Professional Documents
Culture Documents
Arturo Cisneros (Power Product Engineering Test Floor Process Specification for Linear
Manager) Products and Set-up Requirements
Arturo Cisneros (Power Product Engineering Test Floor Process Specification for Linear
Manager) Products and Set-up Requirements
Wilson Melchor (Power Product Test ETS364/600 Automatic Test Equipment (ATE) Platform
Engineering Director) Debugging and Test program Architecture
Week 15
Training Description 21-Feb 22-Feb 23-Feb 24-Feb
Basic Programming – Ensure the trainee could understand
the programming language use for ETS364/600 tester
platform.
Calibration application techniques.
Test Routine Program Features and Debug.
Debugging, Program Compilation and Architecture.
Compilation of Data and Review.
Correlation of FT parameter vs. Reference results.
Learn different improvement techniques per product
specification.
Week 15 Week 16
25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar 6-Mar
Week 17 Week 18
7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar
Week 18
17-Mar 18-Mar 19-Mar 20-Mar
Trainer Training
Arturo Cisneros (Power Product Test Floor Process Specification for Linear Products
Engineering Manager) and Set-up Requirements
Week 19
Training Description 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar
Understand and familiarize with the Linear
Products.
Understand and Familiarize with Test Floor
Process and setup requirements.
Familiarization in all hardware types and
functions.
Installation of setup – Ensure the trainee can
identify correct fixtures for each device, platform
and other setup requirements.
On-boarding to perform hardware debug-repair
and correlation analysis.
Actual training on hardware repair – Ensure the
trainee can perform hardware repair applying
best practices and techniques.
Generate Hardware Debugging Plan and
Correlation Requirements.
Week 20
26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr
Week 21 Week 22
5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr
Week 22
15-Apr 16-Apr 17-Apr
Trainer Training
LTX8080/88 Programming
Fundamentals, Debugging,
Data Analysis and
Wilson Melchor Implementation
Test Routine Program Features. (Classroom
LTX8080/88 Programming session)
Fundamentals, Debugging,
Data Analysis and Debugging, Program Compilation and Architecture.
Wilson Melchor Implementation (Classroom session)
(Power Product Test Compilation of Data and Review. (Classroom
Engineering Director) session)
Correlation of FT parameter vs. Reference results.
(Classroom session)
Learn different improvement techniques per
product specification. (Classroom session)
Week 4 Week 5
21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar
Week 6 Week 7
7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar
Week 10 Week 11
4-Apr 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr
Week 13 Week 14
25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 30-Apr 1-May 2-May 3-May 4-May 5-May 6-May 7-May
Week 17 Week 18
23-May 24-May 25-May 26-May 27-May 28-May 29-May 30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun
Week 21 Week 22
20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul
Week 25 Week 26
18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 29-Jul 30-Jul
Week 3
13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb
Week 8 Week 9
20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr
Week 12
17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr
Week 15 Week 16
8-May 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May
Week 19 Week 20
5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun
Week 23 Week 24
3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul
Week 27
31-Jul 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug
2-Apr
21-May
18-Jun
16-Jul
Task
Hillview Milpitas Site and Team Orientation. Test Engineering Process Flow Training
LTX8080/88 Automatic Test Equipment (ATE) Platform Debugging and Test program Architecture
ETS364/600 Automatic Test Equipment (ATE) Platform Debugging and Test program Architecture
Test Floor Process Specification for Linear Products and Set-up Requirements
Plant and Team Orientation. Familiarization and understanding on test Engineering and process flow
Wrap up meetings with product engineers and product development engineers / De-brief and arrange for travel
Duration
Trainer(s) Expected Outcome (weeks)
· Introduce herself and establish rapport with the ADI Milpitas Design and Test Engineering Team.
· Plant Orientation and Training Overview.
· Initiation to processes, Hardware Management System Overview (on-site).
Peter
Congistre · Creation Hardware Project (initial request) Process Flow.
(Test
· Schematic Entry Process Flow. 3
Operation
Manager, · Lay-out/Design Process Flow / Library Parts Request Process Flow.
Global)
· Fabrication and Assembly (hardware) Process Flow.
· Test Engineering process flow.
· Software/Engineering Change Request/Notification (ECR/ECN/SECN) Process Flow.
· Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics and calibration
board.
John Peters · GUI Operation – Ensure the trainee understands GUI screen purpose and function.
(Equipment 2
Engineer) · Application - Ensure the trainee can operate the equipment and load program file.
· Manual review and troubleshooting exercises – Ensure the trainee can use the manual and can
troubleshoot and resolve any tester issues.
· Review manual material.
· Basic Programming – Ensure the trainee could understand the programming language use for LTX tester
platform.
Wilson · Calibration application techniques.
Melchor · Test Routine Program Features.
(Power 4
Product Test · Debugging, Program Compilation and Architecture.
Engineering
Director) · Compilation of Data and Review.
· Correlation of FT parameter vs. Reference results.
· Learn different improvement techniques per product specification.
· Installation/Setup/Diagnostic/Calibration - Ensure the trainee can setup the diagnostics and calibration
board.
· GUI Operation – Ensure the trainee understands GUI screen purpose and function.
John Peters · Application - Ensure the trainee can operate the equipment and load program file.
(Equipment 3
Engineer) · Manual review and troubleshooting exercises – Ensure the trainee can use the manual and can
troubleshoot and resolve any tester issues.
· Review manual material.
· Basic Programming – Ensure the trainee could understand the programming language use for
ETS364/600 tester platform.
Wilson · Calibration application techniques.
Melchor · Test Routine Program Features and Debug.
(Power
Product Test 4
· Debugging, Program Compilation and Architecture.
Engineering
Director) · Compilation of Data and Review.
· Correlation of FT parameter vs. Reference results.
· Learn different improvement techniques per product specification.
· Understand and familiarize with the Linear Products.
· Understand and Familiarize with Test Floor Process and setup requirements.
Arturo · Familiarization in all hardware types and functions.
Cisneros
(Power · Installation of setup – Ensure the trainee can identify correct fixtures for each device, platform and other
Product setup requirements. 4
Engineering
Manager) · On-boarding to perform hardware debug-repair and correlation analysis.
· Actual training on hardware repair – Ensure the trainee can perform hardware repair applying best
practices and techniques.
· Generate Hardware Debugging Plan and Correlation Requirements.
· Advance EXENSIO data analysis platform.
· Familiarize and operate the tools used for correlation and manufacturing data.
Arturo
Cisneros
(Power · Utilize powerful visualization platform of Spotfire Web Player to access interactive reports and analyses.
4
Product
Engineering · Familiarization on how to analyze debug vs. reference data.
Manager)
· Utilize and interpret different plots, importing/exporting data files.
· Can interpret test parameters vs. circuitry.
Peter
Congistre · Wrap up on PPG MILP products and process.
(Test 2
Operation · Discussions on the support needed from ADI Milpitas and ADPhils for future.
Manager, · Arrange for travel and depart U.S.
Global)
Start End
Week4-5
21-Feb-22 4-Mar-22
Week 6-9
7-Mar-22 1-Apr-22
Week 10-12
4-Apr-22 22-Apr-22
Week13-16
25-Apr-22 20-May-22
Week 17-20
23-May-22 17-Jun-22
Week 21-24
20-Jul-22 15-Jul-22
Week 25-26
18-Jul-22 29-Jul-22