Activity

5-Nov-13
Previous

6-Nov-13
Wednesday

7-Nov-13
Thursday

8-Nov-13
Friday

9.067
0.000
5.491

0.319
0.000
0.098

0.000
1.393
0.000

0.000
0.000
0.000

70.710
23.035
23.035
24.854
23.035
8.783
57.383

1.113
1.387
1.387
1.496
1.387
0.077
0.991

1.432
1.079
1.079
1.164
1.079
0.00
0.827

0.000
0.000
0.000
0.000
0.000
0.000
0.000

41.841
45.532
37.129
31.982
18.764

1.081
1.849
0.000
0.000
1.612

1.080
1.849
0.000
0.000
1.653

0.000
0.000
0.000
0.000
0.000

2.585

0.000

1.988

0.000

0.000

100.000

0.000

0.000

ARABIYAH
PIPE HAULING & STRINGING
PRECASTING OF CONCRETE FOUNDATION (WGP)
PRECASTING OF CONCRETE FOUNDATION (BV)
HASBAH
PIPE HAULING & STRINGING
PIPE BEVELING
INTERNAL COATING, CUT BACK & PRE-BLAST
MAINLINE WELDING
NDE
INTERNAL FIELD JOINT COATING
PIPE BENDING
MEG
TRENCHING & EXCAVATION
STOPAQ APPLICATION
PIPE LOWERING
BACKFILLING
BERM CONSTRUCTION
SOLVENT
PIPE HAULING & STRINGING
A604 - DRAG ANCHOR
GROUTING & SURFACE REPAIR

Total Todate

9.386
1.393
5.589
73.255
25.501
25.501
27.514
25.501
8.860
59.201

44.002
49.230
37.129
31.982
22.029
4.573
100.000

FORECAST PROGRESS REPORT


ITEM
NO.

LINE

COMMON

ARABIYAH

ACTIVITY
RIGHT OF WAY CONSTRUCTION
TRENCHING & EXCAVATION
PIPE LOWERING

HASBAH
TRENCHING & EXCAVATION
PIPE LOWERING
HAULING & STRINGING
AUTOMATIC MAINLINE WELDING

MEG

SOLVENT

MAINLINE WELDING
FIELD JOINT COATING
TRENCHING & SAND PADDING
PIPE LOWERING
HOLIDAY TESTING & BACKFILLING

PIPE BENDING
FIELD JOINT COATING
TRENCHING & SAND PADDING
PIPE LOWERING
HOLIDAY TESTING & BACKFILLING
DRAG ANCHOR - A 603
EXCAVATION / BASE COMPCATION

FROM

TO

QTY

UNIT

REMARKS

PROGRESS ACHIEVED FOR LAST WEEK


ITEM
NO.

LINE

HASBAH

ACTIVITY

TRENCHING & EXCAVATION

HAULING & STRINGING

STATUS

ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL

UNIT

CU M

PREVIOUS SATURDAY

SUNDAY

9-Aug-13

10-Aug-13

11-Aug-13

5037.7

0
0
0
0
0
0
0

448.8
0
200
0
15
0
360

0
0.195
0
88.2
0
100
0
0
0
0
0
0
0
15
0
360
0
5
0
120
0
1.648

0
0.392
0
176.4
0
200
0
0
0
0
0
0
0
11
0
264
0
7
0
168
0
1.483

LM
EA

542

LM

12084

7.223

CU M

3256.05

MEG

TRENCHING & EXCAVATION

HAULING & STRINGING

AUTOMATIC WELDING

MANUAL WELDING

MAINLINE WELDING

FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL
FORECAST
ACTUAL

LM
%

91.015

EA

1184

LM

27540

EA

33

LM

792

EA

596

LM

13596

51.84

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

12-Aug-13

13-Aug-13

14-Aug-13

15-Aug-13

561
0
250
0
15
0
360

673.2
0
300
0
7
0
168

640.2
0
300
0
0
0
0

541.2
0
300
14
0
336
0

0
0.195
0
88.2
0
100
0
0
0
0
0
0
0
14
0
336
0
8
0
192
0
1.813

0
0
0
0
0
0
0
0
0
0
0
0
0
21
0
504
0
6
0
144
0
2.226

0
0.231
0
104.08
0
120
0
0
0
0
0
0
18
20
432
480
6
7
144
168

0
0
0
0
0
0
0
0.952
12
0
288
0
10
20
240
480
6
5
144
120

1.978

1.318

ACTUAL PROGRESS
(1 WEEK)

2864.4
1350
37
888

1.013
456.88
520
0.952
0
0
101
2424
38
912
10.466

REMARKS