Laboratory Utilisation Report: Digital Signal Processing
Laboratory Utilisation Report: Digital Signal Processing
3. a. b. c. d.
ACTIVITIES: Regular Scheduled Classes. Online examinations conducted by TCS etc. on off days. MATLAB based project works. Maintenance Work
SEMESTER No of classes (per week) : Duration of each class: Total no. of students (per week): No. of teachers (per 15 students) No .of Technicians (per 15 students): No. of computer set up used (per class):
Branch and students strength attain the lab. SL. NO. 1. 2. 3. BRANCH ECE EIE CSE STUDENT STRENGTH ODD SEM EVEN SEM 360 180 240 -
b. REPAIR AND MAINTENANCE: Repair and maintenance of this Lab is taken through annual maintenance contract (AMC)by DGT System Pvt Ltd :Hardware & software APLAB :10 KVA UPS M K Enterprises :Air Conditions ITER Maintenance cell :Wiring and Electrical supply Regular maintenance is carried out once in every month by the above agencies. Major repairing is carried out by them as and when required by system. Minor repairing and software installation is taken by our technical instantly if required.