Week 32 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52
Sample
STUDY
PLANNING DEVELOPMENT
MSIL APPROVAL CONCEPT + DRAWINGS FOR DIES/FIXTURES & PANEL CHECKER SUBVENDOR SELECTION RM SELECTION CONCEPT OF PROCESS DESIGN TOOLS & EQUIPMENT MANUFACTURING FINAL MACHINIG CHECKING FIXTURES MANUFACTURING DESIGN OF PROCESS LAYOUT(INHOUSE) DESIGN OF PROCESS LAYOUT(SUBVENDOR END) PROCESS SETUP(INHOUSE & SUBVENDOR -SINGLE PC FLOW -CYCLE TIME/STATION -CAPACITY -CP/CPK WORK INSTRUCTIONS/OPERATION STANDARDS (PICTORIAL) OPERATOR TRAINING & SKILL MATRIX INSPECTION STANDARDS PREPARATION -CHILD PARTS -INPROCESS MISP PCS PFMEA BATCH CODE SYSTEM & TRACEBILITY FOR PART AND SPECIAL PROCESS HT/WELDING/ASSY PRIMARY TOOL BUY OFF TOOL TRIAL AT TOOL MAKER END(T0) PROCESS VALIDATION -POKAYOKE/PAST PROBLEM -DEFECT RATE CHECKING FIXTURE VALIDATION
1/2
MONTHS
Week 29 Week 30
Original
Week 32 Week 31 Week 32 Week 33 Week 34 Week 35 Week 36 Week 37 Week 38 Week 39 Week 40 Week 41 Week 42 Week 43 Week 44 Week 45 Week 46 Week 46 Week 47 Week 48 Week 49 Week 50 Week 51 Week 52
Sample
STUDY EVALUATION
R/M TESTING TOOL TRIAL AT TOOL MAKER END(T1) SAMPLE SUBMISSION(T1) PERFORMANCE TESTING LINE TRIAL AT VENDOR INSPECTION OF BOP PARTS SECONDARY AUDIT BY VENDOR VEHICLE FITMENT MASTER BODY ENDURANCE TESTING SPECIAL CHECKPOINT -CP/CPK/CUT SECTION/PROFILE CHECK /F HECK
A
MAINTAINANCE SCHEDULE -TOOLS/DIES/JIGS/ TROLLEYS/BINS -MACHINE MASS PRODUCTION PREPAREDNESS AUDIT RUN AT RATE TRIAL-SUBVENDOR -VENDOR LIMIT SAMPLE MASTER SAMPLE SENDAI CHECK(MUL) (VENDOR) MONITORING
MONITORING
DEVELOPMENT VISIT TO VENDOR SCHDULE REPORT ECN MONITORING ECN CUT OFF DATE
2/2