4.2.4 Roads\4.4.2.4.2 Section301-FD-500-04 Section 2-2 (24.40m).dwg SIROSH

0 04.06.17 WA Issued for Client's Approval


REVISIONS

EXISTING CONDITION FOR CORRIDOR WIDTH OF 24.40m


SECTION 2-2
0 04.06.17 WA Tender Drawings Submission

CL
Client :
24.40
R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


12.20 CORRIDOR 12.20

3.55 2.50 2.50 7.30 2.50 2.50 3.55


LANDSCAPE SIDEWALK PARALLEL CARRIAGEWAY PARALLEL SIDEWALK LANDSCAPE
PARKING 3.65 3.65 PARKING
LANE LANE
11.30
9.30 8.25
8.13 7.40
7.28 6.55
6.55 5.55
5.55 4.28
4.28 2.90
2.90 1.80 Consultant :
1.80 0.95
0.95 0.50
0.50
2%
S* 2%
* REFER TO NOTE NO. 5
0.80

0.80
0.90

0.90
1.00

1.00

0.80
0.90

0.90
1.00
1.00
0.40

3.00

3.00

0.40

0.60 0.80 1.00 1.55 1.00 0.60 0.85 0.85 0.80 1.00 0.80 0.60
1.20 0.70 1.00 1.00 1.55 1.20 Project :

FALCON CITY OF WONDERS


EASTERN RESIDENCE SOUTH
(H.C)

(H.C)
DEWA(LV)

CHILLED
WATER

CHILLED
WATER

DEWA(LV)
IRRIGATION
IRRIGATION
ETISALAT & DU

SUPPLY

ETISALAT & DU
CCTV / IT
RETURN
DEWA(WD)

DEWA(11kV)

DEWA(WD)
TRANSMISSION

EX. FIRE FIGHTING

DEWA(11kV)
EX. SEWERAGE

EX. SEWERAGE

GAS SERVICES

EX. DRAINAGE

EX. SEWERAGE
STREET LIGHTING

Drawing Title :

TYPICAL, EXISTING & PROPOSED


ROAD & UTILITIES SECTION
AT SECTION 2-2
PROPOSED CONDITION FOR CORRIDOR WIDTH OF 24.40m
6/04/2017 9:44 AM

SECTION 2-2 AEC HN


301 4
0 5m 10m
WA JUNE 2017

1 : 200
301-TD--500-04 0

You might also like