You are on page 1of 1

S CS

S CS
BG
G
CR
CR
DL DL
BG CR
G
CR
DL DL
32A

SMDB-CWH
14-WAY 3-PHASE SMDB PANEL BOARD,
PROVDED ON FXED FREE STANDNG
PLATFORM. ALL OUTGONG WAYS SHALL
BE PROVDED WTH kWHr METER WHCH
SHALL BE LNKED BACK TO THE ETHAD
ARWAYS CENTRE iBeMS SYSTEM.
63A
80A 80A 80A
63A
63A
SOLATOR'S FEEDNG PUMPS SHALL BE
FED ON GALVANSED STEEL
CONTANMENT DROPPNG TO 450mm
AFFL. OUTGONG CONNECTON SHALL
BE PROVDED BT THE PUMP SPECALST.
SOLATOR'S FEEDNG PUMPS SHALL BE
FED ON GALVANSED STEEL
CONTANMENT DROPPNG TO 450mm
AFFL. OUTGONG CONNECTON SHALL
BE PROVDED BT THE PUMP SPECALST.
2
D
2
2 D
2
D
2
DATA CONNECTON TAKEN FROM THE
ETSALAT PRMARY CONNECTON
WTHN THE BASEMENT DATA ROOMS.
DB-01 9-WAY SNGLE PHASE
DSTRBUTON BOARD TAKEN FROM
SBDB-CWH, BOARD PROVDED FOR
GENERAL MEP SERVCES WTHN
ETS ROOM.

C C
C C C
C C
C C
C C
C
EM2
EM2
EM2
EM2
EM2
EX3 EX3
SELF-CONTANED EMERGENCY
LGHTNG LNKED BACK TO BE
ETAHD ARWAYS CENTRE
MONOTRNG SYSTEM.
Ihi: crcwing i: fcr engineering :ervice: cn|y cnc i: Ic Le recc in ccnjuncIicn wiIh c|| re|evcnI crchiIecIurc|,
:IrucIurc|, Ccn:u|I crcwing: cnc Ihe ccnIrccI :pecificcIicn.
IHlS lS NCI /N lNSI/LL/IlCN / WCFKlNG DF/WlNG
/|| :ervice rcuIe: cnc euipmenI |cccIicn: cnc inciccIive, ccIuc| |cccIicn Ic Le ceIerminec frcm:iIe
cimen:icn:.
Ic whcmiI mcy ccncern. Ihe reuiremenI: cf Ihe Hec|Ih & ScfeIy cI Wcrk eIc. /cI 171 & :uL:euenI
cmencmenI: IhereIc cre LrcughI Ic Ihe cIIenIicn cf c|| Ihc:e whc ce:ign, in:Ic|| cr mcinIcin Ihe p|cnI cnc
euipmenI :hcwn cn Ihe:e crcwing: cr whc cre reuirec Ic enIer Ihe crec: :hcwn cn Ihe:e crcwing:.
DC NCI SC/LE FFCMIHlS DF/WlNG
FEV D/IE
KEY FL/N
FEVlSlCNS 8Y CHK
REV DRAWNG NUMBER PROJECT NUMBER
SCALE
ENGNEER
DF/WlNG IlILE
DATE
CHECKED PROJECT MANAGER
DRAWN BY
PROJECT
CLENT
DRAWNG STATUS
ARCHTECT
LEAD CONSULTANT
GENERAL NOTES -
1. THE ELECTRCAL NSTALLATON SHALL FULLY COMPLY WTH
THE ABU DHAB ELECTRCAL & WATER REGULATONS
(ADWEA) & THE ABU DHAB DSTRBUTON COMPANY
REGULATONS (ADDC)
2. THS DRAWNG SHALL BE READ N CONJUNCTON WTH THE
ELECTRCAL SPECFCATON AND ALL OTHER ASSOCATED
DRAWNGS LSTED ON THE CONSULT DRAWNG SSUE
SHEETS. ALL OTHER RELEVANT STATUTORY AND
LEGSLATVE DOCUMENTS SHALL ALSO BE REFERRED TO.
3. CO-ORDNATON BETWEEN OTHER SERVCES
NSTALLATONS AND STRUCTURAL TEMS SHALL BE THE
RESPONSBLTY OF THE CONTRACTOR.
4. THE CONTRACTOR SHALL LASE DRECTLY WTH THE
MECHANCAL CONTRACTOR TO ENSURE ALL MECHANCAL
SUPPLES AND SUPPLED AND NSTALLED N THE
CORRECT LOCATON.
5. FOR LEGEND OF SYMBOLS REFER TO CONSULT DRAWNG
90107-E-001
GENERAL & EMERGENCY LGHTNG
LAYOUTS.
SMALL POWER & DATA LAYOUTS.
FRE ALARM, PA/VA AND DOOR ACCESS
SYSTEMS,

You might also like