Data Sheet for P-2003 A/B (Product Transfer Pump)


NSQTP-20/ED-ME/DS-P-2003-D3
Approved By Checked By Prepared By Description Date Rev.
D0 27.08.2011 Issue for Comment S.M.Alavi S.Omidian S.M.Alavi
D1 10.12.2011 Issue for Approval S.M.Alavi S.Omidian S.M.Alavi
S.M.Alavi S.M.Alavi B.Salahi Issue for Approval 16.04.2012 D2
D3 23.10.2012 Issue for Approval B.Salahi S.M.Alavi A.Amin
Owner: NSQTP-20/ED-ME/DS-P-2003 Contract No.: 1044/03/101
Detail Eng. Contractor: 315-ME-DS-083
Qeshm Topping Plant
(Basic Endorsement, Detail Design & Procurement Engineering Service)
Data Sheet for P-2003 A/B (Product Transfer Pump)
Document Code: D3
Nik Sanat Parsian
This document is the sole property of Nik Sanat Parsian, all information contained herein may neither be reproduced, used,
disclosed, transmitted nor in any way made public without permission of the owner.
Page 2 of 6
Page D0 D1 D2 D3 D4 D5 D6 Page D0 D1 D2 D3 D4 D5 D6
1 3 36
2 3 37
3 3 3 3 3 38
4 3 3 39
5 3 3 3 40
6 3 3 3 41
7 42
8 43
9 44
10 45
11 46
12 47
13 48
14 49
15 50
16 51
17 52
18 53
19 54
20 55
21 56
22 57
23 58
24 59
25 60
26 61
27 62
28 63
29 64
30 65
31 66
32 67
33 68
34 69
35 70
Revision Sheet
Owner: NSQTP-20/ED-ME/DS-P-2003 Contract No.: 1044/03/101
Detail Eng. Contractor: 315-ME-DS-083
Qeshm Topping Plant
(Basic Endorsement, Detail Design & Procurement Engineering Service)
Data Sheet for P-2003 A/B (Product Transfer Pump)
Document Code: D3
Nik Sanat Parsian
This document is the sole property of Nik Sanat Parsian, all information contained herein may neither be reproduced, used,
disclosed, transmitted nor in any way made public without permission of the owner.
Page 3 of 6
1 APPLICABLE TO: PROPOSAL z PURCHASE AS BUILT
2 FOR Nik Sanat Parsian UNIT Feed / Product Storage Unit
3 Qeshm Topping Plant SERVICE Product Transfer Pump
4 NOTES: INFORMATION BELOW TO BE COMPLETED:

BY PURCHASER

BY MANUFACTURER

BY MANUFACTURER OR PURCHASER
5 DATA SHEETS REVISION
6 NO.
7 1
8 2
9 3
10 4
11 APPLICABLE OVERLAY STANDARD(S): 5
z
OPERATING CONDITIONS (5.1.3)
z
LIQUID (5.1.3)
12 FLOW NORMAL 800 (m3/h) RATED (m3/h) LIQUID TYPE OR NAME See remark 8.
13 OTHER * see remark 8 CASE 1 / CASE 2 z HAZARDOUS z FLAMMABLE (5.1.5)
14 SUCTION PRESSUR(MAX./RATED) (1.87/1.03) / (2.16/1.07) (bara) MIN. NORMAL: MAX
15 DISCHARGE PRESSURE 10.26 / 14.39 (bara) CASE 1/ CASE 2
16 DIFFERENTIAL PRESSURE 9.23 / 13.31 (bar) PUMPING TEMP (C) 45 / 45
17 DIFF. HEAD case 1: 137.9 / case 2: 165.9 (m) NPSHA 2.70 / 11.90 (m) VAPOUR PRESSURE (bara) 0.850 / 0.120
18 PROCESS VARIATION (5.1.4) see remark 8 RELATIVE DENSITY (SG) 0.683 / 0.819
19 STARTING CONDITIONS (5.1.4) No auto start pump starts with delivery VISCOSITY (CP) 0.35 / 1.85
20 valve closed. SPECIFIC HEAT Cp (KJ./Kg.K)
21 SERVICE: z CONT INTERMITTENT (STARTS/DAY) CHLORIDE CONCENTRATION (6.5.2.4) (mg/kg)
22 z PARALLEL OPERATION REQ'D (5.1.13) z H2S CONCENTRATION 203.35 ppm / 4.4 ppm (Weight percent) WET (5.12.1.12c)
CORROSIVE / EROSIVE AGENT Yes / - (5.12.1.9)
23
z
SITE DATA (5.1.3)
z
MATERIALS (5.12.1.1)
24 LOCATION: (5.1.30) z ANNEX H CLASS (5.13.1.1) S-1 (Vendor to Confirm)
25 INDOOR HEATED z OUTDOOR z UNHEATED z MIN DESIGN METAL TEMP (5.12.4.1) 6.4 (C)
26 z ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) REDUCED HARDNESS MATERIALS REQ'D (5.12.1.12)
27 CL Eexe or Eexd GR IIA DIV T3 BARREL/CASE IMPELLER
28 WINTERIZATION REQ'D TROPICALIZATION REQ'D CASE / IMPELLER WEAR RINGS
29 SITE DATA (5.1.30) Site condition is specified in Material Requisition. SHAFT
30 ALTITUDE (m) BAROMETER 1 (bara) DIFFUSERS
31
z
RANGE OF AMBIENT TEMPS: MIN / MAX 6.4 ./ 46.6 (C)

PERFORMANCE:
32 z RELATIVE HUMIDITY: MIN / MAX 44.4(Avg min) ./ 86.5(Avg Max) PROPOSAL CURVE NO.
33 UNUSUAL CONDITIONS: (5.1.30) DUST FUME IMPELLER DIA. RATED MAX. MIN. (mm)
34 z OTHER Corrosive Environment (Chloride Ione) IMPELLER TYPE
35 Highly Corrosive / Salt Marine Environment RATED POWER (KW) EFFICIENCY (%)
36

MINIMUM CONTINUOUS FLOW:
37
z
DRIVE TYPE THERMAL (m3/h) STABLE (m3/h)
38 z INDUCTION MOTOR STEAM TURBINE GEAR PREFERRED OPER. REGION TO (m3/h)
39 OTHER ALLOWABLE OPER. REGION TO (m3/h)
40

MAX HEAD @ RATED IMPELLER (m)
41
z
MOTOR DRIVER (6.1.1 / 6.1.4)

MAX POWER @ RATED IMPELLER (kw)
42 z MANUFACTURER shall be in accordance with Client Vendor List NPSHR AT RATED FLOW (m) (5.1.10)
43 (kw) (r/min) MAX SUCTION SPECIFIC SPEED (5.1.11)
44 Frame z ENCLOSURE Min.IP55 z MAX SOUND PRESS. REQ'D 85 (dBA) (5.1.16)
45 z HORIZONTAL VERTICAL SERVICE FACTOR EST MAX SOUND PRESS. LEVEL (dBA) (5.1.16)
46
z
VOLTS/PHASE/HERTZ 6300 / 3 / 50

EST MAX SOUND POWER LEVEL (dBA) (5.1.16)
47
z
TYPE Asynchrony
z
UTILITY CONDITIONS (5.1.3)
48 z MINIMUM STARTING VOLTAGE (6.1.5) %85 V(normal) ELECTRICITY VOLTAGE PHASE HERTZ
49 z INSULATION class F z TEMP RISE class B DRIVERS 6300 3 50
50 FULL LOAD AMPS HEATING 230 1 50
51 LOCKED ROTOR AMPS SYSTEM VOLTAGE DIP z 85% OTHER (6.1.5)
52 z STARTING METHOD D.O.L
53 LUBE STEAM MAX. PRESS (barg) MAX TEMP (oC) MIN. PRESS MIN TEMP.
54 DRIVERS N/A
55 BEARING (TYPE/NUMBER): HEATING 5 (Design: 7) 169 (Design: 194) 3.5 barg 158 oC
56 RADIAL ./ COOLING WATER: (5.1.19) SOURCE
57 THRUST ./ SUPPLY TEMP 35 (C) MAX RETURN TEMP. 45 (C)
58 VERTICAL THRUST CAPACITY NORM PRESS 6 (bara) DESIGN PRESS 8 (bara)
59 UP (N) DOWN (N) MIN RET PRESS 4 (bara) MAX ALLOW D P 0.5 (bara)
60 CHLORIDE CONCENTRATION:
not available. (Fouling Factor:0.00025 m2K/
o
C)
(mg/kg)
880
ATTACHED ITEM NO. ATTACHED ITEM NO.

API 610 Edition 10



MOTOR
GEAR
TURBINE
z
-
MP-2003 A/B
-

DATE BY
z PUMP P-2003 A/B
ATTACHED ITEM NO.

D3
D3
Owner: NSQTP-20/ED-ME/DS-P-2003 Contract No.: 1044/03/101
Detail Eng. Contractor: 315-ME-DS-083
Qeshm Topping Plant
(Basic Endorsement, Detail Design & Procurement Engineering Service)
Data Sheet for P-2003 A/B (Product Transfer Pump)
Document Code: D3
Nik Sanat Parsian
This document is the sole property of Nik Sanat Parsian, all information contained herein may neither be reproduced, used,
disclosed, transmitted nor in any way made public without permission of the owner.
A216 Gr.WCB
A434 Gr.BB
A743 Gr.410
A216 Gr.WCB
450
578
S-5
558
close
78 55
72 72
168 288
288 72
112
111.2
2.5
16682
85dB
WEG
500
450
1485
56
190
Grease
Rolling bearing 2
Page 4 of 6
Owner: NSQTP-20/ED-ME/DS-P-2003 Contract No.: 1044/03/101
Detail Eng. Contractor: 315-ME-DS-083
Qeshm Topping Plant
(Basic Endorsement, Detail Design & Procurement Engineering Service)
Data Sheet for P-2003 A/B (Product Transfer Pump)
Document Code: D3
Nik Sanat Parsian
1
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) z SPECIFICATION NO. Specification for Painting NSQTP-00/ED-PI/SP-5006
4 BB1 BB2 z BB3 BB5 PUMP:
5 CASING MOUNTING: PUMP SURFACE PREPARATION
6 CENTERLINE NEAR CENTERLINE PRIMER
7 FOOT FINISH COAT
8 CASING SPLIT: BASEPLATE: (6.3.17)
9 z AXIAL RADIAL BASEPLATE SURFACE PREPARATION
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 BETWEEN BEARINGS BARREL DETAILS OF LIFTING DEVICES (6.3.20)
13 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
14 MAX. ALLOWABLE WORKING PRESSURE (Mpa) DOMESTIC z EXPORT z EXPORT BOXING REQUIRED
15 @ (C) OUTDOOR STORAGE MORE THAN 6 MONTH
16 HYDROTEST PRESSURE (Mpa) SPACE ROTOR ASSEMBLY PACKED FOR:
17
z
SUCTION PRESSURE REGION MUST BE DESIGNED

SHIPPING CONTAINER (8.2.8.3)

VERTICAL STORAGE (8.2.8.2)
18 FOR MAWP (5.3.6) TYPE OF SHIPPING PREPARATIONN2 PURGE (8.2.8.4)
19 NOZZLE CONNECTIONS: (5.4.2) (Finalized by Vendor)
20 HEATING JACKET REQ'D (5.8.9) z COOLING REQ'D
21 z COOLING WATER (C W) PIPING PLAN (6.5.3.1) Plan A (vendor to confirm)
22 SUCTION 16" C.W PIPING:
23 DISCHARGE 14" z PIPE TUBING FITTINGS
24 BALANCE DRUM C.W. PIPING MATERIALS:
25 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) z S STEEL C STEEL GALVANIZED
26 COOLING WATER REQUIREMENTS:
27 z DRAIN 1 3/4" Flange BEARING HOUSING (m3/h) @ (Mpa)
28 z VENT 1 3/4" Flange HEAT EXCHANGER (m3/h) @ (Mpa)
29 PRESS GAUGE STEAM PIPING: TUBING PIPE
30 TEMP GAUGE
31 WARM-UP BEARING (TYPE/NUMBER) (5.10.1):
32 BALANCE/LEAK-OFF RADIAL /
33 MACHINED AND STUDDED CONNECTIONS (5.4 3.8) THRUST /
34 CYLINDRICAL THREADS REQUIRED (5.4.3.3) LUBRICATION (5.11.3 5.11.4):
35 ROTOR: z RING OIL HYDRODYNAMIC PURGE OIL MISTPURE OIL MIST
36 z COMPONENT BALANCE TO ISO 1940 G1 0 (5.9.4.4) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):
37 SHRINK FIT LIMITED ,MOVEMENT IMPELLERS (8.2.2.3) z PRESSURE LUBE SYS ISO 10438-3ISO 10438-2 (8.2.6.1/8.2.6.5)
38 COUPLING: (6.2.2) OIL VISC ISO GRADE
39 z MANUFACTURER Acc. to Vendor List z MODEL Meta Stream* z OIL PRESS TO BE GREATER THAN COOLANT PRESSURE
40 RATING (kw per 100 r/min) REVIEW AND APPROVE THRUST BEARING SIZE (8.2.5.2d)
41 SPACER LENGTH (mm) z SERVICE FACTOR at least 1.5 OIL HEATER REQUIRED: STEAM ELECTRIC
42 DRIVER HALF-COUPLING MOUNTED BY:
43 z PUMP MFR DRIVER MFR PURCHASER SEE ATTACHED API 670 DATA SHEET
44 COUPLING WITH HYDRAULIC FIT (6.2.10) ACCELEROMETER(S) (6.4.2.1)
45 COUPLING BALANCED TO ISO 1940-1 G6 3 (6.2.3) PROVISION FOR VIBRATION PROBES (6.4.2.2)
46 COUPLING PER ISO 14691 (5.2.4) RADIAL PER BRG AXIAL PER BRG
47 COUPLING PER ISO 10441 (6.2.4) PROVISION FOR MOUNTING ONLY (5.10.2.11)
48 z COUPLING PER API 671 (6.2.4) FLAT SURFACE REQ'D (5.10.2.12)
49 z NON-SPARK COUPLING GUARD (6.2.14c) RADIAL BEARING METAL TEMP THRUST BRG METAL TEMP
50 z COUPLING GUARD STANDARD PER ISO 14120 for less than 3800 RPM (6.2.14a) TEMP GAUGE (WITH THERMOWELLS)
51 BASEPLATES: z MONITORS AND CABLES SUPPLIED BY (6.4.2.4)
52 API BASEPLATE NUMBER (ANNEX D) REMARKS
53 NON-GROUT CONSTRUCTION (6.3.13)
54 OTHER
55 MECHANICAL SEAL: (5.8.1)
56 SEE ATTACHED ISO 21049/API 682 DATA SHEET PUMP BASEPLATE
57 DRIVER
TOTAL
GEAR
SURFACE PREPARATION AND PAINT
HEATING AND COOLING (Remark 2)
SIZE (DN) FLANGE FACING POSITION
CONSTRUCTION
RATING
NO. SIZE (DN) TYPE
BEARING AND LUBRICATION
* Coupling shall be flexible spacer type, made of steel hubs and laminated disc of
stainless steel construction.
INSTRUMENTATION (6.4.2)
Vendor shall recommend all required instrumentation for the proper operation of
total packages and prepare logic diagram after putting order.
MASSES (kg)
This document is the sole property of Nik Sanat Parsian, all information contained herein may neither be reproduced, used,
disclosed, transmitted nor in any way made public without permission of the owner.
180
40
60
SIDE
SIDE
R.F.
R.F.
300#
300#
10"
14"
Metastream
74
460
TSK-0740
Rolling bearing
Angular contact ball bearing
1
2
13880
4480
3000
6400
Page 5 of 6
Owner: NSQTP-20/ED-ME/DS-P-2003 Contract No.: 1044/03/101
Detail Eng. Contractor: 315-ME-DS-083
Qeshm Topping Plant
(Basic Endorsement, Detail Design & Procurement Engineering Service)
Data Sheet for P-2003 A/B (Product Transfer Pump)
Document Code: D3
Nik Sanat Parsian
1
2 z START-UP z NORMAL MAINTENANCE NON-WIT WIT OBSERVE
3 z SPECIFY Two Years Operation z HYDROSTATIC (7.3.2) z
4 z PERFORMANCE (7.3.3) z
5 NPSH (7.3.4.2)
6 z COORDINATION MEETING REQUIRED (9.1.3) z RESET ON SEAL L'KGE (7.3.3.2d) z
7 z MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) RESET REQUIRED AFTER FINAL
8 z MAX RELATIVE DENSITY HEAD ADJUSTMENT (7.3.3.5b)
9 z MAX DIA IMPELLER AND/OR NO. OF STAGES z COMPLETE UNIT TEST (7.3.4.3) z
10 OPERATION TO TRIP SPEED z SOUND LEVEL TEST (7.3.4.4) z
11 CONNECTION DESIGN APPROVAL (5.12.3.4/8.2.1.4) z CLEANLINESS PRIOR TO z
12 INERT GAS INHIBITED STORAGE- SPARE CARTRIDGE (8.2.6.4) FINAL ASSEMBLY (7.2.2.2)
13 z TORSIONAL ANALYSIS REQUIRED (5.9.2.1) NOZZLE LOAD TEST (6.3.6)
14 z TORSIONAL ANALYSIS REPORT (5.9.2.6) CHECK FOR VO-PLANAR
15 z PROGRESS REPORTS (9.3.3) MOUNTING PAD SURFACES (6.3.3)
16 z OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) (if any) MECHANICAL RUN UNITE OIL
17 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) TEMP STABLE (7.3.4.7.1)
18 LATERAL ANALYSIS REQUIRED (8.2.4.1/8.2.4.1.3) z 4 h MECHANICAL RUN AFTER z
19 DYNAMIC BALANCE ROTOR (8.2.4.2) OIL TEMP STABLE (7.3.4.7.3)
20 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) 4 h MECH RUN TEST (7.3.4.7.2)
21 z VENT z DRAIN z COOLING WATER z TRUE PEAK VELOCITY DATA z
22 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) (7.3.3.4d)
23 FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) BRG HSG RESONANCE TEST
24 CONNECTION BOLTING (7.3.4.6)
25 PTFE COATING ASTM A153 GALVANIZED REMOVE/INSPECT
26 PAINTED z SS HYDRODYNAMIC BEARING
27 INSTALLATION LIST IN PROPOSAL (9.2.3L) AFTER TEST (8.2.7.5)
28 z AUXILIARY EQUIPMENT TEST z
29 z SHOP INSPECTION (7.1.4) (7.3.4.5)
30 z PERFORMANCE CURVE APPR. CHARPY TEST (EN 13445/ASME VIII)
31 TEST WITH SUBSTITUTE SEAL (7.3.3.2) z Spare part inspection during running test z
32 z MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
33 z CASING z IMPELLER z SHAFT
34 z OTHER Wear Ring z VENDOR KEEP REPAIR AND HT RECORDS(7.2.1.1c)
35 CASING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5) z VENDOR SUBMIT TEST PROCEDURE (7.3.1.2 / 9.2.5)
z INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) VENDOR SUBMIT TEST DATA WITHIN 24 h (7.3.3.3e)
36 MAG PARTICLE z LIQUID PENETRATE z INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
37 z RADIOGRAPHIC UL TRANSONIC z RECORD FINAL ASSEMBLY RUNNING CLEARANCES
38 z INSPECTION REQUIRED FOR CASINGS (7.2.1.3)(5.12.1.5) z COMPLETION OF INSPECTION CHECK LIST (7.1.6)
38 MAGI PARTICLE z LIQUID PENETRATE
39 z RADIOGRAPHIC UL TRANSONIC
40 z HARDNESS TEST REQUIREDas per ISO 15156, and NACE MR0103 (7.2.2.3)
41
z
ADDITIONAL SURFACE/SUBSURFACE EXAMINATION (7.2.1.3)
42 FOR Shaft
43 METHOD Ultrasonic Test
44
46 1- Material of major part shall be certified to EN10204, level 3.1. When RT is not feasible, UT can be used as substitute.
47 2- Vendor shall state the heating/cooling requirement for approval.
48 3- Pump skid shall be equipped with a plate which can direct any dropped liquid to a drain connection located in middle of skid pump side.
49 4- Tensional analysis is required if the 2 years operating reference is not available for proposed pump type.
50 5- Vendor shall evaluate if lateral analysis is required per Para. 8.2.4.1.2.
51 6- After Mechanical Running test, pump shall be striped; all parts and clearances shall be inspected. If any defects be found, vendor shall made all necessary correction and
52 carry mechanical running test again to insure that no defect (even minor) would happen.
53 7- Material and construction shall be resistant to saliferous dust, insect attacks, moisture and fungus growth.
54 8- Pump shall be able to operate in two cases. Fluid of case one is Naphtha, and fluid of case two is Vacuum Distillate, Light Crude Oil, or ATM Distillate.
55 9- Shut-off Pressure is Case 1: 12.02 barg & Case 2: 17.35 barg & shall be finalized by vendor.
OTHER PURCHASER REQUIREMENTS
QA INSPECTION AND TESTING
SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.)
TEST
REMARKS
This document is the sole property of Nik Sanat Parsian, all information contained herein may neither be reproduced, used,
disclosed, transmitted nor in any way made public without permission of the owner.
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
V-FLO:Confirm
Page 6 of 6
1
APPLICABLE TO : PROPOSALS z PURCHASE AS BUILT
2 FOR Nik Sanat Parsian UNIT Feed / Product Storage Unit
3 SITE Qeshm Topping Plant SERVICE Product Transfer Pump
4 NOTE: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
5
5 PRESSURE VESSEL DESIGN CODE REFERENCE.
6
THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER
7 CASING FACTORS USED IN DESIGN (5.3.4) (TABLE 3)
8 SOURCE OF MATERIAL PROPERTIES
9
10 WELDING AND REPAIRS (5.12.3)
11 THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 10 IF NO PURCHASER REFERENCE IS STATED)
12
z ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)
13 Welding Requirement (Applicable Code or Standard) purchaser-defined Default per Table 10
14 Welder/operator qualification z
15 Welding procedure qualification z as per ASME section IX
16 Non-pressure-retaining structural welding such as baseplates or supports z
17 Magnetic particle or liquid penetrate examination of the plate edges z
18 Postweld heat treatment z
19 postweld heat treatment of casing fabrication welds z
20
21 MATERIAL INSPECTION (7.2.2.1) (7.2.1.3)
22 THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 10 IF NO PURCHASER REFERENCE IS STATED)
23
ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)
24 Type of inspection Methods For fabrication Casings
25 Radiography
26 Ultrasonic inspection
27 Magnetic Particle Inspection
28 Liquid penetrate inspection

29
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
17- Vendor to clarify necessity of minimum flow line.
4- Vibration monitoring system shall be provided by vendor.
5- All parts of lubrication system piping and component shall be stainless steel. Lubrication system shall be in accordance with API 614 chapter 2.
6- Couplings shall be in accordance with API 671.
14- Material certification of major parts (IMPELLER, CASING, and SHAFT) shall be as per DIN EN 10204 level 3.1B.
15- Pump speed 1450 RPM is preferred.
16- The shipment condition shall be considered for worst case (sea weather case).
REMARKS
7- For non-ASME nozzles, counter flanges shall be provided.
8- Vendor shall submit the entire package P&ID for each pump, including lube oil system P&ID, vibration and temperature monitoring system P&IDs,
describing his scope of supply as a part of bid.
10- Pumps shall be equipped with automatic venting devices. automotive venting shall be made thru solenoid or motor operated valve with all necessary
isolating and bypass valves. visual flow glass shall be provided and fitted in venting circuit.
11. Vendor shall assess and report the possible damage result of solid particle present. (for pump and all its auxiliary, including sealing system)
13- The skid shall be fabricated.
12.Vendor shall recommend all required instrumentation for the proper operation of total packages and prepare logic diagram after putting order. All
instrument signals will be transferred to plant control room and control logic will be implemented in process control system by contactor. All
instrumentation shall be wired up to local junction boxes and PCS will be done by others.
1- Material classes mentioned in data sheets are the designer suggestion. Vendor shall consider the fluid composition, operating pressure and temperature,
and proposed suitable material based on his experience.
2- Sealing arrangements, plans, and sealing codes shall be proposed by vendor. Vendor shall use seal manufacturer consulting, and provide his proposal.
API 682 data sheet shall be fulfill and submitted along with proposal.
3- Pumps shall be equipped with non-contacting vibration probs. Probes shall measure vibration and displacement in three axes, axial direction and two
radial directions. Two probes shall be used in each axe. Vibration measurement system shall be in accordance with API 670.
Owner: NSQTP-20/ED-ME/DS-P-2003 Contract No.: 1044/03/101
Detail Eng. Contractor: 315-ME-DS-083
Qeshm Topping Plant
(Basic Endorsement, Detail Design & Procurement Engineering Service)
Data Sheet for P-2003 A/B (Product Transfer Pump)
Document Code: D3
Nik Sanat Parsian
This document is the sole property of Nik Sanat Parsian, all information contained herein may neither be reproduced, used,
disclosed, transmitted nor in any way made public without permission of the owner.

You might also like