Professional Documents
Culture Documents
Tabular Form 1
Tabular Form 1
The table below gives the number of days worked by employees of five grades A B C D & E
in the different departments.
(No. Of days worked in a Year)
Grade
A
B
C
D
E
Finance
300
320
310
290
250
Marketing
307
314
322
313
318
Production
300
315
315
365
365
Personnel
290
300
310
305
300
1. The number of days worked in Finance department was highest for grade
A) B
B) E C) D D)C
2. The grade which worked least in all the departments is
in
Grade A in Personnel
Finance
Grade C in Finance
Grade B in Marketing
Grade E
No
Cant say
10000 hrs
10056 hrs
5. If we say production was non stop throughout the year without a single days break then the
current year.
it is not a leap year
insufficient
it is a leap year
data is
6. If the number of holidays in the year was 15 then average absenteeism of grade E workers in
finance during the year is
75 days
100 days
115 days
15 days
7. Across various departments the number of days put was most by grade
A
8. Across various departments the average number of days put was least by
D
318.25
320
327
318.25
327
341
11. The department which had the most in terms of employee attendance is
Finance
Personnel
Marketing
Production
Production
Finance
Personnel
13. The average number of days people across a;; grades worked in Personnel is
301
302
299
300
14. The average number of days people across all grades worked in Production is
333
329
331
332
15. If grade D got Rs.20 more per day than grade E average earning of Grade D workers over
Grade E Workers
Rs.365
Rs.7200
Rs.7300
Cannot Be determined
1. b By Observation.
2. D By Observation
3. A Grade E in Production had 365 days working
4. C Total days in C= 1257. Total Hours = 1257 8 = 10056 hrs
5. A It is not a leap yr.Refer Q no.3.
6. B Working Days= 350 Grade E in Finance worked for 250 days.Hence absent days=100
7. D Grade D worked for 1273 days in total,which was the most.
8. C Grade A worked for 1197 days in total,which was the least.
9. B Average number of Days= 1273/4= 318.25.
10. A Grade E worked for 1233 days.Hence Average= 1233/4=308.25 days
11. D Comparing Figures Vertically, Production worked for most days
12. C Comparing Figures Vertically, Finance worked for least days
13. A The average number of days for Personnel ( Adding Vertically) = 1505 /5= 301
14. D The average number of days for Production ( Adding Vertically) = 1660 /5= 332
15. C It cannot be determined as because we need to know the average earning for Each type.