You are on page 1of 3

TABULAR Form-1

The table below gives the number of days worked by employees of five grades A B C D & E
in the different departments.
(No. Of days worked in a Year)
Grade
A
B
C
D
E

Finance
300
320
310
290
250

Marketing
307
314
322
313
318

Production
300
315
315
365
365

Personnel
290
300
310
305
300

1. The number of days worked in Finance department was highest for grade
A) B
B) E C) D D)C
2. The grade which worked least in all the departments is
in

Grade A in Personnel
Finance

Grade C in Finance

Grade B in Marketing

Grade E

3. Can we infer that production was throughout the year?


Yes

No

Cant say

Need more data

4. If average day is 8 hours then the amount of work put by grade C is


1257 hrs.

10000 hrs

10056 hrs

None of the above.

5. If we say production was non stop throughout the year without a single days break then the
current year.
it is not a leap year
insufficient

it is a leap year

cannot say for sure

data is

6. If the number of holidays in the year was 15 then average absenteeism of grade E workers in
finance during the year is
75 days

100 days

115 days

15 days

7. Across various departments the number of days put was most by grade
A

8. Across various departments the average number of days put was least by
D

9. The average number of days worked by Grade D is


299.25

318.25

320

327

10. The average number of days worked by Grade E is


308.25

318.25

327

341

11. The department which had the most in terms of employee attendance is
Finance

Personnel

Marketing

Production

12. The department which had the most in terms of absenteeism is


Marketing

Production

Finance

Personnel

13. The average number of days people across a;; grades worked in Personnel is
301

302

299

300

14. The average number of days people across all grades worked in Production is
333

329

331

332

15. If grade D got Rs.20 more per day than grade E average earning of Grade D workers over
Grade E Workers
Rs.365

Rs.7200

Rs.7300

Cannot Be determined

1. b By Observation.
2. D By Observation
3. A Grade E in Production had 365 days working
4. C Total days in C= 1257. Total Hours = 1257 8 = 10056 hrs
5. A It is not a leap yr.Refer Q no.3.

6. B Working Days= 350 Grade E in Finance worked for 250 days.Hence absent days=100
7. D Grade D worked for 1273 days in total,which was the most.
8. C Grade A worked for 1197 days in total,which was the least.
9. B Average number of Days= 1273/4= 318.25.
10. A Grade E worked for 1233 days.Hence Average= 1233/4=308.25 days
11. D Comparing Figures Vertically, Production worked for most days
12. C Comparing Figures Vertically, Finance worked for least days
13. A The average number of days for Personnel ( Adding Vertically) = 1505 /5= 301
14. D The average number of days for Production ( Adding Vertically) = 1660 /5= 332
15. C It cannot be determined as because we need to know the average earning for Each type.