HYDROPOWER CHEVES

DATE

TRANSFER TUNEL DR02


GEOLOGICAL DESCRIPTION AND ROCK MASS CLASSIFICATION

3-Nov-13

IDENTIFICATION
FACE

0+044.00

CH

LITHOLOGY

0+043.00

TO

Breccia

VOLUMETRIC CLASSIFICATION Jv (T.T. E.E. 5.1.2.2)


A1

Very Good

Jv < 5/m3

A2

Good

5<Jv<10

A3

Fair

10<Jv<20

A4

Poor

Jv>20

A5

Ext. Poor

Jv >20

RQD =

115

35

Jn

12

Jr

0.5

Ja

Jw

SRF

2.5

RMR

- 3.3 Jv

RMR(1)
RQD =

35

RMR(2+3)

JOINTS PER
METER

2.92

RMR(4)

0.17

ASSESSMENT

RATING

10-30

UNIAXIAL COMP. STRENGHT (MPa)

GEOMECHANICS CLASIFICATION "Q" (Barton), PARAMETERS


RQD

GEOMECHANICAL CLASSIFICATION RMR (BIENIAWSKI)

JOINTS
CONDITION

D1

D2

D3

AVERAGE

Persistance

1-3 m

Aperture

>5 mm

Roughness

Smooth

25

Infilling

S>5mm

Weathering

Moderately

3
0
1
0
3
35
15
-10

TOTAL

0.40

RMR(5)

GROUNDWATER STATE

Dry

FRACTURE ORIENTATION

RMR RATING

0.19

40

STRUCTURES/JOINTS

J
3

SYSTEM

J5

TYPE
DIP DIRECTION
DIP

J4

1
J
355
55

2
J
204
54

3
J
45
65

J
100
33

J
220
60

THICKNESS (cm)
INFILLING

J2

J
1

FILTRATION
J

Joint

Hd Humid a few drippings

Zfault

Zona de Falla

Hs Many drippings

J5
J
1

INITIAL SUPPORT RECOMMENDED

PHOTOGRAPHY

Rock type IV. Stress class 0.


5 cm fibre reinforced shotcrete at the face and whole section. Welded wire mesh.
Lattice girder @ 1,0 m.
20 cm shotcrete covering the lattice. 02 bolts to tighten the arches foot.
Spilling bars. L=4 m, 32 mm diameter, type IBO, spaced 20 cm, placed between 09:00 and 03:00.
2 m overlapping

01.11.13
CCH REPRESENTATIVE

SSZ

DATE

NPE REPRESENTATIVE

DATE