You are on page 1of 1

Appendix 2-A GENERAL REQUIREMENTS TO COMPLY WITH DURING STREET PLAN SUBMISSION 1.

For work activities that fall within the public street, including occupation of carriageway and walkway, the contractor shall obtain a Road Opening Permit from the Road Infrastructure Management Division of LTA before commencement of works on site. For basement excavation works (where Zone of Influence encroaches within the road reserve), the following requirements shall be complied with: The QP (Civil) shall ensure that any settlement along the adjoining road(s) due to the excavation works will not affect the stability of the road, as well as the riding comfort on the road. Before excavation works begin, the QP (Civil) shall submit the following documents to LTA: i. Soil investigation reports and details of protection measures to prevent subsidence of abutting roads, drains and walkways; Method Statement on supporting and protecting adjacent road reserve; and Certified survey plan indicating levels of adjacent roads, drains and walkways at 5-metre grid interval.

2.

ii.

iii.

3.

Approval shall be obtained from LTA for temporary access to the site.

You might also like