TRAINING PATHWAY : C-051- 2 JUNIOR ELECTRICAL TECHNICIAN

START
C-051-2

C
ELECTRICAL DRAWING
C-051-2 (M01)
PERFORM THREE
PHASE
DRAWINGDDDRAWING
DRAWING

01.04

1/1

PERFORM THREE
PHASE LINE DRAWING

01.02

2/1

PERFORM THREE PHASE
WIRING DRAWING

01.03

3/1


INSTALLATION WIRING
C-051-2 (M02)
CONTINUE

C
INSTALL THREE PHASE
DISTRIBUTION BOARD


03.07

1/2

INSTALL INDUSTRIAL
EARTING SYSTEM


03.08

2/2










































TRY TRUNKING
WIRING
C-051-2 (M05)
CONDUIT WIRING
C-051-2 (M04)
CONTINUE


CONCEALLED
WIRING THREE
PHASE
C-051-2 (M06)

END
C-051-2



CARRY OUT THREE PHASE
CONCEALLED WIRING
03.02

1/6

TROUBLESHOOT THREE
PHASE WIRING/FITTINGS


06.03


1/7

CARRY OUT THREE PHASE
RESIDUAL CURRENT
CIRCUIT BREAKER

05.09 3/3

CARRY OUT THREE
PHASE SEQUENCE TEST
02.06

4/3


TESTING
PROCESS
C-051-2 (M03)


CARRY OUT THREE PHASE
CONTINUITY TEST
05.07

1/3

CARRY OUT THREE PHASE
INSULATATION TEST
05.08

2/3


CARRY OUT THREE PHASE
CONDUIT WIRING

003.03

1/4

CARRY OUT SINGLE
PHASE EARTHING TEST

03.04 1/5
CARRY OUT SINGLE
PHASE EARTHING TEST

03.05 2/5
TROUBLESHOOTIN
G THREE PHASE
C-051-2 (M07)

INSTALL DIRECT
CURRENT MOTOR

07.02

4/7

TROUBLESHOOT THREE
PHASE APPLIANCES
MACHINERY FAULT

06.04

2/7

CARRY OUT MOTOR
CONTROL WIRING
03.06

1/8

TROUBLESHOOT CONTROL
SYSTEM FAULT
06.05

3/7

MOTOR CONTROL
WIRING
C-051-2 (M08)