Professional Documents
Culture Documents
PESA 2010 Spring Jannise
PESA 2010 Spring Jannise
Well Completion
Defined as the design, selection and installation of equipment and the specification of treatment and procedures necessary to bring the well into production and thereafter to produce in a manner which satisfies the operators objectives for the field development.
FLOW COUPLING LANDING NIPPLE FLOW COUPLING SIDE POCKET MANDREL LO LINER HANGER SIDE POCKET MANDREL
RH HYDRAULIC-SET PACKER
CIRCULATING DEVICE
NO-GO NIPPLE
Evaluating the Well After the drill bit reaches target depth the well must be evaluated. Logging While Drilling (LWD) Electric Wireline conveyed logging ((
))
4
Design Criteria
Fluid Characteristics
Production Constraints
Run and Cement the Casing Zonal Isolation Control flow from the desired formation Run the casing
Run and Cement the Casing Zonal Isolation Control flow from the desired formation Run the casing Cement the casing Swell packers
What is a Packer?