Trainer Training

Hillview Milpitas Site and Team Orientation

Peter Cingistre (Test Operation Manager,


Global)
Test Engineering Process Flow Training

LTX8080/88 Automatic Test Equipment (ATE)


John Peters (Equipment Engineer)
Platform Troubleshooting

LTX8080/88 Automatic Test Equipment (ATE)


Wilson Melchor (Power Product Test
Platform Debugging and Test program
Engineering Director)
Architecture

ETS364/600 Automatic Test Equipment (ATE)


John Peters (Equipment Engineer)
Platform Troubleshooting

ETS364/600 Automatic Test Equipment (ATE)


Wilson Melchor (Power Product Test
Platform Debugging and Test program
Engineering Director)
Architecture

Arturo Cisneros (Power Product Engineering Test Floor Process Specification for Linear
Manager) Products and Set-up Requirements
Arturo Cisneros (Power Product Engineering Test Floor Process Specification for Linear
Manager) Products and Set-up Requirements

Arturo Cisneros (Power Product Engineering


Statistical Analysis and Correlation Tools
Manager)

Peter Congistre (Test Operation Manager,


Wrap-up meeting and De-brief
Global)
Training Description Week 1
Establish rapport with the ADI Milpitas Design and Engineering Team, Plant Orientation and
Training Overview.
Initiation of Process, Hardware Management System Overview
Creation Hardware Project (initial request) Process Flow.
Schematic Entry Process Flow.
Lay-out/Design Process Flow / Library Parts Request Process Flow.
Fabrication and Assembly (hardware) Process Flow
Test Engineering process flow
Software/Engineering Change Request/Notification (ECR/ECN/SECN) Process Flow.
Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics and
calibration board.
GUI Operation – Ensure the trainee understands GUI screen purpose and function.
Application - Ensure the trainee can operate the equipment and load program file.
Manual review and troubleshooting exercises – Ensure the trainee can use the manual and
can troubleshoot and resolve any tester issues.
Review manual material.
Basic Programming – Ensure the trainee could understand the programming language use for
LTX tester platform.
Calibration application techniques.
Test Routine Program Features.
Debugging, Program Compilation and Architecture.
Compilation of Data and Review.
Correlation of FT parameter vs. Reference results.
Learn different improvement techniques per product specification.
Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics and
calibration board.
GUI Operation – Ensure the trainee understands GUI screen purpose and function
Application - Ensure the trainee can operate the equipment and load program file.
Manual review and troubleshooting exercises – Ensure the trainee can use the manual and
can troubleshoot and resolve any tester issues.
Review manual material
Basic Programming – Ensure the trainee could understand the programming language use for
ETS364/600 tester platform.
Calibration application techniques.
Test Routine Program Features and Debug.
Debugging, Program Compilation and Architecture.
Compilation of Data and Review.
Correlation of FT parameter vs. Reference results.
Learn different improvement techniques per product specification.
Understand and familiarize with the Linear Products.
Understand and Familiarize with Test Floor Process and setup requirements.
Familiarization in all hardware types and functions.
Installation of setup – Ensure the trainee can identify correct fixtures for each device,
platform and other setup requirements.
On-boarding to perform hardware debug-repair and correlation analysis.
Actual training on hardware repair – Ensure the trainee can perform hardware repair applying
best practices and techniques.
Generate Hardware Debugging Plan and Correlation Requirements.
Introduction and overview of EXENSIO data analysis platform.
Familiarize and operate the tools used for correlation and manufacturing data.
Utilize powerful visualization platform of Spotfire Web Player to access interactive reports and
analyses.
Familiarization on how to analyze debug vs. reference data.
Utilize and interpret different plots, importing/exporting data files.
Can interpret test parameters vs. circuitry.
Wrap up on PPG MILP products and process.
Discussions on the support needed from ADI Milpitas and ADPhils for future.
Arrange for travel and depart U.S.
Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11
Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21
Week 22 Week 23 Week 24 Week 25 Week 26
c
Trainer Training
Hillview Milpitas Site and Team Orientation

Peter Congistre (Test


Operation Manager,
Global) Test Engineering Process Flow Training
Training Description 31-Jan
Establish rapport with the ADI Milpitas Design and Engineering Team, Plant Orientation and
Training Overview.
Initiation of Process, Hardware Management System Overview
Creation Hardware Project (initial request) Process Flow.
Schematic Entry Process Flow.
Lay-out/Design Process Flow / Library Parts Request Process Flow.
Fabrication and Assembly (hardware) Process Flow
Test Engineering process flow
Software/Engineering Change Request/Notification (ECR/ECN/SECN) Process Flow.
Week 1 Week 2
1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb
Week 2 Week 3
11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb
Trainer Training

John Peters (Equipment LTX8080/88 Automatic Test Equipment


Engineer) (ATE) Platform Troubleshooting
W
Training Description 6-Dec 7-Dec

Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics


and calibration board.
GUI Operation – Ensure the trainee understands GUI screen purpose and function.
Application - Ensure the trainee can operate the equipment and load program file.
Manual review and troubleshooting exercises – Ensure the trainee can use the manual and
can troubleshoot and resolve any tester issues.
Review manual material.
Week 4 Week 5
8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec
Week 6
18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec
Trainer Training

LTX8080/88 Automatic Test


Wilson Melchor (Power Product Equipment (ATE) Platform
Test Engineering Director) Debugging and Test program
Architecture
Week 7
Training Description 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec

Basic Programming – Ensure the trainee could understand


the programming language use for LTX tester platform.

Calibration application techniques.


Test Routine Program Features.
Debugging, Program Compilation and Architecture.
Compilation of Data and Review.
Correlation of FT parameter vs. Reference results.
Learn different improvement techniques per product
specification.
Week 8
1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan
Week 9 Week 10
11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan
Week 10
21-Jan 22-Jan 23-Jan
Trainer Training

ETS364/600 Automatic Test Equipment


John Peters (Equipment Engineer)
(ATE) Platform Troubleshooting
Week 11
Training Description 24-Jan 25-Jan 26-Jan 27-Jan
Installation/Setup/Diagnostic/Calibration - Ensure the trainee
can setup the diagnostics and calibration board.
GUI Operation – Ensure the trainee understands GUI screen
purpose and function
Application - Ensure the trainee can operate the equipment and
load program file.
Manual review and troubleshooting exercises – Ensure the
trainee can use the manual and can troubleshoot and resolve
any tester issues.
Review manual material
Week 11 Week 12
28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb
Week 13 Week 14
7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb
Week 14
17-Feb 18-Feb 19-Feb 20-Feb
Trainer Training

Wilson Melchor (Power Product Test ETS364/600 Automatic Test Equipment (ATE) Platform
Engineering Director) Debugging and Test program Architecture
Week 15
Training Description 21-Feb 22-Feb 23-Feb 24-Feb
Basic Programming – Ensure the trainee could understand
the programming language use for ETS364/600 tester
platform.
Calibration application techniques.
Test Routine Program Features and Debug.
Debugging, Program Compilation and Architecture.
Compilation of Data and Review.
Correlation of FT parameter vs. Reference results.
Learn different improvement techniques per product
specification.
Week 15 Week 16
25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
Week 17 Week 18
7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar
Week 18
17-Mar 18-Mar 19-Mar 20-Mar
Trainer Training

Arturo Cisneros (Power Product Test Floor Process Specification for Linear Products
Engineering Manager) and Set-up Requirements
Week 19
Training Description 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar
Understand and familiarize with the Linear
Products.
Understand and Familiarize with Test Floor
Process and setup requirements.
Familiarization in all hardware types and
functions.
Installation of setup – Ensure the trainee can
identify correct fixtures for each device, platform
and other setup requirements.
On-boarding to perform hardware debug-repair
and correlation analysis.
Actual training on hardware repair – Ensure the
trainee can perform hardware repair applying
best practices and techniques.
Generate Hardware Debugging Plan and
Correlation Requirements.
Week 20
26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr
Week 21 Week 22
5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr
Week 22
15-Apr 16-Apr 17-Apr
Trainer Training

Arturo Cisneros (Power Product


Statistical Analysis and Correlation Tools
Engineering Manager)
Week 23
Training Description 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr
Introduction and overview of EXENSIO data analysis
platform.
Familiarize and operate the tools used for
correlation and manufacturing data.
Utilize powerful visualization platform of Spotfire
Web Player to access interactive reports and
analyses.
Familiarization on how to analyze debug vs.
reference data.
Utilize and interpret different plots,
importing/exporting data files.
Can interpret test parameters vs. circuitry.
Week 24
23-Apr 24-Apr 25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 30-Apr 1-May
Trainer Training

Peter Congistre (Test Operation


Wrap-up meeting and De-brief
Manager, Global)
Week 40
Training Description 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov
Wrap up on PPG MILP products and process.
Discussions on the support needed from ADI
Milpitas and ADPhils for future.
Arrange for travel and depart U.S.
Week 41
7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov
Trainer Training Training Description 30-Jan
Establish rapport with the ADI Milpitas Design and
Hillview Milpitas Site and
Team Orientation Engineering Team, Plant Orientation and Training
Overview.

Initiation of Process, Hardware Management


System Overview
Creation Hardware Project (initial request) Process
Flow.
Peter Congistre (Test
Operation Manager, Schematic Entry Process Flow.
Global) Lay-out/Design Process Flow / Library Parts
Test Engineering Process Request Process Flow.
Flow Training
Fabrication and Assembly (hardware) Process Flow
Test Engineering process flow

Software/Engineering Change Request/Notification


(ECR/ECN/SECN) Process Flow.

Trainer Training Training Description 20-Feb


· Installation/Setup/Diagnostic/Calibration - Ensure
the trainee can setup the diagnostics and
calibration board. (Hands-on training Engineering
Lab)

· GUI Operation – Ensure the trainee understands


GUI screen purpose and function. (Hands-on
LTX8080/88 Programming training Engineering Lab)
Troubleshooting for Non-
Programmers · Application - Ensure the trainee can operate the
John Peters equipment and load program file. (Hands-on
(Equipment Engineer) training Engineering Lab)

· Manual review and troubleshooting exercises –


Ensure the trainee can use the manual and can
troubleshoot and resolve any tester issues. (Hands-
on training Engineering Lab)

On-the-Job Training, assisting an experienced


Practical Application engineer with ongoing projects (assigned by
trainer).
(Practical Application)

Trainer Training Training Description 6-Mar

Basic Programming – Ensure the trainee could


understand the programming language use for LTX
tester platform. (Classroom session)
Calibration application techniques. (Classroom
session)

LTX8080/88 Programming
Fundamentals, Debugging,
Data Analysis and
Wilson Melchor Implementation
Test Routine Program Features. (Classroom
LTX8080/88 Programming session)
Fundamentals, Debugging,
Data Analysis and Debugging, Program Compilation and Architecture.
Wilson Melchor Implementation (Classroom session)
(Power Product Test Compilation of Data and Review. (Classroom
Engineering Director) session)
Correlation of FT parameter vs. Reference results.
 (Classroom session)
Learn different improvement techniques per
product specification. (Classroom session)

Practical Application On-the-Job Training, assisting an experienced


through Buddy System engineer with ongoing projects (assigned by
Training trainer).
(Practical Application)

Trainer Training Training Description 3-Apr


Installation/Setup/Diagnostic/Calibration - Ensure
the trainee can setup the diagnostics and
calibration board. (Classroom session)
GUI Operation – Ensure the trainee understands
GUI screen purpose and function. (Classroom
session)
ETS364/600 Programming
Troubleshooting for Non- Application - Ensure the trainee can operate the
Programmers equipment and load program file. (Classroom
John Peters session)
(Equipment Engineer)
Manual review and troubleshooting exercises –
Ensure the trainee can use the manual and can
troubleshoot and resolve any tester issues.
(Classroom session)

Practical Application On-the-Job Training, assisting an experienced


through Buddy System engineer with ongoing projects (assigned by
Training trainer).
(Practical Application)

Trainer Training Training Description 24-Apr

Basic Programming – Ensure the trainee could


understand the programming language use for
ETS364/600 tester platform. (Classroom session)
Calibration application techniques. (Classroom
session)
ETS364/600 Programming Test Routine Program Features and Debug.
Fundamentals, Debugging, Debugging, Program Compilation and Architecture.
Data Analysis and (Classroom session)
Wilson Melchor Implementation
(Power Product Test Compilation of Data and Review. (Classroom
Engineering Director) session)
Fundamentals, Debugging,
Data Analysis and
Wilson Melchor Implementation
(Power Product Test
Engineering Director)
Correlation of FT parameter vs. Reference results.  
(Classroom session)
Learn different improvement techniques per
product specification. (Classroom session)

Practical Application On-the-Job Training, assisting an experienced


through Buddy System engineer with ongoing projects (assigned by
Training trainer).
(Practical Application)

Trainer Training Training Description 22-May


Understand and familiarize with the Linear
Products Business Units. (Classroom Session)
Understand and Familiarize with Test Floor
Process and setup requirements. (Classroom
Session)
Familiarization in all hardware types and functions.
(Classroom Session)
Linear Product
Familiarization, Set-up Installation of setup – Ensure the trainee can
Requirements, identify correct fixtures for each device, platform
Fundamental and and other setup requirements. (Classroom
Techniques in Debugging Session)
Arturo Cisneros and Repair, and Correlation
(Power Product Criteria and Data On-boarding to perform hardware debug-repair
Engineering Manager) Requirements and correlation analysis.

Actual training on hardware repair – Ensure the


trainee can perform hardware repair applying best
practices and techniques. (Classroom Session)

Generate Hardware Debugging Plan and


Correlation Requirements. (Classroom Session)

Practical Application On-the-Job Training, assisting an experienced


through Buddy System engineer with ongoing projects (assigned by
Training trainer).
(Practical Application)

Trainer Training Training Description 19-Jun


Introduction and overview of EXENSIO data
analysis platform (Classroom Session)
Familiarize and operate the tools used for
correlation and manufacturing data. (Classroom
Session)
Utilize powerful visualization platform of Spotfire
Web Player to access interactive reports and
analyses. (Classroom Session)
EXENSIO Statistical tool Familiarization on how to analyze debug vs.
and Application reference data. (Classroom Session)
Arturo Cisneros
(Power Product
Engineering Manager)
EXENSIO Statistical tool
and Application
Arturo Cisneros
(Power Product Utilize and interpret different plots,
Engineering Manager) importing/exporting data files. (Classroom
Session)
Can interpret test parameters vs. circuitry.
Advance data analysis, ANOVA, Product Sensitivity
Analysis (PSA), Measurement System Comparison
(MSC), Statistical Process Control (SPC).
(Classroom Session)

Practical Application On-the-Job Training, assisting an experienced


through Buddy System engineer with ongoing projects (assigned by
Training trainer).
(Practical Application)

Trainer Training Training Description 17-Jul


Wrap up meetings with ·    Wrap up on PPG MILP products and process.
Peter Congistre (Test product engineers and
Operation Manager, product development ·    Discussions on the support needed from ADI
Global) engineers / De-brief and Milpitas and ADPhils for future.
arrange for travel ·    Arrange for travel and depart U.S.
Week 1 Week 2
31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb

Week 4 Week 5
21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar

Week 6 Week 7
7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar
Week 10 Week 11
4-Apr 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr

Week 13 Week 14
25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 30-Apr 1-May 2-May 3-May 4-May 5-May 6-May 7-May
Week 17 Week 18
23-May 24-May 25-May 26-May 27-May 28-May 29-May 30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun

Week 21 Week 22
20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul
Week 25 Week 26
18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 29-Jul 30-Jul
Week 3
13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb

Week 8 Week 9
20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr
Week 12
17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr

Week 15 Week 16
8-May 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May
Week 19 Week 20
5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun

Week 23 Week 24
3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul
Week 27
31-Jul 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
2-Apr
21-May
18-Jun

16-Jul
Task

Hillview Milpitas Site and Team Orientation. Test Engineering Process Flow Training

LTX8080/88 Automatic Test Equipment (ATE) Platform Troubleshooting

LTX8080/88 Automatic Test Equipment (ATE) Platform Debugging and Test program Architecture

ETS364/600 Automatic Test Equipment (ATE) Platform Troubleshooting

ETS364/600 Automatic Test Equipment (ATE) Platform Debugging and Test program Architecture
Test Floor Process Specification for Linear Products and Set-up Requirements

Statistical Analysis and Correlation Tools

Wrap-up meeting and De-brief


Description

Plant and Team Orientation. Familiarization and understanding on test Engineering and process flow

LTX8080/88 Programming Troubleshooting for Non-Programmers

LTX8080/88 Programming Fundamentals, Debugging, Data Analysis and Implementation

ETS364/600 Programming Troubleshooting for Non-Programmers

ETS364/600 Programming Fundamentals, Debugging, Data Analysis and Implementation


Linear Product Familiarization, Set-up Requirements, Fundamental and Techniques in Debugging and Repair, and Correlation Criteria and Data Requirements

EXENSIO Statistical tool and Application

Wrap up meetings with product engineers and product development engineers / De-brief and arrange for travel
Duration
Trainer(s) Expected Outcome (weeks)

· Introduce herself and establish rapport with the ADI Milpitas Design and Test Engineering Team.
· Plant Orientation and Training Overview.
· Initiation to processes, Hardware Management System Overview (on-site).
Peter
Congistre · Creation Hardware Project (initial request) Process Flow.
(Test
· Schematic Entry Process Flow. 3
Operation
Manager, · Lay-out/Design Process Flow / Library Parts Request Process Flow.
Global)
· Fabrication and Assembly (hardware) Process Flow.
· Test Engineering process flow.
· Software/Engineering Change Request/Notification (ECR/ECN/SECN) Process Flow.

· Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics and calibration
board.
John Peters · GUI Operation – Ensure the trainee understands GUI screen purpose and function.
(Equipment 2
Engineer) · Application - Ensure the trainee can operate the equipment and load program file.
· Manual review and troubleshooting exercises – Ensure the trainee can use the manual and can
troubleshoot and resolve any tester issues.
· Review manual material.

· Basic Programming – Ensure the trainee could understand the programming language use for LTX tester
platform.
Wilson · Calibration application techniques.
Melchor · Test Routine Program Features.
(Power 4
Product Test · Debugging, Program Compilation and Architecture.
Engineering
Director) · Compilation of Data and Review.
· Correlation of FT parameter vs. Reference results.  
· Learn different improvement techniques per product specification.

· Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics and calibration
board.
· GUI Operation – Ensure the trainee understands GUI screen purpose and function.
John Peters · Application - Ensure the trainee can operate the equipment and load program file.
(Equipment 3
Engineer) · Manual review and troubleshooting exercises – Ensure the trainee can use the manual and can
troubleshoot and resolve any tester issues.
· Review manual material.

· Basic Programming – Ensure the trainee could understand the programming language use for
ETS364/600 tester platform.
Wilson · Calibration application techniques.
Melchor · Test Routine Program Features and Debug.
(Power
Product Test 4
· Debugging, Program Compilation and Architecture.
Engineering
Director) · Compilation of Data and Review.
· Correlation of FT parameter vs. Reference results.  
· Learn different improvement techniques per product specification.
· Understand and familiarize with the Linear Products.
· Understand and Familiarize with Test Floor Process and setup requirements.
Arturo · Familiarization in all hardware types and functions.
Cisneros
(Power · Installation of setup – Ensure the trainee can identify correct fixtures for each device, platform and other
Product setup requirements. 4
Engineering
Manager) · On-boarding to perform hardware debug-repair and correlation analysis.
· Actual training on hardware repair – Ensure the trainee can perform hardware repair applying best
practices and techniques.
· Generate Hardware Debugging Plan and Correlation Requirements.
· Advance EXENSIO data analysis platform.
· Familiarize and operate the tools used for correlation and manufacturing data.
Arturo
Cisneros
(Power · Utilize powerful visualization platform of Spotfire Web Player to access interactive reports and analyses.
4
Product
Engineering · Familiarization on how to analyze debug vs. reference data.
Manager)
· Utilize and interpret different plots, importing/exporting data files.
· Can interpret test parameters vs. circuitry.
Peter
Congistre ·    Wrap up on PPG MILP products and process.
(Test 2
Operation ·    Discussions on the support needed from ADI Milpitas and ADPhils for future.
Manager, ·    Arrange for travel and depart U.S.
Global)
Start End

31-Jan-22 18-Feb-22 Week 1-3

Week4-5

21-Feb-22 4-Mar-22

Week 6-9

7-Mar-22 1-Apr-22

Week 10-12

4-Apr-22 22-Apr-22

Week13-16

25-Apr-22 20-May-22
Week 17-20

23-May-22 17-Jun-22

Week 21-24

20-Jul-22 15-Jul-22

Week 25-26
18-Jul-22 29-Jul-22