You are on page 1of 22

Welcome to HTLS Conductor

Welcome to HTLS Conductor


1. Capacity Upgrading
2. HTLS Conductor
3. Experience
4. Summary
* HTLS Conductor: High Temperature Low Sag Conductor
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
gventas@ohmtekmin.com
Increase in demand for electricity is a big issue of the day
in many countries.
Very high cost to install new power lines
Too difficult to acquire tower sites
and right-of-way
Not enough time to built new lines
Popular feeling against construction of
high voltage overhead lines
in urban and suburban areas
Very high cost to install new power lines
Too difficult to acquire tower sites
and right-of-way
Not enough time to built new lines
Popular feeling against construction of
high voltage overhead lines
in urban and suburban areas
Re-conductoring of existing lines
with
High Temperature
& Low Sag Conductor
Re-conductoring of existing lines
with
High Temperature
& Low Sag Conductor
However,
Solution
Background
1. Capacity Upgrading
1. Capacity Upgrading
Optimized HTLSC
2. HTLS Conductor
2. HTLS Conductor
Sag
Current
Capacity
Reliability
Installation
Economics
Optimized
HTLS Conductor
High current capacity
Low sag-tension property
Easy and rapid installation
Compatible to
existing installation method
Long term reliability
Conductor cost
Labor cost
Low line loss
The cutting edge technologies of capacity upgrading apply to
various types of conductor.
Developmental Trend
GAP
Conductor
Ampacity
1910 1960 1980 2000 1990
ACSR
AAAC
Year 1880
Copper x 1.0
x 1.5
x 2.0
GAP
Conductor
STACIR
ACSS
4
2. HTLS Conductor
2. HTLS Conductor
Increase G.clearance
under same capacity
Uprating
with equivalent sag
Uprating
for long span
Uprating
with increased sag
Application
x 1.0
x 2.0
x 1.5
x 1.55
x 1.0
Max.
current
Ratio
Conductor Core
90
o
C Al CFCC ACFR
210
o
C STAl INVAR STACIR
150
o
C Hi-TAl Steel Hi-TACSR
150
o
C TAl Steel TACSR
90
o
C Al Steel ACSR
Max.
operating
temp.
Material
Conductor
1
2
3
4
5
Key materials
TACSR
2
Hi-
TACSR
3
1
ACFR
5
* A key to abbreviations:
TAl: Thermal Resistant Aluminum-Alloy
Hi-TAl: High-tensile Strength Thermal Resistant Aluminum-Alloy
STAl: Super Thermal Resistant Aluminum-Alloy
INVAR: a kind of Ni-Fe Alloy
CFCC: Carbon Fiber Composite Cable
STACIR Conductor
2. HTLS Conductor
2. HTLS Conductor
High Strength AW
Aluminum-clad Invar
High Strength AW
Aluminum-clad Invar
STAL
Super Thermal Resistant
Al-Alloy Conductor
STAL
Super Thermal Resistant
Al-Alloy Conductor
Ampacity Upgrading : x 2 ACSR
No limitation for application area
: Heavy wind & snow, galloping area
Equivalent Sag-Tension Properties
to conventional ACSR
No Modification & Reinforcement
on Existing Tower
Easy Installation with Same Method
& Equipment as ACSRs
Reduced Design Time and Cost
High Reliability with Strong Track Record
* Invar is a 36%Ni-Fe Alloy
STAL Conductor
Comparison with other conductors
STAL wire containing Zr element has improved annealing resistance
properties without loss of strength at high operating temperature.
Annealing Characteristics for Al Wire
0 100 200 300 400 500
50
60
70
80
90
100
110
R
e
s
i
d
u
a
l

s
t
r
e
n
g
t
h
,

%
Aging temperature,
o
CX1hr
HAL
STAL
16.2
~17.9
STAL
2.7
60
22.9
~25.7
16.2
~17.9
Hi-TAL HAL
2.7
55
2.7
61
16.2
~17.9
TAL
2.7
60
Tensile Strength
(kgf/mm
2
)
Density
(g/cm
3
)
Conductivity
(%IACS)
STACIR
150 90
Hi-TACSR
(River-crossing)
ACSR
150
A
l
l
o
w
a
b
l
e
T
e
m
p
.

(
o
C
)
Applicable
Conductor
Continuous
Emergency 240 180 120 180
TACSR
x 2.0 x 1.5 x 1.0 Ampacity x 1.5
210
2. HTLS Conductor
2. HTLS Conductor
* HAL : Hard-drawn ALuminum wire
* TAL : Thermal-resistant ALuminum-alloy wire
* Hi-TAL: HIgh-tensile strength Thermal-resistant ALuminum-alloy Wire
* STAl : Super Thermal-resistant ALuminum-alloy Wire
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
gventas@ohmtekmin.com
INVAR Core
-100 0 100 200 300 400
0
10
20
30
40
D
i
m
e
n
s
i
o
n

C
h
a
n
g
e
,

m
Temperature,
o
C
x1/3
Invar is a 36%Ni-Iron Alloy
Low thermal expansion coefficient
at high operating temperature
Equivalent Sag and Lower Tension
at High Operating Temperature
x2 Capacity
Upgrading
-
400
800
1,200
1,600
2,000
0 50 100 150 200 250 300
Cable Temperature - deg C
C
a
b
l
e

S
a
g

-

m
m
ACSR 795kCM Drake
STACIR 795kCM Drake
-
1,000
2,000
3,000
4,000
0 50 100 150 200 250 300
Cable Temperature - deg C
C
a
b
l
e

T
e
n
s
i
o
n

-

k
g
Tension vs Temperature
*
Sag vs Temperature
*
ACSR 795kCM Drake
STACIR 795kCM Drake
Thermal Expansion
G
a
l
v
a
n
i
z
e
d
S
t
e
e
l

w
i
r
e
:
1
1
.
5
x
1
0
-
6
/

* Sag and Tension vs. Temperature Test


was performed at Kinectrics International Inc., Canada.
Al-clad Invar has low thermal expansion coefficient value
(1/3 to steel wire) at high operating temperature (210
o
C).
A
l-clad
Invar W
ire
: 3.7x10
-6
/
Knee point temperature
2. HTLS Conductor
2. HTLS Conductor
Appropriate design is needed to accommodate to
high temperature and high-tensile strength.
Compression Type Dead-end Clamp
Fittings & Accessory
* Conductor dimension : 410mm
2
Remark Type of Fittings
Armor grip or wedge type
are not recommendable.
Compression type
with larger volume
Dead-end clamp
with Jumper terminal
Description
Armor grip type is
not recommendable.
the same as
those used for ACSR
Suspension clamp
Joint sleeve
Bundle spacer
Vibration damper
insulator
ACSR
STACIR
Length (L)
590
675
Diameter (D)
48
52
(Unit: mm)
2. HTLS Conductor
2. HTLS Conductor
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
gventas@ohmtekmin.com
The Installation Methods for STACIR are
exactly the same as those used for ACSR (Stringing, Sagging & Clamping) .
Installation
2. HTLS Conductor
2. HTLS Conductor
Enough time for shut down
1. Determine shut-off period
not considering electric load
(One HTLS circuit has double ampacity)
2. One HTLS circuit : Increasing capacity
Other circuit : Shut down
3. Start replacement work
Enough time for shut down
1. Determine shut-off period
not considering electric load
(One HTLS circuit has double ampacity)
2. One HTLS circuit : Increasing capacity
Other circuit : Shut down
3. Start replacement work
Not enough time for outage
Needed Rapid installation Work
1. Determine outage period
considering electric load
(ex. straight holidays)
2. One circuit : Shut down
Other circuit : Operation
3. Installation Work should be
finished quickly
Not enough time for outage
Needed Rapid installation Work
1. Determine outage period
considering electric load
(ex. straight holidays)
2. One circuit : Shut down
Other circuit : Operation
3. Installation Work should be
finished quickly
Fist Circuit Replacement
Fist Circuit Replacement
Second Circuit Replacement
Second Circuit Replacement
STACIR can reduce outage time in Semi live line installation
because of high efficiency on installation work.
Finished Installation work
in 1 month
Finished Installation work
in 1 month
2circuit
/ 2conductor,
30 r.km
Installation of First Circuit
in 1 month
Installation of First Circuit
in 1 month
Installation
2. HTLS Conductor
2. HTLS Conductor
Capacity Upgrading Capacity Upgrading
Build
New Line
Build
New Line
Replacement
by HTLSC
Replacement
by HTLSC
Required
Required
Low price
Required
Required
Required
Required
High Cost
Required
Grounding
Line Accessories
Conductor & Ground wire
4.1 Conductor Furnishing
4.2 Stringing
4.3 Ground-wire Furnishing
4.4 Ground-wire Stringing
Tower Foundation
Cost of right of way
Preliminary work
Construction
Cost
Not Required
Partially Required
High price
Required
Not Required
Not Required
Not Required
No Cost
Not Required
High Low kWh Loss
Operation
Cost
Low High
Cost due to Difference
of Counstruction Period
Opportunity
Cost
6 Months
(Short Period)
18 Months Based on 30 route.km
Build
Period
Small Cost
(same as ACSR)
Small -
Maintenance
Cost
Replacement
By HTLSC
Construction
Maintenance
Operation
(kWh Loss)
100%
53%
Material
47% Down
Construction
of New Line
Comparative Cost Analysis
(Operation Period : 30 Years)
Economic Evaluation
2. HTLS Conductor
2. HTLS Conductor
P
R
E
L
I
M
I
N
A
R
Y
P
R
E
L
I
M
I
N
A
R
Y
KEPCO / Korea
Increasing demand for electricity
due to rapid growth of industry
and factory automation
Demand for peak load rate
by 9% every year
Very high cost to acquire
new tower site and right-of-way
Not enough time
to construct new power line
Increasing concerns
about environmental preservation
and popular enmity
to overhead power lines
: Sinnamwon T/L (June 2000)
(345kV, 2cct, 17km)
Unit: circuit km
345kV
154kV
Total
High Capacity.
Conductor
383
1,360
1,743
All lines were installed
and run very well without any
problems
Acquire certification of KEPCO
Customer Problems
Ampacity
[A/cond.]
* Condition : Zone , Span 300m
Operating Temp.:ACSR 90, STACIR 210
ACSR
480x2B
Sag [m]
Tension[kgf]
918
10.21
4,140
Existing
STACIR
410x2B
1,707
9.79
4,140
LGC Proposal
Voltage
grade
KEPCO Experience
KEPCO / Korea
Korea Electric Power Corporation
KEPCO / Korea
Korea Electric Power Corporation
3. Experience
3. Experience
KEPCO / Korea
3. Experience
3. Experience
Frequent Black-out in Kuala Lumpur
has been recurring
High cost and difficulty to acquire
right-of-way & erection / installation
Could be completed
within short period of time (2month)
on full turnkey built
Technical & Commercial Proposal
: June 2003
Scope: Conductor & Fittings
Contract : 1
st
47km (Dec. 2003)
2
nd
294km (Jul. 2005)
3
rd
53km (Dec. 2006)
Installation for 1
st
Project :
Jan. 30, 2004 ~ Feb. 29, 2004
TNB / Malaysia
Tenaga Nasional Berhad
TNB / Malaysia
Tenaga Nasional Berhad
: Port Klang P/S~Kapar S/S etc.
(275kV, 2cct, 4km)
ACSR
400 (Zebra)
719Amp/cond.
STACIR
410
1,584Amp/cond.
* Operating Temp.: ACSR 75
STACIR 183
TNB / Malaysia
3. Experience
3. Experience
ENEL / Italy
ENDESA / Spain
Rapid increase overloaded line
Need to exchange existing line for
Upgrading conductor
Technical & Commercial Proposal
: December 2002
Delivery : April 2003
Installation Start : September 2003
Customer Problems Existing LGs Proposal
ENEL / Italy
Enel Distribuzione SpA
ENEL / Italy
Enel Distribuzione SpA
: Model section (April 2003)
(Cable Length, 51km)
STACIR
240
1,207Amp/cond.
* Condition : wind pressure 88kg/
safety factor 2.0
Operating Temp.: ACSR 90
STACIR 210
Rapid increase
in the demand for electric power
Technical & Commercial Proposal
: November 2001
Delivery : September 2002
Installation : December 2002
Under Field Test : January 2003
ENDESA / Spain
Empresa Nacional de Electricidad S.A,
ENDESA / Spain
Empresa Nacional de Electricidad S.A,
: Field Trial Test (Nov. 2001)
(110kV, 2cct, 3km)
Customer Problems
ACSR/AW
477MCM(Hawk)
606Amp/cond.
Existing
STACIR
240
1,207Amp/cond.
LGs Proposal
3. Experience
3. Experience
Increasing demand for
electricity due to rapid
growth of industry and
factory automation
Demand for peak load rate
High cost to acquire new
tower site and right-of-way
Not enough time to
construct new power line
LILO of one circuit of 400kV DC, Dadri-Ballabhgarh New T/L of 30km
Invar Moose Conductor Package associated with high capacity
East- North Interconnector-II (Award No.C-41408-L175/NOA-I/1403)
Customer Problems
Ampacity
[A/cond.]
* Condition : Span 400m
Operating Temp.:ACSR 75, STACIR/AW 210
ACSR
Moose x 2B
614
Existing
STACIR/AW
Moose x 2B
1,700
LSC Proposal
Power Grid / India
Power Grid / India
Power Grid / India
Technical Proposal
: December 2002
Scope: Conductor & Fittings
Contract: September 2004
Qty of conductor: 396km
Type Test: Successfully passed
(August 2005)
Delivered: September 2005
3. Experience
3. Experience
LILO of one circuit of 400kV D/C
Dadri-Ballabhgarh New Transmission Line
at New Delhi (Maharani-Bagh) Sub Station
Type Test Certificate
Power Grid / India
3. Experience
3. Experience
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
gventas@ohmtekmin.com
Increasing demand and investment
of electricity for Beijing Olympics
High cost and difficulty to acquire
right-of-way & erection / installation
Could be completed
within short period of time
China
China
04: 1
st
BukSin-Bukan T/L (110kV, 2cct, 4.3km)
05: 2
nd
WuBei-Wu T/L (220kV, 2cct, 4.5km)
06: 3
rd
Babao-Shangchun T/L (220kV, 2cct, 55km)
07: 5 Packages for GZPSC, KSPSC, KEPC & NCIP (220kV, 349km)
NCIP, CPC, GZPSC, KSPSC
& KEPC / China
2008 Beijing Olympics
Capacity upgrading
by replacement of
the existing ACSR
with Invar conductor
3. Experience
3. Experience
PGCB / Bangladesh
: 230/132kV sub-station at Tongi & Hasnabad
and 132/33kV sub-station at Kalyanpur
PGCB / Bangladesh (SIEMENS)
Power Grid Company of Bangladesh
PGCB / Bangladesh (SIEMENS)
Power Grid Company of Bangladesh
<Layout Plan & Sectional Elevation>
ACSR
400mm
2
Zebra
737A
STACIR
400mm
2
Zebra
1,645A
3. Experience
3. Experience
QPPL / Philippines
: 230kV Mauban Plant-Tayabas Substation T/L (31km)
- Under F/S and
QPPL / Philippines
Quezon Power Philippines Co. Ltd. (IPP)
QPPL / Philippines
Quezon Power Philippines Co. Ltd. (IPP)
3. Experience / Case Study
3. Experience / Case Study
Capacity Upgrading
by replacement
of the existing ACSR conductor
with STACIR 410mm
2
!
A. Existing Power Plant Generation (Unit 1)
1. Plant Capacity : 600MW
2. Transmission Line:
a) Line Voltage: 230kV
b) Line Length: 31 km
c) Structure Type:
Lattice Steel Towers, Double Circuit
e) Line Conductors:
2 x 795 kCM ACSR "Condor"
B. Power Plant Expansion (Unit 2)
1. Plant Capacity : 600MW
Build New Transmission ?
ROW anticipated problems
& insurgency situation in the areas.
Line Capacity > 1,200MW !
Mauban Plant
230kV Mauban -Tayabas T/L
Tension
Tower
Tech. Proposal: April 2007
Approved by DENR: May 2007
Site Survey: June 2007
Approved by TransCo: Sep. 2007
Contract: January 2008
Delivery: April 2008
Reconductoring: May ~ June 2008
STACIR Conductor has more than double ampacity of conventional ACSR
STACIR Conductor has equivalent sag-tension properties to conventional ACSR
Conventional fittings and accessories for ACSR can be used
for STACIR Conductor except compression fittings
Same installation method as conventional ACSR is applied for Invar Conductor
STACIR Conductor has high long-term reliability with strong track record
Double ampacity uprating with STACIR Conductor
on the existing towers
Most power utilities do use STACIR Conductor for their uprating project !
4. Summary
4. Summary
Thank You !
Thank You !
www.lscable.com
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616