WI-RNO-A04-MDSLAM

DSLAM PHYSICAL CHECKLIST

DSLAM ID:
EXCHANGE NAME:
Step
1
1.1
1.2
1.3
2
2.1
2.2
2.3
2.4
3
3.1
3.2
3.3

3.4
3.5

APPENDIX 1 CHECKLIST 1
1 MARCH 2008
REVISION: 0.0

DSLAM PHYSICAL CHECKLIST


DSLAM TYPE:
Descriptions

Status
(/x)

Room Condition
Room air-conditioning unit are working and
temperature maintained in room temperature at
180C 300C.
Equipment and room are locked properly.
Environment is dust free with proper cabling and
floor arrangement.
DSLAM Cabinet
Rack fan is working properly
Check that rack fan blade is clean
Check that fan/ventilation filter is clean and in
place.
Check that Dslam operating temperature is
maintained at less than 550C.
Power
Check DC supply voltage to DSLAM
(Result should be -40V to 56.4V DC)
Check that rectifier is able to support battery on
load.
(First level maintenance).
Check Power Distribution Box has the correct
fuse rating for DSLAM operation.
DSLAM System
Fuse Rating per
shelf
LUCENT
32 amp
LG
16 amp
HYUNDAI
20 amp
NEC
32 amp
MARCONI
25 amp
TURBOCOMM
20 amp
ALCATEL
32 amp
HUAWEI
30 amp
Check that DSLAM is earthed to the ground
through
MGB.
Measure earthing between Ground and DSLAM
shelf.
(Result can be extracted from PRI report)
Ground resistance reading should be less than 1
ohm

Prepared by

Verified by

Signature :
Name :
Designation :
Date:

Signature :
Name :
Designation :
Date::

Remark /
Value