You are on page 1of 2

Nautic Group Pte Ltd

Projects as of 21.03.2013
Well Integrity Programme, Strengthening of 5 Conductors, (NOJ-023) Client: Petronas Carigali through PetroUsaha Offshore S/B Status: Ongoing, 2012 Grouting of Skirt Piles and Pile Sleeves for New Platform Installation (NOJ-021) Client: Heerema Marine Contractors Ned. B.V. Status: Ongoing, 2012 Strengthening of Jacket Braces and Piles for Platform Retrofitting, (NOJ-019) Client: Dragon Oil (Turkmenistan) Ltd. Status: Ongoing, 2012 Grouting of Skirt Piles for new Platform Installation, (NOJ-016) Client: Murphy Sarawak Oil through PetroUsaha Offshore S/B Status: Completed, 2012 Grouting of Leg Brace Clamps, Indonesia (NOJ-014) Client: PT Radiant Utama Interinsco Status: Completed, 2012 TSW Well Integrity Campaign 2012, (NOJ-012) Client: Brunei Shell Petroleum through Joffren Omar S/B Status: On-going since 2006 TSW4 Well Integrity Campaign 2012 (AMDP11), 6 Wells, Brunei (NOJ-011) Client : Shell Brunei through Joffren Omar s/b Status : Completed TSW4 Well Integrity Campaign (CPDP 33), 6 Wells, Brunei (NOJ-010) Client : Brunei Shell through Joffren Omar s/b Status : Completed Cape Lambert Dolphin Installations, Australia (NOJ-009) Client : Rio Tinto through John Holland Status : Completed, 2012 Grouting Works for Pile Sleeves Connection, Panna SBM (NOJ-008) Client: Dolphin Offshore Enterprises Ltd., India Status: On-going, March 2012

Page 1 of 2

Nautic Group Pte Ltd

Well Integrity Campaign, Shell Malaysia (NOJ-007) Client : Shell Malaysia through PetroUsaha Offshore s/b Status : Completed, 2012 Strengthening of N4 Jacket, Persian Gulf (NOJ-006) Client : Dulam, UAE Status : Completed, 2012 Strengthening of MNP & MNW Jackets (NOJ-005) Client : Larsen and Toubro, India Status : Complete KNPG-B Jacket Installation, Malaysia (NOJ004) Client : Petronas Carigali through PetroUsaha Offshore s/b Status : Completed LAM-4 Platform, Jacket Installation, Turkmenistan (NOJ-003) Client : Dragon Oil (Turkmenistan) Ltd Status : Completed Grouting of 8 Skirt Piles, Yetagun, Ph. 4 development project, Myanmar (NOJ-002) Client : TL Offshore Ltd trough PetroUsaha Offshore s/b Status : Completed Analysis and Design of Strengthening for Offshore Flare Tower (NOJ-001) Client : Woodside Engineering Ltd, Australia Status : Completed

Page 2 of 2

You might also like