Everyone has an obligation to stop work that is unsafe.
i
Standard Safety
Practices Manual
BP Canada Energy Company
December, 2007
version 1.1
This Manual is an Uncontrolled Copy

To View Most Recent Version of Contents Refer
to the gHSSEr Website -
http://gasiso14001.bpweb.bp.com/index.asp

Document Owners: gHSSEr Forum
C-7037 XGS
Standard Safety Practices Manual
i
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
2
Standard Safety Practices Manual
3 ii
BP CANADA GAS PERFORMANCE UNIT
SAFETY PRACTICES MANUAL
Accident prevention and ecient operations go hand in
hand; therefore, incorporating safe work practices in our
day-to-day operation is essential to minimize accidents,
injuries and job interruptions.
Tis manual provides safe guidelines for all employees to
use in addressing the potential risks associated with each
task when developing safe work methods. Guidelines
specied are in accordance with governing regulations,
standards, BP Canada requirements, and recommended
good working practices. It will be necessary to incorporate
these practices into the specic situations that will arise in
each operation.
Te manual covers many, but by no means all, of the jobs
and situations encountered in our operations. Should
situations arise which are not adequately covered in the
manual, please bring it to the attention of your immediate
supervisor.
Te denition of a BP representative in this manual is taken
to include employees, contractors, consultants, and service
representatives who have the authority and are duly quali-
ed to direct work on a the behalf of BP. A BP designate is
an individual who has authority to direct a dened scope of
work specied by the BP Representative. Safety is everyones
responsibility.
WORKSITES
Te following must be available at all BP Canada worksites:
Standard Safety Practices Manual
Standard Environmental Practices Manual
Local Emergency Response Plan
Material Safety Data Sheets
Site-Specifc Procedures
ii
Standard Safety Practices Manual
2
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
3 iii
DEVIATIONS
Te Standard Safety Practices Manual is to be used as a
living and working document, and as such must include
provisions to handle warranted deviations. Te Manual
contains practices in accordance with governing regulations,
standards, BP Canada Gas Performance Unit requirements
and recommended or good working practices. Government
Regulations and BP Canada Gas Performance Unit require-
ments are distinguishable throughout the document by the
use of the words Shall, Will and Must, etc. Recommended
or good working practices are recognized by the use of the
words Should, May and Could, etc.
Te following outlines how to handle deviations in our
day-to-day operations to ensure the safe work methods are
practiced.
DEVIATIONS FROM:
A. Recommended or Good Working Practices
(Should, May, Could)
Authorized by Local Management (i.e. minimum,
employee-in-charge + supervisor)
B. Government Regulations or BP Canada
Requirements
(Shall, Will, Must)
Authorized by Safety Department (Performance
Unit) and the applicable Government Agencies.
Frequent deviations in either case should be submitted to
the gHSSEr Forum for review and adoption if warranted.
Procedures for submitting a suggested revision are outlined
in the subsequent pages.
Note: When government regulations call for additional re-
quirements in excess of BP Canada SSPM, the government
regulation will be followed.
iii
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
4
Standard Safety Practices Manual
5 iv
REVISION PROCEDURE
To suggest a Revision
Te Standard Safety Practices Manual is intended to be a
living document, and suggestions for revisions by operat-
ing personnel will be welcomed. To initiate a revision,
please follow these procedures:
1. Forward request to the HSSE Advisor responsible for
your Department/Area.
2. HSSE Advisor to forward to gHSSEr Forum as war-
ranted.
Te gHSSEr Forum will convene periodically to review all
suggested revisions.
Standard Safety Practices Manual
iv
Standard Safety Practices Manual
4
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
5v
Standard Safety Practices Manual
TABLE OF CONTENTS
Standards and Safe Work Practices Index
Golden Rules of safety
CONFINED SPACE ENTRY PRACTICE 1
ENERGY ISOLATION PRACTICE
(Lock Out - Tag Out) 16
GROUND DISTURBANCE PRACTICE 37
LIFTING AND RIGGING PRACTICE 43
MANAGEMENT OF CHANGE PRACTICE 64
PERMIT TO WORK AND HAZARD
ASSESSMENT PRACTICE 87
VEHICLE STANDARD AND ROAD
SAFETY PRACTICE 112
WORKING AT HEIGHTS PRACTICE 136
Safe Work Standards/Practices
ASBESTOS 147
ATMOSPHERIC MONITORING 147
CANADIAN NUCLEAR SAFETY COMMISSION
(CNSC) REGULATED ISOTOPES 151
DRAINING AND DEPRESSURING 153
ELECTRICAL 154
ELECTRICAL STORMS 161
EQUIPMENT SHUTDOWN SYSTEMS,
TEMPORARY BY-PASS 162
EYEWASH STATIONS & DELUGE SHOWERS 163
FIRE PROTECTION EQUIPMENT 167
FIRE RESISTANT WORKWEAR PRACTICE 170
FIRST AID EQUIPMENT AND MEDIC 182
GAS AND LIQUID SAMPLING 183
GUARDS 184
HAND PROTECTION PRACTICE 185
v
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
6
Everyone has an obligation to stop work that is unsafe.
vi
GUIDELINES FOR FIELD VISITS 191
HOUSEKEEPING 193
HOT AND ODD BOLTING PRACTICE 195
HYDRATES, IDENTIFICATION
AND REMOVAL 211
HYDROGEN SULFIDE (H2S) SAFETY 213
INCIDENT/ACCIDENT REPORTING 216
LADDERS AND SCAFFOLDING PORTABLE 217
LADDERS, STAIRS AND PLATFORMS - FIXED 220
LINE THAWING PRACTICE 225
MANUAL LIFTING AND HANDLING
HEAVY OR AWKWARD LOADS 229
METER PROVING 232
MOBILE STEAMERS 234
MOVING HEAVY EQUIPMENT
ON BP WORKSITES 236
NOISE EXPOSURE & HEARING
CONSERVATION 239
PERSONAL PROTECTIVE EQUIPMENT 242
JEWERLY 245
PIGGING OF PIPELINES AND FLOWLINES 248
POSITIVE AIR SHUT-OFF
REQUIREMENTS (PASO) 249
PRACTICE FOR WORKING IN
A COMBUSTIBLE GAS ENVIRONMENT 251
PRESSURE SAFETY VALVES 262
PRESSURE AND LEAK TESTING 264
PURGING 267
RADIOACTIVE OR NATURALLY OCCURRING
RADIOACTIVE MATERIALS (NORM) 269
RAIL CAR LOADING 273
RESPIRATORY PROTECTION 275
HSSE MEETINGS 280
Standard Safety Practices Manual
vi
Standard Safety Practices Manual
6
Everyone has an obligation to stop work that is unsafe.
vii
SAFETY STANDBY 283
SAND BLASTING / ABRASIVE BLASTING 286
SECURITY 288
SERVICE RIG SAFETY 291
SIGNS AND BARRICADES 297
SIMULTANEOUS OPERATING PROCEDURE 298
STRESS RELIEVING 306
SWABBING 307
TANK GAUGING 310
TANK TRUCK LOADING /UNLOADING 311
TOOLS 315
TRAINING 316
WELDING PRACTICES GENERAL 319
WELL SERVICING WORK PLAN 324
WELL TESTING 327
WIRELINE OPERATIONS 331
WELL WORK - HAND OVER BETWEEN
OPERATIONS AND WELLS TEAMS 333
WORKING ALONE PRACTICE 334
Standard Safety Practices Manual
vii
Everyone has an obligation to stop work that is unsafe.
viii
REFERENCES
Alberta Occupational Health and Safety Act and
Regulations http://employment.alberta.ca/cps/rde/
xchg/hre/hs.xsl/307.html
British Columbia Occupational Health and Safety
Regulations http://www2.worksafebc.com/Publica-
tions/OHSRegulation/Search.asp
Codes of Practice http://gasiso14001.bpweb.
bp.com/index.asp
Ontario Occupational Health and Safety Act and
Regulations http://www.e-laws.gov.on.ca
Golden Rules of Safety/Practices (gHSSEr Docu
ments) http://gasiso14001.bpweb.bp.com/index.asp
Internal and External HSSE Links http://canadahsse.
bpweb.bp.com/home/links.html
Legal and Other Matrix http://gasiso14001.bpweb.
bp.com/EMS/Legal%20Requirements/
Process Safety Management http://psmcanada.
bpweb.bp.com
Standard Safety Practices Manual
viii
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
Everyone has an obligation to stop work that is unsafe.
1
CONFINED SPACE ENTRY PRACTICE
1.0 Scope and Applicability
1.1 Tis practice applies to BP Canada Gas
Performance Unit (CGPU) employees,
contracted employees, contractors, and other
visiting personnel doing work on CGPU
premises and sites.
1.2 Tis practice provides guidelines for the
development of site specic procedures to
prevent injury to personnel by ensuring that
an assessment of all known hazards, pre-job
planning, and communications are done prior
to and during work in conned spaces.
1.3 Te purpose of this practice is to ensure that
all reasonable precautions will be taken to
protect the safety of personnel who are or may
be required to work in conned spaces.

2.0 Scope of Denitions
2.1 Conned Space:
A conned space means an enclosed or partially enclosed
space that is not primarily designed or intended for human
occupancy, except for the purposes of performing work,
having restricted access or egress and which, due to its
design, construction, location, atmosphere, the materials
or substances in it, or other conditions, is or may become
hazardous to a worker entering it, or does not have an easy
means of escape for, or rescue of, a worker entering it.
Examples:
2.1.1 Tanks, vessels, towers, heaters, silos, aerial
coolers, bins, hoppers, tank cars, ventilation
or exhaust ducts, sewers, underground utility
tunnels or pipes, scale pits, sumps, vessel
skirts, mud pits and cement and chemical
storage tanks.
Standard Safety Practices Manual
1
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
2
Standard Safety Practices Manual
3
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
2
2.1.2 An excavation is considered a conned space
under certain circumstances, for example if
there is limited access or egress or the quality
of the atmosphere cannot be guaranteed.
2.1.3 A diked area could be considered a confned
space if it is more than 1.5m deep and the
atmosphere cannot be guaranteed.
2.1.4 Tower or vessel skirts, under trailers with
skirts, false ceilings, because of restricted ac-
cess and egress must be considered as conned
space.
2.1.5 Others, such as pipe racks, utility doors,
compressor fan housings and hoardings.
Standard Safety Practices Manual
2
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
3
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
3
DETERMINATION OF CONFINED SPACE

2.2 Entry into a confned space is deemed to have
occurred as soon as the plane of the entry point has
been broken by a part of the body.
2.3 All BP Canada Gas Performance Unit CGPU sites
must:
Identify and document all confned spaces
Label all entry points. Class 1 Confned Spaces
labeled Confned Space, Class 2 & 3 Confned
Spaces labeled Confned Space Permit Re-
quired
Identify and control all hazards prior to entry
utilizing site specic procedures







NO NO NO





YES YES YES





































Does the space
now have or has it
previously had
contents that could
be harmful?
Is the space
enclosed enough to
contain a
hazardous
atmosphere or
other physical
h d?
Is access/egress so
restricted that
emergency exit or
rescue requires
extra manpower or
equipment?
NOT A
CONFINED
SPACE
THIS IS A CONFINED SPACE
Class 1 No Hazard

A Confined Space in
which there does not
exist and is not likely to
exist:
A hazardous gas,
vapour, dust or fumes
An oxygen content
less than 19.5 % or
more than 23% by
volume.
Class III Hazard Exists

A Confined Space in
which there now exists
or is likely to exist:
A hazardous gas,
vapour, dust or
fumes
An oxygen content
less than 19.5 % or
more than 23% and
which cannot be
ventilated to
Class 1I Potential Hazard

A Confined Space in which
there has existed or was likely
to exist:
A hazardous gas, vapour,
dust or fumes
An oxygen content less
than 19.5 % or more than
23% and, which has been
purged, ventilated and
steps taken to provide and
maintain a safe
Class 1 No Hazard

ENTRY REQUIREMENTS
Communication with
back-up
Atmospheric Testing
(if applicable)
All PPE identified
and worn
Rescue plan in place
Rescue Equipment
readily available
Class 1I Potential Hazard

ENTRY REQUIREMENTS
Confined Space Permit
Lockout/Tagout
Procedure followed
Isolation Procedure
followed
Continuous Atmospheric
Testing mandatory
Confined space purged &
ventilated
Rescue Plan in Place
Rescue Equipment set up,
Class III Hazard Exists

ENTRY REQUIMENTS
ALL
REQUIREMENTS
LISTED IN
CLASS II PLUS
THE
FOLLOWING:
Breathing
Apparatus
mandatory for all
personnel entering
START
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
4
Standard Safety Practices Manual
5
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
4
3.0 Scope of Responsibility
3.1 Each worker is responsible to recognize the hazards
of a conned space and take corrective measures to
work within those areas ensuring that site specic
procedures and this practice are followed.
3.2 Te on-site BP representative in charge or designate
must ensure that:
An emergency response plan is in place specifc
to the work being performed
An adequate inventory of protective equip-
ment is available at the work location; e.g. PPE,
supplied air, gas detection, harnesses/lifelines,
ventilation equipment
All workers required to wear respiratory protec-
tion are medically t to wear the associated
equipment and/or perform the required duties
A Confned Space permit is issued laying out
the conditions upon which the work is to be
performed and that this is communicated to all
workers at the site
Te confned space work location is properly
prepared for the work to take place; e.g. area is
ventilated and isolated from external piping/
equipment
Additional risk assessment beyond the scope of
the safe work permit is completed if deemed
necessary based on the scope of the job (see Job
Hazard Analysis form and Prejob Risk Assess-
ment form). Documents will identify and com-
municate to all workers the possible hazards of
working in the conned space and what controls
are in place to make the job safe to proceed
All workers are trained in STOP-THINK-GO
and Time Out for Safety and understand their
obligation to exercise these tools
Standard Safety Practices Manual
4
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
5
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
5
3.3 Te Area Manager has ensured that:
All confned spaces are defned, documented and
labeled in the area sites
Workers who are involved in confned space
work are adequately trained and competent
3.4 Te immediate supervisor or designate overseeing
the conned space work is responsible for:
Reviewing the need for a confned space entry,
ensuring all other options have been ruled out
Assist in completing the rescue plan
Ensuring that everyone involved in the confned
space understands the hazards involved in the job
scope
Maintaining the safe conditions on which the
permit is based
Suspending the permit if the permit conditions
cannot be maintained
Making certain that the confned space is evacu-
ated if the permit is suspended
Ensuring a new work permit is issued at the start
of each shift
Ensuring atmospheric testing and continuous
monitoring is done by qualied gas tester and
ensuring he/she co-signs the permits
Detailed vessel diagrams must be reviewed
during the pre-job risk assessment including the
following items where applicable: entry/exit
points, ventilation points, blinding points, and
Nitrogen vent points
Filing Confned Space Permit at the feld site for
13 months upon completion
Ensuring all workers are adequately trained and
qualied for the job at hand
Approving the means of isolating the confned
space
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
6
Standard Safety Practices Manual
7
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
6
Approving the means of ventilating the confned
space
Ensuring tests and measurements are taken to
determine the presence of, or change in, the
concentration of harmful substances or oxygen
deciencies
Ensuring an emergency and rescue plan is in
place, documented and communicated
Ensuring information on the availability and
proper use of PPE is communicated
Defning the maximum number of workers who
will be allowed access for the purpose of execut-
ing work within the conned space at any one
time
Ensuring that workers entering the confned
space are familiar with the layout of the conned
space
3.5 Te person accepting the permit (Lead Worker in
control of the work) is responsible for:
Notifying Supervisor or designate in the event of
job delays or changing conditions. Te work site
must be re-inspected and tested by the permit
issuer before the job can be allowed to resume
Ensuring the preparation and precautions are
acceptable, understood, and agreed to, before en-
dorsing and accepting a Conned Space Permit
Ensuring all safety equipment is in good working
condition
Establishing an escape plan agreed to by the
Supervisor or designate and Lead Worker
Defning appropriate tools to be used for the job
Ensuring that any person entering the confned
space is aware of his/her responsibilities under
this code, is qualied to use all the personal
protective equipment required, and is aware of
Standard Safety Practices Manual
6
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
7
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
7
the conditions of the conned space entry, e.g.
hazards, communications, escape plan
Renewing permits, obtaining new permit when
required and returning permit to issuer when
permit expires or job is complete
3.6 Te person(s) entering the confned space is respon-
sible for:
Understanding and following the conditions
detailed in the permit
Reporting changing conditions to the Supervisor
or designate and conned space safety standby
Reporting conditions and practices that will not
allow him or her to follow the conditions of the
permit
Using appropriate tools for the job and ensuring
they are in good condition
Reporting defective or damaged tools
Using respiratory protection and other PPE
(personal protective equipment) properly (if
breathing air is used, a full body harness must be
worn)
A tool list must be checked of before and after
entry and exit of the conned space to ensure
nothing is left behind
3.7 Defnition of the Confned Space Safety Standby:
A safety standby person is an employee or
designate used as an observer and back-up,
whenever the above work applications are being
carried out. Tis person is not part of the work
crew, and is only concerned with the safety of the
workers. Safety standby personnel will be identi-
ed by some type of measure as identied in the
pre-job risk assessment.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
8
Standard Safety Practices Manual
9
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
8
3.8 Te Confned Space Safety Standby is respon-
sible for:
Observing work task
Monitoring atmospheric conditions
Ensuring ongoing communications with those is
conned space
Execution of emergency rescue plan and activa-
tion of rescue team
Maintaining entry log and tool log to ensure all
personnel and tools are accounted for
Ensuring unsupervised entry points are fagged
of indicating DO NOT ENTER or made
inaccessible by other means
Ensuring that all workers involved in the task
have the proper training certication in place
Other duties as specifed in the pre-job safety
meeting
For further guidance please check the safety
standby section of the SSPM
NOTE: Safety Standby personnel can not leave their as-
signed post unless personal safety is jeopardized, relieved by
a competent person, or conned space is evacuated.
4.0 Scope of Training and Qualication
4.1 Training is mandatory, to ensure safety, that all
personnel associated with the conned space entry
are trained and competent, commensurate with the
duties assigned in the conned space activity.
4.2 Facilities are required to establish individual training
requirements to meet the needs of the activity.
Preparing Confned Space Entry Permits pre-
entry training is required
Standard Safety Practices Manual
8
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
9
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
9
Confned Space Entry Class 2 or 3 - pre-entry
training and Conned Space entry is required
Safety Watch class 2 or 3 - pre-entry and Con-
ned Space entry training is required
Confned Space Rescue confned space rescue
training is required
Must have frst aid training
5.0 Scope of Pre-entry Procedures
5.1 Pre Entry Cleaning
5.1.1 All conned spaces should be made clean
prior to entry, according to the nature of the
product and residue, using the most practical
method. Workers may only enter a conned
space to clean after all other reasonable means
have been exhausted. Mechanical means are
the preferred method of cleaning, and should
be used prior to any personnel entering the
conned space.
5.1.2 If steam is used as a cleaning medium,
cleaning contractors must ensure appropri-
ate respiratory and other protective gear, and
ensure the conned space is cooled to ambient
temperature and adequate oxygen levels are
present upon completion of cleaning.
5.1.3 Pyrophoric and other products capable of
spontaneous combustion require special
handling methods. Please refer to site-specic
procedures and MSDSs for handling these
materials.
5.1.4 Sludge, fuids and all spent cleaning materials
should be disposed of in accordance with
applicable regulatory requirements and CGPU
site specic waste handling procedures.
5.1.5 INERTING - If an inert gas is used to protect
against an explosive or fammable atmosphere
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
10
Standard Safety Practices Manual
11
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
10
the personal responsible for the conned space
must:
Gain approval from the Operating Centre Man-
ager
Notify BC WCB in writing 7 days prior to the
entry (BC applications)
Ensure all requirements for working in an inert
atmosphere are followed
5.2 Pre-Entry Isolation and Lockout
5.2.1 Electrical equipment controlling or connected
in any way to the conned space or peripheral
equipment shall be tagged and locked, as per
BP Canada Energy Isolation practice gHSSEr
MS 800.
5.2.2 Lines that could allow fuids to enter the con-
ned space shall be disconnected, capped, or
blind fanged, as per gHSSEr MS 800 Energy
Isolation (Lock out/Tag out) practice.
5.2.3 Where connecting lines cannot be removed
and capped or blind fanged, slip or pan-
cake blinds rated for full line operating pres-
sure must be used. If a full-rated ASME blind
cannot be accomplished, a safe process must
be developed in close cooperation with site
engineers. Te ASME size and rating, as well
as the MAWP (maximum allowable working
pressure) must be permanently marked on the
handle in such a manner that the information
is visible when the blind is installed.
5.2.4 Blinds that do not meet engineering practices
and have not been marked accordingly will
not be used.
5.2.5 A blind list will accompany the site specic
job procedure for the conned space being
entered.
5.2.6 Disconnecting or blanking shall be performed
Standard Safety Practices Manual
10
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
11
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
11
as close to the conned space as practical. It
is acceptable to include a re-boiler, exchanger,
etc., as part of the package for the Conned
Space, providing that the entire system is
tested in accordance with the following:
Explosive gases or vapors: continuous monitor-
ing is required where the atmosphere cannot be
guaranteed. When gases lighter than air could be
present, continuous monitoring of high points is
required. When gases heavier than air could be
present, continuous monitoring of low points is
required
NORM: Naturally Occurring Radioactive Mate-
rials should be tested for, if known to exist in the
stream
Noise - All efort must be made to monitor,
minimize and protect against
Benzene: Must be monitored prior to entry and
at frequent intervals, if known to exist in the
stream
Excess or insufcient oxygen: a continuous oxy-
gen monitor is required where the atmosphere
cannot be guaranteed
Toxic or otherwise hazardous vapors or gases
such as hydrogen sulde must be continuously
monitored to ensure conditions on the permit
have not changed
5.2.7 Rotating equipment (e.g. fan blades, pumps,
agitators) must be immobilized and secured
against accidental movement.
5.2.8 Atmospheric monitoring should be completed
immediately prior to entry. Atmospheric
monitoring must be completed within 20
minutes of entry.
5.2.9 Where monitoring is not continuous,
conned spaces shall be re-tested after work
breaks and shift changes before re-entry.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
12
Standard Safety Practices Manual
13
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
12
5.2.10 Conned spaces shall be ventilated to
ensure a known working atmosphere and to
prevent accumulation of any other harmful
substances:
19.5% to 23.0 % oxygen (by volume)
Less than 10 % LEL; Less than 10 ppm H2S
Benzene >0.5 ppm (half mask) or >10 ppm
(breathing air)
Ventilation providing a minimum of 85m3/hr
(50cfm) of clean respirable air is required for
each person inside the conned space with
exception given to a) when the atmosphere is
continuously monitored and shown to contain
respirable air b) the space has an internal vol-
ume greater than 1.8m3 (64ft3) per occupant,
is occupied for less than 15 minutes, and the
work inside generates no contaminates other
than exhaled air
5.2.11 Respiratory protection must be worn while
initial and re-entry atmospheric tests are
being performed
5.3 Temporary Heating Devices
5.3.1 Heaters that are required to maintain a suit-
able thermal environment inside the conned
space shall be located outside the space with
the hot air supply ducted into the space (see
Manufacturers instructions for setup and
venting).
5.3.2 Direct-fred heaters, which discharge exhaust
gases with the heated air, will not be used to
heat conned spaces while they are occupied.
If direct-red heaters are used, personnel must
conrm a safe working atmosphere prior to
entry.
5.3.3 A reassessment of the amount of ventilation
required must be made when heating conned
Standard Safety Practices Manual
12
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
13
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
13
spaces that may release additional toxic,
explosive, or fammable materials at elevated
temperatures.
5.4 Personal Protective Equipment
5.4.1 Appropriate personal protective equip-
ment must be worn for the particular job as
required (i.e. re retardant clothing, gloves,
boots, goggles, face shields, respiratory ap-
paratus, safety harness and lifelines).
5.4.2 Prior to any confned space entry the con
trolled products that may be encountered in
the conned space must be identied and
the MSDS on these materials must read and
understood.
5.4.3 Breathing apparatus is also required as standby
equipment outside the conned space, to be
used by personnel responding to emergency.
5.5 Emergency Rescue
5.5.1 A rescue plan must be completed, reviewed,
documented and a copy must be on site prior
to a conned space entry.
5.5.2 Rescue plans will be kept on le at the
facility. Any equipment required to imple-
ment the plan must be in place prior to the
conned space entry. New plans will be
developed only where a suitable plan does not
already exist.
5.5.3 A competent safety standby person must be in
attendance at the entrance during all phases
of any conned space entry unless classied
as a Class 1 conned space.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
14
Standard Safety Practices Manual
15
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
14
5.6 Communication
5.6.1 A system of communication must be
established and maintained, between the
safety standby person and the person(s) in the
conned space. Tis method must include at
least two of the following:
Simple voice
Visual contact
Radio equipment
Alarm horn
Rope attached to worker
5.6.2 A system of communication must be estab-
lished and maintained between the safety
standby and the rescue personnel.
5.7 Electrically Operated Equipment
5.7.1 Preference should always be given to the use of
pneumatic portable tools and explosion-proof
lamps.
5.7.2 Electrical equipment must be tested for
ground continuity prior to use in a conned
space.
5.7.3 AC electrical equipment, which is used within
the conned space, shall be used in conjunc-
tion with a Ground Fault Circuit Interrupter
(GFI). GFIs are to be located outside con-
ned spaces.
5.8 Static Electricity
5.8.1 Consideration must be given to inclusion of
static relief procedures where there is a poten-
tial of generating static electricity.
5.8.2 Some specic conditions that may lead to
static are:
Standard Safety Practices Manual
14
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
15
C
o
n
f
i
n
e
d

S
p
a
c
e

E
n
t
r
y
15
Te use of high-pressure steam, nitrogen, air
hoses discharging to atmosphere, or vacuum hoses
Te use of sandblasting equipment
Te types of clothing worn
5.9 Unsupervised Entry Points
5.9.1 All conned spaces must be made secure when
left unattended.
5.9.2 Barricades, closures, signage (i.e. Conned
space - Entry by permit only) or other means
of warning that the conned space must not
be entered by unauthorized personnel are
required at all unsupervised entry points. En-
try is prohibited until a new permit has been
issued, all required safety checks have been
completed and the area deemed safe as per the
Conned Space Classication.
6.0 Scope of Forms
6.1 gHSSEr MF 34004 Pre-job Risk Assessment
6.2 gHSSEr MF 82001 Confned Space Entry Permit
7.0 Scope of References
7.1 Alberta General Safety Regulation AR 448/83 as
amended
7.2 B.C. Occupational Health and Safety Regulation
and Guidelines 296/97 as amended
7.3 gHSSEr MS 800- Energy Isolation (Lock Out-Tag
Out) Practice)
7.4 gHSSEr MS 840- Ground Disturbance Practice
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
16
Standard Safety Practices Manual
17
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
16
ENERGY ISOLATION PRACTICE (LOCK OUT
TAG OUT)
1.0 Scope and Applicability
1.1 Tis practice will be used if the unexpected energiza-
tion or startup of machinery or equipment or the
unexpected release of energy could result in health,
safety, environmental or equipment damage losses.
1.2 Tis practice species minimum requirements for the
control of hazardous energy.
1.3 Tis practice applies to all BP Canada Gas
Performance Unit (CGPU) employees, contracted
employees, contractors and other visiting personnel
doing work on CGPU premises and work sites.
1.4 Tis practice does not apply to hot tap operations
performed on pressurized pipelines, provided it can
be demonstrated that:
Continuous service is essential
Shutdown of the system is impractical
CGPU accepted documented procedures are
followed
Equipment is used that will provide proven,
efective protection for employees
2.0 Scope of Denitions
2.1 Functional Area Manager Operating Center Man-
ager or Wells Manager or HSSE Manager.
2.2 Functional Team Lead Area Foreman, Construc-
tion Foreman, Wellsite Leader.
Standard Safety Practices Manual
16
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
17 17
2.3 Area Authority the person who is on-site or as-
sociated with that site and is assigned single point
accountability for that site. Tis person can be the
operator in charge, a maintenance worker, a con-
struction foreman or a wells foreman or designate.
2.4 Authorized worker is a person who applies the
energy isolation procedure and is deemed competent
by the functional team leader or designate.
2.5 Afected worker is a person who works on equip-
ment in which energy control procedures have been
implemented.
2.6 Energy isolating device is a mechanical device that
physically prevents the transmission or release of
energy.
2.7 Energy source is any electrical, mechanical, hy-
draulic, pneumatic, gravitational, chemical, nuclear,
thermal, or other energy source that could cause
injury.
2.8 Personal Lock means a lock for use by an afected
worker to ensure personal lockout protection such
that each lock when applied is operable only by a key
in the workers possession.
2.9 Lockout means the use of a lock or locks to render
the energy isolating device inoperable.
2.10 Lockbox is the control point for the key securing
system which physically prevents access to keys when
locks are applied in a group lockout procedure.
2.11 Identifcation/Warning Tag is a tag directing people
not to start or operate locked out equipment and
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
18
Standard Safety Practices Manual
19 18
indicates the name the lock is assigned to, the date of
the lockout and reason for the lock out. Te identi-
cation/warning tag is attached to each authorized
and afected workers personal lock.
2.12 Warning Tag is a numbered tag directing people
not to start or operate locked out equipment and
references people back to the energy isolation log for
date, name and reason for lockout.
2.13 Permanent Lockout Isolations is equipment, ma-
chinery or process that is indenitely locked out
from service.
3.0 Scope of Responsibilities

3.1 Each functional area manager is accountable for
ensuring that:
An energy isolation system is implemented to
control the hazards at the worksite
3.2 Te functional team lead or designate is responsible
for:
Establishing on site individual training programs
for authorized and afected workers that meet the
sites needs for required energy isolation activities
Ensuring the authorized worker(s) are competent
to perform the energy isolation procedures
Determining the requirement for site specifc
lockout procedures for equipment being worked
on within their area
Tere is an adequate inventory of protective
equipment and energy isolation devices such as
locks, blinds etc. for the job at hand
All workers are trained in STOP-THINK-GO
and Time Out for Safety and feel comfortable in
being able to exercise these tools
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
18
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
19 19
3.3 Te Area Authority in charge or designate is respon-
sible for ensuring:
A proper work permit is issued for the type
of work being undertaken and that everyone
involved is aware of the hazards, controls and
emergency procedures
Te authorized and afected workers are aware
of the risks prior to starting work, including the
hazards of the energy sources to be controlled,
the methods or means to control the energy, and
the prohibitions regarding attempts to restart or
re-energize locked out and tagged equipment
Te equipment to be worked on has been
properly isolated, locked out and tagged and is
veried and documented safe to be worked on
Emergency response plans are in place that
addresses unplanned exposure to energy sources
from the equipment being worked on
Tat all required testing, inspection and checking
of the work site is completed prior to the work
permit being issued
Tat the work area is inspected and checked after
the job is completed
3.4 Te authorized worker is responsible for ensuring
that all equipment and energy sources are properly
isolated and locked and tagged with a personal lock
prior to starting work.
3.5 Te afected workers and authorized workers are
responsible for ensuring no work is performed on the
equipment until it has come to a complete stop and
the afected worker(s) working on the equipment
has a personal lock in place at each isolating device
or at the group lock box when the group lockout
procedure is being used.
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
20
Standard Safety Practices Manual
21 20
4.0 Scope of Expectations
4.1 If the unexpected energization or start-up of equip-
ment or the unexpected release of an energy source
could cause injury, the energy source must be iso-
lated with an energy isolating device and efectively
controlled.
4.2 When energy isolating devices must be locked
out the devices must be locked and tagged in the
position that isolates the afected worker(s) from all
hazardous energy when maintenance/servicing work
is being performed. Each afected worker must
install a personal lock to secure the isolating device
in a safe position.
4.3 A work permit is issued by the Area Authority in
charge or designate to each trade or group of workers
on the job, communicated to all personnel involved
in the work, and posted as required.
4.4 A work permit is not issued until a Pre-job Task
Hazard Analysis is completed to evaluate risks for all
deemed critical and non-routine jobs.
4.5 Workers servicing, maintaining or cleaning cord-con-
nected electrical equipment; for example changing
grinding wheel or repairing a drill, can lock out the
equipment by applying a lock to the electrical plug
or render the equipment inoperative. An acceptable
approach to rendering the equipment inoperative is
for the worker doing the work to:
Disconnect the plug from its electrical supply
Keep the plug in sight and within reach so that
no else can accidentally plug in the equipment
Keep the plug under his or her exclusive and
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
20
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
21 21
immediate control at all times while working on
the equipment
4.6 To complete maintenance, troubleshoot problems
or perform adjustments, it may be necessary to work
on equipment while it is energized. Tis is allowed
only if it is required by the manufacturer or it is not
reasonably practicable (in the case where there are no
manufacturer specifcations) to render the equipment
inoperative. For example, adjusting/tuning engines,
pigging of pipelines or volt/amp checks on electrical
equipment.
4.7 Site specifc procedures and controls must be
developed and implemented to ensure the work is
performed to an equivalent level safely. Tis approach
cannot be used simply because it is more convenient
than locking out equipment.

5.0 Scope of Energy Isolation (Lock Out/Tag
Out) General Requirements
5.1 Te Area Authority designates an authorized worker
to turnof or shut down machinery using the site
specic procedures established for an orderly shut-
down in order to avoid any additional or increased
hazard(s) to employees. Refer to Isolation Log
gHSSEr MF 80001
5.2 A designated authorized worker will physically
identify the required isolation points for isolating the
equipment or machinery from the energy sources.
Te authorized worker positions all the energy-isolat-
ing devices and applies lock out and tag to isolate the
machinery or equipment from the energy source(s).
5.3 Lockout of the equipment will be done with a
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
22
Standard Safety Practices Manual
23 22
lock and tag approved by the Area Authority or
designated authorized worker(s). Areas may elect to
use a group lockout where a number of workers are
working on equipment or a large number of energy
isolating devices must be locked out:
If a group lockout is not used each authorized
worker and all afected workers will place their
personal lock with an identifcation/warning tag
showing the installers printed name, signature,
date of installation and reason for installation on
each energy isolating device. Tis is also logged
on the Energy Isolation Log sheet. Te number
of personal locks and tags on each energy isolat-
ing device equals the number of authorized and
afected workers working on the equipment
For group lockout:
o Te authorized worker will lockout and attach
a warning tag to each isolation device
o Te authorized worker and all afected work-
ers place their personal lock on a group lock
box with an identifcation/warning tag with
the installers printed name, signature, date
of installation and reason for installation at-
tached to it
o Te number of locks on the lock box securing
the master key to the lock box equals the
number of authorized and afected workers
working on the equipment. Each energy
isolating device will have the master lock from
the lock box secured to it
5.4 Lockout devices must be afxed to each energy or
isolating device by the worker authorized by the Area
Authority. Te devices must be attached in a manner
that will hold the energy isolating devices in a safe
or of position.
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
22
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
23 23
5.5 Where a tag cannot be axed directly to the energy
isolating device, the tag must be located as closely
and safely as possible to the device, in a position that
will be immediately obvious to anyone attempting to
operate the equipment.
5.6 If more than one group is working on the same item
(including diferent maintenance crafts), each trade
or group will verify or test the isolation to conrm a
state of zero energy.
5.7 Whenever locks, blinds and tags are installed, details
must be recorded in the Energy Isolation Log and
be available on site for the duration of the lockout
to record and track the status of the isolation. Te
reference number on the Energy Isolation Log must
be recorded on the Permit to Work form completed
for any work falling under the isolation.
5.8 All potentially hazardous stored or residual energy
must be relieved, disconnected, restrained, or other-
wise rendered safe.
5.9 If there is a possibility of re-accumulation of stored
energy to a hazardous level, verication of isolation
will be continued until the servicing or maintenance
is completed, or until the possibility of such accumu-
lation no longer exists.
5.10 After ensuring that all personnel are clear, the
equipment must be tested to verify that it is properly
de-energized, locked out and will not operate. Veri-
fcation must be documented in the Energy Isolation
Log.
5.11 At the beginning of each shift change, the Area
Authority, authorized workers or afected workers
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
24
Standard Safety Practices Manual
25 24
will verify that all equipment is safe for work and has
not been returned to service during their absence.
6.0 Specic Procedures Color Identied
Locks
6.1 Each afected worker must install a personal lock
color-coded to their respective trade or group of
workers prior to commencing work. Such locks will
be operated only by the keys of the individual work-
ers afected by the isolation. Color-coding applies to
BP personnel and FTE. Contractors working on BP
sites will apply their own personal locks identiable
with an attached tag.
6.2 Only the afected worker who installed the lock
may remove it with exception to emergency or if
the worker is not available in which site specic
procedures must be followed.
6.3 Each trade will use a diferent color-coded lock and
will use the colors as listed below:
Construction: Yellow
Electrical: Blue
Instrumentation: Red
Mechanics: Orange
Operations: Green
Permanent Lockout: Black
7.0 Specic Procedures Group Lockout
(Lockboxes)
7.1 Areas may elect to use a group lockout where a num-
ber of workers are working on equipment or a large
number of energy isolating devices must be locked
out.
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
24
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
25 25
7.2 An authorized worker competent in the isolation of
equipment is responsible for:
Locking out the energy isolating devices
Securing the key(s) for the locks used for locking
out energy isolating devices in a lock box by
axing a personal lock on a multiple lock hasp
to the lock box
Completing, signing and posting the Energy Iso-
lation Log that identifes the equipment covered
by the lock out
7.3 Te energy isolation must be verifed by two autho-
rized workers. Verication must be documented in
the Energy Isolation Log.
7.4 Te lockbox will contain as many keyed-alike locks
as required for the energy isolation. Site specic
requirements will determine the size and number
of lockboxes required. Each lockbox must contain
locks with a key unique only to the locks in the re-
spective lockbox. When multiple lockboxes are used
on a site each lockbox must have its own identier
corresponding to its respective locks.
7.5 Each afected worker working on the locked out
equipment must apply a personal lock to the lockbox
referred to in subsection (7.2) before working on the
equipment.
7.6 After each afected worker has completed their work
they must remove their respective locks.
7.7 When all afected workers personal locks are
removed from the lockbox, the authorized worker
must ensure that it is safe to end the group lockout.
Te personal lock of the authorized worker is the last
lock to be removed from the lockbox.
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
26
Standard Safety Practices Manual
27 26
8.0 Energy Isolation Process
Te following steps identify the process in which the
Energy Isolation Practice is to be applied:
8.1 Identify energy source(s) to be isolated electrical,
pneumatic, mechanical, hydraulic, fuids and gases.
8.2 Identify system and isolation points to be isolated.
Isolate all sources of energy:
Shut down electrical equipment using the selec-
tor switch followed by the master disconnect
Isolate all inlet and outlet piping by closing block
valve(s) upstream and downstream, disconnect-
ing, inserting blinds, or use of double block and
bleed
Use blocks, pins, or chains to secure potential
mechanical energy
8.3 De-energize sources of energy:
Stored electrical, hydraulic, pneumatic and gasses
and fuids energy must be bled to obtain zero
energy state
In cases where zero energy state cannot be
attained control measures must be developed
to prevent uncontrolled release of energy. For
example, use blocks, pins or chains that are rated
to restrain the potential energy when equipment
cannot be brought to zero potential energy state
When working on or near exposed de-energized
electrical equipment, a qualied person will use
testing equipment to ensure that all circuits are
dead
8.4 Install/ lockout and tag energy isolation devices:
Lockout energy isolation devices (e.g. block
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
26
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
27 27
valves, electrical switches and breakers, mechani-
cal devices)
Install blinds or disconnect piping as necessary
(lockout required when opening piping)
Afx identifer/ warning tags to each isolation
point
Record points in isolation log
8.5 Verify isolation is complete:
Workers verify zero energy. Ensure that the
switch or START button used to test the lockout
is returned to its OFF or NEUTRAL position to
prevent accidental start-up on re-energization
Isolation points are confrmed to be secure in
safe position
Personal locks of afected workers control the
isolation

8.6 Complete Isolation log:
All workers applying locks sign of isolation log
Workers verifying isolation sign of isolation log
Confrm all isolation points are recorded
Isolation log remains at site for duration of the
energy isolation procedure
9.0 Blinding/Blanking Guideline
9.1 General:
All blinding/blanking or disconnecting and plug-
ging requires a safe work permit with a master
list attached identifying the isolation method and
listing the isolation devices and their location. A
pre-job meeting (accompanied by a Task Hazard
Analysis) needs to be done with all involved
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
28
Standard Safety Practices Manual
29 28
personnel prior to starting work
Cathodic protection must be shut down and
fanges bonded prior to the installation of a blind
or disconnecting of piping
Blinding/blanking or disconnecting and plug-
ging is the preferred method of isolation for
pipes, pipelines, vessels and equipment
If these cannot be done, the recommended
alternative is double block and bleed. After de-
pressuring, the block valves are to be locked and
tagged in the closed position and the bleed valve
locked and tagged in the open position. Te
bleed valve venting safely to atmosphere
Single valve isolation is not recommended. If
necessary, then verication must be made that
the valve is holding before the work commences.
Te work must be accompanied by a risk assess-
ment and specic site procedure with approval
by the Functional Team Leader in charge or des-
ignate. Valves (inlet and outlet) must be locked
and closed and tagged before work begins
9.2 Blinding and Blanking:
o Every blinding job will have a blind list that
was generated by referencing all the available
P&IDs for the system. Te system will also
be physically inspected to make sure that all
the blind locations that were identied on the
P&IDs will completely isolate the system. If
extra blinds are required they will be added to
the blind list
o All blinding jobs will use a tag system to track
blind locations. Tese tags must be attached to
the blind when the blind is installed. A record
must be kept of the blinds that have been in-
stalled with their respective tag number. Blind
boards or multi-part blind tags may be used to
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
28
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
29 29
track installed blinds
o After equipment has been made ready to blind
(depressured) the operator in charge will use
the tag system to track all active blinds. If
blind boards are used the tag is moved from
the blind board and attached to the blind
o Blind equipment as required ensuring the tags
from the board and the blind list correspond
with each other
o Each blind location must be recorded in the
Energy Isolation Log
9.3 Refer the tables in Appendix A to select proper blind
thickness and Appendix B for standard practices for
isolation of pipe, pipelines, equipment and vessels.
10.0 Scope of Restoring Service to Equipment
10.1 After each afected worker has completed their work,
they will remove their respective locks. Upon remov-
ing their locks they must sign of work completed in
the Energy Isolation Log.
10.2 In a group lockout once all afected workers personal
locks are removed from the lockbox, the authorized
worker must ensure that it is safe to end the group
lockout. Te personal lock of the authorized worker
is the last lock to be removed from the lockbox.
Once all locks have been removed from the lockbox
an authorized worker may remove the locks from
the energy isolation devices and return them to their
respective lockbox. Refer to gHSSEr MF 80001.
10.3 Upon removal of locks and blinds the Energy
isolation Log must be updated to record status of
isolation.
10.4 A personal lock can only be removed by the autho-
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
30
Standard Safety Practices Manual
31 30
rized and afected workers who installed the lock.
For situations where an authorized or afected worker
is unavailable to remove their lock (e.g. of-shift,
holidays) or an emergency involving equipment
arises, then the Area Authority will complete gHSSEr
MF80002 (Removal of Absent Employee Personal
Lock Log) to verify that the following steps are
completed:
Making every reasonable efort to contact the
afected worker who installed the lock
Determining conclusively the job has been com-
pleted and no personnel remain in the afected
area
Verifying that the machinery can be operated
safely before removing the lock
Contacting the Functional Team for verbal
authorization to access spare key stored in desig-
nated central location or to cut the lock
Returning the spare key to the designated central
location
Notifying the worker at the start of his or her
next shift that the personal lock was removed
since the workers previous shift
Forwarding completed Form to Functional Team
Lead to sign of documentation and verify spare
key was returned to designated central location
10.5 Before a machine or equipment is started, afected
employees must be notifed that all lockout devices(s)
have been removed and that all blinds have been
accounted for. An authorized worker must verify the
de-isolation and complete the Energy Isolation Log.
Completed log sheet(s) are fled at a central location
for 1 year.
10.6 Te individual restoring energy to the equipment
must:
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
30
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
31 31
Inspect the work to ensure that non-essential
items have been removed
Ensure that the machine or equipment com-
ponents are operationally intact and ready for
service
Check the work area to ensure all employees are
safely positioned or removed from the equip-
ment
11.0 Permanent Lockout Isolation
11.1 Prior to the installation of a permanent lock, a
Management of Change (MOC) will be conducted
to determine and verify the correct isolation points.
11.2 Te functional team lead will designate an authorized
worker to lock each of the energy isolation devices at
the identied isolation points with a permanent lock
(black).
11.3 Te authorized worker will attach a steel tag to the
lock which identies the date of the lockout, group
responsible and a reference number for reference to a
log providing details and reference to the MOC.
11.4 Te authorized worker will record the lockout on the
energy isolation log and le it at a central location
for future reference.
11.5 Keys for the permanent locks must be controlled by
the Functional Team Lead.
12.0 Scope of Regulatory References
Alberta General Safety Regulation (Alberta
Regulation 448/83, as amended)
BC Occupational Health and Safety Regulation
and Guidelines (BC Regulation 296/97, as
amended)
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
32
Standard Safety Practices Manual
33 32
Ontario Industrial Establishments Regulation
(O.Regulation 851, R.R.O. 1990, as amended)
Appendix A
Selection of Temporary Blinds/Blanks
Appendix A is only to be used for temporary blinds and
blanks. Te tables were calculated using A-285 Gr. A plate
material and the formula found in clause 304.5.3 of ASME
B31.3 Chemical Plant and Petroleum Refnery Piping
Code. Te allowable stress used was 90% of the SMYS.
Zero corrosion allowance was used. Tese tables can only
be used for process temperatures less than 100 F (38C).
Te following alternate materials may also be used: A-285
Gr. B and C, A-299, A-525, A-516 and A-537.
If alternative material is used or a higher temperature is
required, thickness requirements must be calculated using
above codes and certifed by a Professional Engineer.
Permanent Blank sizing Requirements must be certied by
Professional Engineer.
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
32
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
33 33
HYDROTEST BLANKS--SELECTION TABLE
NOTE: Te shaded area beneath the line in the above
table applies to RTJ type fanges only.
Tese tables are for selection of temporary blanks only.
DO NOT USE FOR PERMANENT BLANKS!
Pipe Size
(inches) 2 3

4 6 8 10 12
Blank
Thickness
(inches) Pressure (psig)
0.250 952 450 288 139 85 56 40
0.375 2142 1013 648 314 192 127 91
0.500 2048 1800 1152 557 341 225 161
0.625 3200 2813 1800 871 533 352 252
0.750 4608 2243 2592 1254 768 506 362
0.875 6272 3053 2170 1707 1045 689 493
1.000 8192 3987 2835 2230 1365 900 644
1.125 10368 5047 3588 1800 1727 1139 815
1.250 6230 4429 2222 2132 1407 1006
1.375 7539 5359 2689 1929 1702 1218
1.500 8972 6378 3200 2296 2025 1449
1.625 10529 7485 3756 2695 2377 1700
1.750 8681 4356 3125 1936 1972
1.875 9965 5000 3588 2222 2264
2.000 5689 4082 2528 1800


E
n
e
r
g
y

I
s
o
l
a
t
i
o
n







Pipe Size
(inches) 14 16 18 20 24 26 30

Blank
Thickness
(inches) Pressure (psig)
0.250 34 26 21 17 13 10 7
0.375 76 59 46 38 26 22 17
0.500 135 104 82 67 47 40 29
0.625 210 163 129 105 73 62 46
0.750 303 234 186 151 106 89 66
0.875 412 319 253 206 144 121 90
1.000 539 417 330 269 188 158 118
1.125 682 528 417 341 238 200 149
1.250 842 651 515 421 294 247 184
1.375 1018 788 624 509 356 299 223
1.500 1212 938 742 606 423 356 265
1.625 1422 1101 871 711 497 417 312
1.750 1649 1276 1010 824 576 484 361
1.875 1893 1465 1160 946 661 556 415
2.000 2154 1667 1320 1077 752 632 472
























Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
34
Standard Safety Practices Manual
35 34
Appendix B.
Standard Practice For Isolation of Pipes, Pipelines, Equip-
ment and Vessels Matrix

*Te isolation options in the table above are presented in
the order of preference.
See the Legend for an explanation of numbered references
Legend
1. Blind/Blank or plug
2. Disconnect and plug
3. Double Block and Bleed
4. Single Block valves with Authorization (use only if
#3 doesnt exist or #1 & 2 are impractical. Can only
be used if approved by a Professional Engineer or
Functional Team Lead, based on a documented risk
assessment complete with procedures.
5. Double Block Valves (no bleed)
For Unattended, Open
Ended
For Vents and
Piping Where
Equipment/
Drains on
Confined Component is
Physically
Vessels or
Pipelines
Space
Entry
Hot Work Cold Work Removed for
Maintenance
in Operation

Sour Gas 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Gas Liquids (Propane,
Butane)
1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Sweet Gas 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Crude oil (Emulsion,
Bitumen)
1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Steam > 2482 kPa 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Steam < 2482 kPa & >
50.8mm
1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Steam < 2482 kPa &
50.8 or less
1 or 2 1 or 2,3,4,7,8 1 or
2,3,4,5,7,8
1 or 2, 3 1
Acid/Base 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Amines 1 or 2 1 or 2, 3,4,7,8 1 or
2,3,4,5,7,8
1 or 2, 3 1
Flammable Substances 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Non-Flammable
Substances
1 or 2 1 or 2, 3,4,6 1 or
2,3,4,5,6
1 or 2, 3 1
Produced Water 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
Fresh Water 1 or 2 1 or 2,3,4,6 1 or
2,3,4,5,6
1 or 2, 3 1
Toxic Substances 1 or 2 1 or 2, 3 1 or
2,3,4,7,8
1 or 2, 3 1
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
34
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
35 35
6. Single Block valves
7. Common tasks carried out using a standard practice
certifed by Professional Engineer.
8. Unique task carried out using a site specic proce-
dure certifed by Professional Engineer.
Notes
Note A: All valves must be locked out and tagged when us-
ing double block and bleed, bleed must be vented
to atmosphere and consideration must be given to
make sure it is vented to a safe place.
Note B: For valves that are holding but the threads/nipple
are unable to accept a bull plug/cap, the bull plug/
cap will not be required until the valve is replaced.
Note C: Double block and bleed cannot be used to isolate
critical hot work in British Columbia. Refer to
Provincial regulations outside Alberta.
Note D: Tis practice needs to be used with other proce-
dures, codes of practice and standards to provide a
safe work environment (i.e. Lockout Procedures,
H2S Code of Practice).
Blinding/Blanking or Disconnect and plug:
Blinding/blanking or disconnect and plug is the
preferred method for isolating equipment for
work purposes
A blind/blank tag system must be used in all BP
Canada facilities. Tis tag system must also be
used for identifying disconnect and plug loca-
tions. When a blind/blank is being installed the
following are important:
o Site-Specifc blinding/blanking procedures or
guides must be followed
o Gaskets must be installed on the pressure side
and, where possible, on both sides to prevent
damage to fange faces
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
36
Standard Safety Practices Manual
37 36
o Proper pressure rated blinds/blanks and
gaskets must be used. See specication table at
the end of this section
Double Block and Bleed:
If installing blinds/blanks creates a hazard and dis-
connect and plug is impractical, the recommended
alternative for isolating equipment is closing double
(block) valves with a bleed valve in between. Te
bleed valve size between the block valves must be
sucient to handle potential upstream block valve
leakage without applying pressure to the downstream
block valve. Block valves must be locked and tagged
in a closed position and the bleed valve must be
locked and tagged in the open position.
NOTE: Bleed valve outlets must be vented with
consideration given to both Safety and Environ-
mental impacts
Single Block Valves with Authorization:
Closing of inlet valve and outlet valve and then de-
pressuring the equipment. Must verify that the valves
hold before work commences. Valves must be locked
closed and tagged. Can be used only when approved
by a Professional Engineer or Functional Team Lead,
based on documented risk assessment complete with
site-specic procedure.
Double Block Valves (No Bleed):
Two valves closed on each side of the equipment
without de-pressuring between the block valves.
Te block valve nearest to the inlet and the outlet of
the isolated equipment must be locked and tagged
closed.
Single Block:
E
n
e
r
g
y

I
s
o
l
a
t
i
o
n
Standard Safety Practices Manual
36
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
37 37
Closing of inlet valve and outlet valve and then de-
pressuring the equipment. Must verify that the valves
hold before work commences. Valves must be locked
closed and tagged.
Unique task:
Task that is unique and requires the expertise of a
Professional Engineer to ensure that the equipment
isolation meets BP safety requirements and OH&S
regulations.
Reference Forms:
gHSSEr MF 80001 Energy Isolation Log
gHSSEr MF 88001 Permit to Work
gHSSEr MF 34004 Pre-Job Risk Assessment
GROUND DISTURBANCE PRACTICE
1.0 Scope and Applicability
1.1 Tis practice applies to all BP Canada Energy BP
Canada Gas Performance Unit(CGPU) employees,
contracted employees, contractors and other visiting
personnel involved in ground disturbance activities
on CGPU sites.
1.2 Te purpose of this practice is to outline the
requirements for ground disturbance necessary to
ensure worker safety and to avoid contact with all
underground facilities.
2.0 Scope of Denitions
2.1 Ground Disturbance is a man made cut, cavity,
trench or depression in the earths surface. Examples
G
r
o
u
n
d

D
i
s
t
u
r
b
a
n
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
38
Standard Safety Practices Manual
39 38
include excavating, digging, trenching, plowing,
drilling, tunneling, aurgering, back-lling, blasting,
hydrovacing, topsoil stripping, land leveling, grading,
clearing, fencing, rig anchors and soil sampling.
3.0 Scope of Responsibilty
3.1 Each worker has the responsibility to recognize
ground disturbance hazards and take corrective
measures by ensuring this practice is followed.
3.2 On-site BP representative in charge or designate
must ensure that:
Emergency Response Plans are in place to ad-
dress Ground Disturbance specifc hazards as
well as the area Emergency Response Plan
An adequate inventory of Protective Equipment
required for hazards identied for the Ground
Disturbance (shoring, cages, gas detection, bar-
ricades, harness, lifelines etc.) is available
All protective trench devices temporarily used in
an excavation are to be certied by a Professional
Engineer
A Ground Disturbance permit and, where
required, a Conned Space Permit is issued
Ground movement is controlled and collapse
is prevented by systematically shoring, sloping,
benching and use of temporary protective
devices(see section 5.5)
A hazard assessment of the worksite is com-
pleted prior to work commencing, this includes
identication, and where possible, isolation and
depressurization of all underground hazards (e.g.
pipelines, electric cables) within the area to be
disturbed
Tat all workers are trained in STOP-THINK-
G
r
o
u
n
d

D
i
s
t
u
r
b
a
n
c
e
Standard Safety Practices Manual
38
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
39 39
GO and Time Out for Safety and are able to
exercise these tools
All requirements of the Ground Disturbance
Code of Practice and Permit have been met
4.0 Scope Of Training And Certication
4.1 All workers involved in the ground disturbance must
be trained and competent. Tis training can be job
specic training on site by a person who has received
formalized Ground Disturbance Level II training
from a recognized institute. Te person supervising
the job must have formalized Ground Disturbance
Level II training.
4.2 Prior to Ground Disturbance activity commenc-
ing, a Work Permit and Hazard Assessment Form
(gHSSEr MF 88001) and Ground Disturbance
permit (gHSSEr MF 84001) shall be completed.
Ground Disturbance training is not required for the
BP representative completing the Work Permit and
Hazard Assessment Form. Any worker who issues
a Ground Disturbance permit, supervises or inde-
pendently creates a disturbance requires formalized
Level II Ground Disturbance training. Te Ground
Disturbance Permit recipient is not required to have
Ground Disturbance training. Permit recipient is
not required to have training but person supervising
the job must have training and be on-site during the
disturbance. Both permits shall be led at the eld
ofce for 13 months.
4.3 Training shall be conducted by a competent trainer.
Onsite documentation of training will be entered in
the VTA database.
5.0 Scope of Consideration for Ground Disturbance
G
r
o
u
n
d

D
i
s
t
u
r
b
a
n
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
40
Standard Safety Practices Manual
41 40
5.1 A risk assessment is necessary to determine if a
ground disturbance permit needs to be completed
and all steps followed. Tis risk assessment needs to
be completed by a person trained in ground distur-
bance by a recognized institute.
5.2 A Ground Disturbance Permit is required any time
powered mechanized equipment is used to disturb
the ground. An exemption to this rule would be
grading a lease road (see 5.3) as it is considered
low risk due to extra ground cover. Certain manual
penetrating hand tools can damage underground
structures and this should be considered when doing
risk analysis.
5.3 Following is a list of jobs that have been identifed as
low risk jobs and therefore a ground
disturbance permit would not need to be issued:
Using a spade to dig to a depth of less than 30
cm
Pounding in wooden survey peg
Pushing in wire marker fags
Grading a lease road
Using hydro vac at low pressure (< 2200 p.s.i.) to
dig

5.4 Hydrovacing or hand exposure is to be used on plant
facilities (excluding wellsites) to locate any possible
underground facilities. No mechanical excavation.
5.5 A complete hazard assessment for ground distur-
bance needs to address the following areas which are
incorporated in the Work Permit and Hazard Assess-
ment Form (gHSSEr 88001):
G
r
o
u
n
d

D
i
s
t
u
r
b
a
n
c
e
Standard Safety Practices Manual
40
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
41 41
Consideration must be given to all trenches
and excavations being conned spaces.If the
atmosphere in an excavation cannot be guaran-
teed safe, the excavation would be considered a
conned space
If an excavation is more than 1.5 metres deep
and closer to the wall or bank than the depth of
the excavation, it must be properly shored or cut
back before workers can enter the area. If this is
not possible an engineered approved structure for
shoring will need to be installed. Proper shoring
is as follows:
If the soil is considered:
o hard and compact the walls are sloped to
within 1.5 metres of the bottom of the excava-
tion at an angle of not less than 30 degrees
measured from the vertical
o likely to crack or crumble the walls are
sloped to within 1.5 metres of the bottom of
the excavation at an anlgle of not less than 45
degrees measured from the veritcal
o soft, sandy or loose the walls are sloped from
the bottom of the excavation at an angle of
not less than 45 degrees measured from the
vertical
Te employer must ensure the the Spoil Pile is
piled so that:
o the leading edge is at least 1 metre away from
the edge of the excavation
o the slope of the spoil pile adjacent to the
excavation is at an angle of not more than 45
degrees from the horizontal, and
o loose materials are scaled and trimmed from
the spoil pile
Te method of identifcation of underground
facilities
Te method of exposure methods and pressures
G
r
o
u
n
d

D
i
s
t
u
r
b
a
n
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
42
Standard Safety Practices Manual
43 42
involved
Safety and environmental procedures for dealing
with encountered or compromised underground
facilities
Specifc excavation considerations such as soil
type, consistency, natural angle of repose, slurry
disposal, contamination, preexcavated, and spoil
pile placement
Size of excavation, proximity to trafc, stability
of adjacent improvement, structures, vibration
producing equipment, load placement distances
and wieght distribution relating to the excavation
(vehicles, equipment, piping, lay down areas, etc)
Engineering certifcation and design require-
ments for excavations > 6 metres (4.6 metres BC)
Methods to stabilize excavation faces, ramping
and proper access & egress points, maintain a
safe atmsophere, establish degradation factors
(heat, cold, water, soil fuid pressures, environ-
mental conditions)
Te work to be carried out, the number of work-
ers and tools and equipment in the excavation,
PPE requirements and the need for a safety
standby
5.6 During the job, in accordance with the permit,
ground and atmospheric conditions must be con-
tinually monitored for changing conditions.
See gHSSEr MS830.
5.7 Heavy equipment (including pickup trucks) must
not cross a pipeline unless it is properly ramped or
there is a minimum of 1.5 metres of ground cover.
Te pipeline owner may have more stringent requir-
ments therefore this should always be addressed in
the pre-project meeting.
6.0 Scope of Forms
G
r
o
u
n
d

D
i
s
t
u
r
b
a
n
c
e
Standard Safety Practices Manual
42
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
43 43
6.1 gHSSEr MF 84001-BP Canada Energy Ground
Disturbance Permit
6.2 gHSSEr MF 88001 BP Canada Work Permit and
Hazard Assessment
7.0 Scope of References
7.1 Alberta General Safety Regulations AR 448/83 as
amended. Part 32
7.2 B.C. Occupational Health and Safety Regulation
and Guidelines 296/97 as amended
7.3 Ontario Regulation 213 Construction Projects - Part
III Excavations, as amended gHSSEr MS820-
Confned Space Entry Practice
7.4 gHSSEr MS830- Working in a Combustible Gas
Environment Practice
LIFTING AND RIGGING PRACTICE
1.0 Scope and Applicability
1.1 Tis practice applies to all BP Canada Gas Perfor-
mance Unit (CGPU) employees, contracted employ-
ees, contractors and other visiting personnel doing
lifting and rigging operations on CGPU premises
and work sites.
1.2 Te purpose of the practice is to identify safe lifting
and rigging procedures, when it is necessary to
prepare a lifting plan and to make certain all neces-
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
44
Standard Safety Practices Manual
45 44
sary pre-planning has been accomplished when heavy
loads and/or long booms will be in proximity of
operating equipment.
1.3 Te practice defnes training and certifcation
requirements for crane operators, crane inspection,
maintenanace requirements and fundamental operat-
ing requirements used throughout the BP Canada
Gas Performance Unit (CGPU).
1.4 Te practice defnes circumstances and requirements
that classify a lift to be Critical, and if deemed criti-
cal, requires that the Critical Lift form be completed,
signed, and executed by all responsible parties associ-
ated with the lift.
2.0 Scope of Responsibility
2.1 Each worker is responsible for recognizing lifting and
rigging hazards and taking corrective measures to
ensure that this practice is followed.
2.2 Te on-site BP representative in charge or designate
must ensure:
Emergency response plans are in place to ad-
dress specifc Lifting and Rigging hazards for
the job at hand
Tat the workers are trained and competent
to operate the cranes and/or hoists or rig up
for lifting as required for the work at hand
All cranes, hoists and rigging equipment are
properly labelled and inspected daily prior to
work commencing
Tat the safety devices installed on the lifting
equipment are operational
A hazard assesment is completed prior to start-
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
44
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
45 45
ing work that includes identication of the
loads involved and that the lifting equipment
is adequate and otherwise ready for service for
those loads. It will identify that the lift is clear
of overhead obstacles, that workers are aware
of the hazards and there is a clear understand-
ing of communication methods and what
hand signals are to be used, and how the load
is to be balanced and directed throughout the
various stages of the lift
Tat all workers are trained in STOP-
THINK-GO and Time Out for Safety and
feel comfortable in being able to exercise these
tools
3.0 Scope of Training, Certication and Com-
petencies
3.1 Only trained and competent authorized personnel or
trainees under the direct supervision of trained and
competent authorized personnel will be permitted to
operate cranes and hoists or rig up for lifting.
3.2 Te employer of crane operators and riggers will co-
ordinate the training and will maintain the training
records.
3.3 Crane Operators will have:
Appropriate Provincial Crane Operators Certif-
cate or an Inter-Provincial Certicate
Te Alberta Apprenticeship has 3 defned ap-
prenticeship programs for lifting and hoisting
Mobile Crane Certifcation 3 year program,
capable of lifting > 45 tons.
Boom Truck Certifcation is required when
operating:
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
46
Standard Safety Practices Manual
47 46
a) Booms (including telescoping booms and ar-
ticulating booms possessing live lines) capable
of swinging, hoisting and booming up and
down with a lifting capacity of greater than 5
tons and less than 45 tons
b) Articulation booms without live lines with a
lifting capacity of greater than 8 tons and less
that 45 tons
Wellhead Boom Truck to work in this trade
a person must be a registered apprentice or a
certied journeyman or hold a recognized trade
certicate. A wellhead boom truck may be used
for one or more of the following:
1. Wellhead pumping operations.
2. Wireline operations
3. Perforation operations
4. Coiled tubing operations
5. Snubbing operations
6. Rig up and rig out of slant service rigs.
All operators of lifting devices rated > 2000
kilograms shall be certied as a journeyman op-
erator or enrolled in the Alberta Apprenticeship
system. Operators of lifting equipment that is
rated at < 2000 kilograms must be able to show
competence to the items below:
1. Sound working knowledge and understand-
ing of the use of hardware and equipment
2. Ability to read,understand and implement
lift plans and drawings
3. Ability to recognize hazards and risks
within the lift area, have a clear understand-
ing of lift dynamics, and have previous
experience or familiarity with the type of
lift to be performed
3.4 Riggers will have:
Knowledge of equipment
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
46
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
47 47
Experience with lift procedures
Working knowledge of relevant practices, codes
and practices
Ability to prepare and interpret site and lift plans
and drawings
Knowledge of hand signals
4.0 Scope of Inspection and Maintenance
4.1 All cranes, hoists and rigging equipment will be
installed, erected, checked, labelled, examined,
inspected, tested, operated, maintained and repaired
in accordance with the appropriate practice listed in
the applicable provincial regulations.
4.2 All lifting devices (i.e. Davitt Arms) must be certifed
by an engineer and properly labelled for capacities.
4.3 All cranes on CGPU sites must have the most recent
appropriate inspection documentation on site as per
5.1.
4.4 If an incident occurs with lifting equipment (i.e.
shock loading to the boom, sling breaks during lifts),
and damage is suspected, the crane shall be taken out
of service until it is recertied in safe operability.
4.5 All cranes and hoists will receive preventative
maintenance based on usage and manufacturers
recommendations.
4.6 All rigging equipment will be inspected to prior to
each usage to ensure the integrity of the equipment.
All damaged rigging equipment will be removed
from use immediately and destroyed or discarded
or repaired and certied by the manufacturer. (See
Appendix 1 for guidelines regarding sling damage).
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
48
Standard Safety Practices Manual
49 48
5.0 Scope of General Operation
5.1 A substantial and durable rating chart with clearly
legible letters and gures will be provided with each
crane and securely xed to the crane cab in a con-
spicious location visible to the operator while seated
at the controls.
5.2 Cranes will not be operated without the full amount
of any ballast or counterweight in place as specied
by the manufacturer. Te ballast or counterweight
in place that is specied by the manufacturer will not
be exceeded.
5.3 When a crane is to be operated near energized
overhead electrical power lines, a clearance of 3
meters will be maintained as an absolute limit of
approach with the boom, block, and load to ensure
safe operation and eliminate hazards of electrocution.
A crane in transport with the boom or mast lowered
can come within 2 meters of an energized line. If
the voltage is greater than 50kv, the clearance shall be
increased 10 centimeters for every 10kv over 50kv.
5.4 Te crane operator will not lift or carry any load over
or above personnel. Te area of the lift over which
the load is carried should be barricaded (i.e. roping,
taping) and signed. All unnecessary personnel will be
restricted from the barricaded area.
5.5 No hoisting, lowering, swinging, or traveling will be
done while personnel is on the load or the hook.
5.6 All crane hooks must be equipped with a positive
locking safety latch.
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
48
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
49 49
5.7 Te crane operator must test the brakes each time a
load approaching the rated load is handled by raising
it a few inches and applying the brakes.
5.8 Once a load is hooked up, the load is the responsibil-
ity of the crane operator.
5.9 Te command STOP may be given by anyone and
must be obeyed by everyone including the crane or
hoist operator.
5.10 Backhoes, track hoes, front-end loaders, side loaders
and similar earth moving equipment may be used
only for incidental lifting in which they are designed.
Such use of this equipment shall comply with the
equipment manufacturers requirements, specica-
tions and designs for lifting.
5.11 While making lifts, cranes equipped with outriggers
will have them fully deployed whenever possible.
Wood blocks used to support outriggers must be
strong enough to prevent crushing, be free of defects,
and be of sucient width and length to prevent
shifting or toppling under load.
5.12 Tools, oil cans, waste, extra fuses and other necessary
articles will be stored in the tool box and not be
permitted to lie loose in or about the cab.
5.13 Cranes will not be refueled while the engine is run-
ning.
5.14 A carbon dioxide, dry chemical, or equivalent fre
extinguisher will be kept in the cab or the vicinity of
the crane, with easy accessibility.
5.15 Use of a fag man is required to direct the lifting
operator in a blind zone. Te fag man should be
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
50
Standard Safety Practices Manual
51 50
competent in the use of signalling to direct the lift
operator.
6.0 Scope of Rigging the Load
6.1 Only competent riggers will attach a load. A com-
petent rigger must have sucient knowledge of hand
signals and rigging loads and procedures. Prior to a
lifting operation, STOP, THINK, GO and ensure
communication and hand signals are reviewed.
6.2 Ensure that the hoist rope is free from kinks or
twists. Do not wrap the hoist rope around the load.
6.3 Ensure that the load will be attached to the hook by
means of slings or other approved rigging devices.
6.4 Take care to make certain that the sling clears all
obstacles (i.e. sharp edges, portruding objects).
7.0 Scope of Hoisting Operation
7.1 Center the crane over the load before starting the
hoist to avoid swinging the load as the lift is started.
7.2 Te crane operator must make sure the load is well
secured and properly balanced in the sling or lifting
device before it is lifted more than a few inches. A
test lift should be performed.
7.3 Loads should not be swung by the crane to reach
areas not under the crane. Crane hoisting should be
kept vertical. Cranes will not be used for dragging
loads sideways.
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
50
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
51 51
7.4 During hoisting, care should be taken so that there is
no sudden acceleration or deceleration of the moving
load.
7.5 Do not make lifts beyond the rated local capacity of
the crane, slings, chains, cables or any other rigging
and lifting equipment.
7.6 On truck mounted cranes, no loads will be lifted
over the cab of the vehicle except as approved by the
crane manufacturer.
8.0 Scope of Holding the Load
8.1 Te crane operator will not be permitted to leave
their position at the controls while the load is sus-
pended. Do not leave unsupervised loads suspended.
8.2 Neither the load nor the boom will be lowered below
the point where less than ve full wraps of cable
remain on their respective drums.
9.0 Scope of Moving the Load
9.1 Before moving the load, ensure all slings, chains, or
other load lifting devices are fully seated in the saddle
of the hook.
9.2 Everyone in the immediate area must be clear of the
load and aware that a load is being moved. When
raising, lowering, or moving loads, a horn or some
other method of warning must be used to warn
personnel in the area that a lift is taking place.
9.3 Tag lines of sufcient length must be used to steady
or guide the loads as they are being moved unless
they would not be efective (e.g. extremely heavy
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
52
Standard Safety Practices Manual
53 52
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
large loads) or creating an uncontrolled hazard. Rig
matting may be moved without tag lines with the
load less than 1 meter from the ground and workers
standing back from the load.
10.0 Scope of Travelling
10.1 When travelling without a load, the empty hook
should be secured.
10.2 Speed should be kept to a minimum and should not
exceed manufacturers recommendations.
10.3 Before travelling a crane with a load, the crane opera-
tor will be responsible for ensuring position of the
load, boom location, ground support, travel route,
and speed of movement. When travelling with a
suspened load, ground speed should not exceed
5kph. Te crane will have a ground or vehicle guide
to escort them so that travel can be conducted in the
safest manner possible.
10.4 A crane, with or without a load, shall not be travelled
with the boom so that it may bounce back over the
cab.
11.0 Scope of Critical Lift Requirements
11.1 A lift will be considered Critical and a Critical Lift
Plan will be completed when any of the following
conditions or circumstances exists.
11.2 All lifts made over operating process equipment.
Standard Safety Practices Manual
52
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
53 53
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
11.3 Single crane lifts when the total load exceeds 80% of
the cranes load chart.
11.4 Two or more cranes are required for a single piece
of equipment. Boom cats during pipeline stringing
operations would not be considered a critical lift.
11.5 Utilization of poles and derricks that have been
erected for a specic lift.
11.6 If power lines are within twice the maximum swing
radius of the crane, plus the required voltage clear-
ance. Minimum clearance is 3 meters for voltages up
to 50 kilovolts (kV) and distances increasing by 1.5
meters for every extra 150 kV.
11.7 Lifting of personnel. Manbaskets must engineered
and visually inspected before the lift is made. Lifts of
personnel utilizing man baskets must conform to 29
CFR 1926.550 (g).
11.8 BP CGPU or contract employee requests a lift plan.
12.0 Scope of the Critical Lift Plan
12.1 Te contractor performing the Critical Lift must
develop a Critcal Lift Procedure and must include
a Critical Lift Checklist which must reviewed by a
BP CGPU representative. (see Appendix 3 for an
example).
13.0 Drilling and Well Servicing
13.1 Drilling and Service rigs will be maintained and
inspected in accordance with the manufacturers and
American Petroleum Insitudes (API) specifcations.
Certifcation of Masts will be in accordance of CA-
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
54
Standard Safety Practices Manual
55 54
DOC Recommended Practice 1.0, 2.0. 3.0 and 4.0.
13.2 Drilling and Service rigs will also follow Part 37, Oil
and Gas Wells, in the OH&S code in which lifting
related equipment is referenced.
14.0 Scope of Appendices
APPENDIX 1- Sling Checklist
APPENDIX 2- Sling Operating Practices Guidelines
APPENDIX 3- Example of a Critical Lift Plan
completion/Approval Checklist
APPENDIX 4- Initial Crane Inspection
APPENDIX 5- Daily Crane Inspection
15.0 Scope of References
15.1 Alberta General Safety Regulation AR 448/83 as
amended
15.2 B.C. Occupational Health and Safety Regulation
and Guidleines 296/97 as amended
15.3 CAODC Recommended Practices
15.4 Albertas OH&S Act, Regulation and Code Ontario
Regulation 851 Industrial Establishments and
Regulation 213 Construction Projects, as amended
16.0 Forms
gHSSEr MF 34004 Pre-Job Risk Assessment
gHSSEr MF 88001-BP Canada Energy Com-
pany Hot Work/Cold Work Permit
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
54
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
55 55
APPENDIX 1
Lifting and Rigging Practice - Sling Guidelines
Tis checklist is to be referred to prior to the use of
any slings for lifting and rigging procedures. If any of
the following checklist items are identied as an issue,
remove the sling from use immediately.
1) Does the synthetic sling(s) have a rated capacity
tag that is clearly legible?
2) Are there any acid or alkalis burns on the
sling(s)?
3) Is there any melting, charring, or weld spatters
on any part of the sling(s)?
4) Are there any holes, tears, cuts, snags or embed-
ded particles in the sling?
5) Is there any broken or worn stitching in load
bearing splices?
6) Are there signs of excessive abrasive wear?
7) Are there are knots in any part of the sling?
8) Is there any evidence of distortion, excessive pit-
ting, corrosion or broken fttings on the sling(s)?
9) Are there any conditions which cause doubt as to
the strength of the sling?
APPENDIX 2
Sling Operating Practices Guidelines
1) Determine the weight of the load. Te weight of
the load shall be within the rated capacity of the
sling.
2) Select the sling(s) having suitable characteristics
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
56
Standard Safety Practices Manual
57 56
for the type of load, hitch and environment.
3) Slings shall not be loaded in excess of the rated
capacity. Considerations shall be given to the
sling load angle which afects rated capacity.
4) Slings with fttings that are used as a choker
hitch shall be of sucient length to assure that
the choking action is on the webbing, and never
on a tting.
5) Slings used in a basket hitch shall have the load
balanced to prevent slippage.
6) Te opening in fttings shall be the proper shape
and size to insure that the tting will seat prop-
erly in the hook or other attachments.
7) Slings shall always be protected from being cut
by sharp corners, sharp edges, protrusions or
abrasive surfaces.
8) Slings shall not be dragged on the foor or over
an abrasive surface.
9) Slings shall not be twisted or tied into knots, or
joined by knotting.
10) Slings shall not be pulled from under loads if the
load is resting on the sling.
11) Do not drop slings equipped with metal fttings.
12) Slings that appear to be damaged shall not be
used unless inspected and accepted.
13) Te sling shall be hitched in a manner providing
control of the load.
14) Personnel, including portions of the human
body, shall be kept from between the sling and
the load, and from between the sling and the
crane hook or hoist hook.
15) Personnel shall stand clear of the suspended load.
16) Personnel shall not ride the sling.
17) Shock loading shall be avoided.
18) Twisting and kinking the legs (branches) shall be
avoided.
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
56
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
57 57
19) Load applied to the hook shall be centered in the
base (bowl) of the hook to prevent point loading
on the hook.
20) During lifting, with or without the load, person-
nel shall be alert for possible snagging.
21) Te slings legs (branches) shall contain or sup-
port the load from the sides above the center of
gravity when using a basket hitch.
22) Slings shall be long enough so that the rated
capacity of the sling is adequate when the angle
of the legs (branches) is taken into consideration.
23) Place blocks under load prior to setting down
the load, to allow removal of the web sling, if
applicable.
24) Nylon and polyester slings shall not be used at
temperatures above 90 degrees C.
25) Exposure to sunlight or ultra-violet light
degrades the strength of slings. Store slings in a
cool, dry and dark place when not in use.
APPENDIX 3-Example of a Critical Lift Plan
Critical Lift Plan
Completion/Approval Checklist
Note: All applicable forms (Lift Plan, Lifting Near Electri-
cal Hazards Safety Form, etc.) and drawings/plans (Rigging
Drawing, Lifting Site Plot Plan, etc.) must be attached to
this completion/approval checklist prior to the approval
meeting and for the duration of the lift.
Job Name: _____________________________________
Date Lift Expected To Take Place:
Planned Duration Of Lift: hrs.
Site/Ground Evaluation/Preparation:
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
58
Standard Safety Practices Manual
59 58
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Answer YES or NO
(if NO provide explanation and justication of in space
provided after each section)
A detailed site plot plan has been prepared and
includes crane(s) location, all above ground
hazard or obstructions, all underground
hazards, and load travel paths to be utilized
during the lift.
Ground conditions surrounding the crane
location, as indicated in the attached site plot
plan; have been evaluated for underground
hazards such as underground piping,
conduit, and uncompacted backll from
recently lled excavations. Any potential
underground hazard and the position of the
crane has been noted on the site plot plan.
All open excavations in the lift area have
been examined for their potential efect on
the lift in question. All open excavations in
the lift area have been noted on the site plot
plan.

Ground stability has been evaluated and
documented in the attached report for ability
to support the bearing surface of the lifting
equipment being used. All conditions that
may afect the ability of the ground to support
the load, such as dynamic or impact loads,
swing rates and sudden load stops have been
examined. Bearing mats are required if any
question exist as to the grounds ability to sup-
port the lift in question.
Construction details of the bearing mats,
Standard Safety Practices Manual
58
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
59 59
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
if required, are attached and have been
reviewed.
Cranes(s):
Te lift plan for each crane used to support
the load has been completed, reviewed and is
attached to the critical lift plan.
A detailed crane conguration drawing has
been completed, for each crane used to sup-
port the load, and includes, but is not limited
to, boom conguration to be used, the mini-
mum boom angle to the ground, maximum
boom length, maximum operating radius,
minimum jib ofset angle to the ground (if
applicable), to be used during the lift.
Te maximum allowable wind speed has been
established, based on crane manufactures
recommendation and load conguration, and
is clearly labeled on the crane conguration
drawing.

Te percent crane capacity, as noted on the
lift plan, has been veried and the cranes load
chart used to complete the lift plan has been
attached to the critical lift plan.
Load:
A detailed drawing of the load has been
completed and is attached to the critical lift
plan. Te detailed load drawing will show,
at a minimum, information pertaining to the
weight of the load, including any auxiliary
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
60
Standard Safety Practices Manual
61 60
equipment such as ladders, platforms, piping,
insulation, etc. that may be attached to the
load prior to the lift, lifting and tailing lugs
available on the load and their orientation,
anchor bolt pattern of the load, and anchor
bolt pattern of the loads foundation. Any
special lifting requirements will also be clearly
stated on the detailed load drawing.
All information on the detailed load drawing
has been veried for accuracy.
Rigging:
A detailed rigging drawing has been com-
pleted and is attached to the critical lift plan.
Te detailed rigging drawing will show, at a
minimum, all rigging to be utilized for the
lift, including shackles, slings, I-bolts, spreader
bars, chain falls, etc., the conguration of all
rigging, including angles and lengths, attach-
ment to the load and crane.
All information on the detailed rigging draw-
ing has been reviewed and veried acceptable
for the lift in question.
Lift Logistics:
A logistics plan has been prepared and is
attached to the critical lift plan. Te logistics
plan addressing, at a minimum, the travel
path of the crane or cranes supporting the
load, swing radius of the crane or cranes sup-
porting the load, the travel path of the load,
placement of Signal Person(s), communica-
tions between the Signal Person(s) and the
crane operator(s), securing the load once it is
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
60
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
61 61
in place, and access to disconnect the rigging
from the load once the load is secured.
All information in the logistics plan has been
reviewed and is acceptable for the lift in ques-
tion.
Critical Lift Plan Approvals:
Area Manager:
Project/Construction Engineer:
Rigging Inspector:
Job Representative:
Te following items must be addressed on the day of the
lift.
Te Emergency Response Coordinator has
been notied of the lift in question.

Te crane location is in accordance with the
location noted on the site plot plan.
Te crane conguration is in accordance with
the detailed crane conguration drawing.
Te rigging conguration is in accordance
with the detailed rigging drawing.
Te Rigging Inspector has obtained the cur-
rent wind speed and has noted the current
wind speed and the maximum allowable wind
speed in the spaces provided. Te current
wind speed is equal to or below the maximum
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
62
Standard Safety Practices Manual
63 62
allowable wind speed
mph - Current Wind Speed
mph - Maximum Allowable
Wind Speed

A detailed pre-lift safety meeting has been
held and included ALL individuals involved
or afected by the critical lift in question and
covered all details associated with the lift.
Critical Lift Pre-Lift Safety Meeting Attendance:
By signing this form, the following individuals are indicat-
ing they have actively participated in the pre-lift safety
meeting for the critical lift in question and fully understand
the scope of the lift to be made and their assigned roles and
responsibilities.
Equipment Operator:
Rigging Inspector:
Signal Person/Rigger:
Signal Person/Rigger:
Operations Representative:
APPENDIX 4
Initial Crane Inspection
Date: ____________________________
Inspection By. _____________________
_____________ Is Crane Certication Current? Please
include date of certication
____________ Is Operator Certication Current?
____________ Is the size of the crane adequate for the
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
62
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
63 63
jobs anticipated?
____________ Is there a current log book kept with the
crane?
APPENDIX 5
Daily Crane Inspection
Date: ____________________________
Inspection By: _____________________
___Lubrication (gears, pulleys, pins, wire rope)
___Log (check previous reports or logs)
___Cylinders (fttings, hoses, leaks, seals)
___Bolts/Pins ((loose, missing, damaged)
___Capacity (limitations, plate, rigging, chart, log)
___Hoses (leaks, flters, wear secure, connections)
___Manual (familiar with operator/maintenance manual)
___Controls (movement, swing, telescope)
___Brakes (functioning, limit switch)
___Outriggers (functioning, limit switch)
___Pads (large enough, strong enough, good condition)
___Hydraulic Fluid (level ok, flter ok)
___Boom (wear, dents, bolts, pins, cables, sheaves)
___Engine (belts, flters, wiring, PTO)
___Work Area (clean, access, barricades, workers)
___Obstructions (clearances, power lines, vehicles)
___Ground (frm, level, dry)
___Load (capacity, weight known)
___Cable (kinks, damage, wear, capacity)
___Rigging (capacity, fttings, hardware, clips)
___ Rigger (understanding of hand signals, roles, high
L
i
f
t
i
n
g

O
p
e
a
r
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
64
Standard Safety Practices Manual
65
M
O
C
64
visibility vest)
___Hook (bent, twisted, safety catch, wear, cracks)
___Sheaves (cable fts, wear)
___Track or tires (clean, free of debris, condition)
MANAGEMENT OF CHANGE PRACTICE
1.0 Purpose, Scope and Applicability

1.1 Management of Change (MOC) is a system to evalu-
ate, authorize and document changes before they are
made and ensure proper closure after the changes are
completed.
1.2 Its purpose is to establish the procedures necessary to
ensure that the risks arising from proposed changes
are managed to an acceptable level.
1.3 Te MOC practice applies to all permanent, tempo-
rary and emergency changes to organization, stang
levels, systems, procedures, equipment, products,
materials or substances.
1.4 MOC practice is also an excellent communica-
tion tool to inform impacted groups or areas that a
change is being considered and/or about to occur.
1.5 Te practice is designed to insure compliance with
gHSSEr Element 7 and Group Process Safety and
Integrity Management Practice Element 2.
1.6 Te practice covers modications intended for
implementation by BP personnel and contractors, as
well as projects designed by an approved engineer-
Standard Safety Practices Manual
64
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
65 65
ing contractor, but does not apply to project scope
changes which are managed by the engineering
contractor using their internal processes.
1.7 Te practice should be applied when assessing any
signifcant change in BP operations in the (CGPU),
in particular:
Modifcations to plant facilities and equipment
Changes to the organization
Modifcations to wells within the well integrity
envelope
Changes to critical information and procedures
Changes to IT systems and softwar
1.8 It is the intention of this process to highlight changes
that afect the original design intent of the facility,
which includes facility and equipment, organization-
al structures and supporting documentation, with
the intention of maintaining an auditable trial from
the original design through to the current status. Te
application of this process provides this audit trail.

1.9 It is not necessary to follow this practice when:
Routine activities covered by practice
maintenance and operations procedures (e.g.
scafolding) are undertaken under other safety
management controls, such as safe systems of
work and permits
Carrying out replacement-in-kind work
Replacing an individual with someone having
the same competencies
If you are not sure whether an MOC practice is
required, access this web link to an MOC deci-
sion tree:
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
66
Standard Safety Practices Manual
67 66
Technical MOC Practice Decision Tree
1.10 A Temporary change is not intended to be perma-
nent (e.g. 30, 60, 90 days) and will not exceed the
indicated timeframe for the change without an ad-
ditional authorization and review. SmartMOC can
be used to record the termination/reassessment date
and forward a reminder task to the SPA.
1.11 An Emergency Change is one in which personnel
assume the responsibility to make a change without
invoking the full MOC practice. Tis type of change
is justied when the following circumstances exist:
Immediate danger to personnel
Potential for major equipment damage
Potential for major operational loss
Serious environmental impact
Community complaint
Regulatory violation
In spite of the fact that emergency change initially by passes
the formal change process, it is vital that there be at least
one review with a minimum of three people, preferably
from diferent disciplines and the change must be approved
by a Technical Authority or line supervisor. Only in true
life-or-death situations where minutes count can a single
person assume full responsibility for making a change
without reviewing that change with others. Te formal ap-
plication of the MOC practice must follow the emergency
change as soon as possible.
1.12 Organizational Change can range from substitu-
tion of personnel to the elimination of positions.
Changes to the organizations structure and respon-
sibilities are refected in HSSE responsibilities and
accountabilities; therefore, organizational change
whether permanent or temporary must formally
assess and recorded.
M
O
C
Standard Safety Practices Manual
66
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
67 67
1.13 An Administrative Change is one that impacts a pol-
icy, procedure, process or form and includes changes
from regulators or outside agencies. Tese changes
stand alone and are not initiated as the consequence
of a Technical or Organizational change. Policies,
procedures, processes or forms afected as a result of
a Technical or Organizational change are resolved as
part of the original instigating change.
1.14 Managing a change to a DCS (Distributed Control
System) or a SCADA (Supervisory Control and Data
Acquisition) system requires completion of specifc
records for assurance. Details of how to manage this
type of change are available at the following web
link:
MOC practice for SCADA Change Worksheet
2.0 Roles and Responsibilities
2.1 In summary, the MOC practice requires com-
petent personnel in the following three areas:
Initial approval and risk assessment: Facilitator
and Approval Authorities
Implementation of change: Single Person Ac-
countable, Gatekeeper and Assurance role
Performance Unit technical authority frame-
work: Engineering Authorities, Technical
Authorities and Technical Reviewers
2.2 Te key process roles in the MOC practice are the
Facilitator and Approval Authorities. Tey have the
following roles and responsibilities:
2.2.1 Te Facilitator:
Facilitators will be appointed for each major site
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
68
Standard Safety Practices Manual
69 68
or group of smaller sites
Tey are typically the Management of Change or
Process Safety Management Coordinators
Facilitators must be properly trained in the
change assessment methodology being used
Tey should have detailed knowledge of the site,
its hazards and procedures
Te Facilitators are responsible for:
o Logging data associated with the change into
the SmartMOC system
o Selecting the appropriate method of assess-
ment and managing the process
o Identifying which Technical Authorities
should be involved in the assessment of risk
associated with a given change proposal
o Making recommendations, including condi-
tions for implementation and such monitor-
ing requirements as deemed necessary, to the
Approval Authority
o Ensuring that the assessment team includes all
necessary knowledge and competence for the
change being assessed
o Maintaining a record of the status of all MOC
practice documentation
o Recommending improvements to this proce-
dure
Note: Te Facilitator and the Approval Authorities cannot
be the same person
2.2.2 Te Approval Authority:
Approval Authorities should be appointed for
each major site or group of smaller sites
Tey will typically be the Manager, or their
designate(s) based on their role, responsibility,
accountability and delegation of authority
Te formal delegation of authority for MOC
M
O
C
Standard Safety Practices Manual
68
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
69 69
practice within CGPU can be accessed at the
following web link:
Approval Authority for MOC practice
Te Approval Authority is responsible for:
o Initial approval or rejection, within the
Performance context, of a change to proceed
to assessment
o Nominating a Facilitator to manage the assess-
ment
o Setting the initial workfow schedule for the
change
o Accepting the outcome of the assessment and
approving, or not, the change to move to
implementation. In this role, if appropriate,
they will identify the implementation process
o Ensuring that any changes stay within defned
scope and that the recommendations from the
assessment are fully implemented
o Ensuring that the roles within the MOC prac-
tice are carried out by competent personnel
o Feedback to the Originator or Facilitator
when rejecting a proposal
o Ensuring appropriate fnancial support for the
change
Note: Te Facilitator and the Approval Authority cannot be
the same person
2.3 Te key process roles in the implementation of any
approved change are the SPA, the Gatekeeper and
the Assurance role. Tey have the following roles
and responsibilities:
2.3.1 Te Single Point Accountable role (SPA):
Te SPA person will be recommended as part of
the approval process
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
70
Standard Safety Practices Manual
71 70
Te SPA is responsible for:
o Implementation and management of the ap-
proved change through the MOC practice
o Implementing recommendations from an
MOC practice, including updating documen-
tation
o Maintaining the change within the scope
assessed by the MOC practice and ensuring
that any changes to the scope are adequately
assessed
o Completing the Pre-Startup Compliance
Review when the change is managed using the
MOC practice
2.3.2 Te Gatekeeper role:
Te Gatekeeper will be recommended as part of
the approval process if the change is managed
outside the MOC practice
Te Gatekeeper will typically be responsible for:
o Te funding budget, but the Approval
Authority will be responsible if the change is
implemented within the MOC practice
o Approving the stages of the implementation
process, in particular, sanction of the scope,
cost and timescale
o Providing or obtaining resources for imple-
mentation of the change
o Completing the Pre-Startup Compliance
Review when the change is managed using an
outside process
2.3.3 Te Assurance role:
Will be recommended as part of the approval
process and will typically be the Facilitator
Te Assurance role is responsible for:
o Attesting that the change has addressed the
risks and actions identied in the assessment
M
O
C
Standard Safety Practices Manual
70
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
71 71
o Attesting that the change has been controlled
within the scope of the original MOC as-
sessment, or that any changes to the original
scope have been adequately assessed
o Liaising with the Gatekeeper, during imple-
men tation of the change through
another process, to ensure adequate resources
are available
o Assisting the SPA or Gatekeeper to document
the Pre-Startup Compliance Review
2.4 Te Performance Unit Technical Authority Frame-
work:
o Te key roles in the CGPU Technical Author-
ity framework supporting MOC practice are
Engineering Authorities, Technical Authorities
and Technical Reviewers
o Te roles and responsibilities of these authori-
ties are detailed in the CGPU Engineering
and Technical Authorities Register
o Te Register can be accessed through the fol-
lowing web link:
Technical Authorities Register Rev 2
2.4.1 Te Engineering Authoritys responsibilities
for MOC practice are:
Technical approval authority for MOC practice
proposals dened as high risk
Assures compliance with the engineering aspects
of Management of Change
2.4.2 Te Technical Authoritys responsibilities for
MOC practice are:
Technical approval authority for MOC practice
proposals dened as medium risk providing:
o Independent assessment of the risks associated
with the proposed change
o Review of the key documents related to the
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
72
Standard Safety Practices Manual
73 72
proposed change
o Specication of the maximum implementa-
tion period for temporary modications
o Independent technical arbitration
2.4.3 Te Technical Reviewers responsibilities for
MOC practice are:
Act as the point of contact for MOC practice
requests at the facility level within their assigned
discipline for changes dened as low risk
Provide requested technical advice and recom-
mendations within the required time frame
Specify the maximum duration permitted for
temporary deviations
Participate in Process Hazards Analyses as is ap-
propriate
Chair or participate in Management of Change
technical and safety reviews
Act as point of contact for new projects in area of
competency
Evaluate risk associated with each decision or
recommendation carefully and base technical
recommendations on reasonable risk
3.0 Supporting Technology
3.1 Te SmartMOC software program developed by Dya-
dem International, in relationship with CGPU, is the
database that supports MOC practice in the CGPU.
All facilities are encouraged to utilize the SmartMOC
program as it insures management of the process. A
log-in name and password are required to access the
software and can be obtained from your PSMC. Te
software can be accessed at the following website:
SmartMOC Log-in Page
4.0 Process Description
M
O
C
Standard Safety Practices Manual
72
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
73 73
4.1 All potential changes that are assessed by the MOC
practice are carried out through the following main
process steps. SmartMOC automates this workfow
so that as each step is completed, the change
advances to the next step and advises the identied
resource to expedite the change.
4.2 Initiation Step:
Any BP employee or full time contractor in
CGPU may initiate a change proposal under the
MOC practice
At this stage, the Initiator has the greatest knowl-
edge of the change and needs to communicate
that information in sucient detail to eliminate
delays in the evaluation of the change and in-
clude any supporting or relevant documentation
Te Initiator should:
o Identify the type of change: Technical, Admin-
istrative* or Organizational*
o Identify the implementation type: Permanent,
Temporary* or Emergency*
o Identify the location of the change, the date
initiated, their name and if they are represent-
ing others
o SmartMOC shares the Maximo equipment
database. Te database can be searched to
identify the equipment afected by the change
o Identify a title for the change.
o A unique le number will be generated by
Smart MOC
Defne the reason or scope of the proposed
change by including any relevant history or back-
ground of the problem or opportunity and any
other pertinent information
Identify the high-level risks they may be aware
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
74
Standard Safety Practices Manual
75 74
of associated with the change during its imple-
mentation, e.g. hot work required, equipment
shutdown, etc.
Include the potential opportunities presented
by the proposed change to improve things like
safety, integrity, production, environment, etc.
Suggest a high-level plan for achieving the
change. How would you make the change?
Estimate the cost of the change
Identify the Preliminary Approval Authority.
Tis will generally be the Initiators direct report
supervisor, but can be whomever is appropriate
to approve the change being proposed
Record the details in the Initiator Section of the
SmartMOC program and attach any supporting
documentation
* NOTE: Not available in Phase 1 deployment of Smart-
MOC, but the type can be noted in the comments section
and a task created for the removal date of a temporary
change.
4.3 Preliminary Approval Step:
o Based on the details presented in the Initiator
section the Approval Authority assesses if the
change proposal is worthwhile, taking into
account Performance context, likely cost and
benets
o If satised, the Approval Authority then
endorses the change in principal, assigns a
suitable Facilitator to carry out the Change
Assessment, and sets the initial workfow
schedule
o If the Approval Authority rejects the proposal,
the reason for rejection is recorded and the
process terminated with the feedback being
given to the Initiator
M
O
C
Standard Safety Practices Manual
74
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
75 75
o Record the details in the Approval Section of
the SmartMOC program
4.4 Change Assessment Step - General:
On acceptance of the assignment, the Facilitator
will instigate the change assessment:
o Ensure that the scope of the change and sup-
porting information is clear
o Ensure that all relevant information required
to assess the risks are identied and gathered
o Notify the appropriate evaluation personnel
and/or Technical Authorities
o Carry out the risk assessment with the ap-
propriate personnel
o Select the appropriate method for risk assess-
ment. Additional guidance on Process
o Hazard Analysis is available at the following
web link: http://psmcanada.bpweb.bp.com
A detailed record of the assessment should be at-
tached to the SmartMOC fle by the Facilitator.
Tis should include:
o Further clarication of the scope of the change
if required
o Te assumptions associated with the change
o Whether or not the change has been under-
taken before
o Te rationale behind the assessment technique
selected
o Te risks that are associated with all stages of
the change
o Te mitigation measures required
o Te plan to put in place the mitigation mea-
sures and the change
o Recommendations to proceed or reject the
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
76
Standard Safety Practices Manual
77 76
change
o Recommendations on the way that the modi-
cation should be implemented
o Recommendations for the SPA and/or the
Gatekeeper
4.5 Change Assessment Step - Technical Change:
Only a trained Facilitator can perform certain
types of Process Hazard Analyses. A list of
trained Facilitators within CGPU is available at
the following web link:
BP CGPU Facilitators
o Make an initial determination of the risk level
to identify the level of Technical Authority
required to approve the change
o Review safe process start-up, operation and
shutdown in the full range of foreseeable
conditions and scenarios including upsets
to insure the risks are reduced to as low as
reasonably practicable (ALARP)
o Review all activities required to maintain facil-
ity in a safe condition during the change
o Identify all activities required to insure a fully
functioning health, safety and environmental
protection program, and vigorous process
safety and integrity management systems
o Identify and include efects of the change on
the Emergency Response Plan
o Identify the Process Safety Information or
other documentation that will need to be
produced or updated as a result of the change
4.6 Change Assessment Step - Organizational Change:
Te key objective is to ensure that the changed
organization has the resources (human, time, in-
M
O
C
Standard Safety Practices Manual
76
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
77 77
formation, etc.), competency and motivation to
deliver without making unrealistic expectations
of people
Te risk assessment should use two approaches:
o Mapping of tasks and individuals from the old
to the new organization
o Scenario assessments should be made where
the reorganization impacts staf that may have
a role in handling or responding to crises such
as upsets and emergencies
o A knowledge based checklist to aid in assess-
ing organizational change are available at the
following web link:
Organizational Change Checklist
4.7 Change Assessment Step - Administrative Change:
Identify afected documents, systems, processes
and procedures
Ensure ISO-14001 document requirements are
met if they are afected
4.8 Change Recommendation Step:
Te Facilitator determines if there is a need to
identify a diferent Approval Authority based
on the category and ranking of the greatest risk
identied in the assessment
Te Facilitator meets with the Approval Author-
ity and briefs them on the output of the assess-
ment
Based on the results of the change assessment,
the Facilitator recommends whether the risks
associated with the change can be managed
At this session the Approval Authority should
make a check on the quality of the assessment
and documentation
Te implementation route for the change should
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
78
Standard Safety Practices Manual
79 78
also be discussed at the meeting
Te risk ranking also sets the workfow manager
in SmartMOC. Te workfow manager tracks
the completion of the change and monitors sub-
sequent steps in the process and sends reminders
if critical timelines approach
Record the details in the Assessment Section
of the SmartMOC program and attach any
checklists or PHA les developed
4.9 Sanctioning the Change Step:
Based on the review meeting, the Approval Au-
thority is responsible for deciding if the change is
justied
If it is, then the Approval Authority decides
whether the change will be implemented using
this MOC practice or another process. Other
processes can include the Project Management
Plan or other internal/external process
By sanctioning the change, the Approval Author-
ity is conrming that funding for the change is
also sanctioned
If not approved to proceed, the Approval
Authority records the decision not to implement
the change and informs the Facilitator and the
Initiator
Record the details in the Approval Section of
SmartMOC
4.10 Assurance Step:
As part of the handover, the Approval Authority
will identify the Assurance role
Te Assurance Role will verify that all the
requirements identied in the process to manage
the change and its risks are completed satisfac-
torily and there is a clear, transparent audit trail
M
O
C
Standard Safety Practices Manual
78
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
79 79
through supporting documentation
Tis assurance is defned in the Records Assur-
ance Form and the Pre-Startup Compliance
Review documentation
Te Assurance Role will perform this verifcation
step regardless of how the change is implemented
Record the details in the Assurance Section of
SmartMOC.
4.11 Handover Step:
Once approval has been given for the imple-
mentation the information and risks associated
with the change are communicated to the person
responsible for implementing the change
Tere are two types of handover associated with
change management:
o Handing over the assessment using the MOC
practice to an Single Point Accountable (SPA)
person to implement the change
o Handing over the remaining change
management activity to a Gatekeeper for
another supporting process or procedure to
manage the change
Record the details in the Handover Section of
SmartMOC
4.12 Handover for Implementation Using the MOC prac-
tice:
When a change has been sanctioned, and the
Approval Authority decides that it can be imple-
mented within this MOC practice, the job will
be handed over to the Single Point Accountable
person to implement the change
Changes that are implemented using the MOC
practice remain the responsibility of the Approval
Authority
Te SPA is responsible for planning, organizing,
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
80
Standard Safety Practices Manual
81 80
leading and controlling all resources associated
with completing the change:
o Te SPA can utilize SmartMOC to manage
tasks associated with completing the change
o PHA recommendations can be uploaded and
managed in SmartMOC directly from PHA
Pro software if it was utilized to record the
hazard analysis
If at any time the SPA cannot make the change
within the dened scope, the equipment should
be made safe and an additional MOC practice
raised to consider the additional changes
required
Record the details in the SPA Section of
SmartMOC

4.13 Handover for Implementation by a Supporting
Process or Procedure:
When a job has been sanctioned, and the
Approval Authority decides that it will be
implemented outside this MOC practice, the
change will be handed over to a Gatekeeper for
implementation in another supporting process or
procedure
Te supporting process is responsible for delivery
of the change
Changes that are implemented in this way
become the responsibility of the Gatekeeper
Changes to be implemented by supporting pro-
cesses or procedures will not be closed out in the
MOC practice until signed of by the Approval
Authority
Record the details Gatekeeper Section of
SmartMOC
4.14 Close Out Step:
Changes that are sanctioned and managed within
M
O
C
Standard Safety Practices Manual
80
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
81 81
the MOC practice, or another process, will be
kept open until the SPA or Gatekeeper informs
the Assurance Role that the change and all sup-
porting documentation is completed
When the Assurance role has verifed the change
is complete, they will inform the Approval
Authority that the change has been completed
within the scope of the assessment and that the
associated work and documentation is complete
Te Approval Authority will review the change
and conrm acceptance of the change by signing
of the MOC practice fle as complete
Te records of the MOC practice will be kept
until the end of the facilitys life
Record the details in the Completion Section
of SmartMOC
5.0 Support for Management of Change
5.1 Training for awareness of MOC practice is manda-
tory for all CGPU personnel. To facilitate the train-
ing, e-Training modules have been developed and are
accessed at the following web link:
Management of Change Practice Training
5.2 SmartMOC also has a comprehensive Help screen
system that explains the software in detail.
5.3 Super Users have been identifed for each Operat-
ing Centre and staf department in Calgary to aid
personnel with the transition to the new procedure
and software. For a list of these helpful and knowl-
edgeable individuals access the following web link:
MOC practice Coordinators by Area
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
82
Standard Safety Practices Manual
83 82
6.0 Performance Measurement
6.1 Te performance of the system will be assessed using
the following Key Performance Indicators:
Number of MOC practices closed out in time
(e.g. all formal documentation was completed
within 90 days of start-up)
Number of high risk MOC practices whose
close-out is overdue
7.0 Audit and Performance Review
7.1 Te Engineering Authority for CGPU (Manager,
Technical Integrity Group), or delegate, will monitor
compliance with the MOC practice on an annual
basis to conrm:
Te process is being correctly applied
Appropriate risk assessment processes are being
conducted
Technical Authorities are being involved appro-
priately
Temporary and permanent MOC practices are
closed out in a timely manner
8.0 Online Reference Documents
gHSSEr requirements of MOC
Getting HSSE Right
PSIM Practice Implementation Guide
Element 2 - MOC
SmartMOC software SmartMOC Log-in Page
E-Training Modules for MOC
Management of Change Training
Engineering & Tech. Authorities Register
Technical Authorities Register Rev 2
Delegation of Authority for MOC
Approval Authority for MOC
M
O
C
Standard Safety Practices Manual
82
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
83 83
Process Hazard Analysis Manual PSM/PHA
CGPU PHA Facilitators BP CGPU Facilitators
MOC practice Coordinators by Area
MOC Coordinators by Area
MOC practice for DCS & SCADA Changes
MOC for SCADA Change Worksheet
Do I need an MOC?
Technical MOC Decision Tree
http://psmcanada.bpweb.bp.com
9.0 Forms
Management of Organizational Change Checklist
gHSSEr MF36101
Pre-Start-up Compliance Review gHSSEr MF 36104
HSSE Review Checklist HSSEMF36102
Technical Review Checklist HSSEMF36103
Records Assurance Checklist HSSEMF36105
Chemical Assessment & Ranking Tool
gHSSEr MF36106
Checklist for Organizational Change
Organizational Change Checklist
Equipment Specifc Knowledge Based Checklists
Equipment Checklists
M
O
C
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
84
Standard Safety Practices Manual
85 84
M
O
C

















































Process Safety Management
Technical Integrity Group
Canada Gas Performance Unit

M A N A G E M E N T O F C H A N G E


Technical Management of Change Decision Tree

Figure 1
Standard Safety Practices Manual
84
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
85 85
M
O
C


Figure 2
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
86
Standard Safety Practices Manual
87 86
M
O
C


Figure 3
Standard Safety Practices Manual
86
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
87 87
PERMIT TO WORK AND HAZARD ASSESSMENT
PRACTICE
1.0 Scope and applicability
1.1 Tis practice applies to all BP Canada Gas
Performance Unit (CGPU) employees, contracted
employees, contractors and other visiting personnel
doing work on CGPU premises and work sites.
1.2 Tis practice addresses issuing and obtaining permits
to work within the CGPU and requirements for
completing task level hazard assessments.
1.3 Te purpose of this practice is to ensure that CGPU
employees, contracted employees, and contractor
staf use the proper permit to work and complete an
adequate task hazard assessment for the particular
job being undertaken.
1.4 Te types of permits covered in this Practice are:
Hot work permits
Cold work permits
Confned space permits
Ground disturbance permits
1.5 Te types of hazard assessments covered in this
Practice are:
Permit to Work and Hazard Assessment
Procedure
Job Safety Environmental Analysis (JSEA)
Stop Tink Go
Time Out for Safety
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
88
Standard Safety Practices Manual
89
P
e
r
m
i
t

t
o

W
o
r
k
88
1.6 Refer to North America Gas SPU Control of Work
Practice for requirements around permitted activities
and risk assessment requirements.
2.0 Denitions
2.1 Area Authority (AA)- Te Area Authority is the
person appointed by the OCM or Wells Team
Leader for confrming all work activities conducted
are consistent with the COW Practice and associated
practices and permit requirements. In the case of
major projects, the Project Manager, in consultation
with the OCM or Wells Team Leader, will assign
the AA. Tis role can be delegated to another person
who is a BP Employee or contractor.
2.2 Issuing Authority (IA)- Te Issuing Authority is
the person appointed by the OCM or Wells Team
Leader- and assigned by the AA for issuing permits
consistent with all associated practice and permit re-
quirements. In the case of major projects, the Project
Manager, in consultation with the AA, will assign the
IA.
2.3 Performing Authority (PA)- Te PA is the person
who has been assigned by the AA to be responsible
for activities carried out on the work site, and is
accountable to the IA/AA for the safe delivery of all
work activities. Ta PA may be performing a task or
may be supervising a group that is performing a task.
In special cases the PA may also be the IA if compe-
tent in the practice and requirements in question.
2.4 Person in Charge (PIC)- Te PIC is appointed by the
AA to be responsible for coordinating among mul-
tiple PAs and IAs working at one site to confrim safe
delivery of all work activities. Te PIC is an onsite
Standard Safety Practices Manual
88
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
89 89
individual that has working knowledge of all work
activities being performed by all groups/personnel
working on location. Te PIC can be the AA. IA, or
one of the PAs.
2.5 Procedure A step by step description of how to
proceed from start to nish in performing a task
properly.
2.6 Job Safety Environmental Analysis/(JSEA) A
document that has been approved for use by the
BP representative in charge or by a contractor that
details the job steps, hazards and controls. BP JSEA
are documented on form gHSSEr MF34002 and BP
NAG JSEAs are documented here- NA Gas JSEA
Process.
3.0 Scope of Responsibility and Accountability
3.1 Each Operating Center Manager, Wells Team Leader,
and Major Project Manager is accountable for ensur-
ing that:
A work permit and hazard assessment system
is implemented to control the hazards at the
worksite
Workers are appropriately trained and competent
in its use
3.2 Te Area Authority will:
Ensure that a proper permit is issued for the type
of work being undertaken and that everyone
involved is aware of the hazards, controls and
emergency procedures
Ensure appropriate permits are issued, closed,
and led
Identify a Person in Charge (PIC) for each
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
90
Standard Safety Practices Manual
91 90
worksite prior to commencement of activity and
approve any replacements
Assign a compenent Issuing Authority (IA)
and/or Performing Authority (PA) for each work
site and/or activity
Confrm with the IA that all appropriate control
measures have been, or will be, put in place prior
to commencement of activity
Require that the IA and site work group perform
a risk assessment and agree that needed risk
mitigation has occurred and that the work can
proceed safely
Ensure an assessment of the hazards associated
with the work being performed and control
measures are identied as part of the permitting
process
Verify that all required testing, inspection and
checking of the work site is completed prior to
the work permit being issued
Ensure that the work area is inspected and
checked after the job is completed
3.3 Te Issuing Authority (IA) is accountable for ensur-
ing that:
Workers are aware of STOP-THINK-GO and
Time Out for Safety from their Level 1 indoc-
trination and feel comfortable being able to use
those tools
Workers are indoctrinated/orientated prior to
work starting and have all the required tickets
and certications for the job or task
Tere is proper issuance and closure of permits
in their area of competnecy, e.g cold work, hot
work, conned space entry, ground disturbance,
or critical lifting
Tey are on site for permit issuance and then as
required as per specic task requirements
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
90
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
91 91
Tey review with all site personnel a site specifc
emergency response plan
Coordinate with the PIC and maintain full
knowledge of all work in progress in the area
concerned, imcluding any work that is under
someone elses authority/control, i.e. SIMOPS
Tere is good cummunication with the AA about
the issuance and closure of permits
All site personnel involved in a work activity are
competent and correctly outted for the wok
they will perform.
Workers have clear understanding of the scope of
work, hazards, controls, and mitigations
Te correct tools and equipment are available
and appropriate certifcations and/or inspections
are reviewed or made as appropriate
Te required permits are in place and that
work undertaken on site is consistent with, and
conned to, the original scope of work
3.4 Te Performing Authority (PA) is responsible for:
Confrming that the following have been clearly
established, communicated, and understood:
a process for the transfer of Control of Work
between work groups, what procedures and poli-
cies will be followed (e.g. what permit tracking
system will be used), and who is in charge
Verifying the permit and hazard assessment is
reviewed by all workers associated with the job
prior to them starting work on the job, even
if they were not present while completing the
permit
Informing the Issuing Authority of any changes
in conditions, and for understanding and follow-
ing the conditions of the permit
Ensuging adequate handovers take place between
ingoing and outgoing PAs at shift and crew
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
92
Standard Safety Practices Manual
93 92
change periods
Accepting and signing authorized permits for the
work activity being performed
Participating in the risk assessment for the
planned activity
Confrming, by including in the JSEA discus-
sion, that all persons involved in the task fully
understand the scope of the work, hazards, and
controls for the job
Confrming that all members of the work party
sign the permit
Confrming that only work within the scope of
the permit takes place
Confrming that the worksite is kept in a clean
and safe condition both during and upon
completion of the job
Confrming that appropriate lessions learned
from the job are captured, incorporated, and
shared
Conforming all workers involved in the permit-
ted work activity sign the JSEA and permits(s)
acknowledging their understanding and agree-
ment. In the event that there is more than one
work team, there will be representation from
each team during the risk assessment
Observing work activities and if an individual
feels that he/she cannot safely manage more
than one concurrent task, stop the appropriate
portions is assigned work and request assistance
from the IA/AA
3.5 Te Person in Charge (PIC) is responsible for ensur-
ing that their permitting system meets this Practice
and complies with the CGPU permit to work
system. Tey must receive written authority from
the Operating Center Manager, Wells Team Leader,
or Major Project Manager to use their permitting
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
92
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
93 93
system at a CGPU work site. Otherwise, the CGPU
permit to work system will be used.
Te Person in Charge will:
Function as a liason between all personnel and
groups on location
Coordinate any issues that could result in a
change in work scope with the AA
Confrm that all people working on site have
reviewed and signed the JSEA(s)/permits and
veried that the appropriate permits have been
completed
Remain on site until work activities have
stopped, permits are closed, and appropriate
equipment has been secured for the shift
4.0 Scope of Expectations
4.1 All workers will acquire the appropriate permit and
conduct the appropriate hazard assessment for the
type of work they are about to perform.
4.2 All workers are instructed on work permitting and
hazard assessment requirements as part of their
site-specifc orientation training (see gHSSEr MS312
Indoctrinations, Orientations & Monitoring).
4.3 Te work area should be inspected for all hazards
by the Issuing Authority prior to issuing the permit.
Items for consideration include the hazards associ-
ated with a potentially fammable atmosphere, need
for isolation and/or purging, presence of combustible
materials, conficting jobs in the area and availability
of re ghting equipment.
4.4 Te Issuing Authority keeps the green and white
copies of the permit and hazard assessment. Te
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
94
Standard Safety Practices Manual
95
P
e
r
m
i
t

t
o

W
o
r
k
P
e
r
m
i
t

t
o

W
o
r
k
P
e
r
m
i
t

t
o

W
o
r
k
receiver keeps the goldenrod copy of the permit and
hazard assessment when doing the work and they
will return the form when the work is completed
or it is the end of the shift. Tis expectation does
not apply for work that is self-permitted. When the
work is completed, the green copy of the form may
be provided to the contractor for their records. See
section 6.0 for more information.
4.5 A new permit is issued at the beginning of every
shift. At the end of the work, the Issuing Authority
indicates if the job is completed, the equipment is
ready to be started and the work area is cleaned.
4.6 All permits and hazard assessments become void if
an emergency occurs at the location that may or may
not be related to the scope of work covered by that
specic permit and hazard assessment form.
5.0 Completing the Work Permit and Hazard
Assessment
5.1 Te work permit form, gHSSEr MF 88001 has four
main parts. Te form is completed with input from
all people participating in the job.
5.2 Complete the basic job information in Part 1. In
Part 1, check all Golden Rules that apply to the job.
If a procedure or JSEA exists that covers all or part
of the job, its name or number should be referenced
right after the question Procedure/JSEA available.
Tis document must be reviewed prior to starting
the job.
5.3 Part 3 must be completed for all jobs that require a
work permit unless the job falls into one of the two
exceptions outlined in sections 5.5 or 5.8.
Standard Safety Practices Manual
94
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
95
P
e
r
m
i
t

t
o

W
o
r
k
P
e
r
m
i
t

t
o

W
o
r
k
P
e
r
m
i
t

t
o

W
o
r
k
5.4 Part 3 should be completed after the work area is
inspected.
5.5 If an approved procedure or JSEA covering the scope
of the entire job exists, completion of Part 3 is not
required. Te procedure or JSEA must be referenced
in Part 1 and reviewed prior to starting the job.
5.6 Review the questions in Part 2 and check each as
applicable or not applicable to the job. For questions
17 28, if the answer to the question is yes than
the control required to mitigate the hazard must be
identied in the column to the right of the question.
See appendix 1 for more information on the intent
of each question.
5.7 Using the hazards identied in Part 2, list the job
steps, the potential hazards associated with each step
and the controls needed to prevent the potential
adverse efect on people and the environment in Part
3:
In the frst column, describe the work identifed
on the Permit, list the basic tasks for the job in
order and identify what is to be done, not how to
do it
In the second column, consider the hazards as-
sociated with the job, focus on each job task and
identify actual and potential hazards including
hazards from the job itself, hazards from the
work area, chemical hazards and physical hazards
In the third column, list the controls, procedures
or actions the team will take to control the
hazard associated with the job step in the third
column
If part 3 does not provide sufcient space for
identifying job steps, hazards and controls, use
form gHSSEr MF 34002 either as a separate
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
96
Standard Safety Practices Manual
97
P
e
r
m
i
t

t
o

W
o
r
k
P
e
r
m
i
t

t
o

W
o
r
k
document or stamped on the back of the Gold-
enrod copy of the form
5.8 If the job involves any of the following, Part 3 is not
to be completed and a job specifc JSEA using form
gHSSEr MF 34002 must be completed:
Jobs which require a rescue plan (not a response
plan but a job where physical rescue may be
required such as class 2 or 3 confned space,
work at heights using fall arrest, work requiring
SCBA/SABA)
Jobs which require entry into a Class 2 or 3
conned space
Jobs which require ground disturbance
Jobs which require critical lift plans
Jobs where the BP or contractor representative
deem that an additional hazard assessment is
required
5.9 Te required atmospheric testing must be completed
as per section 7.5 and documented on Part 4 of the
work permit.
5.10 Each person that participated in the permit and
hazard assessment must print their name and initial
in Part 4.
5.11 At the conclusion of the job or at the end of the
shift, the 3 questions (Job Completed, Work Area
Cleaned, Contractor Locks Removed) located at the
bottom of the work permit should be checked yes or
no and the form returned to the Issuing Authority.
5.12 If the JSEA developed for the job is deemed ap-
propriate for future use, it should be approved for
on-going use by the BP representative in charge.
Standard Safety Practices Manual
96
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
97
P
e
r
m
i
t

t
o

W
o
r
k
P
e
r
m
i
t

t
o

W
o
r
k
6.0 Scope of Self-Permitting
6.1 Many activities conducted in the Gas Business Unit
are done in isolation of other workers. Workers must
follow this Practice but are allowed to issue their own
permits and document their own hazard assessments
for certain work.
6.2 In order for a worker to issue their own permits, they
must have a Level 2 Indoctrination and have demon-
strated a level of competence in completing the job
to the BP representative in charge or designate.
6.3 Self-permitting can be conducted by BP employees,
full time equivalent contractors (FTEs) and other
designated contractors.
6.4 Self-permitting cannot be conducted on a location
where operating staf attend the facility for the
majority of a shift. At these locations, the Issuing
Authority issues the permit to the worker to ensure
proper communication in the event of simultaneous
operations or conficting jobs.
6.5 A self-issued permit can be prepared for any job
involving cold work, hot work, energy isolation,
ground disturbance (if the worker has current Level
2 ground disturbance training), lifting and work at
heights where worker safety is addressed through
engineering controls. Self permitting (working
alone) is not allowed for any job requiring work at
heights in which the fall protection plan does not ad-
dress the provisions for self rescue in the event of an
arresting fall. Self permitting is not allowed for any
job requiring entry into a class 2 or 3 confned space.
6.6 Te worker requiring the permit must contact the
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
98
Standard Safety Practices Manual
99
P
e
r
m
i
t

t
o

W
o
r
k
Issuing Authority for the location prior to starting
work to advise of the work being conducted and
determine potential hazards to the worker.
6.7 Once the job is complete, the worker signs of the
permit and contacts the Issuing Authority to advise
the status of the work and that the worker is leaving
location. Arrangements are made to provide a copy
of the completed permit to the Issuing Authority.
6.8 Requirements 6.6 and 6.7 do not apply if the work is
being done by the Issuing Authority.
6.9 If the worker is visiting more than one location in
a day to perform a similar task, one permit can be
completed for the entire day. Each location is clearly
identied on Part 1 of the form and the worker dis-
cusses each location with the Issuing Authority prior
to starting work that day. When the worker arrives at
each location, he or she reviews the permit to assess if
all hazards have been identied and updates the form
and implements the new hazard controls.
6.10 Other site specic requirements such as working
alone procedures and working with H2S will also
apply when self-permitting.
7.0 Scope of Hot Work Permits
7.1 Hot Work means:
cutting, welding, burning, air gouging, riveting,
drilling, grinding, chipping, bung
the use of non-classifed electrical equipment
the introduction to a work process of a combus-
tion engine
any other work where fame is used or sparks are
Standard Safety Practices Manual
98
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
99
P
e
r
m
i
t

t
o

W
o
r
k
produced
work on electric cables and equipment
7.2 Hot Work Permits are issued where the atmosphere
could become in excess of 0% LEL and/or there is a
potential for a fre and/or explosion, or if electricity
or static charges exists.
7.3 A safety standby person may be required as per
site specic procedures for any hot work to be per-
formed. Te only duty of the safety standby person
is to observe the job and be able to communicate
with others should assistance be required. Te
safety standby person must have immediate access to
emergency equipment such as a re extinguisher, gas
detector and two-way radio or other means of com-
munication. For more information, please reference
Safety Standby in SSPM.
7.4 Under no circumstances will any hot work activity
be permitted where LEL is greater than 10%. Work
must be completed to eliminate the source of the gas
release.
7.5 Where atmospheric testing is required during hot
work and conned space work, the employer will en-
sure that continuous monitoring of oxygen, H2S and
LEL hazards are done and that tests are documented
at regular intervals (i.e. prior to starting work and
after each break as a minimum). Te test results must
be documented on form gHSSEr MF 88001.
8.0 Scope of Cold Work Permits
8.1 Cold work permits are issued for work where there
is no danger for re or explosion based on the tools
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
100
Standard Safety Practices Manual
101
P
e
r
m
i
t

t
o

W
o
r
k
and equipment being used for the job and the
atmosphere will remain normal for human respira-
tion. Examples include lifting, entry into a Level 1
conned space and work at heights.
8.2 Te atmosphere must remain normal for human
respiration.
8.3 No permit is required for the following jobs:
A worker taking readings
A worker making external adjustments to the
process (changing valve positions, equipment
settings etc.)
Daily, weekly and monthly housekeeping activi-
ties
BP tradesperson working in their respective
shops unless their work meets the denition of
hot work
A worker taking other visitors on a tour of a
facility for the sole purpose of observation (i.e.
SOCs, HSSE inspections, review of new facilities
installation). A permit is required if photos will
be taken in a potentially explosive atmosphere
Additions may be made to the above list by area
management after a documented hazard assess-
ment of the work is completed and reviewed
by a team consisting of the Area Authority, the
Operating Center Manager, Wells Team Leader
(if applicable), Major Project Manager (if ap-
plicable), the BP safety coordinator and at least
one representative of the afected workers
9.0 Scope of Conned Space Permits
9.1 Conned space permits are issued for entry into a
Class 2 or Class 3 confned space. See Confned
Standard Safety Practices Manual
100
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
101
P
e
r
m
i
t

t
o

W
o
r
k
Space Practice gHSSEr MS820 for complete details.
10.0 Scope of Ground Disturbance Permits

10.1 Ground disturbance permits are issued for any work
operation or activity that results in a disturbance of
the earth. It applies to all pipeline right-of-ways,
company leases, construction sites. See Ground
Disturbance Practice gHSSEr MS840 for complete
details.
11.0 Changing Area Authority
11.1 A work permit and hazard assessment is required
when the area authority for an existing lease dis-
charges their accountabilities to wells or construc-
tion. For example, during a workover of an existing
well or when construction is taking place at an
existing location.
11.2 Te following components of the permit are com-
pleted to document a lease turn-over:
Te date, location and time
Under work description, insert an expected end
date
Complete Part 2 only to refect the hazards of the
location at the time of the turn over:
o Identify if multiple types of operations will
need to take place at the location and the pro-
cedure for checking-in with the area authority
(i.e. well work and daily operator checks)
o Identify any concerns or potential hazards
with permanent equipment or materials
on-site and document any energy isolation
applied
o Identify if there are WHMIS controlled prod-
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
102
Standard Safety Practices Manual
103
P
e
r
m
i
t

t
o

W
o
r
k
ucts on-site as part of permanent operations
o Identify the linkage of site activities with the
emergency response plan for the area
o Questions 2, 4, 7, 10, 11, 12, 13, 19, 20, 21,
22, 23, 24, 25, 27, 28 must be answered to
refect the status of the lease and the hazards
associated with the permanent equipment
on-site
Part 3 does not need to be completed
A single atmospheric test should be completed
and documented prior to lease turn-over
Te issuer is the current area authority and the
receiver is the new area authority
11.3 To discharge area authority accountabilities back to
the original area authority, the job completed box
should be checked yes on the original form, and the
date and initials of the person accepting the lease
should be written near the check-box. Tis task
should be completed after the condition of the site is
reviewed by the two Area Authorities.
11.4 For more information, please reference SSPM Well
Work Hand over between operations and Wells
Teams.
12.0 Assurance Process
12.1 People with SOC training can use the SOC process
to provide assurance that the permit to work Practice
is followed. An SOC can be conducted while a job
is in progress to link the hazards identied in the
discussion with what is documented on the permit.
12.2 All workers can use the job observation process to
provide assurance that the permit to work Practice is
Standard Safety Practices Manual
102
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
103
P
e
r
m
i
t

t
o

W
o
r
k
followed. A job observation can be conducted while
a job is in progress, after the permit to work and
hazard assessment form has been completed or at the
conclusion of the job to verify that the steps required
for completing a permit were followed.
13.0 Record Keeping
13.1 After the work is completed, all work permits and
hazard assessment forms and associated documents
are signed of in accordance with the permit and
retained in the feld ofce for a period 13 months.
14.0 Scope of References
14.1 Alberta General Safety Regulation AR 448/83 as
amended
14.2 B.C. Occupational Health and Safety Regulations
and Guidelines 296/97 as amended
14.3 gHSSEr MS820 - Confned Space Practice
14.4 gHSSEr MS840 - Ground Disturbance Practice
14.5 gHSSEr MS 312 - Indoctrinations, Orientations and
Monitoring
14.6 NAG SPU Control of Work (COW) Policy
http://docs.bpweb.bp.com/NAG:/content/hse/on
shore/documents/K0000002586
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
104
Standard Safety Practices Manual
105
P
e
r
m
i
t

t
o

W
o
r
k
15.0 Forms
15.1 gHSSEr MF 88001 - Permit to Work and Hazard
Assessment Form
15.2 gHSSEr MF84001 - Ground Disturbance Permit
15.3 gHSSEr MF84001 - Confned Space Entry Permit
15.4 NAG JSEA Form NA Gas JSEA Process
Appendix 1
Details on the Intent of Work Permit and Hazard Assess-
ment Questions
Part 2 of the work permit and hazard assessment form
contains 28 questions. Te questions were chosen because
they represent the majority of the hazards in our various
worksites and they build on learnings identied during
incident investigations.
Questions 1-16 are simple questions that can be answered
yes, no, or not applicable to the job. In some cases, a
line has been added so brief details for that question can
be identifed. Questions 17-28 require a yes, no, or not
applicable to the job answer and for all questions answered
yes, the control measures required to mitigate the hazard
must be identied.
Te following lists each question on the form, and provides
some interpretation on how to answer it.
1. Safety Stand by required? Name
For jobs that require a designated safety stand-by,
this question should be checked yes. Tis might
include entry into a class 2 or 3 confned space,
work at heights or use of mobile equipment in
an area with heavy foot trac. If the question is
answered as yes, the name of the safety stand-by
Standard Safety Practices Manual
104
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
105
P
e
r
m
i
t

t
o

W
o
r
k
should be written on the document. Te roles
and responsibilities for that worker need to be
reviewed prior to work starting.
2. Have conficting activities/simultaneous operations
been identifed? List:
If there are other activities in the area that this
work will be taking place or simultaneous opera-
tions in the same area, the question should be
answered yes and those other activities listed in
the space provided. Part 3 should identify the
controls required for ensuring adequate commu-
nication between diferent activities. A separate
SIMOPS plan may need to be developed.
3. Is additional PPE required? Face/eyes
Chemical Protection Respiratory Fall Protection
Hands/Gloves
Te minimum required PPE is listed near the top
of the form. Tis question addresses other PPE
that may be required. If any boxes are checked, a
space is provided to specically identify the item
or items of PPE that are required. It should be
clear to all workers if additional PPE is required
at all times during the job or only during specic
times.
4. Area safe for personnel/vehicle entry? Record test
below.
Tis question is focused on air quality. Oxygen,
LEL and H2S (if applicable) should be checked
prior to work commencing and documented on
Part 4 of the form.
5. Will workers be getting down from equipment or
climbing of of equipment? 3-point contact, step of
dont jump of.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
106
Standard Safety Practices Manual
107
A signifcant number of recordable injuries are
related to workers getting down from equipment
at various heights. If workers need to access
work areas or equipment at heights, this question
reinforces the need to descend using caution and
maintaining a 3-point contact.
6. Have all locations that pertain to the job been
reviewed? (Secondary locations-dump sites, assembly
points, permit area)
Some jobs require work in multiple locations.
If materials are being transferred from one area
to another or if there is a second muster point
close to where the work will be taking place, this
location should be noted on the form.
7. MSDS for WHMIS Controlled products afecting
job is available and understood? List WHMIS
controlled products.
Te MSDS for all WHMIS Controlled products
must be reviewed before handling these materials
so adequate controls may be put in place such as
ventilation or PPE. Te MSDS does not need to
be at the work site but the information must be
available to workers by phone or radio.
8. Do workers need job specifc certifcations?
Documented training is required for some
jobs in addition to what is asked at the Level 1
indoctrination (H2S and WHMIS). If specifc
certications are required (i.e. crane operator,
frst aid, confned space) answer the question yes
and list the training required on the space in the
form. Tickets demonstrating training must be
veried.
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
106
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
107
9. Have all tools and equipment that pertain to the job
been identied and checked to be in good condition?
Certications checked if appropriate.
All tools and equipment required for the job
should be identied prior to the job starting.
Te condition of tools and equipment should be
checked by the person that will be using them.
If a tool or piece of equipment is not suitable for
use, it should be either repaired or destroyed. In
some cases, certications are required such as
crane inspections, and the document should be
reviewed prior to issuing the permit and hazard
assessment.
10. Have all job-related cathodic protection and/or
overhead/underground power lines been located and
identied?
All power lines near the work area need to be
identied prior to work starting and controls put
in place to ensure that power lines will not be
contacted during the work.
11. Have all underground piping/obstructions been
identied?
Underground piping, tanks and lines need to be
identied for all jobs involving ground distur-
bance, all jobs requiring the use of heavy equip-
ment (i.e. a crane and outriggers) and for all jobs
using mobile equipment as striking or driving
over an underground obstruction can lead to
signifcant injury and/or property damage.
12. Fire eyes/gas detectors bypassed?
Fire eyes and/or gas detectors may need to be by-
passed for certain jobs involving hot work inside
a building. Additional procedures may need to
be followed to by-pass these safety devices.
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
108
Standard Safety Practices Manual
109
13. Protection of all sewer catch basins and foor drains?
Tis question must be answered yes when doing
welding inside a building or near any outdoor
sewer catch basins that could contain hydrocar-
bon.
14. Housekeeping - cords, cables, hoses, tools, material
or debris controlled and out of the path of workers.
Rules around housekeeping specifc to the job
and the materials, tools and equipment should
be reviewed so areas where people need to walk
are kept free of hazards.
15. Are additional permits required? Ground disturbance
Conned space Critical lift
Tis question is a double check of the Golden
Rules identied in Part 1 of the form. If the
answer is yes, identify using a check box which
additional permit is required. Te document
should be completed prior to starting the job and
attached to this form.
16. Are all personnel involved with the job participating
in the pre-job meeting? If no, who is responsible to
update these workers?
If some workers will be joining the work site at
a later time, one person needs to be designated
to review the contents of this form with those
workers so they understand the hazards of the
jobs, the controls for those hazards and their role
in promoting a safe and environmentally friendly
work atmosphere.
17. Have the risks of working alone been assessed?
If a worker will be working alone, this question
must be answered yes and the control measures
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
108
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
109
for ensuring that workers safety documented in
the column to the right. Controls might include
reviewing the local working alone procedures or
establishing a communication plan with dened
check-in intervals.
18. Is heavy manual lifting involved? Potential of injury
due to over exertion or strain by lifting, pulling,
pushing or twisting.
Tis question links too many of the recordable
injuries that have occurred as a result of manual
lifting, pulling, pushing or twisting. If this
type of work is required, consider if mechani-
cal devices can be used to reduce the chance of
strain. Determine how heavy a load will be and
the number of people required to lift it. Review
proper lifting techniques.
19. Are personnel at risk of slip, trip, or fall to the same
level or to the area below?
Tis question links too many of the recordable
injuries that have occurred as a result of slips,
trips and falls. Te work area including any sea-
sonal infuences should be reviewed and controls
put in place to maximize traction.
20. Are there driving hazards associated with the job?
Tis will be yes for almost all jobs to cover the
drive to the work site or the drive home. Review
any specic hazards and rules of the road for that
day.
21. Can personnel be placed in line of re? (struck by
protruding, moving objects, sharp edges, objects
falling, caught in or between)
Tere are many considerations for this question.
It should rst consider permanent hazards of
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
110
Standard Safety Practices Manual
111
the site equipment and then must consider the
hazards of the job. If the job creates potential
line of re hazards, they need to be identied
during the hazard assessment and controls put in
place to reduce or eliminate the hazard.
22. Can personnel come in contact with an energy
source or be exposed to hazardous material?
Consider energy sources and hazardous materials
in and around the work area. Controls might
include energy isolation, using a spotter or using
additional PPE.
23. Are personnel working in the vicinity of mobile
equipment?
If the answer to this question is yes, controls
should include verifying that back-up alarms are
fully functioning and a spotter is designated for
the job. Hand signals between the spotter and
driver must be reviewed.

24. Are there fre hazards associated with the task?
Equipment needed? Identify.
If the job could result in a fre, this question
should be answered as yes. Steps should be taken
to execute the job to minimize the chance of a
re starting. Appropriately sized extinguishers
and other re ghting equipment needs to be
available and readily accessible for workers to en-
sure a safe exit from the area should a re occur.
25. Have environmental controls/procedures necessary
for spills/atmospheric release/waste been identifed
due to loss of containment, failure of equipment or
other form of release?
If the job could result in a spill, atmospheric re-
lease or will generate waste, identify if additional
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
110
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
111
site-specic procedures need to be reviewed. In
some cases, a brief overview of waste storage
areas and segregation practices or material
handling techniques needs to take place.
26. Is materials/equipment required to be lifted by
mechanical means? I.e. bobcat, hoist, crane.
If materials will be lifted by mechanical means,
document the controls required to ensure a safe
lift. Te lift plan should consider equipment
capabilities, tag lines, the need for spotters, etc.
27. Is a rescue or environmental response plan required?
List team and verify training.
Tis is in addition to the local ERP and would
be required for jobs involving conned space en-
try, some jobs requiring work at heights and jobs
that involve handling large volumes of liquids
that can have a negative impact on the environ-
ment if released. Identify what is needed at the
job site to immediately address the emergency
situation and ensure that equipment is available
before starting the job.
28. Energy isolation complete? Equipment de-pressured
purged blinded lock-out tag out
stored energy
If energy isolation is required for the job, the
type of energy isolation applied should be noted
using the check boxes. Te control column
should be used to identify how energy was
isolated and reference site-specic practices and
procedures for energy isolation.
P
e
r
m
i
t

t
o

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
112
Standard Safety Practices Manual
113
VEHICLE STANDARD AND ROAD SAFETY PRACTICE
1.0 Scope and Applicability
1.1 Tis standard applies to all drivers operating vehicles
for BP CGPU and NGLBU sites. Tis includes
employees using personal vehicles for company
business. In this standard, these vehicles are referred
to as company vehicles. Te standard is applicable
to summer and co-op students, full time equivalent
contractors and ofce staf that may be traveling on
company business.
1.2 Te purpose of this standard is to ensure BP CGPU
and NGLBU employees, contracted employees,
contractors and other visiting personnel use vehicles
in a safe manner.
2.0 Scope of Vehicle Standard Elements
2.1 Vehicle Specications-Te vehicles must be t for
purpose and has been maintained in safe working
condition with seatbelts installed and functional.
Seat Belts must be worn at all times while a vehicle is
in motion.
Clarifcation: http://HSSE.bpweb.bp.com/fles/
showdocument.asp?tb=subcategory&ID=915
Always refer to the vehicle owners service
manual for the proper maintenance inspections
and required service
It is highly recommended that all vehicle main-
tenance be completed by the appropriate (Ford,
GM, Dodge) authorized dealership while the
vehicle is in the warranty period
All BP, Personal, and rented vehicles must be
equipped with Anti-Lock Brakes and Standard
Air Bags
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
112
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
113
Monthly vehicle safety check sheets must be
lled out by the designated driver for that vehicle
All drivers are required to complete daily vehicle
logs, complete monthly vehicle usage reports (per
local area schedule) and report all personal and
commuting mileage as requested
Te driver will walk around their vehicle prior to
each trip to check for potential hazards such as
objects, people or other vehicles prior to driving
and observe the condition of the vehicle such as
tires and lights are in good working condition
and that window, lights and mirrors are clean
Te vehicle must be equipped with tires properly
selected and maintained for the driving condi-
tions that could be experienced in the area.
During the period of November 1 to March 31
all BP vehicles and other vehicles being used
on a full time basis within the Canadian Gas
Performance Unit, must be equipped with winter
tires (see Appendix 2 Winter Tire Requirements
in this Practice)
Headlights/Driving Lights As a best practice
when driving in conditions that may include re-
duced visibility such as fog, smoke, snow, dust or
low light; it is required that drivers turn on their
headlights rather than relying on the vehicles
daytime running lights. When traveling in the
above conditions it is paramount to provide
maximum visibility to third party drivers that
may be traveling behind our vehicle
Fit for purpose also refers to using the right
vehicle for the right purpose. An example of this
would be to use a 4 wheel drive truck to access a
drilling rig at a remote site.
No alterations or modifcations are to be made to
the vehicle that can afect the functionality of the
vehicle safety equipment (E.g., a bush guard will
alter the efectiveness of the air bags.)
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
114
Standard Safety Practices Manual
115
Additional vehicle specifcations:
- 4 Wheel Drive for all feld service vehicles.
Exceptions will be allowed based on approval
of local management
- A seat which provides good vibration
dampening, lumbar support, and good
adjustability of body position to provide
ergonomically sound driving position
A method of communication (cell phone
or radio) may be portable or permanently
installed. NOTE: a cell phone or other two way
communication device is not to be used when
vehicle is in motion. An exception would be
when traveling on a road which requires the use
of two way communication. See section 2.6
Local area management may determine that the
following items are appropriate based on risk
assessment for that area:
- Auxiliary driving lights installed according to
the Alberta Highway Trafc Act and Motor
Transport Act
- High frequency deer whistles
- Back up alarms
2.2 Passengers-Te number of passengers does not ex-
ceed the manufacturers specications for the vehicle.
2.3 Loads-Loads are secure and do not exceed manufac-
turers specication and legal limits of the vehicle. All
equipment, tools or other cargo being transported in
the cargo and passenger areas of all vehicles shall be
secured to prevent serious injury to occupants, in the
event of a sudden stop or an incident. All vehicles
should be assessed to see if headache racks are needed
and if so should be installed.
Clarifcation http://HSSE.bpweb.bp.com/fles/show-
document.asp?tb=subcategory&ID=916
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
114
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
115
2.3.1 Securing Of Loads (Load Binders) - BP Can-
ada E&P has determined that the use of lever-
type load binders poses an unnecessary level of
risk and shall be phased out of BP operations.
Advances in equipment technology provide
the opportunity for continual improvement
by replacing lever-type load binders with the
comparable, safer ratchet-type load binder.
- Warnings and Application Instructions:

Failure to use load binders properly may result in
serious injury or even death to you or others
Do not operate a load binder while standing on
the load
Move the handle with caution. It may whip
Keep all body parts clear
Keep yourself out of the path of the moving
handle and any loose chain lying on the handle
You must be familiar with state and federal
regulations regarding size and number of chain
systems required for securing loads on trucks
Always consider the safety of nearby workers as
well as yourself when using load binders
While under tension, a load binder must not
bear against an object, as this will cause side load
Do not use a handle extender (cheater pipe) - see
instructions
Do not attempt to close or open the binder with
more than one person
- Instructions - Ratchet Load Binders
Manually unscrew the end hoods to get enough
reach
Position ratchet binder so it can be operated
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
116
Standard Safety Practices Manual
117
from the ground, ideal placement is between
waist & chest high
Attach one hook on the chain close to an anchor
point to minimize hook rotation
Take up as much slack as possible and hook the
chain to the opposite end of the load binder
Set the pawl and start closing the load binder,
use clean gloves
Keep fngers and hands away from pawl and gear
Maintain a bufer zone from the end of the
ratchet handle
Secure footing and stroke handle until desired
tension is achieved, handle extensions are prohib-
ited
Loads can shift, check the tension of the load
binder frequently, re-tighten as needed
- Maintenance of All Load Binders
Routinely check load binders for wear, bending,
cracks, nicks, or gouges. If bending or cracks are
present - Do not use load binder
Routinely lubricate pivot and swivel points of
Lever Binders, and pawl part and screw threads
of Ratchet Binders to extend product life and
reduce friction wear
2.4 Driver Training-All drivers are appropriately assessed
licensed, trained and medically t to operate the
vehicle.
Clarifcation:http://HSSE.bpweb.bp.com/fles/show-
document.asp?tb=subcategory&ID=927
- Operators of BP vehicles must provide proof
of appropriate licence on annual basis. On an
exception basis drivers may be requested to
provide a copy of the Drivers Abstract (e.g. After
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
116
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
117
a vehicle incident)
- It is the responsibility of the driver to inform
their supervisor within the next working day of
a drivers license suspension. Failure to inform is
considered a severe ofence, and will be subject to
discipline
- All drivers shall have their appropriate class of
drivers licence and TDG or DOT certifcate (if
applicable) in their possession
- A risk assessment must be performed at each job
site to determine what type of additional driving
training is needed. Te following are examples of
the types to consider
- Adverse road conditions (gravel, lease roads,
snow and ice, mud, etc.):
- Winter Driving
- Backing
- Sloped surfaces
- Reverse skidding
- Fatigue and Journey Management
- Deer and animal avoidance
- Understanding 4 X 4s
- All drivers shall have passed a BP approved
drivers evaluation course (with skid control if
available) prior to operating a BP vehicle. All
professional drivers shall complete a BP approved
defensive driver training course as per the HSSE
training matrix
- All areas within the BP Canada Gas Performance
Unit will assess their roads as per Local Hazard
Maps to determine which areas would require
chaining on tires. Areas must develop a plan for
chaining requirements. Areas on roads must be
identied which would be used for safe installa-
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
118
Standard Safety Practices Manual
119
tion of chains. Tings that should be considered
are:
o Winter driving conditions(November
1-March 1 minimum)
o Muddy driving conditions
o Grade of roads (e.g. 10% grade)
2.5 Driver Fatigue and Alertness-All drivers are appropri-
ately rested and alert.
Clarifcation: http://HSSE.bpweb.bp.com/fles/
showdocument.asp?tb=subcategory&ID=917
- Fatigue and stress are two common mental
factors which afect a drivers ability to perform.
When a driver nds they are in this condition,
they should not drive, pull over and take a break
or a nap, or pull over and stretch
- Professional drivers as dened by the BP Global
Driving Standard must have fatigue training as
per HSSE raining Matrix - http://gasiso14001.
bpweb.bp.com/EMS/Competency%20Training/
FIELD%20TRAINING%20MATRIX.xls
2.6 Mobile Phones-Driver. Drivers must not use a
mobile phone or other two way communication
device while a vehicle is in motion. Only short
duration calls on a radio are permitted by exception
on roads which are radio controlled or required
by regulation (e.g. when moving oversized loads
in a convoy with escort vehicles(s)Clarifcation:
http://HSSE.bpweb.bp.com/fles/showdocument.
asp?tb=subcategory&ID=918
Cellular phones, voice mail devices, recording pagers or
other communication devices which are not intrinsically
safe(explosion proof ), may not be used in classifed areas
where a hazardous atmosphere could exist.

V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
118
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
119
2.7 Journey Requirements-
Clarifcation: http://HSSE.bpweb.bp.com/fles/
showdocument.asp?tb=subcategory&ID=919
- Drivers will contact the local BP management
to be familiar with area specic regulations and
policies and, where possible, acquire a local road
hazard analysis map
- Driving time should be taken into consideration
as part of the hours of travel and work for that
day in order to address the issues of fatigue and
journey management. STOP, THINK, GO
- High risk road locations should be identied,
communicated to all drivers, and posted in a
conspicuous location
- All BP light vehicles within the CGPU will be
equipped with VDRs (Vehicle Data Recorders)
2.8 Seatbelts-Seatbelts are worn by all occupants at all
times whenever the vehicle is in motion. All people
in the vehicle must be wearing a three point seat belt.
Lap belts may not be used unless a hazard assess-
ment has been completed and approved by the Area
Authority.
Clarifcation: http://HSSE.bpweb.bp.com/fles/
showdocument.asp?tb=subcategory&ID=920
2.9 Alcohol and Drugs-Te driver is not under the infu-
ence of alcohol or drugs, or any other substance or
medication that could impair their ability to drive.
Clarifcation: http://HSSE.bpweb.bp.com/fles/
showdocument.asp?tb=subcategory&ID=921:
2.10 Read the label of all over-the-counter medications
before considering driving. Refer to BPs Alcohol
and Drug Policy. Consult your physician if questions
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
120
Standard Safety Practices Manual
121
arise regarding prescription medication
2.11 Safety Helmet-Safety helmets are worn by riders and
passengers of motorcycles, quads, snow mobiles and
similar types of vehicles.
Clarifcation: http://HSSE.bpweb.bp.com/fles/
showdocument.asp?tb=subcategory&ID=1027
3.0 Additional Specic Requirements.
3.1 Regulatory or posted speed limits shall not be
exceeded and all vehicles must be driven in a manner
that respects the road conditions.
3.2 Firearms shall not be carried in company vehicles.
Where Bear Watch or other area specic wild-life
expertise is needed on site, it will be addressed in an
HSSE Assurance Plan for the job and third party
trained and competent experts will be used. Where
fare guns are required, site-specifc procedures must
be developed for the transport and operation of this
equipment. Shotguns must not be used for fare
guns.
3.3 Vehicles must be backed into parking stalls where it
is allowable or where drive-through parking is not
possible. Where space permits, drive-through park-
ing is the preferred technique.
3.4 No vehicle shall encroach within 8 meters of any
wellhead, piping, process vessel or tank containing
combustible fuids unless required by a specifc main-
tenance or operating function and an appropriate
risk assessment and necessary hot work permit have
been completed.
3.5 A driver, pulling into a well/battery/drilling opera-
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
120
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
121
tion/compressor site or pump station, must park the
vehicle pointing towards the access road for a quick
exit.
3.6 Pets will not be permitted in company vehicles while
traveling on BP business or while on BP CGPU and
NGLBU premises.
3.7 It is recommended that drivers wear their safety
glasses while driving on gravel roads as there is a
high risk of rocks, ice or debris to be thrown into the
windshield by another vehicle.
3.8 Backing - is to be avoided when practical. Drivers
will park in spaces where they can legally drive
forward when leaving; otherwise they will back into
the parking space upon arrival. A spotter shall be
used to assist the driver during backing operations
of heavy vehicles, vehicles with trailers, and vehicles
with limited visibility from their rear window.

4.0 Scope of Towing and Tow Straps
4.1 Tow trucks are to be used as the frst choice for tow-
ing. STOP, THINK, GO (TOW).
4.2 Nylon tow ropes or chains must not be used. Nylon
braided (fat) tow straps with loop ends (no hooks)
are acceptable.
4.3 Vehicles should be equipped with the manufacturers
specied towing hooks or properly mounted towing
hitch. A Ditch Hitch is a recommended towing
device which ts into the hitch receiver.
4.4 Pulling force on the tow hooks must not exceed the
manufacturers specications.
4.5 Tere should be constant tension on the tow strap
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
122
Standard Safety Practices Manual
123
when towing, it should not be jerked.
4.6 BP vehicles are not allowed to pull a trailer device
that is not company owned or leased.
5.0 Scope of Boosting and Jump Starting
5.1 When boosting or jump starting, both batteries must
be the same voltage and the vehicles must not be
touching.
5.2 Te vehicles must be in park or neutral with park-
ing brakes on and both engines and all accessories
shut of.
5.3 Put the booster cables on the positive battery posts
rst, then put the negative cable on the good battery
and nally ground the last cable to the engine block
of the vehicle with the dead battery.
5.4 Keep clear of the vehicles during the boosting opera-
tion and use the reverse procedure to remove the
cables.
5.5 Always wear eye protection when boosting or jump
starting a vehicle.
6.0 Scope of Vehicle Incident Reporting
6.1 All vehicle incidents must be reported to drivers
immediate supervisor immediately if possible but no
later than within 24 hours or next business day.
6.2 All vehicles incidents involving a third party, public
or private property must be reported to Kendal
Adjusters Inc. (John Bicknell 403-256-8400) within
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
122
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
123
24 hours. You will be required to fax a copy of the
Incident Report, copy of the Police Report and
any relevant cost estimates. Vehicles are not to be
repaired until authorized by Kendal Adjustors or BP
Fleet Management.
6.3 All vehicles incidents over $1000 are to be reported
to the local Police authorities within 24 hours.
6.4 Vehicles incidents that do not involve a third party
or public or private property should be handled as
follows:
< = $1000 damage 1 estimate required for repair
$1001 - $3000 damage 2 estimates required for repair
$3001 - $5000 damage 3 estimates required for repair
+$5000 damage 3 estimates required for repair
AND contact BP Fleet
Management for authorization
6.5 All vehicle incidents involving rental vehicles should
be reported to rental agency (Hertz) as soon as prac-
tically possible. Te claim processing will be handled
by their representative.
7.0 Scope of Material Handling
7.1 Site-specic materials handling and transportation
procedures may be required.
7.2 Transportation of Dangerous Goods (TDG)
certifcate, the TDG applicable permits and the
OMNIBUS permit must be carried in the vehicle
where applicable.
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
124
Standard Safety Practices Manual
125
8.0 Scope of Safety Equipment
8.1 All company vehicles including rental vehicles will
have safety equipment that is appropriate for local
risk assessments and conditions Te following is
suggested minimum equipment for vehicles going to
eld locations. Vehicles not travelling to remote sites
or in adverse conditions may not require all of the
equipment listed.
- Regulatory acceptable rst aid kit
- Refective warning devices
- Bear kits where necessary
- Fire extinguisher
- Refective clothing
- Extra clothing or blankets if applicable
based on geographic location
- Candle and matches if applicable based on
geographic - Non-perishable high energy
food
- Shovel. if applicable based on geographic
location
- Axe or a hatchet if applicable based on
geographic location
- Flashlight (explosion-proof is recommended
for feld service vehicles)
- Extra batteries for fashlight
- Booster cables
- Tow strap
- Water, Caution Water may freeze.
9.0 Scope of Appendices
Appendix 1- BP CGPU and NGLBU All Terrain Vehicle
Practice
Appendix 2- CGPU Winter Tire Reguirements
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
124
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
125
10.0 Reference Documents
GLOBAL DRIVING STANDARD :
http://HSSE.bpweb.bp.com/driving_safety/default.
asp?cat=147
gHSSEr MS 430 - HSSE Nonconformance and Incident
Reporting Procedure
gHSSEr MF 86001 Monthly Vehicle Inspection
Checklist
gHSSEr MF 86002 Licence Verifcation Form
APPENDIX 1
BP CGPU and NGLBU All-Terrain Vehicle Practice
1.0 Scope and Applicability
1.1 Tis practice provides guidelines for the safe opera-
tion of All-Terrain Vehicles (ATV) defned as Quads
and snowmobiles.
1.2 Tis practice applies to all CGPU and NGLBU
employees, contract employees and contractors who
operate all-terrain vehicles (Quads and Snowmobiles)
while working for the CGPU and NGLBU.
1.3 Tis practice addresses the practices, conditions and
behaviors that have the largest impact upon safe driv-
ing. (Driving all-terrain vehicles is one of the highest
risk tasks performed by our staf.)
2.0 Training
2.1 All operators of all-terrain vehicles are required
to pass a recognized certied all-terrain
vehicles rider course.
3.0 Ground Rules
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
126
Standard Safety Practices Manual
127
3.1 Drivers will at all times adhere to the ground rules
provided in this section of the standard.
3.2 No horseplay while operating all-terrain vehicles.
3.3 Site specifc procedures must be developed to address
communication needed to meet working alone re-
quirements. Tis may involve radio/cellular contact,
check in location and times, travel routes, etc.
3.4 All-terrain vehicles must not be overloaded with
personnel or equipment. Manufacturers guidelines
must be followeed for load restrictions.
3.5 All-terrain vehicles must not be operated while under
the infuence of drugs or alcohol.
3.6 Firearms will not be carried on all-terrain vehicles.
3.7 CSA approved helmets must be worn at all times
while operating an ATV. DOT/Snell approval in the
US.
3.8 A regular maintenance program following the manu-
facturers guidelines must be implemented to ensure
the ATVs reliability and safe operating condition.
3.9 Pre-trip checklists must be developed.
3.10 Operator must be familiar with the owners manual.
3.11 ATVs must be operated in a manner so as to mini-
mize disturbance to all wildlife.
4.0 Licensing
4.1 Provincial Regulations require that all-terrain vehicles
must be licensed and insured while traveling on
public lands.
4.2 Every All-Terrain Vehicle being operated by CGPU
and NGLBU employees, full time equivalent con-
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
126
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
127
tractors and contractors doing work for CGPU and
NGLBU must be licensed and insured.
5.0 Minimum Equipment
Mounted winch for appropriate load ratings
(quads) where local management deems it ap-
propriate
Regulatory acceptable frst aid kit
5Ib A B C fre extinguisher
Axe/Hatchet or folding pruning saw
Approved tow strap
Tire repair kit, air pump ( quads )
Operators manual
Mounted carrying case
Explosion proof fash light
Pepper spray, bear scare, air horn ( quads ) where
local management deems it appropriate
Water proof matches
Small container of gas line antifreeze where ap-
plicable
Tool kit
Small tarp
Emergency food source
Spare drive belt and spark plugs where appli-
cable.
Whip fag antennae
6.0 Personal Protective Equipment
CSA approved helmet. DOT/Snell approved in US.
Goggles or safety glasses
Gloves
Appropriate CSA approved footwear
Refective clothing
Transporting
6.1 Proper procedures must be developed and followed
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
128
Standard Safety Practices Manual
129
while loading and of-loading ATVs, which can be a
very hazardous task.
7.0 Transporting of quad units

V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
B
P

C
a
n
a
d
a

E
n
e
r
g
y


G
a
s

P
e
r
f
o
r
m
a
n
c
e

U
n
i
t


P
R
O
C
E
D
U
R
E

T
I
T
L
E
:



Q
U
A
D

L
O
A
D
-
O
F
F
L
O
A
D

P
R
O
C
E
D
U
R
E



P
R
O
C
E
D
U
R
E

#
:




L
O
C
A
T
I
O
N
:



C
G
P
U

D
A
T
E

I
S
S
U
E
D
:

N
O
V
.

1
1
T
H
,

2
0
0
5

D
A
T
E

R
E
V
I
S
E
D
:




J
A
N
U
A
R
Y

2
1
/
0
6

P
R
E
P
A
R
E
D

B
Y
:



A
T
V

S
T
A
N
D
A
R
D

C
O
M
M
I
T
T
E
E

A
P
P
R
O
V
E
D

B
Y
:


g
H
S
S
E
r

C
O
M
M
I
T
T
E
E


J
o
b

S
t
e
p
s

P
o
t
e
n
t
i
a
l

H
a
z
a
r
d
s
/
L
o
s
s

C
o
n
t
r
o
l

S
t
a
t
e
m
e
n
t
(
s
)

C
o
n
t
r
o
l

C
o
d
e

1

T
h
e

f
o
l
l
o
w
i
n
g

p
r
o
c
e
d
u
r
e

h
a
s

b
e
e
n

d
e
v
e
l
o
p
e
d

t
o

p
r
o
v
i
d
e

o
p
e
r
a
t
o
r
s

o
f

b
o
t
h

q
u
a
d

a
n
d

6
x
6

u
n
i
t
s

a

s
a
f
e

t
o
o
l

t
o

l
o
a
d

a
n
d

o
f
f
l
o
a
d

t
h
e

u
n
i
t
s

f
r
o
m

a

t
r
a
n
s
p
o
r
t

u
n
i
t

(
o
u
t

o
f

t
h
e

b
a
c
k

o
f

a

t
r
u
c
k

b
o
x
,

f
r
o
m

a

t
r
a
i
l
e
r

u
n
i
t

o
r

f
r
o
m

a

q
u
a
d

d
e
c
k
.
)



F
i
r
s
t

a
n
d

f
o
r
e
m
o
s
t

t
h
e

o
p
e
r
a
t
o
r

o
f

t
h
e

r
e
f
e
r
r
e
d

q
u
a
d

/

6
X
6

u
n
i
t

m
u
s
t

h
a
v
e

s
u
c
c
e
s
s
f
u
l
l
y

p
a
s
s
e
d

a

r
e
c
o
g
n
i
z
e
d

a
l
l
-
t
e
r
r
a
i
n

v
e
h
i
c
l
e

c
o
u
r
s
e
.

I
n
-
e
x
p
e
r
i
e
n
c
e
d

q
u
a
d

o
p
e
r
a
t
o
r
s

m
a
y

n
o
t

h
a
v
e

k
n
o
w
l
e
d
g
e

o
f

t
h
e

p
r
o
p
e
r

u
s
e

o
f

a

q
u
a
d
,

i
t
s

l
i
m
i
t
a
t
i
o
n
s

e
t
c

a
n
d

m
a
y

n
o
t

k
n
o
w

t
h
e

s
p
e
c
i
f
i
c

s
i
t
e

s
p
e
c
i
f
i
c

t
o
o
l
s

a
n
d

p
r
o
c
e
d
u
r
e
s

t
o

e
n
s
u
r
e

s
a
f
e

o
p
e
r
a
t
i
o
n

o
f

a

q
u
a
d

A
l
l

o
p
e
r
a
t
o
r
s

o
f

q
u
a
d
s

M
U
S
T

h
a
v
e

c
e
r
t
i
f
i
c
a
t
i
o
n

o
f

s
u
c
c
e
s
s
f
u
l
l
y

p
a
s
s
i
n
g

a

r
e
c
o
g
n
i
z
e
d

a
l
l
-
t
e
r
r
a
i
n

v
e
h
i
c
l
e

o
p
e
r
a
t
o
r
s

c
o
u
r
s
e
.



T
h
e

C
o
m
p
o
n
e
n
t
s

o
f

t
h
e

t
r
a
i
n
i
n
g

m
u
s
t

b
e

c
o
n
s
i
s
t
e
n
t

w
i
t
h

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

2
.


T
/
S

M
S
-
8
6
0

2

E
n
s
u
r
e

t
h
a
t

t
h
e

o
p
e
r
a
t
o
r

o
f

t
h
e

Q
u
a
d

h
a
s

b
e
e
n

t
r
a
i
n
e
d

i
n

a
l
l

s
i
t
e

s
p
e
c
i
f
i
c

p
r
o
c
e
d
u
r
e
s

i
n
v
o
l
v
i
n
g

t
h
e

p
r
o
p
e
r

u
s
e

a
n
d

o
p
e
r
a
t
i
o
n

o
f

t
h
e

u
n
i
t

i
n

h
i
s

s
p
e
c
i
f
i
c

a
r
e
a
.


S
a
m
e

a
s

a
b
o
v
e

M
u
s
t

h
a
v
e

r
e
v
i
e
w
e
d

a
n
d

b
e
e
n

t
r
a
i
n
e
d

i
n

a
l
l

t
h
e

s
i
t
e

s
p
e
c
i
f
i
c

p
r
o
c
e
d
u
r
e
s

i
n
v
o
l
v
i
n
g

q
u
a
d

u
s
e
.

D
o
c
u
m
e
n
t
a
t
i
o
n

o
f

t
h
i
s

m
u
s
t

b
e

i
n

p
l
a
c
e
.

T
h
e

C
o
m
p
o
n
e
n
t
s

o
f

t
h
e

t
r
a
i
n
i
n
g

m
u
s
t

b
e

c
o
n
s
i
s
t
e
n
t

w
i
t
h

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

2
.



T
/
S

M
S
-
8
6
0

Standard Safety Practices Manual
128
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
129
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e


J
o
b

S
t
e
p
s

P
o
t
e
n
t
i
a
l

H
a
z
a
r
d
s
/
L
o
s
s

C
o
n
t
r
o
l

S
t
a
t
e
m
e
n
t
(
s
)

C
o
n
t
r
o
l

C
o
d
e

3

I
f

t
h
e

q
u
a
d

h
a
s

t
o

b
e

l
o
a
d
e
d

o
n
t
o

a

t
r
a
n
s
p
o
r
t

u
n
i
t

a
n
d

m
o
v
e
d

t
o

a

l
o
c
a
t
i
o
n

p
r
i
o
r

t
o

i
t
s

u
s
e
,

t
h
e

o
p
e
r
a
t
o
r

m
u
s
t

b
e

t
r
a
i
n
e
d

i
n

t
h
e

p
r
o
p
e
r

u
s
e

o
f

t
h
e

t
r
a
n
s
p
o
r
t

u
n
i
t
,

t
h
e

m
i
n
i
m
u
m

r
e
q
u
i
r
e
m
e
n
t
s

o
f

t
h
e

t
r
a
n
s
p
o
r
t

u
n
i
t

a
n
d

t
h
e

p
r
o
c
e
d
u
r
e

t
o

l
o
a
d

t
h
e

q
u
a
d

o
n
t
o

t
h
e

u
n
i
t
.

T
h
e

u
n
i
t

m
a
y

n
o
t

b
e

d
e
s
i
g
n
e
d

t
o

s
a
f
e
l
y

t
r
a
n
s
p
o
r
t

a

q
u
a
d

d
u
e

t
o

i
t
s

s
i
z
e
,

s
h
a
p
e
,

l
a
y
o
u
t

e
t
c
,

a
n
d

c
o
u
l
d

r
e
s
u
l
t

i
n

i
n
j
u
r
y

t
o

t
h
e

o
p
e
r
a
t
o
r

a
n
d

o
r

e
q
u
i
p
m
e
n
t
.

T
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

m
u
s
t

b
e

o
f

a
n

a
p
p
r
o
v
e
d

t
y
p
e

a
n
d

m
u
s
t

b
e

a
p
p
r
o
v
e
d

b
y

t
h
e

F
o
r
e
m
a
n

o
f

t
h
e

a
r
e
a
,

b
e
f
o
r
e

i
t
s

u
s
e
.

T
h
i
s

a
p
p
r
o
v
a
l

m
u
s
t

b
e

d
o
c
u
m
e
n
t
e
d
.

T
h
e

t
r
a
n
s
p
o
r
t

v
e
h
i
c
l
e

m
u
s
t

m
e
e
t

t
h
e

r
e
q
u
i
r
e
m
e
n
t
s

w
i
t
h

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

9
,

1
0
,

o
r

1
1
.

T
/
S

M
S
-
8
6
0

4

E
n
s
u
r
e

t
h
a
t

a
n

a
d
e
q
u
a
t
e

a
p
p
r
o
v
e
d

r
a
m
p

i
s

a
v
a
i
l
a
b
l
e

t
o

p
e
r
f
o
r
m

t
h
e

l
o
a
d
i
n
g

t
a
s
k
.

D
u
e

t
o

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

d
e
s
i
g
n

a
n
d

t
h
e

r
a
m
p

d
e
s
i
g
n

t
h
e
y

m
a
y

n
o
t

b
e

c
o
m
p
a
t
i
b
l
e

a
n
d

c
o
u
l
d

l
e
a
d

t
o

p
e
r
s
o
n
a
l

i
n
j
u
r
y

o
r

e
q
u
i
p
m
e
n
t

d
a
m
a
g
e
.

R
a
m
p
s

m
u
s
t

b
e

a
p
p
r
o
v
e
d

b
y

t
h
e

A
r
e
a

F
o
r
e
m
a
n
,

w
h
o

w
i
l
l

e
n
s
u
r
e

t
h
a
t

a
l
l

u
s
e
r
s

a
r
e

a
w
a
r
e

o
f

i
t
s

p
r
o
p
e
r

o
p
e
r
a
t
i
o
n

a
n
d

t
h
a
t

t
h
e
y

(
t
h
e

r
a
m
p

u
s
e
r
s
)

p
r
o
p
e
r
l
y

i
n
s
p
e
c
t

t
h
e
m

p
r
i
o
r

t
o

u
s
e

t
o

e
n
s
u
r
e

t
h
a
t

t
h
e
y

a
r
e

i
n

g
o
o
d

r
e
p
a
i
r
.

D
o
c
u
m
e
n
t

i
n
s
p
e
c
t
i
o
n

o
n

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

c
h
e
c
k
l
i
s
t


r
e
f
e
r

t
o

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

9
.
9
0

R
e
c
o
m
m
e
n
d
a
t
i
o
n

i
s

t
h
e

F
u
l
t
o
n

T
r
i
f
o
l
d

R
a
m
p

(
S
R
7
7
)

-

r
e
f
e
r

t
o

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

1
2
.
2
.

T
/
E

5

P
o
s
i
t
i
o
n

t
h
e

t
r
a
n
s
p
o
r
t

u
n
i
t

a
s

b
e
s
t

p
o
s
s
i
b
l
e

u
s
i
n
g

t
h
e

p
r
o
f
i
l
e

o
f

t
h
e

t
e
r
r
a
i
n

t
o

d
e
c
r
e
a
s
e

t
h
e

a
n
g
l
e

o
f

t
h
e

r
a
m
p
s
.

M
o
r
e

a
n
g
l
e

o
f

t
h
e

r
a
m
p
s
,

t
h
e

g
r
e
a
t
e
r

t
h
e

r
i
s
k

f
o
r

a
n

i
n
c
i
d
e
n
t

t
o

o
c
c
u
r

d
u
r
i
n
g

t
h
e

l
o
a
d
i
n
g

o
p
e
r
a
t
i
o
n
.

C
o
m
p
l
e
t
e

a

s
i
t
e

w
a
l
k

a
r
o
u
n
d

p
r
i
o
r

t
o

p
o
s
i
t
i
o
n
i
n
g

t
h
e

t
r
a
n
s
p
o
r
t

u
n
i
t

t
o

l
o
a
d

t
h
e

q
u
a
d

(
s
)
.

E
n
s
u
r
e

t
h
e

g
r
o
u
n
d

i
s

l
e
v
e
l

a
n
d

u
s
e

t
h
e

t
e
r
r
a
i
n

t
o

l
e
s
s
e
n

t
h
e

s
l
o
p
e

o
f

t
h
e

r
a
m
p
s
.

T

6

T
e
s
t

t
h
e

b
r
a
k
e
s

o
n

t
h
e

q
u
a
d

b
e
f
o
r
e

a
t
t
e
m
p
t
i
n
g

t
o

l
o
a
d

t
o

e
n
s
u
r
e

a
d
e
q
u
a
t
e

o
p
e
r
a
t
i
o
n
.

A
n

a
p
p
r
o
v
e
d

A
T
V

h
e
l
m
e
t

a
n
d

w
o
r
k

b
o
o
t
s

m
u
s
t

b
e

w
o
r
n

w
h
e
n
e
v
e
r

t
h
e

q
u
a
d

i
s

i
n

m
o
t
i
o
n
.

U
n
a
b
l
e

t
o

s
t
o
p

t
h
e

q
u
a
d

w
h
e
n

l
o
a
d
i
n
g
.


B
r
a
k
e
s

m
u
s
t

b
e

i
n

g
o
o
d

o
p
e
r
a
t
i
o
n

c
o
n
d
i
t
i
o
n
.


E
n
s
u
r
e

t
h
e

Q
u
a
d

P
r
e
/
P
o
s
t

T
r
i
p

I
n
s
p
e
c
t
i
o
n

C
h
e
c
k

L
i
s
t

(
C
H
-
A
-
0
0
0
2
)

i
s

c
o
m
p
l
e
t
e
d

p
r
i
o
r

t
o

o
p
e
r
a
t
i
n
g

t
h
e

q
u
a
d
.

T
/

E

7

E
n
s
u
r
e

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

i
s

c
l
e
a
r

o
f

a
n
y

d
e
b
r
i
s

o
r

o
t
h
e
r

e
q
u
i
p
m
e
n
t
,

p
r
i
o
r

t
o

l
o
a
d
i
n
g
.

M
a
y

c
a
u
s
e

u
n
i
t

t
o

b
e

u
n
s
t
a
b
l
e
.

T
h
e

l
o
a
d

a
r
e
a

m
u
s
t

b
e

f
r
e
e

o
f

a
n
y

m
a
t
e
r
i
a
l
,

t
o
o
l
s

o
r

s
u
p
p
l
i
e
s

a
n
d

t
h
e

d
e
c
k

m
u
s
t

b
e

c
l
e
a
n

o
f

a
n
y

s
l
i
p
p
e
r
y

s
u
r
f
a
c
e
s
.

T

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
130
Standard Safety Practices Manual
131
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e


J
o
b

S
t
e
p
s

P
o
t
e
n
t
i
a
l

H
a
z
a
r
d
s
/
L
o
s
s

C
o
n
t
r
o
l

S
t
a
t
e
m
e
n
t
(
s
)

C
o
n
t
r
o
l

C
o
d
e

8

I
n
s
t
a
l
l

t
h
e

r
a
m
p
s

t
o

t
h
e

t
r
a
n
s
p
o
r
t

u
n
i
t

e
n
s
u
r
i
n
g

t
h
a
t

t
h
e

r
a
m
p
s

a
r
e

s
a
f
e
l
y

s
e
c
u
r
e
d

t
o

t
h
e

t
r
a
n
s
p
o
r
t

u
n
i
t
.

R
a
m
p
s

m
a
y

b
e
c
o
m
e

d
e
-
t
a
c
h
e
d

f
r
o
m

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t
,

o
r

n
o
t

b
e

d
e
s
i
g
n
e
d

f
o
r

t
h
e

u
s
e

t
h
a
t

i
s

r
e
q
u
i
r
e
d
.

E
n
s
u
r
e

t
h
e

r
a
m
p
s

a
r
e

d
e
s
i
g
n
e
d

f
o
r

t
h
e

q
u
a
d

w
e
i
g
h
t

a
n
d

s
i
z
e
.


E
n
s
u
r
e

t
h
e

r
a
m
p
s

a
r
e

i
n

g
o
o
d

c
o
n
d
i
t
i
o
n

w
i
t
h

a
l
l

s
e
c
u
r
i
n
g

m
e
c
h
a
n
i
s
m
s

i
n

p
l
a
c
e

a
n
d

i
n

g
o
o
d

r
e
p
a
i
r
.

R
e
f
e
r

t
o

t
h
e

Q
u
a
d

P
r
e

/
P
o
s
t

C
h
e
c
k

l
i
s
t

r
e
f
e
r
r
e
d

t
o

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

4
.

T

9

D
r
i
v
e

t
h
e

q
u
a
d
s

t
o

t
h
e

r
a
m
p
s
,

s
t
o
p
p
i
n
g

j
u
s
t

s
h
o
r
t

o
f

r
a
m
p
s
.

E
n
s
u
r
e

t
h
a
t

t
h
e

q
u
a
d

i
s

i
n

t
h
e

4
X
4

m
o
d
e

a
n
d

i
n

t
h
e

l
o
w
e
s
t

g
e
a
r
.


S
t
a
n
d

o
n

t
h
e

q
u
a
d

s

f
o
o
t

p
e
g
s

a
n
d

l
e
a
n
i
n
g

s
l
i
g
h
t
l
y

f
o
r
w
a
r
d

w
i
t
h

k
n
e
e
s

b
e
n
t

s
l
i
g
h
t
l
y
;

s
l
o
w
l
y

p
r
o
c
e
e
d

u
p

t
h
e

r
a
m
p
.

A

l
o
a
d
i
n
g

i
n
c
i
d
e
n
t

c
o
u
l
d

o
c
c
u
r

w
h
e
r
e

t
h
e

o
p
e
r
a
t
o
r

c
o
u
l
d

s
u
s
t
a
i
n

p
e
r
s
o
n
a
l

i
n
j
u
r
y

o
r

t
h
e

q
u
a
d

/

r
a
m
p
s

c
o
u
l
d

b
e

d
a
m
a
g
e
d
.

O
p
e
r
a
t
o
r
s

m
u
s
t

w
e
a
r

a
n

a
p
p
r
o
v
e
d

h
e
l
m
e
t

-

r
e
f
e
r

t
o

M
S
-
8
6
0
,

A
p
p
e
n
d
i
x

1
,

s
e
c
t
i
o
n

6
.

L
o
w

g
e
a
r

a
n
d

i
n

t
h
e

4
X
4

m
o
d
e

w
i
l
l

e
n
s
u
r
e

r
e
q
u
i
r
e
d

p
o
w
e
r

a
n
d

t
r
a
c
t
i
o
n

i
s

a
v
a
i
l
a
b
l
e
.

S
t
a
n
d
i
n
g

o
n

t
h
e

p
e
g
s

a
n
d

l
e
a
n
i
n
g

f
o
r
w
a
r
d
,

t
h
e

o
p
e
r
a
t
o
r

w
i
l
l

h
a
v
e

t
h
e

b
e
s
t

c
o
n
t
r
o
l

o
f

t
h
e

q
u
a
d
.

P
r
o
c
e
e
d
i
n
g

s
l
o
w
l
y

r
e
d
u
c
e
s

t
h
e

r
i
s
k

o
f

n
o
t

b
e
i
n
g

a
b
l
e

t
o

s
t
o
p

i
n

t
h
e

d
e
s
i
r
e
d

p
o
s
i
t
i
o
n
.

T
/
E
/
S

1
0

O
n
c
e

t
h
e

q
u
a
d

h
a
s

c
l
e
a
r
e
d

t
h
e

r
a
m
p
s

a
n
d

i
s

o
n

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

s

d
e
c
k
,

s
l
o
w
l
y

m
o
v
e

t
h
e

q
u
a
d

t
o

i
t
s

d
e
s
i
r
e
d

l
o
c
a
t
i
o
n
,

s
t
o
p
,

e
n
g
a
g
e

t
h
e

p
a
r
k

b
r
a
k
e

a
n
d

s
h
u
t

o
f
f

t
h
e

e
n
g
i
n
e
.

T
h
e

u
n
i
t

c
o
u
l
d

i
n
-
a
d
v
e
r
t
a
n
t
l
y

m
o
v
e

o
f
f

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t
.

P
a
r
k

b
r
a
k
e

m
u
s
t

b
e

e
n
g
a
g
e
d

a
n
d

t
h
e

u
n
i
t

l
e
f
t

i
n

g
e
a
r

a
n
d

t
h
e

e
n
g
i
n
e

s
h
u
t

o
f
f
.

C
o
n
s
i
d
e
r

a

c
u
s
h
i
o
n

t
y
p
e

d
e
v
i
c
e

f
o
r

t
h
e

f
r
o
n
t

o
f

t
h
e

t
r
u
c
k
.

T

1
1

S
e
c
u
r
e

t
h
e

q
u
a
d

w
i
t
h

a

m
i
n
i
m
u
m

o
f

f
o
u
r

n
y
l
o
n

t
i
e
-
d
o
w
n

s
t
r
a
p
s

(
r
a
t
c
h
e
t

t
y
p
e
)

t
o

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

s

d
e
c
k
.


U
n
i
t

c
o
u
l
d

l
e
a
v
e

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

a
n
d

c
a
u
s
e

d
a
m
a
g
e
.

U
s
e

p
r
o
p
e
r

n
y
l
o
n

t
i
e
-
d
o
w
n

s
t
r
a
p
s

a
n
d

s
e
c
u
r
e

t
h
e

s
t
r
a
p
s

t
o

t
h
e

q
u
a
d

a
n
d

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

s

t
i
e
-
d
o
w
n

p
o
i
n
t
s
.


T
h
e

q
u
a
d

u
n
i
t

m
u
s
t

b
e

s
e
c
u
r
e
d

o
n

a
l
l

f
o
u
r

c
o
r
n
e
r
s
.

D
O
-
N
O
T

u
s
e

t
h
e

w
i
n
c
h

c
a
b
l
e

a
s

a

t
i
e

d
o
w
n
.

T

1
2

C
o
m
p
l
e
t
e

a

w
a
l
k

a
r
o
u
n
d

o
f

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

d
e
v
i
c
e

t
o

e
n
s
u
r
e

t
h
a
t

t
h
e

u
n
i
t

i
s

p
r
o
p
e
r
l
y

s
e
c
u
r
e
d

a
n
d

t
h
a
t

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

c
a
n

b
e

s
a
f
e
l
y

m
o
v
e
d
.

O
t
h
e
r

h
a
z
a
r
d
s

c
o
u
l
d

i
m
p
e
d
e

t
h
e

u
n
i
t

s

m
o
v
e
m
e
n
t

r
e
s
u
l
t
i
n
g

i
n

i
n
j
u
r
y

o
r

e
q
u
i
p
m
e
n
t

d
a
m
a
g
e
.

C
o
m
p
l
e
t
e

a

u
n
i
t

f
i
n
a
l

i
n
s
p
e
c
t
i
o
n

a
n
d

a
n

a
r
e
a

w
a
l
k

a
r
o
u
n
d
.

C
h
o
o
s
e

a
n

e
g
r
e
s
s

p
a
t
h

f
r
e
e

o
f

o
b
s
t
r
u
c
t
i
o
n
s

a
n
d

h
a
z
a
r
d
s
.

T

Standard Safety Practices Manual
130
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
131
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e


J
o
b

S
t
e
p
s

P
o
t
e
n
t
i
a
l

H
a
z
a
r
d
s
/
L
o
s
s

C
o
n
t
r
o
l

S
t
a
t
e
m
e
n
t
(
s
)

C
o
n
t
r
o
l

C
o
d
e

1
3

T
r
a
n
s
p
o
r
t

t
h
e

q
u
a
d
s

v
i
a

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

t
o

i
t
s

d
e
s
i
r
e
d

l
o
c
a
t
i
o
n
.

D
r
i
v
i
n
g

h
a
z
a
r
d
s
,

r
o
a
d

c
o
n
d
i
t
i
o
n
s
,

w
e
a
t
h
e
r
,

e
t
c
.

m
a
y

c
o
n
t
r
i
b
u
t
e

t
o

a
n

i
n
c
i
d
e
n
t

a
n
d

o
r

i
n
j
u
r
y

d
u
e

t
o

t
h
e

u
n
f
a
v
o
r
a
b
l
e

c
o
n
d
i
t
i
o
n
s

f
o
r

t
h
e

t
r
a
n
s
p
o
r
t

v
e
h
i
c
l
e
.

C
o
m
p
l
e
t
e

a

s
a
f
e

j
o
u
r
n
e
y

m
a
n
a
g
e
m
e
n
t

p
l
a
n

p
r
i
o
r

t
o

s
t
a
r
t
i
n
g

t
h
e

t
r
i
p
.


T
a
k
e

t
h
e

t
i
m
e

t
o

s
a
f
e
l
y

s
t
o
p

a
n
d

c
h
e
c
k

t
h
e

s
e
c
u
r
e
d

l
o
a
d

d
u
r
i
n
g

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

t
r
i
p
.

T

1
4

O
n
c
e

a
t

t
h
e

d
e
s
i
r
e
d

l
o
c
a
t
i
o
n
,

c
h
o
o
s
e

a

s
p
o
t

t
o

o
f
f
l
o
a
d

t
h
e

q
u
a
d
,

a
g
a
i
n

u
s
i
n
g

t
h
e

t
e
r
r
a
i
n

a
s

a
n

a
d
v
a
n
t
a
g
e

t
o

l
e
s
s
e
n

t
h
e

s
l
o
p
e

o
f

t
h
e

r
a
m
p
(
s
)

a
n
d

t
o

e
n
s
u
r
e

t
h
e

u
n
i
t

i
s

l
e
v
e
l
.

C
o
m
p
l
e
t
e

a

h
a
z
a
r
d

a
s
s
e
s
s
m
e
n
t

o
f

t
h
e

o
f
f
l
o
a
d

a
r
e
a
.

E
q
u
i
p
m
e
n
t

d
a
m
a
g
e

m
a
y

o
c
c
u
r

i
n

s
p
o
t
t
i
n
g

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

a
n
d

o
r

d
u
r
i
n
g

t
h
e

o
f
f
l
o
a
d

p
r
o
c
e
d
u
r
e
.

P
r
i
o
r

t
o

s
p
o
t
t
i
n
g

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t
,

c
o
m
p
l
e
t
e

a
n

a
r
e
a

h
a
z
a
r
d

a
s
s
e
s
s
m
e
n
t
,

c
h
o
o
s
e

a

l
e
v
e
l

l
o
c
a
t
i
o
n

f
r
e
e

o
f

a
n
y

h
a
z
a
r
d
s

a
n
d

w
i
t
h

s
a
f
e

a
c
c
e
s
s

a
n
d

e
g
r
e
s
s
.

T

1
5

O
n
c
e

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

i
s

s
e
c
u
r
e
d

(
p
a
r
k

b
r
a
k
e

s
e
t

o
n

t
h
e

t
r
u
c
k
)
,

e
n
s
u
r
e

t
h
e

q
u
a
d

s

p
a
r
k

b
r
a
k
e

i
s

s
t
i
l
l

e
n
g
a
g
e
d

a
n
d

p
r
e
p
a
r
e

t
o

o
f
f
l
o
a
d
.



U
n
i
t

c
o
u
l
d

i
n
a
d
v
e
r
t
e
n
t
l
y

m
o
v
e

c
a
u
s
i
n
g

p
e
r
s
o
n
a
l

i
n
j
u
r
y

o
r

e
q
u
i
p
m
e
n
t

d
a
m
a
g
e
.

E
n
s
u
r
e

t
h
e

q
u
a
d

s

p
a
r
k

b
r
a
k
e

i
s

e
n
g
a
g
e
d
.

T

1
6

I
n
s
t
a
l
l

t
h
e

r
a
m
p
s

t
o

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t
.

R
a
m
p
s

m
a
y

b
e
c
o
m
e

d
e
t
a
c
h
e
d

f
r
o
m

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t
,

o
r

n
o
t

b
e

d
e
s
i
g
n
e
d

f
o
r

t
h
e

u
s
e

t
h
a
t

i
s

r
e
q
u
i
r
e
d
.

E
n
s
u
r
e

t
h
e

r
a
m
p
s

a
r
e

d
e
s
i
g
n
e
d

f
o
r

t
h
e

q
u
a
d

w
e
i
g
h
t

a
n
d

s
i
z
e
.


E
n
s
u
r
e

t
h
e

r
a
m
p
s

a
r
e

i
n

g
o
o
d

c
o
n
d
i
t
i
o
n

w
i
t
h

a
l
l

s
e
c
u
r
i
n
g

m
e
c
h
a
n
i
s
m
s

i
n

p
l
a
c
e

a
n
d

i
n

g
o
o
d

r
e
p
a
i
r
.

C
h
e
c
k

t
h
e

o
f
f
l
o
a
d

a
r
e
a

a
n
d

s
e
e

i
f

y
o
u

r
e
q
u
i
r
e

a

s
t
o
p
p
i
n
g

d
e
v
i
c
e

(
e
n
s
u
r
e

t
h
e

q
u
a
d

c
a
n
n
o
t

f
r
e
e

w
h
e
e
l

i
n
t
o

a

s
t
a
t
i
o
n
a
r
y

o
b
j
e
c
t

o
r

h
a
z
a
r
d
.
)

A

s
t
o
p
p
i
n
g

d
e
v
i
c
e

c
o
u
l
d

b
e

a

s
m
a
l
l

l
o
g

o
r

a

4
X
4

p
o
s
t
.

T

1
7

C
h
e
c
k

t
o

s
e
e

i
f

t
h
e

p
a
r
k

b
r
a
k
e

i
s

s
t
i
l
l

e
n
g
a
g
e
d

a
n
d

s
h
i
f
t

t
h
e

q
u
a
d

i
n
t
o

n
e
u
t
r
a
l
.

S
a
f
e
l
y

r
e
m
o
v
e

t
h
e

t
i
e
-
d
o
w
n

s
t
r
a
p
s

a
n
d

s
t
o
r
e

t
h
e

s
t
r
a
p
s

i
n

a
n

a
r
e
a

t
h
a
t

w
i
l
l

n
o
t

i
m
p
e
d
e

w
i
t
h

t
h
e

s
a
f
e

o
f
f
l
o
a
d

o
f

t
h
e

q
u
a
d

u
n
i
t
.

Q
u
a
d

u
n
i
t

c
o
u
l
d

m
o
v
e

r
e
s
u
l
t
i
n
g

i
n

p
e
r
s
o
n
a
l

i
n
j
u
r
y

o
r

e
q
u
i
p
m
e
n
t

d
a
m
a
g
e
.

R
e
-
c
h
e
c
k

t
h
e

p
a
r
k

b
r
a
k
e

a
n
d

e
n
s
u
r
e

t
h
a
t

t
h
e
r
e

a
r
e

n
o

o
b
s
t
r
u
c
t
i
o
n
s

i
n

t
h
e

q
u
a
d

s

p
a
t
h

t
h
a
t

w
i
l
l

i
m
p
e
d
e

a

s
a
f
e

o
f
f
l
o
a
d
.

T

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
132
Standard Safety Practices Manual
133
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e


J
o
b

S
t
e
p
s

P
o
t
e
n
t
i
a
l

H
a
z
a
r
d
s
/
L
o
s
s

C
o
n
t
r
o
l

S
t
a
t
e
m
e
n
t
(
s
)

C
o
n
t
r
o
l

C
o
d
e

1
8

P
o
s
i
t
i
o
n

y
o
u
r
s
e
l
f

t
o

t
h
e

f
r
o
n
t

o
f

t
h
e

q
u
a
d

a
n
d

r
e
l
e
a
s
e

t
h
e

p
a
r
k

b
r
a
k
e
.

P
l
a
n
t

f
e
e
t

f
i
r
m
l
y

a
n
d

s
l
o
w
l
y

p
u
s
h

t
h
e

q
u
a
d

t
o
w
a
r
d

t
h
e

r
a
m
p
s
.

W
o
r
k
e
r

c
o
u
l
d

f
a
l
l

o
f
f

o
f

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

r
e
s
u
l
t
i
n
g

i
n

a

p
e
r
s
o
n
a
l

i
n
j
u
r
y
.

E
n
s
u
r
e

t
h
a
t

y
o
u

c
a
n

s
a
f
e
l
y

g
e
t

t
o

t
h
e

f
r
o
n
t

o
f

t
h
e

q
u
a
d

(
s
e
l
e
c
t

t
h
e

e
a
s
i
e
s
t

a
n
d

s
a
f
e
s
t

r
o
u
t
e
.
)

E
n
s
u
r
e

o
f

g
o
o
d

f
o
o
t
i
n
g
.

T

1
9

O
n
c
e

t
h
e

q
u
a
d

i
s

p
a
r
t
i
a
l
l
y

d
o
w
n

t
h
e

r
a
m
p

a
n
d

w
a
n
t
i
n
g

t
o

m
o
v
e

d
o
w
n
w
a
r
d

o
n

i
t
s

o
w
n
,

u
s
e

t
h
e

h
a
n
d

b
r
a
k
e
s

t
o

s
l
o
w

t
h
e

p
r
o
g
r
e
s
s
.


O
n
c
e

t
h
e

q
u
a
d

i
s

p
o
s
i
t
i
o
n
e
d

a
b
o
u
t

t
w
o

t
h
i
r
d
s

o
n

t
h
e

r
a
m
p

a
n
d

y
o
u

a
r
e

s
t
i
l
l

s
t
a
n
d
i
n
g

w
e
l
l

o
n

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t
,

r
e
l
e
a
s
e

t
h
e

b
r
a
k
e
s

a
n
d

a
l
l
o
w

t
h
e

q
u
a
d

t
o

d
e
s
c
e
n
d

t
h
e

r
e
s
t

o
f

t
h
e

w
a
y

o
n

i
t
s

o
w
n

(
f
r
e
e

w
h
e
e
l
.
)

W
o
r
k
e
r

c
o
u
l
d

f
a
l
l

o
f
f

o
f

t
h
e

t
r
a
n
s
p
o
r
t
a
t
i
o
n

u
n
i
t

r
e
s
u
l
t
i
n
g

i
n

a

p
e
r
s
o
n
a
l

i
n
j
u
r
y
.

C
o
n
d
u
c
t

t
h
i
s

t
a
s
k

s
l
o
w
l
y

a
n
d

i
f

y
o
u

l
o
o
s
e

c
o
n
t
r
o
l
;

l
e
t

g
o

o
f

t
h
e

q
u
a
d

a
n
d

e
n
s
u
r
e

t
h
a
t

y
o
u

p
r
e
v
e
n
t

y
o
u
r
s
e
l
f

f
r
o
m

i
n
j
u
r
y
.

T


Standard Safety Practices Manual
132
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
133
8.0 Trailer Checks (Pre / post use)
Trailer decking must provide adequate unob-
structed surface area to provide safe load ooad
of the ATV unit
Hitch safety chains and securing pin (lock, pin,
bolt)
Trailer ball / reciever compatability
Tire conditions
Spare tire
Trailer jack
Lights working condition
Licence plate and registration
General trailer condition
Trailer ramps must be checked for working
condition (cracks, ramp securing devices, welds,
hinge joints, damage, clean free of mud / ice)
Suggested manufacturer: Fulton Trifold Utility
model SR77
Ratchet straps and securing points are in good
working condition
Trailer must be regulary maintained to the
manufactures specications such as (axle bear-
ings, wheel lug torque, hitch wear, suspension)
9.0 Truck Box
Truck box must provide adequate unobstructed
surface area to provide safe load / ofoad of the
ATV unit
Tailgate cables and attachment points must be
inspected for damage, corrosion and wear
Ensure that the tailgate hinges and latches are in
safe working condition
Ratchet straps and securing points are in good
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
134
Standard Safety Practices Manual
135
working condition
Portable ramps must be checked for working
condition (cracks, ramp securing devices, welds,
hinge joints, damage, clean free of mud / ice)
Suggested manufacturer: Fulton Trifold Utility
model SR77
No ATV units are to be carried on the tailgate
due to the unrated load capacity of the tailgate
APPENDIX 2
BP CGPU Winter Tire Requirements
1.0 Scope and Applicability
1.1 Tis policy applies to BP Canada Energy BP Canada
Gas Performance Unit(CGPU) vehicles operated on
BP business within the November 1 to March 31
timeframe.
1.2 Tis policy provides requirements and guidance for
winter tire and studded tire usage for BP vehicles.
1.3 Te purpose of this policy is to ensure that all BP
vehicles are equipped with the most appropriate tires
for winter driving conditions.
1.4 All BP owned vehicles operated within the Canada
Gas Performance Unit will be equipped with Winter
Tires during the winter months as described above.
1.5 It is also expected that long term contractors (those
working on our sites in excess of 30 days) will abide
by this policy.
2.0 Denitions
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e
Standard Safety Practices Manual
134
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
135
2.1 Snow Tire -Tese tires have tire tread composed of
special rubber compounds and tread designs that
enhance their performance in snow and ice condi-
tions. Studless winter tires (typically Q-rated with a
mountain-snowfake symbol shown below) are now
available to motorists as a substitute for studded tires.
2.2 Studded Tire Tese tires are designed for ice and
snow conditions. Tey can be used alternatively to
Snow Tires.
3.0 Scope of Responsibility
3.1 It is the responsibility of the manager at each site to
ensure that all of the BP owned vehicles are equipped
with snow or studded tires during the mandatory
period of November 1 through March 31. If driving
conditions deteriorate before November 1 it is rec-
ommended that snow or studded tires are installed
at that time. Also it is recommended that snow or
studded tires are kept on the vehicles until March 31
and until winter conditions subside.
3.2 Snow tires are manufactured and supplied by a
number of manufacturers. CertainTire brands can be
purchased with the PHH card and these should be
used if possible. Any tire that displays the mountain
snowfake symbol on it is considered a snow and ice
tire and is acceptable provided it meets sizing and
rating requirements specied by the manufacturer.
Tires not baring this symbol are not considered a
snow tire. Only Snow Tires and Studded Tires are
considered acceptable.
V
e
h
i
c
l
e

a
n
d

R
o
a
d

P
r
a
c
t
i
c
e


Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
136
Standard Safety Practices Manual
137
4.0 Scope of Training and Qualication
4.1 It is the responsibility of each area manager to
review the Winter Tire requirements with the work-
ing group in the fall before winter driving conditions
set in.
5.0 Snow Tire requirements and guidelines.
5.1 Install four winter tires To help maintain control
and stability of your vehicle in icy conditions, Trans-
port Canada and the Rubber Association of Canada
recommend that you install winter tires in sets of
four. At BP CGPU this is mandatory.
6.0 Scope of References
6.1 http://www.tc.gc.ca/roadsafety/tires/wintertires/
tirelist.htm
6.2 http://www.tc.gc.ca/roadsafety/tires/wintertires/
menu.htm
WORKING AT HEIGHTS PRACTICE
1.0 Scope and Applicability
1.1 Tis Practice applies to BP Canada Gas Performance
Unit (CGPU) employees, contract personnel con-
ducting work for or on behalf of BP, and, all other
visiting personnel who are participating in working
at heights activities on BP Canada premises or work
sites.
1.2 Te purpose of the Practice is to eliminate or mini-
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
136
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
137
mize fall hazards and ensure personnel are protected
while conducting working at heights activities.
1.3 Te Working at Heights Practice states when fall
protection is required and describes the necessary
expectations and responsibilities in the preparation
and execution of conducting work at heights.
2.0 Scope of Denitions
2.1 Anchor Point: any point of attachment for the
purposes of fall protection, certied by a professional
engineer, commonly referred to as an anchor point.
2.2 Competent Worker: One who is adequately quali-
ed, suitably trained and with sucient experience
to safely perform work with minimal or no supervi-
sion (Alberta OH&S SR 13.3).
2.3 CAN/CSA: Canadian Practices Association.
2.4 Deceleration Device: Any mechanism which serves
to dissipate the force of the fall which would
otherwise be imposed on the worker, for example an
OH&S approved energy absorber.
2.5 Engineered: Designed and/or approved by a Regis-
tered Professional Engineer.
2.6 Fall Arresting Device: A device that provides a
means of arresting the accidental vertical or near
vertical fall of an individual, and subsequent to the
arrest of the fall does not, by itself, permit the release
or further lowering of the individual.
2.7 Fall Arrest System: Te system utilized to minimize
the chance for injury during a fall. It consists of
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
138
Standard Safety Practices Manual
139
an engineered anchor point, connecting means and
a full body harness body holding device and shock
absorbing lanyard. (Harness CSA Standard Z259.1
0-M90) (Lanyard CSA Z259.11-M92)
2.8 Fall Restraint System: A system of components
designed to eliminate the chance of an accidental
fall. Tis may be accomplished by use of barricades
and hand railing, or may utilize an anchor point, a
connecting means (such as a lanyard), and a body
supporting device (such as a full body harness).
2.9 Free Fall Distance: Te distance a worker may fall
before a fall arrest system engages and begins to slow
the fall.
2.10 Personal Fall Protection Equipment: Any equip-
ment that is personally tted issued and forms part
of the fall protection system. It is usually composed
of the safety harness. (Harness CSA Standard Z259.-
0-M90)
2.11 Safety Harness: A device used to transfer the forces
experienced during and after a fall to the torso or up-
per legs of a worker. Te 5 point full body harness is
required. Belts or 3 point harnesses are not allowed.
2.12 Shock Absorbing Lanyard Shock Absorbing Devise
used in combination with safety harness designed
to limit the fall arrest forces so they do not exceed
the injury threshold of the human body. (Lanyard
CSA Z259.11-M92)
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
138
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
139
3.0 Scope of Responsibility
3.1 Each worker has the responsibility to recognize fall
hazards and take corrective measures by ensuring this
Practice and the written fall protection program are
followed.
3.2 Te on-site BP representative in charge or designate
must ensure that:
- Workers are trained and veried competent in
the hazards, use, care, and maintenance of fall
protection equipment and including established
procedures or practices relating to the use and care
of the equipment
- Emergency Response Plans are in place when fall
protection equipment is utilized
- Maintenance of an adequate inventory of Personal
Fall Protection Equipment meeting an OSHA,
ANSI or CSA Practice
- A documented fall protection plan is developed as
part of the task hazard risk assessment prior to the
work being performed
- All workers are trained in STOP-THINK-GO and
Time Out for Safety and feel comfortable being
able to exercise these tools
4.0 Scope of Training and Certication
4.1 All workers working at heights must be trained and
competent in fall protection equipment application,
care, use, maintenance, and limitations. Te training
shall be conducted by a qualied trainer. Recom-
mended Fall Protection training is OSSA Certied
(OIL SANDS SAFETY ASSOCIATION) as this
training is currently the best industry practice train-
ing for oil and gas.
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
140
Standard Safety Practices Manual
141
4.2 Any worker responsible for performing rescue activi-
ties must be trained in the proper techniques for the
rescue system.
4.3 Training or retraining is necessary when an employer
has a reason to believe a worker does not have the
necessary understanding and/or skill required.
5.0 Scope of Expectations
5.1 General:
- All workers must ensure that a fall protection
system is utilized when work is to be conducted at
heights that are:
o At or greater than 2 meters, or
o At a height less than 2 meters if there is an
unusual possibility of injury from a fall
- Acceptable fall protection can be provided by
permanent, temporary, or personal CAN/CSA
approved fall protection equipment systems.
- Fall protection system is identied as:
o A personal fall arrest system
o A travel/fall restraint system
o A safety net
o A control zone, or
o Another system approved by a Director of
Inspection
Note: An employers rst choice should require the use
of adequate guardrails to protect personnel. Te guardrail
must meet the design requirements listed in AB OH&S
section 315 or, an OH&S approved travel restraint system
to prevent a worker from reaching an edge from which the
worker could fall.
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
140
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
141
5.1.1 When Personal Fall protection Equipment
is utilized, personnel must wear a CAN/
CSA approved full body harness. (CSA
Standard Z259.10- M90)
5.1.2 When Personal Fall Protection Equipment
is used, these systems must be attached
properly to engineer approved anchor
points with an ultimate load capacity of at
least 22.2 kn. (5000 pounds) per person in
any direction the load can be applied, or
twice the maximum arrest force. Anchor
points used for the attachment of personal
fall protection equipment must be inde-
pendent of any anchorage being used to
support, suspend, or lift platforms or loads.
5.1.3 All Personal Fall Protection Equipment
must be connected and used in accordance
with manufacturers specications and
instructions.
5.1.4 Personal fall arrest systems will be rigged to
minimize the free fall distance to less than
2 meters or the manufactures specication
with a shock absorber and, 1.2 m without
a shock absorber when added distance of
an extended shock absorber creates a greater
risk. Te deceleration force will not exceed
8 Kn and the personal fall protection
system must allow for an unobstructed fall.
5.2 Permanent & Temporary Platforms
A written fall protection plan is required as part of the risk
assessment/pre-job task analysis for working at heights of
1.2 meters or greater from a permanent work platform
or 2 meters and greater from a temporary work area., or
if a worker could fall less than 1.2 meters and there is an
unusual possibility of injury because of additional hazards.
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
142
Standard Safety Practices Manual
143
5.3 Lifts
A fall restraint system is required when conducting work
at heights greater than 2 meters from Scissor lifts, vertical
aerial platforms, or Boomed Genie lifts if the platform
being using is operated on rm, substantially level surface
with the entire manufacturers guardrails and chains in
place and meet Alberta OH&S Sec 315. However, if the
manufacturers specications require the use of a fall arrest
system when the vertical aerial platform is being used, then
the manufacturers specications take precedence and must
be followed. An efective written Emergency Response Pro-
cedure using task hazard analysis / risk assessment must be
developed as part of the Fall Protection Plan as an alternate
to mechanical lift equipment failure.
5.4 Boomed Lifts
A worker working from a boomed Arial Platform or Genie
lift shall be protected from falling by using a personal fall
arrest system consisting of full body harness and shock
absorbing lanyard meeting CSA requirements and a
manufacturer engineered anchor point. Te lanyard if at all
possible should be the length to prevent the worker from
being ejected from the platform but not restrict their work
or compromise the function of the fall arrest system. (CSA
Z259.10 M90 & CSA Z259.11-M92)
5.5 Man baskets
Under normal circumstances, a worker working from
a man basket shall be protected from falling by using a
fall arrest system such as a vertical lifeline and rope grab
combination or a self-retracting lifeline. Te lifeline shall be
secured to an anchor point on the boom of the crane from
which the man basket is suspended. In the event that it is
impracticable to provide a personal fall arrest system for one
or more workers in a man basket, Alberta OH&S section
350 requires that:
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
142
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
143
A separate man basket support be attached
between the suspended man basket and the hoist
line above the hook assembly and
each worker within the man basket wears a full
body harness with lanyard securely attached to
the man basket
Te separate or secondary man basket support,
in combination with worker attachment to the
man basket, functions as a fall arrest system. To
limit a fall distance and the arresting force
experienced by a falling worker, the secondary
man basket support must be as short as possible
An efective written Emergency Response Pro
cedure using task hazard analysis / risk assess
ment must be developed as part of the Fall
Protection Plan as an alternate to Man basket
equipment failure
5.6 Above Water or Liquids
A fall protection system in combination with a life jacket
is required at any height if personnel are to conduct work
above/beside cold or moving water, or other liquids that
pose a drowning hazard to workers other than work from
a boat.
5.7 Vertical Lifelines
Vertical lifelines used in a personal fall arrest systems
installed and utilized shall comply with the following:
Is made of wire rope or appropriate material suit-
able for all relevant work site hazards and secured
to an anchor point capable of withholding 27 Kn
and engineer approved
Extend to a least 1.2 metes from the ground or
safe work platform
Has only one person attached unless other wise
designed by manufacture
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
144
Standard Safety Practices Manual
145
Is efetely protected to prevent abrasion and
secured to minimize swing
5.8 Horizontal Lifelines
Horizontal lifelines used in a personal fall arrest systems
installed and utilized shall comply with the following:
- Is made of wire rope at 12 millimeters in thick-
ness, splice free, capable of withholding 89 Kn
and connecting hardware with a tensile strength
of at least 71Kn, the system must be engineer
approved
- Te horizontal line should extend to no less than
6 meters and no greater than 18 meters and be at
least 2 meters above the working surface
- Secured to an anchor point capable of withhold-
ing 71 Kn and engineer approved
- Personnels free fall distance should be no more
than 1.2 meters with at least 3.5 meters of clear-
ance between the work surface and ground
- No more than three personnel shall be connected
to the same horizontal line at any time
6.0 Scope of Emergency Procedures
6.1 General:
A written Emergency Response Procedure as part
of the task hazard analysis / risk assessment must
be developed as part of the Fall Protection Plan
and identifed on the Pre-Job / permit process
As a minimum, the Emergency Response Proce-
dure will identify:
o Rescue equipment available
o Trained rescue personnel
o Job specic rescue procedures
o Requirement for procedure to be reviewed
during each Pre-job / permit issuance
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
144
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
145
6.2 Man Baskets & Lifts
A written Emergency Response Procedure using task hazard
analysis / risk assessment must be developed as part of the
Fall Protection plan to retrieve personnel in case of equip-
ment failure when utilizing Man Baskets and mechanical lifts.
7.0 Scope of Inspection and Maintenance
7.1 Inspection: Fall Arrest Systems (FAS) must be
inspected by a trained and competent worker before
and after use in accordance with manufacturers
recommendations.
7.2 Storage: Fall protection equipment must be stored
according to manufacturers recommended practices.
Special attention must be given to temperatures,
clean, dry conditions and sunlight.
7.3 Removal from service: Any component of a fall pro-
tection system that has been involved in a fall arrest
must be removed from service and tagged as such or
destroyed.
7.4 Cleaning, repairing and maintenance: Te compo-
nents of a fall protection system must be cleaned
repaired and maintained according to manufacturers
instructions.
7.5 Recertication and inspections of Fall arrest equip-
ment must be planned and conducted formally
according to manufacturers specications.
8.0 Scope of Equipment Practices, Regulations
and References
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
146
Standard Safety Practices Manual
147
8.1 All components of a fall protection system must meet
the material and assembly specications set forth in
local regulations and known Practices (see Alberta
OH&S Code 145 or British Columbia Occupational
Health and Safety Regulation and Guidelines 296/97
as amended). or Ontario Regulation 851 Industrial
Establishments and Regulation 213 Construction
Projects, as amended
8.2 CAN/CSA Practices include but are not limited to:
Safety Harnesses, Lanyards: Z259.1-95 (R1999)
Linemens Harnesses, Straps: Z259.3 M1998
Full Body Harnesses: Z259.10 M90 (R1998)
Fall Arrest, Descent, Lifeline Devices: Z259.2
Shock Absorbers: Z259.11 M92 (19998)
Vertical Lifeline: Z259.2.1 -98
Connecting Components: Z259.12.01
Automatic and manual decent device::
Z259.2.3.99
Self Retracting Devices: Z259.2.298
9.0 Forms
gHSSEr MF 34004- PreJob Risk Assessment
Maximum Tie Of Points
W
o
r
k
i
n
g

a
t

H
e
i
g
h
t
s
Standard Safety Practices Manual
146
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
147
ASBESTOS
For information on asbestos contact your PU Industrial
Hygienist. Refer to gHSSEr MS 920 Asbestos Code of
Practice (BP Guidelines for Handling Asbestos and Man-
Made Vitreous Fibers)-
http://gasiso14001.bpweb.bp.com/index.asp
ATMOSPHERIC MONITORING
PURPOSE:
To establish guidelines for providing a safe work environ-
ment through atmospheric monitoring.
APPLICATION:
Any area where the work environment is, or may become
hazardous due to the presence of combustible or toxic gas,
or when the oxygen content is less than 19.5%, or greater
than 23% by volume.
DEFINITION:
Atmospheric Monitoring includes:
O2 Monitors
H2S Detectors
Combustible Gas Detectors
Toxic Gas Detectors
Carbon Dioxide Monitors
PRECAUTIONS:
Some atmospheric monitoring equipment requires
minimum oxygen content in order to perform according to
manufacturer specications. Te O2 reading must be taken
prior to an LEL reading to verify that the monitor can read
properly.
A
s
b
e
s
t
o
s
A
t
m
o
s
p
h
e
r
i
c

M
o
n
i
t
o
r
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
148
Standard Safety Practices Manual
149
POTENTIAL HAZARDS:
Lack of oxygen
Combustible Gas
Toxic Gas: H2S, benzene and other toxic
Substances
PROCEDURES:
Detection Equipment:
All work locations must have combustible gas,
toxic gas and oxygen detection equipment
available, as required, for monitoring the
atmosphere, prior to and during work proce-
dures.
All worksite locations that have portable
and permanent atmospheric monitor-
ing equipment must develop site specic
procedures that govern instrument use, care,
maintenance, function testing, calibration and
documentation, repairs and training.
All survey equipment used for testing confned
spaces, hot work or any other permit required
testing should be function tested prior to each
use.
Combustible Gas Testing:
A combustible gas test shall be taken when Hot work
is performed within 8 meters of any well, process
vessel, tank or related equipment, where combustible
gas is, or may be present.
H2S Gas Detectors:
H2S gas detectors are used to measure the concentra-
tion of H2S in a work area. Tere are two basic types
of detectors:
Drager and Gastec Sampling Tubes. NOTE:
When monitoring in an unknown concentra-
tion, SCBA/SABA must be worn by the
individual
A
t
m
o
s
p
h
e
r
i
c

M
o
n
i
t
o
r
i
n
g
Standard Safety Practices Manual
148
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
149
[See: H2S Safety] [See: Respiratory Protection]
Tis method is considered to be accurate
plus or minus 25% when proper sampling
procedures are used
Electronic Sensor. Electronic sensors measure
the airborne concentration of H2S on an elec-
tronic circuit. Te signal, which can also be
used to set audible and visual alarms at specic
concentrations, identies the H2S level on a
gauge. Te advantage of this type of unit is
that monitoring can be continuous. Te unit
may be carried on a belt (personal monitor),
or permanently mounted in areas where H2S
could accumulate
Monitoring Units:
All buildings where H2S may exceed 100 PPM
should have xed monitoring units set to give an
audible and visual alarm at 10 PPM. H2S visual
alarm will be a blue beacon and LEL / General visual
alarm will be a red beacon. Safe operating procedures
must be written and followed should circumstances
preclude such installation.
Confned-Space Entry:
Combustible gas, toxic gas, and oxygen-deciency tests
must be performed prior to a conned-space entry and
at frequent intervals during the work period. Respira-
tory protection must be worn while the initial tests are
being performed.
[See: Confned-Space Entry]
[See: Respiratory Protection]
Hot Work:
All hot work requires monitoring of the atmosphere for
combustible gas prior to and at frequent intervals dur-
ing the work. If the hot work is being performed within
a conned space, continuous monitoring is required
for combustible gas, toxic gas, and oxygen deciency.
.If there is a potential for the atmosphere to change un-
A
t
m
o
s
p
h
e
r
i
c

M
o
n
i
t
o
r
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
150
Standard Safety Practices Manual
151
predictably after a worker enters the conned space, the
atmosphere must be continuously monitored. Re-entry
to a worksite must be accompanied by gas detection
before work resumes.
[See: Safe Work Permits]
Precautions:
Some atmospheric monitoring equipment requires
minimum oxygen content in order to perform accord-
ing to manufacturer specications. Te O2 reading
must be taken prior to an LEL reading to verify that the
monitor can read properly. Equipment specifcations
should be veried for equipment operating conditions
prior to installation and use.
Oil Spills:
Additional atmospheric monitoring may be required
at spill sites.
[Contact Safety Coordinator or Industrial Hygienist for
advice, as necessary]
TRAINING:
All personnel that use or are responsible for atmospheric
monitoring equipment shall be properly trained in the
operation and use of the equipment and the site specic
procedures that were written for the particular equipment.
BENZENE:
For information on benzene, contact your P.U. Industrial
Hygienist. Refer to the sites-specic Code of Practice and
BP Guidelines for Handling Benzene.


A
t
m
o
s
p
h
e
r
i
c

M
o
n
i
t
o
r
i
n
g
Standard Safety Practices Manual
150
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
151
CANADIAN NUCLEAR SAFETY COMMISSION
(CNSC) REGULATED ISOTOPES
PURPOSE:
To establish the requirements for the safe handling of
CNSC isotopes.
APPLICATION:
All worksites where Canadian Nuclear Safety Commis-
sion (CNSC) regulated isotopes may be handled, i.e.
radiographic inspection of vessels, piping and pipelines,
radioactive isotope use, wireline logging, etc
POTENTIAL HAZARDS:
Exposure to radioactive sources.
PREPARATIONS:
CNSC Certifcation:
Contractors must have a valid license issued by
the Canadian Nuclear Safety Commission to per
form all work involving CNSC regulated isotopes.
[See: BP Canada Welding Quality Control Manual
for radiographic inspection requirements]
Work Planning
Work planning for use of CNCS licensed isotopes
must include consultation with the CNCS licensed
Contractor.
Pre-Job Safety Meeting:
Must be conducted prior to commencement of
operation. [See: Safety Meetings]
[See: TDG-Packaging and Safe Transport of Radioac
tive Material]
[See: Canadian Nuclear Safety Commission Act and
regulations]
PROCEDURES:
C
N
S
C

I
s
o
t
o
p
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
152
Standard Safety Practices Manual
153
Safe handling procedures should include:
Specifc job procedures to be followed
A certifcation of the type and quantity of CNCS
licensed radioactive sources furnished and used
Te expected efuent concentrations and meth-
ods of control if applicable
Te person in charge, responsible for the opera-
tion.
Equipment and worksite must be properly prepared (i.e.
isolated, depressured, made accessible, etc.) Te worksite
should be roped of. Radiation warning signs must be
posted, and unauthorized entry of personnel banned, in the
area afected by the work.
In no event shall a pregnant employee be allowed in the
vicinity of CNSC Licensed radioactive operations.
CNCS licensed radioactive source shall not be left unat-
tended at the jobsite unless it has been isolated to prevent
any accidental exposure.
PRECAUTION:
Radioactive isotopes may afect some LEL monitors and fre
detection systems. Station shutdown could result when us-
ing a highly energetic radioactive source in the vicinity of a
detector. A risk assessment must be performed to determine
the scope and risk from radioactive sources. Fire detection
systems sensitive to radiation may have to be by-passed
when radioactive sources are in use in the immediate area.
Care must be taken to reactivate the detection system when
the work is completed.
[See: Equipment Shutdown Systems]
Radiation survey meters are not explosion proof, thus a Hot
Work Permit is required.
RESPONSIBILITIES:
C
N
S
C

I
s
o
t
o
p
e
s
Standard Safety Practices Manual
152
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
153
Te BP Canada Representative is responsible for ensuring
that only CNSC licensed operators are used when handling
CNSC licensed radioactive sources and that all procedures
are supplied and followed.
Te CNCS licensed Contractor performing work with
licensed isotopes is responsible for ensuring that safe
handling procedures and contingency plans have been de-
veloped which comply with all government regulations. He
is also responsible for ensuring that all applicable protective
equipment, instruments, rescue and decontamination
facilities are on hand and in operable condition before the
job commences.
DRAINING AND DEPRESSURING
PURPOSE:
To provide safe precautions for the draining and depressur-
ing of toxic or combustible materials.
APPLICATION:
All plant and eld operations.
POTENTIAL HAZARDS:
Static Electricity- [See: Electricity]
Combustible and Toxic Fluids
Environmental Impact
PRECAUTIONS:
Draining and Depressuring should be carried out in a
controlled fashion. Valves should be opened slowly.
Depressuring:
Caution should be exercised to ensure that any vessel,
line, or piece of equipment to be depressured, has been
completely isolated. Depressuring should be done
only by qualied personnel. Valves that are blocked in
should be tagged. Pressure gauges should not be relied
D
r
a
i
n
i
n
g

&

D
e
p
r
e
s
s
u
r
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
154
Standard Safety Practices Manual
155
on for assurance of complete depressuring. [See: Energy
Isolation]
Draining:
When draining a vessel, certain precautions must be
followed:
1. Before draining, the worker must know where
the material is going, and the situation at that
area (i.e., welding in the vicinity, or if it is a
liquid, how it is being contained).
2. Pressured vessels should not be drained
through hose. Temporary, secured piping or
existing drain lines should be used.
3. When draining, the worker should not leave
the area. If it is necessary to leave, he should
close the valve.
ELECTRICAL
PURPOSE:
To provide a general understanding of the hazards associ-
ated with electricity.
APPLICATION:
All plant and eld operations.
POTENTIAL HAZARDS:
Static Electricity:
Sparks resulting from the accumulation of static electricity
often cause res. A static charge can be generated from
friction resulting from the passage of oil through a pipeline,
the pouring of liquid from one container to another, or
steam passing through a hose. Static electricity can also be
caused by the fow of air, vapor, steam, water, moving belts
of fywheels or rubbing clothing. Te hazard is more severe
in dry cold weather than in humid weather when most
surfaces are coated with a lm of moisture, making them
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
154
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
155
good conductors and draining of static charges.
Steam, a blast of sand, or hydrocarbons rushing through
hose or pipe, or issuing from open end pipes, can generate a
large static charge. Te operator should refrain from open-
ing sample lines or drains any wider than necessary.
Another source of potential static electricity is the use of
portable plastic fammable liquid containers (1 - 5 gallon
containers used for removing, lling, storing on a plastic
pickup box liner).
PROCEDURES:
Most power tools and portable electrical test equipment are
not rated for use in hazardous areas, and are equipped with
standard U-ground plugs. It is necessary, in many instances,
to use a short cheater cord to adapt for explosion-proof
electrical receptacles, or extension cords to the non-explo-
sion-proof tool or test equipment. Due to the hazards of
arcing electrical equipment or connections, the following
procedures must be followed:
All electrical equipment not approved for use in
hazardous areas, must be treated as hot work,
taking the necessary gas checks and obtaining
Hot Work Permits - [See: Safe Work Permits]
All extension cords used must have explosion-
proof ends (connectors)
All cheater cords must be less than 2 feet in
length with one male explosion-proof end and
one female standard U-ground plug, and must
be used only at the immediate location of the
tool or test equipment
All connections at standard U-ground plugs
must be made and adequately taped (to prevent
them from pulling apart), before plugging into
the explosion-proof receptacles
When the job is completed, connections must be
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
156
Standard Safety Practices Manual
157
broken at the explosion-proof receptacle rst
All portable electrical equipment that is approved
for use in hazardous areas (such as some pumps
and air movers driven by explosion-proof mo-
tors) must have cords equipped with explosion-
proof ends. Tis cord must be rated for extra
hard usage as per the Canadian Electrical Code
(re: rule 18-122) Where an electrical hazard
exists because of dampness (i.e., boilers being
cleaned), portable lighting units should be used.
Portable lighting units must have heavy-duty
extension cords with ground fault interrupter,
or that permitted by local regulations. Suitable
guards must be provided for portable lamps
Grounding/Bonding:
Te terms bonding and grounding should not be used
interchangeably, because the two processes have distinctly
diferent functions. Bonding eliminates a diference in po-
tential between objects, but does not eliminate a diference
in potential between these objects and the earth. Ground-
ing eliminates a diference in potential between an object
and ground. Te usual precaution to avoid static electricity
sparking is proper bonding and grounding:
Bonding and grounding are efective only when
applied to conductive bodies. Bonding and
grounding systems should be inspected regularly
for good mechanical condition.
Before loading or unloading any fuid/material
by hose or piping, the truck/equipment must be
grounded and bonded.
When samples are taken in a container, the
operator must ensure the container is in contact
with the lling nozzle or bonded by cable. When
drawing samples in a glass bottle, the lling
nozzle must be in contact with the liquid in the
bottle.
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
156
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
157
When Draining or Depressuring fuid/material
into a container, the container must be bonded
to the drain and depressuring valve.
All equipment and buildings must be grounded
according to the applicable electrical regulations.
Cathodic Protection:
Te nature of a cathodic protection system is to put an
electrical charge on the pipe or equipment in question, to
prevent external corrosion. As a result, the cathodic protec-
tion must be shut of or disconnected, and the equipment
bonded and grounded before work is started.
Work in the Vicinity of Underground Power Cable:
No person shall commence excavation work until the
vicinity has been checked and underground electrical power
cables located.
Electrical power cables should be shut-of whenever
possible, prior to commencing work. All underground
power cables shall be located by hand digging method or
Hydrovacing methods.
PRECAUTION:
Electrical Grounding:
Serious harm can result from electricity with rela-
tively low voltages if equipment is not properly
grounded.
Portable Lighting:
Where an electrical hazard exists because of damp-
ness (i.e., boilers being cleaned), portable lighting
units should be used. Portable lighting units must
have heavy-duty extension cords with ground fault
interrupter, or that permitted by local regulations.
Suitable guards must be provided for portable lamps.
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
158
Standard Safety Practices Manual
159
Batteries:
Batteries used and/or stored in enclosed spaces must
be vented to remove hydrogen gases. Sealed,
maintenance free batteries are excluded from this
requirement.
Inspection:
Termography (infra-red scan) is a recommended
practice on electrical equipment to locate potential
problems. Tis should be done on a routine basis or
before any major shutdowns.
Identifcation:
All electrical panels should be identied as to the
equipment they control.
Appropriate signs should be posted on electrical
switch gear cabinets, sub-stations and rooms to warn
personnel of electrical danger.
Danger An Equipment Starts Automatically sign
must be displayed on equipment which starts
automatically.
Above Ground Clearance:
PRECAUTION:
Minimum clearance from an overhead power line is as
follows:
Te employer must accurately determine the voltage of any
energized electrical equipment or conductor and the mini-
mum distance from it required by 19.24 (2) subsection (1).
Safe limit of approach distances from overhead power lines
for persons and equipment
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
158
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
159
Alberta - Refer to OH & S sections 225, 226 schedule 4 for
further information
British Columbia - Refer to OH & S Table 19-1 for further
information
Ontario:
Over 750 V to 150 kV: 3m
Over 150 kV to 250 kV: 4.5m
Over 250 kV: 6m
Tese clearances apply to any direction, vertical or hori-
zontal. If it is necessary to work closer than the minimum
distance, authorization shall be obtained from the utility
E
l
e
c
t
r
i
c
a
l


Operating voltage between conductors of overhead
power line


Safe limit of approach distance for persons and
equipment


0-750 volts
Insulated or polyethylene covered conductors

300 millimetres

0-750 volts Bare, uninsulated


1.0 meter


Above 750 volts Insulated conductors


1.0 meter


750 volts 40 kilovolts


3.0 meters


69 kilovolts, 72 kilovolts


3.5 meters


138 kilovolts, 144 kilovolts


4.0 meters


230 kilovolts, 260 kilovolts


5.0 meters


500 kilovolts


7.0 meters




Minimum distance Voltage
Phase to phase

Meters Feet

Over 750 V to 75 kV


3

10

Over 75 kV to 250 kV


4.5

15

Over 250 kV to 550 kV


6

20

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
160
Standard Safety Practices Manual
161
company. When utility company approval or authorization
is required, the operating line voltage must be veried by a
designated, competent individual from the utility company.
Te area directly under or adjacent to an overhead power
line shall not be used for storage of material, or equipment.
No excavations or similar operation shall be carried out in
the vicinity of overhead power lines that would reduce the
original support of the power line. Earth or other material
shall not be placed under or adjacent to an overhead power
line in such a manner that the minimum ground clearance
would be reduced.
Vehicle load clearance shall not be of a height that would
be in violation of the safe limits of approach from overhead
power lines.
RESPONSIBILITIES:
Only company-authorized personnel may work on electri-
cal equipment.
[See: Electrical Protection Branch Regulations]
TRAINING:
Only the following trained and BP authorized personnel
will be allowed to do Electrical work on BP Facilities and
Pipelines:
a) Journeyman Electricians
b) Electrician Apprentice
c) Refer to the Provincial Electrical regulations.
Only Journeyman Electricians or, Apprentices under the
direct supervision of Journeyman Electrician, may work on
equipment rated at more than 750 volts.
Any person who knows of a re of electrical origin or sus-
pected electrical origin shall, as soon as practicable, report
the accident, contact or re to a technical Administrator
for the electrical discipline or to a safety codes ocer and
the safety codes ocer shall notify a technical Administra-
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
160
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
161
tor for the electrical discipline. After an accident described
in subsection (1), no person shall remove or interfere with
anything in, on or about the place where the accident oc-
curred until permission has been granted by a safety codes
ocer in the electrical discipline, unless it is necessary to
do so to prevent death or injury, to protect property or to
restore service. Refer to Safety Codes Act Section 16 (1-3)
for further information.
ELECTRICAL STORMS
GUIDELINES TO STAY SAFE DURING ELECTRICAL
STORMS:
Each morning check local weather websites for
severe weather forecasts. Plan your day.
If a potential electrical storm is approaching,
outside work must cease until safe to resume.
If you can hear thunder you are still in the strik-
ing distance of lighting.
If possible, go indoors or as a second option into
a non convertible vehicle...Most homes, ofce,
business and process buildings are grounded as
per regulatory requirements.
Once indoors, stay away from windows and
doors.
Do not use corded telephones except for emer-
gencies.
If possible unplug electronic equipment before
the storm arrives and avoid contact with electri-
cal equipment or cords during the storm.
Avoid contact with plumbing, including sinks,
baths and faucets.
If outdoors, go to a low point. Lightening hits
the tallest object. Get down if you are in an
exposed area.
Stay away from trees.
E
l
e
c
t
r
i
c
a
l
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
162
Standard Safety Practices Manual
163
Avoid metal objects such as golf clubs, fshing
rods, metal tools,...
If you feel a tingling sensation or your hair
stands on end, lightning may be about to strike.
Crouch down and cover your ears.
Stay away from all sources of water or wet grass.
Dont stand close to other people - spread out.
Victims of lightning strikes should be given CPR
if necessary, and seek medical attention.
EQUIPMENT SHUTDOWN SYSTEMS, TEMPORARY
BY-PASS OF
PURPOSE:
To provide for the safe use of temporary bypasses of
shutdown systems.
APPLICATION:
All Production Equipment
DEFINITION:
Equipment shutdown systems are:
a) Electrical
b) Pneumatic
c) Mechanical
POTENTIAL HAZARDS:
If equipment shutdowns are left disabled, the potential for
damage to equipment or injury to personnel exists.
PROCEDURES:
Equipment protection devices must not be altered, tam-
pered with, adjusted or repaired, except by qualied persons
designated by the supervisor in charge.
E
q
u
i
p
m
e
n
t

S
h
u
t
d
o
w
n
Standard Safety Practices Manual
162
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
163
Equipment shutdown systems, whether electrical, pneu-
matic, or mechanical should not be by-passed. Te piece of
equipment should be taken out of service to make necessary
repairs. However, there are situations where it becomes
impractical or impossible to work with a piece of equip-
ment without some manner of by-passing or jumping the
shutdown system temporarily.
In all areas the potential hazards must be evaluated and a
site-specic procedure developed to maintain safe opera-
tion.
RESPONSIBILITIES:
Responsibility lies with the Supervisor and employees in-
stalling, operating, or repairing equipment, while shutdown
systems are by-passed.
EYEWASH STATIONS & DELUGE SHOWERS
PURPOSE:
To provide guidelines for the provisions and placement
of eyewash stations and deluge showers in BP Canada
worksites.
APPLICATION:
All BP Canada worksites where personnel exposure to
injurious chemicals exists.
PREPARATIONS:
Each worksite must be evaluated to determine the need for
emergency eyewash stations and safety showers. Minimiz-
ing exposure through the use of alternative chemicals,
enclosed systems or bulk storage should be the rst line of
defense.
Where the exposure cannot be eliminated, the risk should
be categorized as high, moderate or low in accordance with
BC Occupational Health and Safety Regulations 5.88:
E
y
e
w
a
s
h

S
t
a
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
164
Standard Safety Practices Manual
165
High: risk of irreversible tissue damage to the
eyes or skin or of serious illness resulting from
rapid absorption of a toxic substance through the
eyes or skin, or where the risk of igniting cloth-
ing is present.
Moderate: risk of irritation or other reversible
harm to the eyes or skin, or of illness resulting
from absorption of a toxic substance through the
eyes or skin.
Low: risk of mild eye or skin irritation.
Emergency eyewash and shower facilities must :
o Be designed so that once activated, the fow of
water will continue without requiring the use
of the operators hands.
o Clearly identify their location and provide
directions for use.
o Be protected from all potential chemical
contamination, freezing and from high heat
exposure.
o Where specied, provide tempered water
(15 30C) unless non-tempered water is
recommended by a Doctor to reduce the risk
of worker injury.
Personal protective equipment must be supplied. Te use of
this equipment is mandatory.
Note: Special care must be exercised in the selection of
personal protective equipment at worksites where large
volumes of water are not readily available.
PROCEDURES:
Location:
High Risk
Tempered continuous fow eyewash stations and deluge
showers must be placed within 5 seconds walking distance
E
q
u
i
p
m
e
n
t

S
h
u
t
d
o
w
n
Standard Safety Practices Manual
164
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
165
but no greater than 6 m (20 ft) from high-risk areas. For
high risk corrosive gases such as ammonia or chlorine, the
facilities must not be located in the gas storage or use area,
but rather adjacent to it.
Showers may be located further than 6m if:
A non-tempered drench hose is within 5 seconds
walking distance but no greater than 6 m.
A tempered shower facility can be reached within
5 minutes of the accident.
Moderate Risk
Tempered emergency eyewash and shower equipment must
be within 10 seconds walking distance but no further than
30 m (100 ft) unless:
First aid services are maintained to start treat-
ment within 5 minutes of an accident.
A drench hose is located with 10 seconds walk-
ing distance but no greater than 30 m.
Low Risk
Efective means to fush the eyes and skin within 10
seconds walking distance but no further than 30 m (100 ft).
Volume of Water Required:
Safety showers and/or emergency eyewash
stations must meet the requirements of ANSI
standard Z358.1-1981.
Safety showers, emergency eyewash stations and
portable self-contained units must be capable of
delivering sucient water for not less than 15
minutes (or more if required by the nature of the
material).
Eyewash stations must be capable of delivering a
minimum of 1.5 L/min of water with a pressure
not exceeding 175 kPa (24psi) and with a spray
pattern designed to efectively fush both eyes.
Drench hoses must be capable of delivering a
E
y
e
w
a
s
h

S
t
a
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
166
Standard Safety Practices Manual
167
minimum of 11.4 L/min.
If potable water systems are available, eyewash and showers
should be permanently installed.
Where potable water systems are not available, approved
portable or self-contained safety showers and/or eyewash
units are recommended.
Eyewash Bottles:
As a minimum, emergency eyewash bottles, one liter size,
should be available at all worksites. Tis may require a
bottle in each vehicle.
Upon opening or breaking the seal of the one liter eyewash
bottle, the entire contents must be used or disposed. Only
bottles with an identied expiration date are approved for
use at BP Canada worksites.
Employees should immediately go to the nearest available
source of potable water to continue fushing for a minimum
of 15 minutes, and to obtain medical help as soon as
possible.
PRECAUTIONS:
Alarm devices should be considered for remote or large
worksites. Tis precaution will signal others that the shower
or eyewash unit has been activated. Back-up personnel can
then proceed to the location.
Eyewash and shower stations should be:
Tested upon initial installation in accordance
with manufacturers instructions.
Checked weekly to ensure access is not blocked
by material or equipment.
Permanently plumbed eyewash stations should:
Use only potable water.
Be fushed weekly (note BC requires monthly)
for a minimum of 5 minutes to completely fush
the branch of water line supplying the unit. Tis
will verify they are operational, and ensure a
E
y
e
w
a
s
h

S
t
a
t
i
o
n
s
Standard Safety Practices Manual
166
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
167
clean supply of water.
Portable or self-contained eyewash or shower
units should:
Use only potable water or an isotonic saline
fushing solution.
Have the water replaced regularly or as per
manufacturers specications, to ensure a clean
supply of water.
All operational checks and fushes should be recorded.
RESPONSIBILITIES:
It is the responsibility of the BP Canada Supervisor in
charge, and all employees, to assess the need and provide
emergency eyewash or safety shower units where required.
TRAINING:
Employees in charge of handling or working with injurious
chemicals must be instructed in the proper use and location
of all emergency eyewash and safety shower units.
FIRE PROTECTION EQUIPMENT
PURPOSE:
To provide information on reliable re suppression equip-
ment, specic work areas with the proper type of protection
relative to classication, and a method of inspection and
training to ensure that equipment is properly maintained
and functional at all times.
APPLICATION:
All BP Canada eld locations.
PROCEDURES:
Classication of Fires:
Class A Fires Occur in ordinary combustible
F
i
r
e

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
168
Standard Safety Practices Manual
169
materials such as wood, cloth, and paper. Extin-
guishing agents most commonly used are water
and type ABC dry chemical agent (Ansul Foray).
Class B Fires Occur in the vapor-air mixture
over the surface of a fammable liquid such as
grease, gasoline, or oil. BC type dry chemical
(Ansul Purple- K), foam, carbon dioxide, and
water fog may be used as extinguishing agents.
Class C Fires Occur in electrical equipment.
Non-conducting extinguishing agents must
be used. Carbon dioxide is the most suitable
extinguishing agent. Dry chemical agents can
be used, but require extensive clean-up of equip-
ment after the re.
Class D Fires Occur in combustible materials
such as magnesium, titanium, zirconium, and
sodium. Specialized techniques, extinguishing
agents, and extinguishing equipment have been
developed to control and extinguish res of this
class. Te most commonly used agent is MET-L-
X.
Location and Placement of Extinguishers:
Fire extinguishers must be placed in accordance with
local re regulations, National Fire Protection Association
(NFPA) guidelines, and the guidelines included in the chart
later in this section.
Recharge:
All re extinguishers must be recharged with the proper
chemical immediately after use. Only a certied technician
can recharge a re extinguisher in non emergency situ-
ations. Chemicals must never be mixed, as the resulting
chemical reactions may damage the extinguisher, as well
as create a safety hazard. Fire extinguishers that are of the
external cartridge type or wheeled units must be recharged
by personnel trained in recharging. Chemicals used for
F
i
r
e

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
168
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
169
recharging must be of the type used by the manufacturer of
the extinguisher.
ABC Extinguishers Foray
BC Extinguishers Purple-K
LOCATION AND PLACEMENT OF FIRE EXTIN-
GUISHERS RECOMMENDED
Inspection and Maintenance:
All maintenance must be performed by a competent person
in accordance with the manufacturers specications. (A
competent person is one who has been trained in the re-
quired maintenance procedure.) Te following inspections
are the minimum requirement. Te ndings of inspections
must be documented and retained on le at each BP
Canada location.
Monthly Inspection Requirements:
1. All units must be in the designated location and
visible.
2. All units must be checked to ensure operational
reliability (i.e., seals in place, nozzle and hoses
unobstructed, easy access to units).
Annual Inspections must be performed as per manufactur-
ers specications and applicable government regulations.
TRAINING:
Te efectiveness of fre-fghting equipment may increase
by as much as 40% when it is used by a trained employee.
Regular re training is a requirement under occupational
health and safety legislation, and is also in the companys
best interest to prevent loss to people, property, and process.
[See: Training]
RESPONSIBILITIES:
It is the responsibility of BP Canada to ensure that
F
i
r
e

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
170
Standard Safety Practices Manual
171
adequate, properly maintained re protection is available at
each worksite.
Te contractor is responsible for the proper operation,
inspection and maintenance of their re protection equip-
ment according to Government Regulations.
FIRE RESISTANT WORKWEAR PRACTICE
1.0 Scope
1.1 Tis practice applies to all BP Canada Gas Perfor-
mance Unit (CGPU) and Canadian Natural Gas
Liquids BU employees, contracters, and other visiting
personnel doing work on BP premises and work sites.
2.0 Purpose
2.1 Te fre resistant workwear (FRW) program is designed
to emphasize and enhance employee safety, through
ensuring the use of appropriate personal protective
workwear in potentially hazardous areas, by reducing
the risk of thermal burns.
3.0 General Provisions
3.1 Fire resistant work wear must not be used as a substi-
tute for proper job planning or minimizing potential
hazards.
3.2 Tis policy is based on material contained within
the Canadian General Standards Board, **CGSB
155.20, Work Wear for Protection Against
Hydrocarbon Flash Fire and **CGSB 155.21,
Recommended practices for the Provision and Use
of Work Wear for Protection Against Flash Fire, and
the Canadian Association of Petroleum Producers
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
170
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
171
(CAPP), Consumer Guideline for the Selection of
Fire Resistant Work Wear for Protection Against
Hydrocarbon Flash res.
3.3 Te outermost garments must be fre resistant and
shall have refective striping as per the specifcations
outlined in Appendix IV of this policy. BP Canada
requires that all employees, contractors wear re
resistant/retardant outerwear with refective striping
while working on BP worksites. Visibility is a safety
requirement. See Alberta OH&S GSR Section 18,
or B.C. WCB OH&S regulations section 8.24,
8.31., and Saskatchewan and Ontario Applicable
Regulations. FRW coveralls are prone to damage
from sparks, welders and welders helpers may wear
FRW CarHarts or Leathers but the recommended
garment for welders is FRW Excel Brown Duck.
Regulation 851 Industrial Establishments section 84,
and Regulation 213 Construction Projects, sections
21 and 25
4.0 Limitations of Fire Resistant Work Wear:
4.1 Te protective garments addressed in **CGSB 155.20,
and outlined in Appendix II of this policy, provide a
measure of protection against unplanned exposure to
hydrocarbon fash fre (approximately 84 kw/m2) for
relatively short periods of time, typically three seconds
or less. Protective garments may serve to reduce the
severity of burn injury as a result of a fash fre and
may not completely prevent an injury. Garments
that continue to burn after a fash fre incident are
hazardous.
5.0 Use of Protective Work Wear
5.1 Te protective work wear should provide a good
functional t for maximum protection and comfort
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
172
Standard Safety Practices Manual
173
on the job. Users should be aware that the t of the
garment could have a direct infuence on how much
protection can be provided by a particular garment.
For example, a garment that is too loose or too tight
will not ofer maximum FR protection.
5.2 Te protective work wear must be worn properly.
Te zipper must be worn closed and sleeves and cufs
worn down and secured. For maximum protection
collar should be worn closed.
5.3 Single layer protective garments are more efective
when worn over an additional layer of clothing (See
Appendix I)
5.4 Protective neck, head, hand and foot coverings
should be worn if the occupational hazard warrants
their use.
5.5 Certain synthetics or synthetic blends worn as
undergarments may not be appropriate for use under
re resistant work wear, as the transferred heat from
a fash fre may cause them to melt. Undergarments
with melt resistant properties are required (e.g. cot-
ton, aramid, wool). See Appendix I.
5.6 Rainwear, high visibility vests and garments shall
be in accordance with applicable sections of
**CGSB155.20.
5.7 Applications where disposable garments could be
used are to protect regular FRW from extremely dirty
jobs (e.g., tank cleaning, equipment tear down), or
other fabric degrading jobs (e.g., painting).
WARNING: Disposable garments shall only be worn over
fre resistant garments and must meet the fame resistant
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
172
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
173
test and be approved as outlined in**CGSB 155.20. Tey
are not intended to be the primary garment for workers.
NOTE: Te outer most primary garment in any protective
ensemble shall not be made of any fabric that burns, melts,
or drips. Te use of a garment that burns, melts, or drips
that is worn over a Fire Resistant garment may contribute
to the severity of a burn injury.
6.0 Where Fire Resistant Workwear Is Required
6.1 Fire resistant work wear shall be worn whenever an
employee enters a BP worksite where there is foresee-
able exposure for a hydrocarbon fash fre or an
explosion from combustible gas or natural gas liquids
is present.
6.2 Tese foreseeable hazardous areas include but are not
limited to:
Service rig operations
Gas plants
Pipelines, pump stations
Oil batteries
Natural gas liquids facilities
Aircraft refueling operations
Laboratories
Wellheads
Construction sites
Drilling rig operations
6.3 If, following a documented (e.g. MOC) site-
specic hazard evaluation, by the BP representative
or designate in charge, it is determined that there is
no foreseeable exposure to an accidental release of
explosive, or fammable mixtures, (e.g. an ofce set-
ting or while driving company vehicles), these areas
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
174
Standard Safety Practices Manual
175
or tasks of exception where re resistant work wear is
not required, will be exempt.
7.0 Fire Resistant Work Wear Material Selection
and Ordering
7.1 BP Canada identies the preferred material and gar-
ment selection for its workers, through contractual
agreements with a garment manufacturer. (See
Appendix II).
7.2 All re resistant work wear selected for use must
meet or exceed the requirements established in
the Canadian General Standards Board, **CGSB
155.20, Work wear for Protection Against Hydro-
carbon Flash Fire.
7.3 Use form GHSSER MF 90001 to order work wear.
Obtain appropriate approval prior to faxing to sup-
plier.
8.0 Fire Resistant Work Wear Provisions
8.1 Management, either local or within a Performance
Unit, must develop a site specic policy that ad-
dresses the following points:
Employee eligibility for FRW
Type of garments (See Appendix II)
Quantity of garments
Frequency of replacement and process for handling
Approval process for purchasing FRW garment(s)
How garments will be repaired in their area
Handling of garment maintenance, and
Other sections of this policy as applicable
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
174
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
175
9.0 Employee Responsibilities
9.1 Ensures that all work is conducted in accordance with
approved procedures, equipment and training.
9.2 Maintains assigned fre resistant work wear in a proper
manner, e.g. sleeves rolled down, to ensure maximum
protection.
10.0 Employee Training
10.1 As an important part of using personal protective
equipment employees must be familiar with:
When and why FRW is required to be worn
Te capabilities and limitations of FRW use
Proper garment care
Te proper wearing of the garments
Te potential hazards associated with the use of
non-fre resistant work wear in a fash fre sit
tion
10.2 As with all employees training, this should be
documented on individual training records or safety
meeting attendance minutes.
11.0 Contractor and Visitor Requirements
11.1 Contractors are required to wear re resistant work
wear at all times and under the same conditions as
that of BP staf.
11.2 Fire resistant work wear worn by contractors must
meet or exceed the requirements of **CGSB 155.20,
or as outlined in local area site-specic requirements
for contractors.
11.3 Unless prior contractual arrangements are made with
BP, contractors are required to have a re resistant
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
176
Standard Safety Practices Manual
177
work wear policy that complies with the applicable
safety regulations as detailed in Operating Policy.
11.4 Unless defned in the site-specifc fre resistant work
wear policy, a visitor is dened as a person who nor-
mally is not employed at the specic work location.
11.5 Visitors unless otherwise instructed by a local area
site specic re resistant work wear guideline, must
wear re resistant work wear at all times.
12.0 Maintenance of Protective Work Wear
12.1 To ensure proper repair and maximum garment
longevity, repairs and approved alterations to re
resistant work wear will be handled on a local basis,
as required, at company expense.
12.2 Repairs should only be made with components,
which comply with the original garments specica-
tions and construction.
12.3 Adequate decontamination of protective work wear,
according to the manufacturers recommendations,
by laundering or dry-cleaning is imperative in order
to maintain fame resistance and thermal protection.
Where oily soil is present, periodic dry cleaning of
garments may be necessary in order to remove fam-
mable contaminants or contaminants which may
impair the fame resistance. Te site-specifc FRW
policy should also address this item.
12.4 When laundering protective garments, launder suf-
ciently to prevent build up of hard to remove stains,
which could reduce fame resistance. Pre-treat oily
stains by either rubbing liquid detergent or powdered
detergent mixed with water into the stain or use a
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
176
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
177
pre-wash product recommended for oil stains. Use
a heavy-duty liquid or powdered laundry detergent
and the hottest water recommended on the garment
label. It is harder to remove oily soil with cool wash
water
12.5 Follow all laundry precautions on the garment.
Tere are products which will lessen the efectiveness
of the fame resistance, in particular:
a) Whether the use of chlorine bleach is advised
or should be avoided
b) Whether a heavy-duty soap can be used or
laundering must be limited to a heavy-duty
synthetic detergent
12.6 Unless otherwise decided by local management, the
responsibility for keeping issued FRW reasonably
clean and free of fammable or combustible materials
that could degrade the re resistant characteristics
of the clothing will remain with the employee. All
cleaning must be done in accordance with manufac-
turers specications.
12.7 See Static Electricity section for additional mainte-
nance recommendations.
13.0 Static Electricity
13.1 Te major static hazard is the body which can store a
large static charge. It is imperative that in situations
where static electricity poses a signicant hazard that
the body be grounded regardless of the type of cloth-
ing worn. Clothing can generate static electricity of
sucient energy to ignite combustible atmospheres.
It is important to minimize the build up of static
electricity on workwear in order to prevent the
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
178
Standard Safety Practices Manual
179
clothing from becoming a source of ignition for a
fash fre.
13.2 Workers should be grounded before entering a
high-risk area to minimize the possibility of static
build-up and discharge.
13.3 Workers should also avoid removing any garments
while in the high-risk area. Friction of one fabric
against another may contribute to the generation of
electrical charge.
13.4 One approach to reduce the static build up on
garments is to use an antistatic treatment during
laundering. Tis treatment works by trapping water
on the fabric to distribute the static charge through
conductivity. Te antistatic treatment must be added
during each laundering according to the manufactur-
ers directions.
13.5 Over drying in the dryer should be avoided to mini-
mize static build up.
Appendix I
Clothing Worn Underneath Fire Resistant Work Wear
Other material worn in conjunction with re resistant work
wear (e.g. clothing worn underneath) should not contribute
to the injury of a worker in a hydrocarbon fash fre situa-
tion. While the outermost layer of work wear worn must
be of re resistant material clothing worn underneath shall
be of a nonfusible type. Tat is, clothing that does not
melt.
Examples of acceptable nonfusible materials that can be
worn underneath re resistant outerwear include:


F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Standard Safety Practices Manual
178
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
179
Appendix II
Fire Resistant Work Wear Supplier
Bulwark Protective Apparel Inc., located in Edmonton,
Alberta supplies all Fire Resistant Work Wear to BP Canada
Gas PU and NGL BU employees. Use form gHSSEr MF
90001 to order work wear.
Te material garment selection (see below) and contractual
arrangements have been approved by BPs Fire Resistant
Work Wear Committee (see Appendix III).
Approved Material and Garments
Listed below are the Blue colored garments that can be
purchased as standard issue garments. Any other garments
purchased must have management approval.
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Linen Wool Cotton
Kermel Viscose Leather
Nomex Proban
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
180
Standard Safety Practices Manual
181
Appendix III
BP Canadas Fire Resistant Work Wear Committee:
Chairman Dennis Steciw
Oce 403-233-1292
Cell 403-803-3085
Members - Jason Groot
Ofce 403-233-1981
Cell 403-815-7215
Bill Adam
Ofce 403-233-1426
Cell 403-874-4375
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r

Product Style Fabric
One Gas Monitor Pocket Mesh or Solid
Unlined Coverall CLB6RB Excel FR Royal
Unlined Coverall CNB6RB Nomex IIIA Royal
Insulated Coverall CLC8RB Excel FR Royal
Insulated Bib Coverall BLC8RB Excel FR Royal
Button Front Shirt SLU2LB Excel FR Light Blue
Button Front Shirt SLU2NV Excel FR Navy
Button Front Shirt SND6RB Nomex IIIA Royal
Button Front Shirt SND6NV Nomex IIIA Navy
Pant Jean Style PLJ8NV Excel FR Navy
Pant Jean Style PNJ8NV Nomex IIIA Navy
Pant Jean Style PNJ8RB Nomex IIIA Royal
Insulated Parka JLP8RB Excel FR Royal
Insulated Bomber Jacket JLR8RB Excel FR Royal
Insulated Bomber Jacket JNR8RB Nomex IIIA Royal
Lined Bomber Jacket JLJ8RB Excel FR Royal
Lined Bomber Jacket JNJ8RB Nomex IIIA Royal
Mens Navy Fleece Hooded Jacket SEH6NV Excel FR Navy
Insulated Vest LNS2NV Nomex IIA Navy
Shopcoat KEL2LB Excel FR Light Blue
Hard Hat Hood HLH2RB Excel FR Royal
Hard Hat Liner HNL2NV Nomex IIIA Navy
Hard Hat Face Mask HNM2NV Nomex IIIA Navy
Balaclava HNB2NA Nomex IIIA Natural
Brown Duck Unlined Bib Overall BLF8BD Excel FR Brown Duck
Brown Duck Lined Bib Overall BLN4BD Excel FR Brown Duck
Brown Duck Linemans Coat JLC2BD Excel FR Brown Duck
Traffic (orange) or Visitor (blue) vest KNV20RB Nomex IIIA Royal
Mock styled neck long sleeved FRW
shirt
SEL2NV Excel FR Navy
Regular Style Neck Long Sleeved
FRW Shirt.
SEK2NV Excel FR Navy

Standard Safety Practices Manual
180
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
181
Appendix IV
Refer to the table below for the minimum conguration for
refective striping on outermost garments for use by workers
working for BP or on behalf of BP.
Worker in Ontario: Regulation 213 Construction Projects,
section 69.1
BC WCB Standard Protective Equipment Standard 2-1997
High Visibility Garment -
http://www2.worksafebc.com/Publications/OHSRegula-
tion/WCBStandards.asp?ReportID=30947
AB OH&S Personal Protective Equipment Flame Resis-
tant Clothing Part 18-
http://employment.alberta.ca/documents/WHS/WHS-
LEG_ohsc_2006.pdf
Welders
Ontario Regulation 213 Construction Projects, section 69.1
- Retro-refective and fuorescent garment requirements
http://www.e-laws.gov.on.ca
Due to the fact that welders wear leathers on the upper
portion of the chest, their garments will need to have an
additional band of striping around the waist of their gar-
ments. Tis will ensure that the minimum required amount
of striping shows when they are wearing leathers.
F
i
r
e

R
e
s
.

W
o
r
k
w
e
a
r
Type of Worker: Minimum Striping Requirements based on legislation below:
Alberta BP Employee Workers Compensation Board of British Columbia
Alberta Full Time Equivalent Workers Compensation Board of British Columbia
Contractor working in BC Workers Compensation Board of British Columbia
Contractor working in AB Occupational Health and Safety


Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
182
Standard Safety Practices Manual
183
FIRST AID EQUIPMENT AND MEDIC
PURPOSE:
To establish practices and provide equipment and emer-
gency conveyance to ensure that adequate medical rst aid
treatment is available at all BP worksites.
APPLICATION:
All BP Canada worksites where employees or other workers
are present on a temporary or permanent basis.
PROCEDURES:
Equipment:
Standard frst aid equipment requirements must
be available and maintained for each worksite in
accordance with provincial regulations
Emergency conveyance must follow provincial
regulations
Each worksite should have access to occupational
medical advice, i.e., of-site communications
Te attendant must not be assigned or undertake
activities that will interfere with the attendants
ability to receive and respond to a request for
rst aid
Te attendant should be present in the area
served, during all working hours
Te service and attendant should be accessible
where the attendant can reach injured workers
within 10 minutes walking time or driving time
to render rst aid. (BC First Aid Regulation
G3.18(2))
RESPONSIBILITY:
It is the responsibility of the BP Employee in charge to
ensure that adequate First Aid Equipment is available, and
strategically located for ease of availability. As per provincial
regulations employees must be familiar with their location
F
i
r
s
t

A
i
d

E
q
u
i
p
m
e
n
t
Standard Safety Practices Manual
182
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
183
and adequately trained as per provincial regulations to
render rst aid. In Ontario, minimum requirements are
set out in Regulation 1101 First Aid, under the Workplace
Safety and Insurance Act.
GAS AND LIQUID SAMPLING
PURPOSE:
To provide a guide for the safe sampling and handling of
gas and liquids samples.
APPLICATION:
All facility and eld operations.
POTENTIAL HAZARDS:
Te sampling of gases and liquids represents a danger to
personnel and equipment due to the nature of the fuids
and the conditions of temperature and pressure present.
Static Electricity [See: Electrical]
PRECAUTIONS:
Prior to sampling, the approved container
must be checked to ensure that it is of suitable
construction for the gas or liquid being handled,
and has a pressure rating sucient to handle the
working pressure.
Specifc procedures are necessary when sampling
propane and butane in special sampling
bombs. Tey must not be completely liquid-
lled, as they are not designed to withstand the
extreme pressures of liquid expansion.
All sample containers must be properly labeled.
Applicable personal protective equipment shall
be worn while sampling.
When sampling or checking is being done at a
bleed valve, the valve should be opened slowly.
G
a
s

&

L
i
q
u
i
d

S
a
m
p
l
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
184
Standard Safety Practices Manual
185
If no fow occurs, a blockage could blow loose
when the valve is opened wide, resulting in a
sudden release of energy. Tis could result in re
and/or injury due to the escape of gas at high
pressure.
Site-specifc procedures shall be developed to
identify the hazards associated with sampling.
(i.e., sour gas)
[See: Respiratory Protection]
[See: Personal Protective Equipment]
[See: Permits]
[See: Safety Standby]
Transportation and Handling:
Te handling and transportation of samples must
comply with Government regulations for the
transportation of dangerous goods (TDG) and
the requirements of WHMIS.
TRAINING:
Only properly trained personnel should be taking samples.
GUARDS
PURPOSE:
To provide safe work practices for protection of personnel
from rotating equipment and heat sources.
APPLICATION:
All plant/feld activities and equipment.
POTENTIAL HAZARDS:
All rotating equipment, belts, pulleys, grinder, etc., that
present a hazard to personnel must be guarded.
Any openings that could present a hazard to personnel must
be guarded.
G
u
a
r
d
s
Standard Safety Practices Manual
184
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
185
All piping and equipment operated at a temperature that
could cause personnel injury, must be insulated, clad,
guarded or otherwise protected.
PREPARATIONS:
Before any guards are removed from rotating equipment,
the equipment must be locked out and tagged.
[See: Energy Isolation]
PROCEDURES:
Te guarding requirements and design for various aspects
of oil and gas operations are covered in Provincial OH&S
Regulations.
Guards should be re-installed prior to start-up.
PRECAUTIONS:
Under some maintenance circumstances, equipment may
have to be operated without guards in place. In this case,
the equipment must be marked and suitably illuminated to
identify and minimize the hazard. Guards must be replaced
as soon as possible.
HAND PROTECTION PRACTICE
1.0 Scope and Applicability
1.1 Tis practice is applicable to all Canada Gas Perfor-
mance Unit employees, contractors, sub-contractors
and visitors to CGPU work sites.
1.2 Te purpose of this practice is to ensure that all
reasonable precautions will be taken to protect the
safety of personnel who are or may be required to
work with their hands.
1.3 Te requirement set forth in this practice will act
as the minimum requirements. Specic contractors,
H
a
n
d

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
186
Standard Safety Practices Manual
187
manufacturers or plants may have more stringent
requirements. In event of any discrepancies, the more
stringent requirements will prevail.
2.0 Purpose
Personal Protective Equipment (PPE) is intended to
protect, shield or isolate personnel from chemical and
physical hazards. Tis practice outlines the type of gloves
that personnel must wear when performing jobs that expose
the hands to absorption of harmful substances, cuts or
lacerations, abrasions, punctures, chemical or thermal burns
and harmful temperature extremes. Other types of PPE for
hands include barrier creams, nger guards, thimbles, cots
and palm pad mitts alone or in combination with Gloves.
Tis practice addresses the proper selection of gloves for
activities. Selection of hand protection is based on evalu-
ation of the task being performed, conditions present,
and duration of exposure, potential hazards identied and
performance characteristics of glove material.
3.0 Glove Selection
General Purpose - Leather Palm Gloves
For general construction work, not including any
hot work (i.e. welding), chemical handling, sheet
metal handling and electrical work, leather palm
gloves will serve as the minimum requirement
for all (BP Canada) employees, contractors,
subcontractors and visitors on any (BP Canada)
controlled sites. Leather palm gloves will provide
protection against abrasions, scrapes and cuts
associated with the day-to-day activities on
construction sites. Drilling and Well Service
activities are granted an exception to use cotton
Green King gloves.
Chemical Resistant - Neoprene/Nitrile Gloves/
Natural Rubber/Polyvinyl Alcohol PVA / Polyvi
nyl Chloride PVC/Viton
H
a
n
d

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
186
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
187
When working with chemicals, ensure that the
applicable Material Safety Data Sheet (MSDS)
is available, has been read, understood and the
protective measures as prescribed by the Manu-
facturer is followed. Important things to keep in
mind when selecting gloves are cuf style, length,
lined vs. unlined, chemical compatibility and
gauge. Additional information on the proper
selection and use of chemical resistant gloves is
available from the chemical manufacturer, glove
manufacturer and occupational hygiene.
Abrasion/Cut Resistant - Kevlar/Kevlar- Com-
posite Gloves
In applications where the potential for cuts and
abrasions to the hands are high, i.e. sheet metal
handling and insulating, use of utility, banana,
or lock blade knives, abrasion and cut resistant
gloves shall be worn. (jack knife blades that do
not use a lock blade mechanism are not allowed).
Electrical Work - Rubber Gloves
Important to ensure the gloves being used has
the correct voltage rating for the specic task.
Heat/Temperature Resistant - Welding Gloves
Important considerations when selecting welding
gloves are not only the heat protection it pro-
vides, but also the dexterity and sensitivity that
the gloves provide.
NORM (Naturally Occurring Radioactive Material) -
When working in areas where NORM could be present
gloves should provide protection from physical hazards not
chemical and most importantly must be disposable.

Other
Some specic tasks might require special and specic
protection i.e. jack hammering, requires gel padded anti-
vibration gloves.
H
a
n
d

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
188
Standard Safety Practices Manual
189
Table 1 gives examples of job tasks and the proper selection
of gloves for that task
4.0 Tasks not normally requiring hand protec-
tion
While this practice requires the use of hand protection
while conducting work it is recognized that some job tasks
must be performed without an individual wearing hand
protection. Although a thorough evaluation of the types
of hand protection available should be carried out prior to
making this decision.

H
a
n
d

P
r
o
t
e
c
t
i
o
n


Table 1 Glove Selection
Example Job Tasks / Work
Activities Requiring Hand
Protection
Leather
Chemical
Resistant
(per
MSDS)
1

Welders /
Thermall
y
Insulated
Cut
Resistant
(e.g.,
Kevlar)
Voltage Rated
(per NFPA 70E)
2
Abrasive Blasting
Biological Substances
Chemical Handling (e.g., paints,
solvents, additives, lubricants,
engine oils, hydrocarbons,
& fuels)

Compressor / Pump / Engine /
Crane Maintenance

Chipping, Chiseling, Grinding,
Hammering, Scraping
or
Electrical Work on Energized
Equipment

Heaters / Reboilers Lighting
of

Housekeeping (moving
equipment & debris)

Ladders Use of
NORM Exposure to
Pigging - Launching /
Retrieving

- If
retrieving

Pipe / Tubing Handling,
Cutting, Threading

Pressure Washing
If using
chemical
additives

Process Equipment
Modifications
Pressuring / de-pressuring
lines & line breaking
Inserting / removing blinds,
sight glasses, & gauges
Operating valves, orifice
meters & controllers

Standard Safety Practices Manual
188
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
189
Te justication is two fold. First the task being performed
is considered low risk with respect to hand/fnger injury
potential. Second the task being performed requires micro/
precise movement of hands ngers and the use of gloves
cause a loss of dexterity.

In order to comply with this practice, the minimum
required hand protection dened in this practice must be
worn by all employees, contractors and visitors to (CGPU)
sites unless a properly performed and documented hazard
assessment shows that hand injury hazards can be elimi-
nated or controlled.
Examples of job tasks that may not require the use of gloves
are listed in Table 2
H
a
n
d

P
r
o
t
e
c
t
i
o
n
Table 1 Glove Selection
Example Job Tasks / Work
Activities Requiring Hand
Protection
Leather
Chemical
Resistant
(per
MSDS)
1

Welders /
Thermall
y
Insulated
Cut
Resistant
(e.g.,
Kevlar)
Voltage Rated
(per NFPA 70E)
2
Respirable Fibers Handling of
Rigging
Scaffolding Erection and use
of

Sharp Objects / Materials
Exposure to
or
Tank Gauging
Temperature Extremes
Exposure to
or
Tool Use (non-powered and
powered)

Welding / Cutting / Brazing
Fitters
& Helpers
Welders



Table 2: Example Job Tasks / Work Activities
Not Normally Requiring Hand Protection
Specific Examples

Activities conducted inside of living quarter,
control room and break room settings

office work, eating, smoking, etc.
Working with small hardware and equipment

bolts/nuts/screws/pins, tube fittings and ferrules,
Teflon tape, wiring connections, adjusting
programmable flow meters, etc.

Using fine instruments and electronics

multi-meters, Pride Route meters, gas meters,
cameras, two-way radios, computers etc.


Donning PPE

hearing protection, fall protection, cleaning safety
glasses, SCBA's, respirators, etc.

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
190
Standard Safety Practices Manual
191
5.0 Hazard Assessments
OH&S Regulations require that an employer shall ensure
that a known hazard which cannot be readily controlled or
eliminated and that has the potential for causing serious
injury be identied and brought to the attention of workers
who may be exposed to the hazard.
Hazard Assessments may be performed on tasks to deter-
mine if hazards may be present that necessitates
the use of specic hand protection.
For individual jobs the hazard assessment may be approved
by the permit issuer.
For repetitive jobs the hazard assessment will be approved
by the plant/facility supervisor.
Step 1 - Determine what specifc job tasks hazards
are present.
Step 2 - Develop procedures that will eliminate
or control identied hazards to the hands. If identied
hazards cannot be adequately addressed, the minimum
required hand protection must be worn by all afected
personnel.
Step 3 - Document and maintain the hazard assess-
ment at the work site (Attachment 1 or similar forms may
be used for the assessment).
Complete hazard assessment below and maintain document on site
H
a
n
d

P
r
o
t
e
c
t
i
o
n



Location: Date:
List the tasks to be performed:


Identify and list the hazards associated with the task:


List the control measures (if any) taken to reduce the risk of hand injuries:


List the hand protection required:

List of personnel performing task(s), attach a list if necessary:

Name, signature and title of personnel conducting assessment:

Reviewed by BP Project Manager or Designate:
Date: Approved Not Approved
Standard Safety Practices Manual
190
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
191
6.0 Key Responsibilities
Operating supervisors are responsible for implementing and
enforcing this practice, whereas all personnel are responsible
for complying with it. It is the responsibility of the job
team lead to reference this practice while developing and
reviewing Job Safety and Environmental Analyses.
7.0 Scope of Forms
7.1 gHSSEr MF34004 Pre-job Risk Assessment
GUIDELINES FOR FIELD VISITS
1.0 Scope and Applicability
1.1 Tis procedure identies the steps needed to pro-
mote HSSE issues during feld visits by CGPU staf.
1.2 Tis procedure applies to all Gas Performance Unit
activities.
2.0 Responsibility
2.1 It is the responsibility of each team leader or his/
her designate to review this procedure as part of
employee training and awareness.
2.2 It is the responsibility of each employee to follow this
procedure when preparing for a eld visit.
3.0 General Procedures
3.1 HSSE issues at a site location will vary based on the
daily activities. Communication topics should be
adjusted to focus on the scope of work for the day
and the site specifc HSSE issues associated with the
project.
F
i
e
l
d

V
i
s
i
t
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
192
Standard Safety Practices Manual
193
3.2 Prior to the visit, contact the relevant HSSE coor-
dinator and/or project manager and/or OCM and/
or foreman to identify any functional group HSSE
issues, site specifc gHSSEr notifcations or alerts and
any current HSSE.
3.3 Prior to the site visit ensure all people traveling to
the site have the appropriate PPE, HSSE tools (SOC
cards if trained in SOC, HSSE opportunity cards),
safety training tickets as required (e.g.H2S alive) and
proof of indoctrination. Take time to ensure familiar-
ity with HSSE awareness programs (e.g. stop, think,
go; green hand; ISO 14001).
3.4 It is recommended to review the 8 golden rules of
safety and identify relevant issues for the scope of
work at the location before proceeding to the loca-
tion.
3.5 While at the site, dont stop the regular fow of work.
If you wish to participate in a meeting with the work
group, consult the person in charge of the site prior
to your visit to determine what time pre-job opera-
tions or HSSE meetings are held.
3.6 Together with the foreman or the site supervisor,
conduct a site walk around that can include any of
the following components:
Evaluate housekeeping
Talk to workers about their activities
Carry out Safety Observation Conversations (SOCs)
Review compliance with one or two practices or
relevant HSSE issues as identifed by the group
HSSE coordinator
Review status on follow up of actions on gHSSEr
notications and alerts for that location
F
i
e
l
d

V
i
s
i
t
s
Standard Safety Practices Manual
192
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
193
Review compliance with applicable permit
conditions
3.7 Hold a debrief meeting with the foreman or site
supervisor to discuss your ndings and suggestions
before leaving the site.
3.8 Leave completed HSSE opportunity cards and SOC
cards with the foreman or site supervisor or provide
to the HSSE representative in Calgary to ensure
inclusion in the monthly HSSE statistics.
3.10 Present your fndings to the functional group man-
ager or OCM as appropriate upon returning to the
oce.
4.0 Documentation
4.1 Safety Observation Conversation (SOC) cards
(C-15) and HSSE Opportunity cards (C-1518)
should be utilized during eld visits. Tey are avail-
able through all HSSE representatives in Calgary.
HOUSEKEEPING
PURPOSE:
To outline the requirements for housekeeping from the
point of view of safety of workers.
APPLICATION:
All BP Canada employees, contractors and facilities
POTENTIAL HAZARDS:
Slipping
H
o
u
s
e
k
e
e
p
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
194
Standard Safety Practices Manual
195
Tripping
Fire
Falls
Crushing
Caught Between (Pinned)
PROCEDURES:
Poor housekeeping practices are responsible
for many accidents in the work place. With a
little efort, this problem is easily eliminated
Good housekeeping practices include keeping
tools, materials, equipment, buildings, and
properties clean and in good order
Good housekeeping is the day-to-day respon-
sibility of all employees and is a continual
process. Periodic cleanups, or cleanups when
time permits, is not considered to be adequate
Tools and materials shall not be scattered
around the walking or working surfaces while
the job is in progress. Haphazardly scattered
tools, equipment and materials are an invita-
tion to an accident
No job is complete until tools have been
cleaned and properly stored, scrap and waste
materials disposed of, and the equipment and
work location is in good orderly condition,
and approved for continued operation
Sharp and pointed tools shall be stored prop-
erly. Leaving such tools lying around loose
creates an unnecessary hazard
Slick spots on the walking surface caused by
water, oil or other substances shall be cleaned
up immediately. Allowing this condition
to exist, even for a short period of time, is
dangerous
Waste rags, trash, etc., must not be permitted
to accumulate. All of it should be properly
disposed of as soon as possible
H
o
u
s
e
k
e
e
p
i
n
g
Standard Safety Practices Manual
194
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
195
Materials or equipment delivered to the job
site shall be kept well away from the working
area until needed
Protruding nails, straps, or wire shall not be
permitted to exist in the work place. Tey
shall be removed immediately when found
Material which is to be stacked, shall be
cross-tied or otherwise secured so it will not
fall over. Rolling stock such as pipe should be
secured so it cannot roll onto an employee
Aisleways and walking surfaces shall always be
kept clear of materials and equipment
It is each workers responsibility to take action
and manage slipping hazards including that of
mud, ice and snow build up. Workers must
use caution in these conditions and apply
immediate mitigating hazard controls such as:
keeping walkways and stairs clean, spreading
de-icer / sand / nut plug to improve traction
and or barricading of unsafe areas to prevent
workers from entry.
HOT AND ODD BOLTING PRACTICE
1.0 Purpose/Scope
Te purpose of this document is to describe the require-
ments and limitations for hot bolting and odd bolting in
E&P operations for the North American Gas SPU.
1.1 General
Te removal and replacement of fange bolts on live equip-
ment is practiced for several reasons including:
Repairing corroded or damaged bolts
Upgrading the material specifcation/grades of
bolts
Minimizing time spent freeing bolts during plant
shutdowns
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
196
Standard Safety Practices Manual
197
Note: Hot and Odd bolting can be performed safely if
planned, engineered, and executed properly. Te risk as-
sociated with performing Hot and Odd bolting should be
evaluated against the risks associated with the start-up and
shut-down of process equipment that would be required to
depressure the fange in question and the lower risk option
selected.
1.2 Potential Hazards
1.2.1 Hot Bolting
In hot bolting there is a potential risk of leakage caused by:
Reduced gasket compression during bolt
removal
Gasket failure from over-tightening of bolts
on replacement
Failure of bolts due to the increased stress
resulting from adjacent bolt removal
1.2.2 Odd Bolting
In odd bolting there is a potential risk of leakage caused by:
Reduced gasket compression during bolt
removal
Inadequate tightening on bolt replacement
Inadvertent re-pressurization of the equipment
during and subsequent to odd bolting.
Note: Te scope of application is covered in Section 3.0 of
this document.
Warning: Removing, replacing or retightening bolts on
live piping and equipment is potentially hazardous but
can be performed safely. Extreme caution needs to be
exercised when assessing, planning, and carrying out these
operations. Due to the potential risk, Performance Unit
Leaders should carefully consider whether to allow Hot and
Odd Bolting in their operating areas and retain the right to
prohibit Hot and Odd Bolting.
2.0 Denitions
Accountable Person is the person in the organiza-
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
196
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
197
tion that has the ultimate responsibility. Tis
person is usually the Operations Center Manager
or the Decommissioning Manager
Competent Person (CP) is the on-site BP
representative that is competent to supervise the
Hot/Odd Bolting operation. Te CP shall have
a demonstrated knowledge and understanding of
the process system that is to be Hot/Odd Bolted.
Te CP shall be designated by the Accountable
Person
Document Control Management System is an
established means of controlling the issue, use
and updating of documents used in the manage-
ment of a site
Hot bolting is the sequential removal, cleaning,
lubrication and retting, or replacement of one
bolt at a time in a fanged joint, when the system
is pressurized or if the fange acts as secondary
containment
Odd bolting is the sequential removal of alter-
nate bolts from a fanged joint when the system
is shut down, isolated and at low pressure or
depressurized but not necessarily gas-free
Te words bolt(s) or bolting includes bolts, stud
bolts, studs, nuts and washers, as appropriate
Responsible Person is a suitably trained and
experienced individual who has been formally as-
sessed as competent in Hot/Odd Bolting and has
been given specic actions or areas of responsibil-
ity by an Accountable Person
Subject Matter Expert is an acknowledged expert
in mechanical engineering. Tis person is usually
the SPU Mechanical Engineering Technical
Authority
Technical Reviewer is a facility engineer or
subject matter expert competent in the design,
maintenance, and operation of mechanical pres-
sure systems
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
198
Standard Safety Practices Manual
199
3.0 Applicability
3.1 Applicability
Tis procedure applies to hot and odd bolting
activities on piping systems and piping connections
at vessels that:
Are standard joint types on weld neck fanges
such as raised face (RF) or ring type (RT)
joints in accordance to Tables 1 and 2
Have steel fanges meeting the applicable
ANSI or API specications
Meet the pipe size, pressure rating, fange
type, and bolt count specied in the Tables 1
and 2. Older fanges may have a lower rating
than those in Tables 1 and 2, and for these
fanges the lower rating shall be used
Have an operating temperature greater than
0F(-18C) and less than 140F(60C)
Contain hydrocarbon liquids, sweet natural
gas, produced water, glycol, or other non-
toxic gases
3.2 Specifc Exclusions
Tis procedure specically excludes hot and odd
bolting activities on piping systems and piping con-
nections at vessels that:
Contain steam, toxic oil or gas (sour gas),
toxic chemicals, or asphyxiates
Are in cryogenic service
Involve clamped fanges (e.g. Grayloc, Victau-
lic, etc.)
Are non-standard fanged joints and/or all
those found on heat exchanger head, tube
sheet or shell joints. Tese joints shall be
subjected to a full engineering assessment
Are associated with transmission pipelines or
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
198
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
199
regulated gathering lines due to regulatory
restrictions and the potential for high external
loadings
3.3 Restrictions
Only one hot bolting operation may take
place in a facility at a time unless approved
by the Accountable Person or his designee.
An approved SIMOPS plan and MoC system
must be in place
If the fange has an insulating kit, a replace-
ment kit must be available onsite prior to the
commencement of work, in the event of an
insulation washer / sleeve failure
Flanges that have been sealed or patched shall
not be hot or odd bolted
No hot bolting shall be done at pressures
higher than those listed in Tables 1 and 2
4.0 Control of Work and Exception Process
4.1 Control of Hot Bolting Work that Conforms to the
Allowable Guidelines within this Practice
Te overall practice of Hot and Odd Bolting is
prohibited in a PU until approved by the Perfor-
mance Unit Leader (PUL) using the Management of
Change process. A PUL may decide to prohibit Hot
and Odd Bolting in their area.
Te Hot / Odd Bolting Work Form in Attachment
1 shall be used to verify and approve work in confor-
mance with this practice.
4.2 Approval for Hot Bolting Outside of the Guidelines
or any Odd Bolting
In circumstances where the Accountable Person
believes that hot bolting might be safely performed
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
200
Standard Safety Practices Manual
201
outside of the applicability criteria in Section 3.0
and/or outside of the requirements specifed within
Section 5.0 and where there is no other practicable
alternative, an MoC is required that includes:
A full engineering assessment of the fange
A Risk Assessment outlining rigorous control
measures must be conducted (i.e. SIMOPS
plan, mitigation measures, drains, emergency
response plan, fre hoses etc.)
A recommendation from the Subject Matter
Expert and approval from the Accountable
Person
5.0 Procedure/Process
Hot Bolting allows for the replacement of one stud at a
time until all the studs have been replaced on a weld neck
fange. Prior to removing any studs, all existing studs shall
be checked for tightness by torquing the fanged joint to
the manufacturer specications. Bolts should then be
removed and replaced one at a time in accordance with
a specifed cross bolting sequence/pattern. All new studs
and nuts shall be torqued according to the manufacturer
specications.
Careful consideration must be given to corroded studs,
nuts, and fanges. Degradation due to corrosion must be
assessed by the Subject Matter Expert before the procedure
is allowed to continue.
Hot bolting of corroded nuts and studs is prohibited. Hot
bolting and hot work are not allowed within 100 ft (30 m)
of each other.
A BP Competent Person shall be present during all hot
bolting activities.
Working on live piping and equipment should normally
only be contemplated when the advantages have been as-
sessed against the risk. Te risk assessment should include:
a) As-built design of the fanged joint including
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
200
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
201
bolting and gasket specications.
b) Contents of the piping or equipment (e.g. the
fammability and/or toxicity of the process fuid).
c) Design and actual operating pressures and
temperature conditions - check that the pressure
in the piping/equipment will be at the specifed
reduced value and that the process conditions
can be held stable for the duration of the hot
bolting operation.
d) Te possibility of process upsets occurring, the
consequences of the upset and control measures
that can be put in place to minimize/eliminate
process upsets.
e) Te location and condition of the nearest up-
stream and downstream isolation valves relative
to the joint should be identied, documented
and discussed with all involved personnel prior
to commencing the work.
f ) Position and functionality of pipe supports
relative to the fanged joint - From a mechanical
standpoint, it must be established that there
are no unacceptably high external loads and/or
bending moments acting on the joint. Tere
should be no signicant vibration of the piping
at the joint.
g) Position and type of fexible expansion joint
afecting the fanged joint.
h) Maintenance history of the joint.
i) Personnel access and egress as part of a com-
pleted Emergency Response Plan for this work
activity.
j) Method of removing seized nuts - Hot work
cutting or burning of seized bolts is prohibited
on fanges in hydrocarbon service due to the
fammability hazard and/or the toxic fumes
hazard when cadmium or zinc coated fastenings
are burned. Cold cutting is permissible with the
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
202
Standard Safety Practices Manual
203
appropriate permit to work.
k) Possible degradation of the bolts, e.g. corrosion,
stress corrosion cracking, fatigue.
l) Possible degradation of the gasket.
m) Hidden or unseen anomalies or corrosion.
Potential Hazards In hot bolting there is a potential
risk of leakage caused by:
Reduced gasket compression during bolt
removal
Inadequate tightening on bolt replacement
Gasket failure from over-tightening of bolts
on replacement
Te practice of hot bolting shall only be allowed for those
fanges indicated in Table 1 (ANSI class fanges) and Table
2 (API class fanges).
NOTE: Some fanges require a decreased pressure rating
during hot bolting (from 9% to 72% less than normal
pressure rating) or are not allowed at all (ANSI 150 class
fanges). Use Table 1 and Table 2 in conjunction with local
hot-bolting safety practices to enhance personnel safety and
insure code compliance.
5.1 Hot Bolting Procedure
Cold cutting of bolts on non-hydrocarbon lines can
be used, but the blowout potential of the gasket and
its ability to be retightened should be considered and
included in the work plan.
Bolt removal, examination, and replacement shall be
as follows:
(1) Before the work starts, authorized personnel shall
check that:
a. All necessary materials, equipment, and
personnel are onsite
b. All relevant procedural requirements have
been met including all relevant HSSE require-
ments.
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
202
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
203
c. Appropriate safeguards are in place
d. Te pressure in the piping and equipment is at
the specied pressure and that process condi-
tions are stable.
e. Te work form for Hot /Odd Bolting is
prepared (see Attachment 1).
(2) Te authorized personnel shall check that:
a. Each of the existing bolts is tight to the correct
torque to ensure that bolts have not relaxed in
service.
b. Any abnormal conditions, such as loose bolts,
shall be reported to the Competent Person.
(3) Hot bolting shall be carried out on only one bolt
at a time, in a sequence specied in Figure 1, or
by other approved job-specic instructions.
(4) Each bolt complete with nuts will be removed
and examined. Nuts and bolts found to be in re-
usable condition shall be cleaned and lubricated
prior to reuse. Damaged bolts and nuts will be
disposed of and replaced by new items of the
correct specication. If there is any doubt as to
the integrity of the bolting, it shall be replaced.
Exposed fange surfaces must be cleaned and the
area under the nuts thoroughly lubricated.
(5) Te bolt shall be correctly tightened and
tensioned to specied torque gures obtained
prior to starting the task. Te torque gures shall
be consistent with the fange design, bolt type,
material, and condition. Initial retightening of
the bolts shall not introduce additional local
compression of the gasket.
(6) After all the bolts have been replaced, a fnal
tightness check will be carried out in the se-
quence specied in Figure 1.
(7) Te Competent Person shall inspect the com-
pleted job and sign the Hot/Odd Bolting form
and other required permits. Any comments shall
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
204
Standard Safety Practices Manual
205
be attached to the form.
(8) On completion of work, the completed Hot/
Odd Bolting form should be led within the
Document Control Management System.
5.2 Odd Bolting Procedure
Bolt removal, examination, and replacement shall be
as follows:
(1) Before the work starts, authorized personnel shall
check that:
a. All necessary materials, equipment, and
personnel are onsite
b. All relevant procedural requirements have
been met including all relevant HSSE require-
ments.
c. Appropriate safeguards are in place
(2) Normally, odd bolting is preceded by hot bolting
(to ensure that bolts to be removed are in good
condition and reasonably free to move). Te
Competent Person should check the signed Hot/
Odd Bolting form for any comments that could
be relevant to the odd bolting activity.
(3) Te Competent Person shall ensure that:
3.8.1 Te pressure in the piping and equipment
is at the specied pressure and that process
conditions are stable.
3.8.2 Each of the existing bolts is tight to the
correct torque to ensure that bolts have not
relaxed in service.
3.8.3 Any abnormal conditions, such as loose
bolts, shall be reported to the Competent
Person.
(4) Bolt removal shall be carried out according
to the methods specied in the approved job
procedure.
(5) Te sequence of bolt removal will be specifed
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
204
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
205
as in Figure 2 or other job specic instruc-
tions.
(6) Te Competent Person shall inspect the
completed job and sign the Hot/Odd Bolting
form. Any comments should be attached to
the Hot/Odd Bolting form.
(7) On completion of work, the completed
Hot/Odd Bolting form should be fled within
the Document Control Management System.
Table 1 (ANSI Class Flanges)
Flange Pressure Ratings During Hot Bolting (1)
(Temporary Removal (2) of Only One Bolt at a Time (3)
Under Operating Pressure)
H
o
t

&

O
d
d

B
o
l
t
i
n
g

Normal
Pipe
Size
ANSI
Class
Flange
Type
(4)

Normal
Bolt Count
Normal
PSI Max
Hot
Bolt
PSI
Max
Hot
Bolt
Allowed
Comments
2
2
2
2
2
2
2
150
300
600
600
900
1500
2500
RF
RF
RF
RJ
RJ
RJ
RJ
4
8
8
8
-
8
8
285
740
1480
1480
-
3705
6170
-
740
1480
1480
-
2850
3700
No
Yes
Yes
Yes
-
Yes
Yes
Insufficient gasket-seating force


Not available. Use 2ANSI 1500

23% pressure reduction
40% pressure reduction
3
3
3
3
3
3
3
150
300
600
600
900
1500
2500
RF
RF
RF
RJ
RJ
RJ
RJ
4
8
8
8
8
8
8
285
740
1480
1480
2220
3705
6170
-
740
1325
1325
1975
575
3680
No
Yes
Yes
Yes
Yes
Yes
Yes
Insufficient gasket-seating force

10% pressure reduction
10% pressure reduction
10% pressure reduction
30% pressure reduction
40% pressure reduction
4
4
4
4
4
4
150
300
600
600
900
1500
RF
RF
RF
RJ
RJ
RJ
8
8
8
8
8
8
285
740
1480
1480
2220
3705
-
740
1350
1350
2220
3705
No
Yes
Yes
Yes
Yes
Yes
Insufficient gasket-seating force

9% pressure reduction
9% pressure reduction


6
6
6
6
6
6
150
300
600
600
900
1500
RF
RF
RF
RJ
RJ
RJ
8
12
12
12
12
12
285
740
1480
1480
2220
3705
-
740
1480
1480
2220
3705
No
Yes
Yes
Yes
Yes
Yes
Insufficient gasket-seating force





8
8
8
8
8
8
150
300
600
600
900
1500
RF
RF
RF
RJ
RJ
RJ
8
12
12
12
12
12
285
740
1480
1480
2220
3705
-
740
1325
1325
2220
3705
No
Yes
Yes
Yes
Yes
Yes
Insufficient gasket-seating force

10% pressure reduction
10% pressure reduction


10
10
10
10
150
300
600
600
RF
RF
RF
RJ
12
16
16
16
285
740
1480
1480
-
740
1480
1480
No
Yes
Yes
Yes
Insufficient gasket-seating force



12
12
12
12
150
300
600
600
RF
RF
RF
RJ
12
16
20
20
285
740
1480
1480
-
740
1480
1480
No
Yes
Yes
Yes
Insufficient gasket-seating force



Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
206
Standard Safety Practices Manual
207
Table 1 (ANSI Class Flanges) -Continued
Flange Pressure Ratings During Hot Bolting (1)
(Temporary Removal (2) of Only One Bolt at a Time (3)
Under Operating Pressure)
1. Ratings are for ANSI B16.5 fanges made of
American Society for Testing Materials (ASTM)
A-105 material at
-20 F to 200 F, and with A193 Grade. B7 bolts.
Calculations are in accordance with ANSI B31.3.
2. Temporary is dened as no more than 10 hours
at any one time and no more than 100 hours per
year, per ANSI
B31.3 code for Occasional Variations.
3. Only a single fange bolt can be removed at a
time.
4. RF is raised face type and RJ is ring joint type.
All fanges are weld neck.
H
o
t

&

O
d
d

B
o
l
t
i
n
g
H
o
t

&

O
d
d

B
o
l
t
i
n
g

Normal
Pipe
Size
ANSI
Class
Flange
Type
(4)

Normal
Bolt Count
Normal
PSI Max
Hot
Bolt
PSI
Max
Hot
Bolt
Allowed
Comments
16
16
16
16
150
300
600
600
RF
RF
RF
RJ
16
20
20
20
285
740
1480
1480
-
740
1350
1480
No
Yes
Yes
Yes
Insufficient gasket-seating force

9% pressure reduction

18
18
18
18
150
300
600
600
RF
RF
RF
RJ
16
24
20
20
285
740
1480
1480
-
740
1250
1480
No
Yes
Yes
Yes
Insufficient gasket-seating force

16% pressure reduction

20
20
20
20
150
300
600
600
RF
RF
RF
RJ
20
24
24
24
285
740
1480
1480
-
740
1300
1480
No
Yes
Yes
Yes
Insufficient gasket-seating force

12% pressure reduction

24
24
24
24
150
300
600
600
RF
RF
RF
RJ
20
24
24
24
285
740
1480
1480
-
740
1300
1480
No
Yes
Yes
Yes
Insufficient gasket-seating force

12% pressure reduction


Standard Safety Practices Manual
206
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
207
Table 2 (API Class Flanges)
Flange Pressure Ratings During Hot Bolting (1)
(Temporary Removal (2) of Only One Bolt at a Time (3)
Under Operating Pressure)
1. Ratings are for API 6B & 6BX fanges made of
American Society for Testing Materials (ASTM)
A-105 material (for API 6B fanges 5K rating or
less) or AIS 4130 (for API 6BX fanges 10K &
15K rating) at -20 F to 200 F, and with A193
Grade B7 bolts. Calculations are in accordance
with ANSI B31.3.
2. Temporary is dened as no more than 10 hours
at any one time and no more than 100 hours per
year, per ANSI
B31.3 code for Occasional Variations.
3. Only a single fange bolt can be removed at a time.
4. RJ is ring joint type. All fanges are weld neck.
6.0 Key Documents, Tools, References
BP GoM Safe Practices Manual
UKCS-SOP-075, Hot and Odd Bolting Procedure (April
2005, Issue 2)
D/UTG/054/00, BP Amoco Piping Joints handbook
H
o
t

&

O
d
d

B
o
l
t
i
n
g
H
o
t

&

O
d
d

B
o
l
t
i
n
g

Normal
Pipe
Size
API
Class
Flange
Type
(4)

Normal
Bolt Count
Normal
PSI Max
Hot
Bolt
PSI
Max
Hot
Bolt
Allowed
Comments
1-13/16
1-13/16
10K
10K
RJ
RJ
8
8
10000
15000
4100
5700
Yes
Yes
59% pressure reduction
62% pressure reduction
2-1/16
2-1/16
2-1/16
5K
10K
15K
RJ
RJ
RJ
8
8
8
5000
10000
15000
2900
3350
4650
Yes
Yes
Yes
42% pressure reduction
67% pressure reduction
69% pressure reduction
2-9/16
2-9/16
2-9/16
5K
10K
15K
RJ
RJ
RJ
8
8
8
5000
10000
15000
3150
3350
4400
Yes
Yes
Yes
37% pressure reduction
67% pressure reduction
71% pressure reduction
3-1/8
3-1/8
3-1/8
5K
10K
15K
RJ
RJ
RJ
8
8
8
5000
10000
15000
2850
3300
4400
Yes
Yes
Yes
43% pressure reduction
67% pressure reduction
71% pressure reduction
4-1/16
4-1/16
4-1/16
5K
10K
15K
RJ
RJ
RJ
8
8
8
5000
10000
15000
2750
2800
4400
Yes
Yes
Yes
45% pressure reduction
72% pressure reduction
71% pressure reduction
5-1/8
5-1/8
5K
10K
RJ
RJ
8
12
5000
10000
3075
3100
Yes
Yes
39% pressure reduction
69% pressure reduction
7-1/16
7-1/16
7-1/16
5K
10K
15K
RJ
RJ
RJ
12
12
16
5000
10000
15000
3300
3400
4650
Yes
Yes
Yes
34% pressure reduction
66% pressure reduction
69% pressure reduction

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
208
Standard Safety Practices Manual
209

Figure 1: Hot bolting removal and tightening sequence.

H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
208
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
209
Figure 2: Odd bolting removal and tightening sequence.
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
210
Standard Safety Practices Manual
211
Attachment 1
HOT / ODD BOLTING WORK FORM
H
o
t

&

O
d
d

B
o
l
t
i
n
g
Standard Safety Practices Manual
212
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
213
Attachment 1
HOT / ODD BOLTING WORK FORM
H
o
t

&

O
d
d

B
o
l
t
i
n
g
PERSON
Signature Date
FINAL INSPECTION: COMPETENT PERSON
Signature Date
(1) DESIGN CONDITIONS (from P&IDs, Piping Specs, Maintenance History, Current Operations)

Line/Vessel Number Line/Vessel Contents
Normal Operating Pressure
(psig)
Normal Operating Temperature
(C/F)
Line/Vessel Service/Fluid Flange Standard/Rating
Joint Location(s) Piping Specification
Gasket Type/Specification
Location Sketch Attached: YES /
NO
Number of Joints to be Hot
Bolted Grade of Bolt Material
Number of Bolts in Flange Torque Loading (max/min
Bolt Diameter
(2) SITE INSPECTION
(If NO is the correct answer (condition status) of any of the below items, then a full Engineering Assessment shall be completed as per
Section 4.1 of the Procedure with the appropriate approvals prior to proceeding. The BU Management of Change Procedure shall be
followed to document the exception process required by Section 4.1.
YES NO YES NO
Number of bolts as per Table in Section
5.0
Pipe supports inspected and found
satisfactory
Joint inspected and found satisfactory and
free from leaks. (No visual damage or
signs of bending stress in joint)
Adequate access for safe work
Joint free from vibration Pressure of system at or below specified
value as per Section 5.0
Operating Temperature <140F (60C) Operating Temperature > 0F (-18C)
Flange type as per Section 5.0 Ambient Temperature > 0F (-18C)
Flange rated as per Section 5.0 Risk assessment completed as required by
Section 5.0
Applicability requirements in Section 3.1
are met
Applicability exclusions in Section 3.2 are
not violated
3) PREPARATION CHECKLIST (If NO is the correct answer (condition status) of any of the below items, the work shall NOT
proceed)
YES NO YES NO
Bolt removal sequence issued Provision for bolt cutting (if allowed) Hot
cutting is NOT permitted on
hydrocarbon service.
Bolt removal methods issued Emergency Response Plan prepared
Bolt tightening procedure issued Equipment/materials available at site
All requirements of Procedure met
(4) CONDITION CONFORMANCE TO SPU HOT / ODD BOLTING PROCEDURE
TECHNICAL REVIEW COMPLETE:
TECHNICAL REVIEWER
Signature Date
APPROVAL TO PROCEED: RESPONSIBLE
Standard Safety Practices Manual
210
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
211
HYDRATES, IDENTIFICATION AND REMOVAL
PURPOSE:
To provide guidelines for the proper identication and safe
removal of gas hydrates.
APPLICATION:
All BP plant and eld facilities.
DEFINITION:
Gas hydrates are solid compounds formed by the reaction
of a gas with water. Some of the light hydrocarbons that are
components of natural gas, form hydrates under pressure at
temperatures above 0 degrees Celsius. Tese hydrates form
as crystals and look like snow. In pipelines, they can pack
solidly to form a restriction resulting in partial or no fow.
Tis is referred to as line freezing.
POTENTIAL HAZARDS:
Caution must be exercised when a line where hydrates are
suspected, is being de-pressured and opened; the hydrates
may plug the line and trap pressure as well as dissolve and
release hydrocarbons and toxic gases after de-pressuring:
High pressure
Propelled solids
Explosive forces
Flammable fuids
Toxic products
NOTE:
1. Hydrates may occur as single or multiple plugs.
2. Hydrated lines should never be totally depres-
sured. Pressure should only be reduced to a point
below the hydrate curve.
H
y
d
r
a
t
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
212
Standard Safety Practices Manual
213
PROCEDURES:
Identication:
Static pressure spiking on pipeline systems is the rst indi-
cation that hydrates are beginning to form. A drop in fow
should not be solely attributed to liquid hold-up; hydrates
must be considered as the possible cause. Te same applies
to fowing wells, particularly if the wellhead temperature
and pressure are dropping.
A pipeline system should not be run when hydrates are
forming, unless methanol is being injected or the fowing
temperature is being increased over a short period of time.
Removal:
Prior to removal, a site specic procedure must be devel-
oped following the Canadian Association of Petroleum
Producers guidelines for the safe handling of hydrates.
Site specic procedure must include, but not be limited to
the following:
1. All hydrates must be considered to be safety
hazards.
2. Supervisor or designate must be notied when a
hydrate is identied.
3. All piping/equipment used for de-pressuring
will meet BP Process Piping specications; all
threaded piping is to be no more than 1/2 NPT.
Depressuring valves must be needle or globe
valves.
4. When de-pressuring, the hydrate must be de-
pressured from both ends with the diferential
pressure on both sides of the hydrate not to
exceed 10%. If pressure is relieved on only one
side of the hydrate, a potential exists for sudden
rapid movement of the hydrate which may result
in damage to piping or vessels.
H
y
d
r
a
t
e
s
Standard Safety Practices Manual
212
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
213
H
y
d
r
o
g
e
n

S
u
l
f
i
d
e
HYDROGEN SULFIDE (H2S) SAFETY
PURPOSE:
To set out safe work practices for the safe handling of
hydrogen sulfde (H2S) gas by identifying the potential
sources, training of employees, and developing and apply-
ing special work procedures.
APPLICATION:
All personnel who may be exposed to Hydrogen Sulde gas.
PROCEDURES:
Properties and Toxicity of Hydrogen Sulde:
All personnel entering a facility where H2S may
be present must be aware of the properties and
toxicity of hydrogen sulde gas. Tey must be
able to recognize its presence, and know how to
protect themselves from its lethal efects. Te
two tables on the following pages show the
properties and toxicity of hydrogen sulde
Identication of Sour Sites:
At each BP Canada work lease, all sources and
concentrations of H2S must be identied. All
areas where concentrations may exceed 10 PPM
must have a sign posted at the lease entrance
showing the poisonous gas symbol. A sign stating
the legal description of the surface location,
name and telephone number of the licensee or
operator must also be posted. Te lease must be
fenced in accordance with the applicable govern-
ment regulations. Entrance roads to the lease
must be considered part of the lease for posting
purposes.
All leases where H2S exists must have a form of
wind direction indication.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
214
Standard Safety Practices Manual
215
PROPERTIES:
Color - Colorless
Odor - Very ofensive, similar to rotten eggs in
small quantities
Vapor - Density 1.189 (air 1.0) H2S is heavier
than air (thus low-lying areas may be more
severely contaminated)
Boiling Point -60 Degrees C
Explosive Limits: 4.3 46.0 percent by volume
in air
Auto Ignition Temp 260 Degrees C
Water Soluble Yes (4 volumes gas in 1 volume
water at 0 Degrees C)
Flammability Forms explosive mixture with air
or oxygen
TOXICITY
Indoctrination Requirements for Work on Sour Sites:
At locations where H2S is present, H2S Alive
certication is required.
H
y
d
r
o
g
e
n

S
u
l
f
i
d
e
Standard Safety Practices Manual
214
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
215
Entry to Sour Work Sites:
Before any person enters the immediate area
where a system contains H2S in sucient con-
centration such that the occupational exposure
limits could be exceeded, all of the following
conditions must be satised:
1. Te atmosphere in and around all buildings
and equipment located on a worksite must be
controlled within the occupational exposure
limits. Te exposure limits are as follows:
15 PPM ceiling exposure limit. Tis limit
cannot be exceeded at any time without respi-
ratory protection
2. All employees who work in operations where
they may come in contact with hydrogen sul-
de gas in excess of the occupational exposure
limits should be equipped with a personal
hydrogen sulde gas detector that is capable of
alarming at 10 PPM unless continuous atmo-
spheric monitoring is conducted or checked
according to a site-specic procedure.
3. Continuous monitoring equipment is present
in all buildings to be accessed, or it has been
checked according to a site-specic procedure.
4. Any duties other than routine shall be accord-
ing to a site-specic procedure.
5. Communication monitoring, entry and work
procedures are in place.
Complete risk assessment to determine if
respiratory protection and emergency back-up
personnel are required.
[See: Respiratory Protection]
[See: Safety Standby]
H2S TRAINING DEVIATION
Workers that are required to perform work in potential
H
y
d
r
o
g
e
n

S
u
l
f
i
d
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
216
Standard Safety Practices Manual
217
H2S atmospheres require current H2S Alive training.
Workers that are part of tours / inspections that want to
enter potentially low risk conditions for H2S exposures and
are not expected to engage in physical work activities may
be provided with a temporary deviation to enter the site
without having H2S Alive Training.
A completed hazard and risk assessment with deviation
form must be lled out in its entirety and signed by the
OCM or his / her designate prior to entry. Te worker
being provided with the deviation is required to be ac-
companied with a BP representative for the duration of
time on lease. Te deviation must also be supported with
the individual being escorted 100% of the time on site with
a worker with valid H2S training.
Refer to Form MF 91001 Deviation from Standard/
Practice Form
INCIDENT/ACCIDENT REPORTING
PURPOSE:
To provide incident/accident reporting requirements. (Refer
to BU specifc reporting guidelines)
APPLICATION:
All employees involved in, or witness to, an incident
resulting in, or having the potential to result in injury or
property damage.
PROCEDURES:
When an incident occurs, the employees involved in, or
witness to the incident, are responsible to:
Prevent further injury and property damage if
this can be accomplished without endangering
their safety
I
n
c
i
d
e
n
t
/
A
c
c
i
d
e
n
t

Standard Safety Practices Manual
216
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
217
Report immediately to supervisor or designate
Log all pertinent data for inclusion in inci
dent/accident report
Secure evidence
If the BP Canada Supervisor or designate in charge of
the worksite believes further action is needed to prevent
loss of life or property, he/she will initiate the Emergency
Response Plan.
Site-Specic Procedure:
Each Performance Unit/Service Unit shall have a
written incident/accident reporting procedure.
[See: gHSSEr MS 430]
Note: Contact your HSSE representative for assistance with
incident investigation and report preparation.
LADDERS AND SCAFFOLDING PORTABLE
PURPOSE:
To outline precautions for the safe usage of portable ladders
and scafolding.
APPLICATION:
All plants, eld, pipelines facilities or work locations where
work is being conducted on behalf of BP Canada.
PROCEDURES:
Storage:
Ladders must be removed and properly stored
after each use. Leaving ladders leaning against
equipment, vessels, etc., is not acceptable.
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
218
Standard Safety Practices Manual
219
Inspection:
Ladders and scafolding shall be inspected prior
to each use. Defective ladders or scafolding in
need of repair must be removed from service,
tagged and replaced.
Maintenance:
Ladders and scafolding must be properly main-
tained to allow safe and trouble-free use.
PRECAUTIONS:
Portable Ladders:
An employer must ensure that a portable ladder
complies with:
o CSA Standard CAN3-Z11-M81 (R2001),
Portable Ladders
o ANSI Standard A14.1-2000, American Na-
tional Standard for Ladders Wood Safety
Requirements
o ANSI Standard A14.2-2000, American Na-
tional Standard for Ladders Portable Metal
Safety Requirements, or
o ANSI Standard A14.5-2000, American
National Standard for Ladders Portable
Reinforced Plastic Safety Requirements
o Ladders must be equipped with non-slip feet
and be secured against movement
o Extension ladders must be equipped with suit-
able extension locks
o Wooden and berglass ladders may be used
only when working near or with electrical
circuits. Metal ladders must not be used in
this application
o When in use, the ladder must extend 1 meter
past any platform or landing, and be secured
from movement. It must be positioned so that
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
218
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
219
it is no more than one quarter of its height
away from the well or structure against which
it stands, and is secured and placed on a base
that is level and stable
o Te ladder should be moved as the work
progresses
o When on ladder the worker muster ensure
three-point contact while climbing or station-
ary
o When working from a ladder at a height over
2 meters, the top must be secured, and the
worker must have fall protection
o Both hands should be free when climbing up
or down ladders. If material must be trans-
ported, it should be handled with a rope
o Only one person shall be on a ladder at a time
For heights over 6.5 meters, a ladder must not be
used; scafolding must be in place
A worker may not work from the top 2 rungs,
steps or treads of a stepladder unless:
(a) Te stepladder has a railed platform at the
top, or
(b) Te manufacturers specifcations for the
stepladder permit
A constructed portable/temporary ladder will
meet all material and construction specications
outlined in the Alberta OH&S Code Section
134
Scaolding:
Standards and Applications:
o CAN/CSA S269: approved scafolding must
be used when constructing and erecting scaf-
folding structures to work from.
o In applications between 2 and 6.5 meters,
scafolding is recommended as an alternative
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
220
Standard Safety Practices Manual
221
to a ladder.
o Scafolding must be constructed/installed in
accordance with all applicable regulations and
as outlined in OH&S Code Part 23.
o Scafolds must be constructed in accordance
with the manufacturers specications.
o Scafolds must be tagged appropriate to the
current inspected usable condition, with ap-
propriate documentation and time of inspec-
tion
o No person shall utilize a scafolding unit that
does not indicate by tagging safe for use or,
tagging has expired, or there is no tagging
present.
o Scafold must be equipped with acceptable
access and egress.
o All Work conducted from scafolding will
require Toe boards, top rails, midrails and
ladder well protection specications prior to
work commencing.
o Scafold erection and construction will be
conducted by a certier competent person.
[See: Working from heights]
[See: BP Golden Rule Working at Heights]
LADDERS, STAIRS AND PLATFORMS - FIXED
PURPOSE:
To provide direction for the design and installation of xed
ladders, stairs and platforms.
APPLICATION:
All plant, pipeline, rigs and eld facilities.
PROCEDURES:
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
220
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
221
Te design and usage of xed ladders, stairs and platforms
shall comply with government regulations.
and BP Engineering Specifcations. Prior to the design of a
permanent installation these documents should be
consulted.
[See: Canadian Standards Association]
[Occupational, Health and Safety
Regulations]
[See: BP Engineering Specifcations]
Lease Spacing Requirements (Reference only)
PURPOSE:
To outline the guidelines for working with xed ladders and
platforms on all facilities.
SPECIFICATIONS:
Stairways:
o Facilities with Stairways utilized for access must
ensure:
a. Te width of the treads and the height of the
rise of a stairway are uniform throughout its
length, and
b. Te treads of a stairway are level.
c. A stairway with 5 or more risers has the ap-
propriate handrail required by this Code, and
d. A stairway with open sides has a handrail and
an intermediate rail or equivalent safeguard to
each open side.
o Facilities utilizing stairs with 5 of more risers
must ensure the stairway is equipped with a
handrail that :
a. Extends the entire length of the stairway
b. Is between 800 millimeters and 920 millime-
ters above the front edge of the treads, and
c. Is substantial and constructed of material with
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
222
Standard Safety Practices Manual
223
properties the same as or better of lumber 38
millimeters by 89 millimeters
d. Post supporting a railing are spaced not more
than 3 meters apart at their vertical centers. A
xed walkway, service stair or stile shall be at
least 55 cm in width.
Fixed Ladders:
o Design criteria:
a. Fixed ladder shall meet the requirements of
PIP Standard STF05501 (February 2002),
Fixed Ladders and Cages, published by the
Construction Industry Institute.
b. If a xed ladder is made of a material other
than steel, the facilities must ensure that the
design is certied by a professional engineer
as being as strong as or stronger than that
required by PIP Standard STF05501.
c. Facilities shall ensure that a self-closing double
bar safety gate, or equally efective means, is
provided at ladder way foor openings and
platforms of xed ladders, this does not apply
at landings.
Work Platforms:
o Covering Openings :
a. When working on a platform with an open-
ing or hole through which a worker can fall
personnel shall be protected by:

a. A securely attached cover designed to
support an anticipated load, or
b. Guardrails and toes boards.
b. If personnel remove a cover, guardrail or toe
board, or part of them, protecting an opening
or hole for any reason, then they must ensure
a temporary cover or other means of protec-
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
222
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
223
tion replaces it immediately.
c. If a temporary cover is used to protect an
opening or hole, an employer must ensure a
warning sign or marking clearly indicating the
nature of the hazard:
a. Is posted near or xed on the cover, and
b. Is not removed unless efective means of
protection is immediately provided.
Guardrails:
o Facilities must ensure that a guardrail required by
this Code has:
(a) A horizontal top member installed between
920 millimeters and 1070 millimeters above
the base of the guardrail,
(b) A horizontal intermediate member spaced
mid-way between the top member and the
base,
(c) Vertical members at both ends of the hori-
zontal members with intermediate vertical
supports that are not more than 3 meters apart
at their centers, and
(d) Despite subsection (1), a temporary guardrail
does not require a horizontal intermedi-
ate member if it has a substantial barrier
positioned within the space bounded by the
horizontal top member, toe board and vertical
members that prevents a workers falling
through the space.
(e) A guardrail is secured so that it cannot move
in any direction if it is struck or any point
comes into contact with a worker, materials or
equipment.
Toe boards:
o An facility must ensure that:
(a) A toe board required by this Code is not less
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
224
Standard Safety Practices Manual
225
than 140 millimeters in height above the
surface of the work area, and
(b) Te space between the bottom of the toe
board and the surface of the work area is not
more than 6 meters high.
o An facility must ensure that toe boards are
installed at the outer edge above the work area
if a worker may be under a permanent foor,
mezzanine, walkway, ramp, runway or other
permanent surface where guardrails are installed,
or materials can fall more than 1.8 meters
o A facility must ensure that toe boards are
installed at the outer edge above the work area of
temporary scafolding or a temporary work plat-
form if materials can fall more than 3.5 meters
o A facility must ensure that toe boards are
installed around the top of a pit containing a
machine with exposed rotating parts if workers
may be working in the pit
o Tis section does not apply to the entrance of a
loading or unloading area if the employer takes
other precautions to ensure that materials do not
fall from the permanent surface while loading.
Rest platform exemption:
o If each worker working on a drilling rig or
service rig on a xed double ladder is equipped
with and wears a climb assist device that com-
plies with the manufacturers specications or
specications certied by a professional engineer,
an employer is not required to:
a) Provide the ladder with rest platforms, or
b) To have the side rails extend not less than
1050 millimeters above the point at which the
workers go on or of.
L
a
d
d
e
r
s
/
S
c
a
f
f
o
l
d
i
n
g
Standard Safety Practices Manual
224
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
225
LINE THAWING PRACTICE
1.0 Scope and Applicability
1.1 Te purpose of this practice is to establish a safe means
to provide a sucient heat source to thaw frozen
liquids inside of steel piping.
1.2 Tis practice is applicable to all Canada Gas Perfor-
mance Unit employees, contractors, sub-contractors
and visitors to CGPU work sites.
1.3 Te purpose of this practice is to ensure that all rea-
sonable precautions will be taken to protect the safety
of personnel who are or may be required to participate
in these types of activities.
1.4 Te requirement set forth in this practice will act as the
minimum requirements. Specic contractors, manufac-
turers or plants may have more stringent requirements.
In event of any discrepancies, the more stringent
requirements will prevail.
2.0 Purpose
Tawing of frozen liquids in steel pipe is a high risk task
that should never include the use of an open fame such as a
tiger torch to transfer direct heat to the steel pipe. Frozen
hydrocarbon lines may have reduced pipe wall integrity and
when the frozen hydrocarbon is heated and changes state
to a gas; may provide a most dangerous fuel source for an
open fame. Tis practice outlines the types of safer heat
mediums available to assist in thawing lines and the hazards
associated with each application. Also included in the prac-
tice are considerations to prevent freezing in steel piping as
L
i
n
e

T
h
a
w
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
226
Standard Safety Practices Manual
227
well as options to consider during construction to assist in
thawing lines once the lines are put into winter service.
3.0 Pre-work required prior to heating of frozen
steel lines
Prior to applying a heat medium to a frozen
line; workers must ensure that the line does
not have a diferential pressure greater then
2800 kpa(g)
Operations should attempt to carefully depres-
surize both sides of the frozen section of the
line
Using methanol carefully pressurize (manually
operated Baker pump) the upstream side of
the ice plug without exceeding the MOWP
of the line or 2800 kpa(g) diferential across
the ice plug. Consult the methanol MSDS to
verify proper PPE
Consideration must be made to allow for liq-
uid and vapor expansion as the ice plug begins
to change state. If at all possible the upstream
product feed valve should be isolated
Te work area must be fagged of to prevent
unauthorized workers from entry
Sensitive instrumentation and non steel ft-
tings must be protected prior to applying heat
to a steel line
4.0 Type of heat mediums available for thawing
frozen lines
Electrical Heat Trace Portable generator or purchased
power
A good option is to strip insulation of of the frozen
line and install electrical heat tracing. Te heat trace
L
i
n
e

T
h
a
w
i
n
g
Standard Safety Practices Manual
226
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
227
must be installed as per both CSA and the Electrical Code
requirements. Tere are diferent options with the types
of electrical heat trace being that it is available in both AC
and DC supplies. After the installation of the electrical
heat trace the line is wrapped with insulation to maintain
the heat to the pipe wall. Hazards include electrical energy,
sharp or damaged insulation, insulation bers (glass foam,
fberglass or silicate), and if using a portable generator
maintaining to the hot work permit and 8 meter rule for
potential ignition sources. When utilizing purchased power
the electrical connections must be explosion proof for a
Class 1 Division 1 area.
Prior to construction, selective piping should be
evaluated during the HAZOP study to consider installing
electrical heat trace lines before to the insulation is installed.
If the heat trace is installed it does not have to be put into
service and will provide an excellent option for assisting in
thawing the line in the event of future freezing. Tere is
minimal cost of doing this at the time of construction ver-
sus having to remove the insulation to apply a heat source.
Saturated steam utility low pressure
With the availability of mobile steamer units (eld
operations / well servicing) and onsite low pressure boilers
(drilling rigs / large service rig operations) provide a good
option to provide heat for the thawing of frozen lines.
Te frozen line must have the insulation removed prior to
applying steam to the bare pipe. Caution must be used if
applying steam vapor near insulation as moisture directed
inside the insulation may in fact lead to external pipe
corrosion. A recommendation rather then applying steam
directly to the pipe is to use heat conduction by strapping
stainless steel tubing to the suspected section of frozen pipe,
re-bundle the coupled lines with quick-wrap insulation, and
connect the stainless tubing to the steam supply and then
carefully controlling the discharge out of the tubing with a
control valve. Caution with regards to hot burner surfaces
L
i
n
e

T
h
a
w
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
228
Standard Safety Practices Manual
229
and steam burns must always be controlled in addition to
the hazard of the open fame ignition source of the boiler
(hot work permit and adhering to the 8 meter rule.)

Hot air - supplied by a Herman Nelson type of heater
Another option for heat medium is using hot air
directed from a gas red heater unit. Te hot air is directed
of of the discharge of the heater with the utilization of a
series of fexible heater ducts. With this option it is more
challenging to direct heat directly to the surface of the pipe
without wasting heat. Hazards include: hot surfaces of the
heater and open fame ignition sources as well as refueling
requirements. Te heater unit must again be positioned a
minimum 10 meters from any process piping or building.
Operations must maintain a continuous LEL monitor
upstream of the unit (when the heater is in operation.)

Hot engine exhaust Internal combustion engine

Another option that may be available is using the
hot exhaust of of an internal combustion engine such as
a feld technicians truck. A fexible rubber exhaust hose is
connected to the tailpipe and directed to the frozen line.
Tis type of application is dangerous and can only be used
in open spaces and never used inside buildings due to the
carbon monoxide concern. An additional hazard is ensur-
ing that the vehicle is safely parked outside of the 8 meter
minimum.
5.0 Hazard Assessments
OH&S Regulations require that an employer shall ensure
that a known hazard which cannot be readily controlled or
eliminated and that has the potential for causing serious
injury be identied and brought to the attention of workers
who may be exposed to the hazard.

Step 1 - Determine what specifc job tasks
L
i
n
e

T
h
a
w
i
n
g
Standard Safety Practices Manual
228
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
229
hazards are present.
Step 2 - Develop procedures that will
eliminate or control identied hazards
when required to
thaw frozen lines.
Step 3 - Document and maintain the hazard
assessment at the work site.

6.0 Key Responsibilities

Operating supervisors are responsible for implementing and
enforcing this practice, whereas all personnel are responsible
for complying with it. It is the responsibility of the Area
Authority to reference this practice while developing and
reviewing Job Safety and Environmental Analysis.
7.0 Scope of Forms
7.1 gHSSEr MF34004 Pre-job Risk Assessment
MANUAL LIFTING AND HANDLING HEAVY OR
AWKWARD LOADS
PURPOSE:
To establish guidelines for lifting, moving or handling of
any item.
APPLICATION:
Tis policy applies to all BP employees, contractors and
third parties who have a responsibility for ordering or carry-
ing out manual handling activities.
DEFINITION:
Te identication of manual handling activities that pose a
risk to health and safety and the development of workplace
M
a
n
u
a
l

L
i
f
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
230
Standard Safety Practices Manual
231
modications are achieved through implementation of the
procedure Identifying and Assessing Manual Handling
Risk.
Manual Lifting and moving forces should not exceed 20
kg or 4.5 kg during seated work. However, this maximum
force limit standard may be lowered to account for indi-
vidual physical characteristics. Tese weight restrictions
only apply to ideal lifting conditions such as smooth lifts,
weight held close to the body, unrestricted lifting posture
and a good grip.
PREPARATIONS:
All work involving manual lifting or moving must be
evaluated before work begins. Te evaluation should
include identifying any manual lift or carrying tasks that
have a potential to injure, perform a risk assessment and
identify risk control measures that includes considering job
redesign, mechanical lifting equipment and/or training.
PPE should also be considered such as gloves, protection
from chemicals, etc.
For help on identication, risk assessments and risk mitiga-
tion, refer to Guidance for Assessors Manual Handling
Programme: HSSE Group Resource Occupational Hygiene
and Environmental Health Team.
PROCEDURES:
SOCs and/or Critical Task Analysis should have been com-
pleted for common and routine manual lifting and moving
tasks. Examples of common, routine tasks are: barrel
moving, small pump lifting, valve replacements, furniture
moving, shipping and receiving goods on pallets. Refer to
the site specic procedure, if available.
If it is not a routine task and procedures are not available,
perform a risk assessment before commencing work and
detail risk reduction methods on the Safe Work Permit.
M
a
n
u
a
l

L
i
f
t
i
n
g
Standard Safety Practices Manual
230
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
231
Answer the following questions:
Is the item to be moved greater than 20 kg?
Is it an awkward shape or have rough or sharp
edges?
Does it have to be carried greater than 10 me-
ters?
Does it involve twisting of the body?
Do you have to bend down or reach for it when
picking it up or putting it down?
If the answer is yes to any of the questions, consider using
the proper moving equipment. If circumstances are such
that is not possible to use equipment to lift heavy or
awkward loads, then an alternative documented plan using
a hazard assessment and site specic procedure must be
developed to ensure an adequate level of safety to prevent
injuries.
PROPER LIFTING TECHNIQUES:
All workers should use mechanical means to lift objects
heavier than 20 kg.
Safe manual lifting requires the following steps:
1. Plan the lift. Get help for dicult loads.
2. Check your path is clear to where the object will rest.
3. Bend your legs half way, as if to sit.
4. Keep your back straight but inclined forward far
enough so that your arms can lift vertically.
5. Keep your feet fat and 30-40 cm apart for a
solid stance.
6. Grasp the object rmly.
7. Take a deep breath.
8. To lift, straighten legs and body, moving arms to
a comfortable position. Do not twist your back
while lifting the load.
9. Keep the object close to your body. Know your
limits.
M
a
n
u
a
l

L
i
f
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
232
Standard Safety Practices Manual
233
NOTE:
All manual lifts should be planned to elimi-
nate any twisting of the back during the lift.
When in doubt, use mechanical means to
make the lift or move.
METER PROVING
PURPOSE:
To provide guidelines for safe Meter Proving operations.
APPLICATION:
All BP Canada Plant and Field locations.
POTENTIAL HAZARDS:
Static Electricity [See: Electricity]
Combustible/Toxic Fluids
PREPARATIONS:
Safe work Permits should be issued for all meter
proving
Attention should be paid to lease lay-out to pro-
vide safe and accessible prover connections.[See:
Lease Design]
Under most conditions, respiratory protection
will not be required. However, the meter prover
operator must wear breathing apparatus when
crude or products containing poisonous gases
are handled, if tests indicate such protection is
needed. A safety standby may be required.[See:
Respiratory Protection Equipment], [See: Safety
Standby]
Appropriate personal protective equipment must
be worn. [See: Personal Protective Equipment]
Proving lines and connections must be properly
identied according to government regulations,
M
e
t
e
r

P
r
o
v
i
n
g
Standard Safety Practices Manual
232
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
233
M
a
n
u
a
l

L
i
f
t
i
n
g
i.e., WHMIS. TDG
PROCEDURES:
1. Each portable meter prover must be equipped
with a minimum of 1 30# LTK B.C. dry
chemical re extinguisher. When proving meters,
the re extinguisher should be removed from its
holder and placed on the upwind side, and in
position for immediate use.
2. A bonding and grounding cable shall be pro-
vided for each meter prover. In order to protect
against the build-up of static electricity, the
bonding and grounding cable shall be properly
placed so that the meters and prover are bonded
together and grounded. Tis shall be the rst
thing hooked up at the beginning of a proving
and the last thing disconnected at the end of the
proving operation.
3. When using fexible hoses to connect the prover
to the meter unit, be sure the hoses are rated to
stand the operating pressure. Tey must be visu-
ally inspected prior to use and replaced if their
condition indicates a possibility of failure.
4. It is recommended that the vehicle should not be
left idling while proving operations are under-
way. Also the wheels shall be chalked with park
brake set.
5. Always open the proper valves to relieve the pres-
sure on dust covers before attempting to remove
these covers. Extreme care should be used when
breaking connections or purging hoses and pip-
ing. [See: Draining and Depressuring]
6. Connections should not be drained on the
ground. Catch all drainings in a suitable con-
tainer for proper disposal.
7. In all cases, when using a prover that employs an
electronic counter system, all electrical connec-
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
234
Standard Safety Practices Manual
235
tions shall be made before the power is turned
on. After the meters have been proved, the power
shall be turned of before the electrical connec-
tions are disconnected.
PRECAUTIONS:
When meter prover leveling jacks are used, they should
be supported with blocks or rm footing, so that the ad-
ditional weight of the liquid will not unbalance the trailer
frame, making it a possible hazard to the operator.
RESPONSIBILITY:
1. Te BP Canada employee in charge is re-
sponsible for ensuring that safe meter proving
operations are conducted.
2. For BP Canada-owned proving units, the
prover operator is responsible for the safe
operation of the meter proving unit.
3. Te Service contractor is responsible for ensur-
ing that equipment, personnel, and job proce-
dures adhere to all applicable government and
BP Canada regulations and practices.
TRAINING:
Meter Prover Unit operators must be properly trained in
the safe operation of their equipment.
MOBILE STEAMERS
PURPOSE:
To provide guidelines for safe use of mobile steaming
equipment.
APPLICATION:
All BP Field facilities and leases.
POTENTIAL HAZARDS:
M
o
b
i
l
e

S
t
e
a
m
e
r
s
Standard Safety Practices Manual
234
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
235
Combustible Fluids
Steam Burns
Chemicals Hazards: Any chemicals used with the
water must have the applicable MSDS available
on-site and the appropriate labeling requirements
must be met, i.e., WHMIS.
Static Electricity [See: Electrical]
PREPARATIONS:
Where steaming could generate a hazard to personnel or
equipment, an authorized BP Canada Representative must
be on-site. He must conduct and document a pre-job safety
meeting, and an appropriate work permit must be obtained.
[See: Permits]
PROCEDURES:
1. Te steamer must be positioned a minimum of
25 meters from any wellhead, tank, or process
vessel, and pointed towards the access road for
quick exit. Any operation within 25 meters must
be treated as Hot Work.[See: Service Rig Safety]
2. Te Steamer should be upwind of any potential
source of combustible gas, where possible.
Caution must be exercised with respect to the
expansion of metals and trapped fuid.
PRECAUTIONS:
1. All protective equipment required by govern-
ment regulations and BP Safety Requirements
must be worn during all steaming operations.
[See: Personal Protective Equipment]
2. Caution must be exercised to ensure that cata-
lytic heaters, gas, re and H2S detection heads,
instrument recorders, instrumentation panels,
and electrical or sensitive equipment are not
steamed. Tis equipment should be protected
prior to steaming to prevent damage.
M
o
b
i
l
e

S
t
e
a
m
e
r
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
236
Standard Safety Practices Manual
237
MOVING HEAVY EQUIPMENT ON BP WORKSITES
PURPOSE:
Tis safety practice provides guidelines for the safe moving
of heavy equipment on BP Canada worksites.
APPLICATION:
BP Canada Plants, Field Operations, Construction Sites
and areas of heavy trac.
POTENTIAL HAZARDS:
Serious injury or death [See: Personal Protective
Equipment]
Contact with piping or stationary equipment
[See: Ground Disturbance]
Contact overhead power lines [See: Electrical
Equipment]
Lack of co-ordination with other operations [See:
Permit to Work]
DEFINITION:
1. Heavy Equipment includes pump trucks, rig
trucks, pickers, tracked equipment (i.e. Dozers),
graders, etc.
2. Heavy trac areas include highways and second-
ary roads and construction sites.
PREPARATIONS:
All routine job procedures and practices must be followed
before the heavy equipment is moved on to BP property.
PROCEDURES:
1. Face to face communication with the person in
charge of the site must occur before the pick up
or unloading of equipment on the job site. If
no one is at the site, the supervisor in charge or
M
o
v
i
n
g

H
e
a
v
y

E
q
u
i
p
.
Standard Safety Practices Manual
236
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
237
designate must be notied.
2. Te pre-job meeting and a safe work permit
must detail the specic instructions of where the
equipment is to be loaded or unloaded on the
job site and the potential hazards on the job site
i.e. power lines, pipelines, wellhead, etc.
3. Te right of way or lease boundary must be
well fagged or otherwise defned such that the
equipment operator will not enter into a trespass
situation.
4. If unloading or picking up equipment in
darkness, all lights on the equipment must be
operational or there is an alternate light source
available.
5. Before operating powered mobile equipment, the
equipment operator must complete a visual in-
spection of the equipment and the surrounding
area to ensure that the powered mobile equip-
ment is in safe operating condition and perform
inspections periodically in order to ensure the
continued safe operation of the equipment.
6. Equipment operators must wear provided seat-
belts in equipment when equipment is in motion
or engaged in an operation where the equipment
may become unstable.
7. If the equipment operator is using a ground
guide, the communication hand signals at the
end of this section should be used (See: Heavy
Equipment Hand Signals at the end of this sec-
tion.) and the ground guide must be visible at all
times.
8. All employees must establish eye contact and
have conformation of contact from the equip-
ment operator (i.e. nod, hand wave, call on a
radio) prior to entering the hazard area
9. Every piece of moving equipment shall have only
ONE individual directing it on the work site.
Tis person will be wearing distinguishable PPE
M
o
v
i
n
g

H
e
a
v
y

E
q
u
i
p
.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
238
Standard Safety Practices Manual
239
PRECAUTIONS:
1. Workers on the worksite must wear refective
striping on the FRC that are visible day and
night while working around heavy equipment.
2. Heavy equipment operators should be able to
prove their competency operating the equip-
ment.
3. Equipment must maintain 8 meters separation
form wellheads and facilities, unless under the
direction of a ground guide.
RESPONSIBILITIES:
Responsibility lies with the BP supervisor on site to ensure
the above procedures are followed.
Heavy Equipment Hand Signals
Note: Tese signals are Intended for All Heavy Equipment
Other Tan Cranes. Standard Riggers Signals are to be
Used for Cranes.
M
o
v
i
n
g

H
e
a
v
y

E
q
u
i
p
.







1. Raise Attachment
(bowl, blade)
2.Lower Attachment
(bowl, blade)


Fingers Curled with
Thumb Pointing Up.

Fingers Curled with
Thumb Pointing
Down.
3. Push 4. Pull

First of One Hand
Smacking into the
palm of the Other.
Both Fists Clenched
Together Initially.
Move Fists Apart in
a Lateral Motion.
5. Lower the Load 6. Raise the Load

Elbow at 90 Index
Finger Pointing
Down Making
Circular Motion.

Elbow at 90 Index
Finger Pointing Up
Making Circular
Motion.
7. Slow Down 8. Unload

Palms of Hands
Turned Down with a
slight Up and Down
Motion


Quick Motion of the
Arm with Fingers
Curled and Thumb
Extended.
9. Stop 10. Emergency Stop

Raise Hand to Head
Heights with the
Palm of Hand
Towards the
Machine.

Hands Spread
Sideways.













Standard Safety Practices Manual
238
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
239
NOISE EXPOSURE & HEARING CONSERVATION
PURPOSE:
To prevent the occurrence of occupational noise induced
hearing loss. All employees whose noise exposures equal
or exceed the allowable exposure levels shall be included
in the Hearing Conservation Program. Refer to the BP
Canadian Gas Hearing Conservation Code of Practice for
more details.
APPLICATION:
All BP operating facilities and associated personnel
Selected contractors may be included in audio-
metric testing and noise exposure monitoring
All other contractors are expected to comply
with provincial regulations regarding Hearing
Conservations Programs
POTENTIAL HAZARDS:
Noise levels in excess of the allowable 85 dBA
time-weighted average (TWA) for an 8-hour
shift or 82 dBA TWA for a 12-hour shift
Key Performance Indicators
Te hearing loss rate target for each work group
is zero confrmed abnormal shifts and 7% con-
rmed early warning shifts
PROCEDURES:
1. Area Sound Surveys: (Format Section)
All facilities will have an initial sound level
survey conducted to establish a baseline. Te
sound level data shall be plotted on a diagram
to generate the noise map of the surveyed area
which includes buildings and outdoor areas.
Tis noise map must be reviewed with onsite
personnel and be posted at a prominent loca-
N
o
i
s
e

E
x
p
o
s
u
r
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
240
Standard Safety Practices Manual
241
tion and accessible for worker review.
Areas shall be re-surveyed at a minimum of
every ve years or shortly after a change in
production process, equipment or controls
which may increase/decrease the noise levels.
2. Employee Dosimetry Monitoring:
A representative sample of employees, whose
work tasks may be exposed regularly to high
noise sources, may be monitored to determine
the time-weighted average (TWA) noise
exposure of a work shift.
If the employees exposure equal or exceed the
8-hour TWA of 85 dBA or 12-hour TWA of
82 dBA, the employee shall be included in the
Hearing Conservation Program.
Dosimetry monitoring shall be repeated
whenever a change in production, process,
equipment or controls increases the noise
exposures.
3. Identifcation of High Noise Sources:
Where noise level in any location (buildings,
units, etc.) or outdoor areas that exceeds 82
dBA, must be marked with signs that identify
it as a high noise area and requiring the use of
appropriate hearing protection.
All employees or contractors who enter areas
where the sound levels are 82 dBA or greater
shall wear appropriate hearing protection.
Areas where sound levels equal or exceed 100
dBA, appropriate double hearing
protection devices (earmufs over earplugs) are
required.
4. Temporary Worksites:
It is the responsibility of the BP Canada su-
pervisor in charge, or his designate, to ensure
adequatehearing protection is worn on all
temporary worksites where noise levels exceed
N
o
i
s
e

E
x
p
o
s
u
r
e
Standard Safety Practices Manual
240
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
241
82 dBA, i.e. rig operations.
Noise Reduction Reviews:A formal, docu-
mented Noise Reduction Review must be
conducted for all existing areas where noise
levels exceed 100 dBA. A formal review must
be completed for all new facilities expected to
have noise levels exceed 100 dBA in the facil-
ity design phase. Tis review must include
representatives from operations, engineering
and HSSE. An acoustical engineer must also
be included.
5. Hearing Protection Equipment:
Ear plugs and/or ear mufs must be made
available at all worksites. Contact Safety
Coordinator or Industrial Hygienist to ensure
appropriate hearing protectors are selected,
tted and used.
Audiometric Testing:
All new employees must have a baseline
audiogram (hearing test) in conjunction with
their pre-employment medical or, at the latest,
within six months of their hiring date.
All employees who are included in the Hear-
ing Conservation Program and are exposed to
noise levels equal to or exceed 82 dBA TWA
for a 12-hour shift or 85 dBA TWA for an
8-hour shift must have an audiometric testing
every two years, or as per jurisdiction regula-
tions.
RESPONSIBILITIES:
It is the responsibility of each supervisor and
site Safety Coordinator to ensure that noise
controls and hearing conservation are imple-
mented and enforced
Contractors are required to comply with these
N
o
i
s
e

E
x
p
o
s
u
r
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
242
Standard Safety Practices Manual
243
noise controls and hearing conservation mea-
sures with the exception of the Audiometric
testing and noise monitoring. Tese should
be part of their Safety Program
PERSONAL PROTECTIVE EQUIPMENT
PURPOSE:
To outline the requirements for the selection, care, and use
of personal protective equipment.
APPLICATION:
All personnel working on BP Canada worksite.
POTENTIAL HAZARD:
Exposure to physical and chemical hazards
can occur through contact of the skin, eyes,
inhalation, and ingestion
All workers on BP Canada worksite must wear
approved personal protective equipment as
identied as needed in the hazard assessment
that is appropriate to the work being done,
and the nature of the hazards involved. [See:
MSDS for hazardous material requirements.]
PREPARATIONS:
Te Local Area Manager may exempt certain ofces,
control rooms, vehicles, other non-hazardous areas, eld
tours, and casual visitors from some provisions of this
section. Tese exemptions must be communicated to all
applicable worksites, as required and a deviation from
standard completed.
PROCEDURES:
P
e
r
s
o
n
a
l

P
r
o
t
e
c
t
i
v
e

E
q
u
i
p
.
Standard Safety Practices Manual
242
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
243
Head Protection:
Approved industrial protective headgear must be worn by
all personnel on eld worksites. For further information see
applicable provincial regulations.
NOTE:
Metal hard hats must not be worn
If hair is deemed to be of excessive length and
may constitute a safety hazard, a hair net or
other means of connement for the hair must
be used
Eye Protection:
C.S.A.-approved safety glasses with C.S.A
approved side shields must be worn by all per-
sonnel at BP worksites where required. When
the nature of the work might result in an eye
or facial injury, additional protection, such as
a face shield or goggles, is required. Prescrip-
tion glasses must meet C.S.A. specications.
Types of eye protectors are shown in the table
at the end of this section
Employees wearing contact lenses must
wear all applicable safety eye protection. An
employer must ensure that, if wearing contact
lenses poses a hazard to the workers eyes dur-
ing work, the worker is advised of the hazards
and the alternatives to wearing contact lenses.
Permeable contact lenses are recommended
over non-permeable
Respiratory Protection:
An employer must determine the degree of
danger to a worker at a work site and whether
the worker needs to wear respiratory protective
equipment if:
(a) a worker is or may be exposed to an airborne
contaminant or a mixture of airborne
P
e
r
s
o
n
a
l

P
r
o
t
e
c
t
i
v
e

E
q
u
i
p
.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
244
Standard Safety Practices Manual
245
contaminants in a centration exceeding their
occupation exposure limits, or
(b) the atmosphere has or may have an oxygen
concentration of less than 19.5 percent by
volume.[See: BP Canada Respiratory Protec-
tion Program]
Hearing Protection:
Whenever noise hazards exist at BP Canada
worksites, all personnel entering will be pro-
vided with and must wear appropriate hearing
protection.
[See: Noise Exposure and Hearing Conservation]
Fire Resistant Clothing:
Fire resistant work wear shall be worn on all
BP worksites. See FRW Practice.
Whenever special clothing is required for han-
dling dangerous chemicals or for re-ghting,
it will be provided by BP Canada and worn
only by trained and competent personnel.
Hand Protection:
See Hand Protection Practice.
Chemical Protective Clothing:
Chemical Protective Clothing (CPC) includes
chemically resistant gloves, aprons, boots and
suits (both partially and fully encapsulating).
CPC shall be selected specically to provide
protection for the particular chemical or
chemical material in use. Refer to Material
Safety Data Sheet for recommended CPC
In situations where CPC is required, decon-
tamination procedures must be utilized that
enhances the removal of the particular chemical
Procedures should refect the type of CPC needed
Worksites should determine, in consultation
with the CPC manufacturer, when CPC
P
e
r
s
o
n
a
l

P
r
o
t
e
c
t
i
v
e

E
q
u
i
p
.
Standard Safety Practices Manual
244
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
245
should be replaced
Foot Protection:
C.S.A.-Grade 1 (green triangle) approved
footwear must be worn by all workers entering
eld worksites.
Boot style is recommended minimum 150mm
(6) high, from the bottom of the heel to the
top of the boot to provide ankle support.
An aggressive tread designed for snow/ice or
the use of boot grippers are required in winter
conditions to reduce the risk of slipping on
ice or snow pack. Te use of boot grippers is
only required for Operations. Drilling and
Completions move onto and of of metal
surfaces very frequently and are permitted to
use sanding.
Sole puncture protection is required
Safety footwear must be maintained in good
safe working condition. (i.e. no holes in upper
material or soles, no steel toes exposed)
JEWELRY
Wearing exposed jewelry on BP worksites is prohibited with
the exception of oce buildings. Rings, bracelets, watches,
neck chains and exposed body piercing are considered
jewelry. Medic Alert devices are not considered jewelry.
Personal Floatation Device:
All personnel working from a boat, barge, or
in an area where a fall into water could result
in drowning must wear a personal foatation
device, i.e. life jacket that meets the Canadian
General Standards Board Specifcations 65.7-M88 or
65.11-M88. Additional safety equipment such
as safety harnesses and lifelines should be used
when working on ice or near cold, fast moving
water
P
e
r
s
o
n
a
l

P
r
o
t
e
c
t
i
v
e

E
q
u
i
p
.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
246
Standard Safety Practices Manual
247
RESPONSIBILITY:
It is the responsibility of all BP Canada employees to ensure
potential exposure hazards are identied, and the appropri-
ate protective equipments are worn by all (i.e. employees,
contractors and visitors).
Chemical Protective Glove Selection Chart
P
e
r
s
o
n
a
l

P
r
o
t
e
c
t
i
v
e

E
q
u
i
p
.
T
a
s
k

C
h
e
m
i
c
a
l
s

G
l
o
v
e

M
a
t
e
r
i
a
l

T
y
p
e

o
f

G
l
o
v
e

B
r
a
n
d

N
a
m
e

A
c
k
l
a
n
d
s

O
r
d
e
r

N
u
m
b
e
r


L
u
b
e

o
i
l


G
l
y
c
o
l


C
o
n
d
e
n
s
a
t
e


G
a
s
o
l
i
n
e
/
D
i
e
s
e
l

F
u
e
l


M
I
D
E
A
/
D
E
A


F
r
a
c

O
i
l
/
I
n
v
e
r

M
u
d
s

1
.

V
i
l
t
o
n

2
.

N
i
t
r
i
l
e

3
.

V
i
t
o
n
/
N
e
o
p
r
e
n
e

T
h
i
n

g
l
o
v
e

(
4
-
5

m
i
l
)


B
e
s
t

N
-
D
e
x

G
l
o
v
e
s
(
N
i
t
r
i
l
e
)

(
B
E
M

7
2
3
)


A
n
s
e
l
l

E
d
m
o
n
t

T
o
u
c
h

a
n
d

T
u
f
f

(
N
i
t
r
i
l
l
e

p
o
w
d
e
r

f
r
e
e
)
(
A
N
L

9
2
-
6
0
0
-
1
0
)

F
i
n
e

w
o
r
k

r
e
q
u
i
r
i
n
g

l
i
g
h
t

g
l
o
v
e
s


E
n
g
i
n
e

o
v
e
r
h
a
u
l
s


H
e
a
d

c
h
a
n
g
e
s


P
i
s
t
o
n
/
l
i
n
e
r

r
e
p
l
a
c
e
m
e
n
t


S
e
a
l

c
h
a
n
g
e
s
/
p
u
m
p

r
e
p
a
i
r
s


S
a
m
p
l
e

c
o
l
l
e
c
t
i
o
n


O
r
i
f
i
c
e

p
l
a
t
e

c
h
a
n
g
e
s


M
e
t
h
a
n
o
l

1
.

V
i
l
t
o
n

2
.

B
u
t
y
l

N
a
t
u
r
a
l

R
u
b
b
e
r

(
l
a
t
e
x
)

T
h
i
n

G
l
o
v
e

(
5

m
i
l
s
)


A
n
s
e
l
l

E
d
m
o
n
t

D
u
r
a
t
o
u
c
h

S
h
e
e
r

(
l
a
t
e
x
)

(
A
N
L

3
4
-
5
2
5
)


L
u
b
e

o
i
l


G
l
y
c
o
l


C
o
n
d
e
n
s
a
t
e


G
a
s
o
l
i
n
e
/
D
i
e
s
e
l

F
u
e
l


M
D
E
A
/
D
E
A


F
r
a
c

O
i
l
/
I
n
v
e
r
t

M
u
d
s


1
.

V
i
l
t
o
n

2
.

N
i
t
r
i
l
e

3
.

V
i
t
o
n
/
N
e
o
p
r
e
n
e

S
u
m
m
e
r

W
i
n
t
e
r


B
e
s
t

A
n
s
w
e
r

N
i
t
r
i
l
e

l
a
m
i
n
a
t
e
d

(
B
E
M

2
7
3
5
)


B
e
s
t

N
i
t
r
i
-
P
r
o

N
i
t
r
i
l
e

c
o
a
t
e
d

(
B
E
M

7
1
6
6
)


A
n
s
e
l
l

E
d
m
o
n
t

H
y
c
r
o
n

G
e
n
e
r
a
l

P
u
r
p
o
s
e

g
l
o
v
e
s

N
i
t
r
i
l
e

c
o
a
t
e
d

(
A
N
L

2
4
-
8
0
5
-
1
0
)


A
n
s
e
l
l

E
d
m
o
n
t

H
y
c
r
o
n

N
i
t
r
i
l
e

c
o
a
t
e
d

j
e
r
s
e
y

l
i
n
i
n
g


W
i
n
t
e
r

(
A
N
L

5
2
-
5
9
0
-
1
0
)

R
o
u
g
h

o
r

a
b
r
a
s
i
v
e

w
o
r
k

r
e
q
u
i
r
i
n
g

h
e
a
v
e

g
l
o
v
e
s


M
a
n
u
a
l

m
a
t
e
r
i
a
l

h
a
n
d
l
i
n
g


P
u
l
l
i
n
g

o
r

s
t
r
i
n
g
i
n
g

j
o
i
n
t
s


L
i
n
e

p
i
g
g
i
n
g


V
a
c

t
r
u
c
k
i
n
g


F
r
a
c

o
r

w
i
l
l

c
o
m
p
l
e
t
i
o
n
s


M
e
t
h
a
n
o
l

1
.

V
i
l
t
o
n

2
.

B
u
t
y
l

N
a
t
u
r
a
l

R
u
b
b
e
r

(
l
a
t
e
x
)

S
u
m
m
e
r


B
e
s
t

N
i
t
t
y

G
r
i
t
t
y

n
a
t
u
r
a
l

r
u
b
b
e
r

c
o
a
t
e
d

(
B
E
M

6
5
N
F
W
)

Standard Safety Practices Manual
246
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
247
Chemical Protective Glove Selection Chart
P
e
r
s
o
n
a
l

P
r
o
t
e
c
t
i
v
e

E
q
u
i
p
.
S
u
b
m
e
r
s
i
o
n

o
f

h
a
n
d
s

i
n
t
o

c
h
e
m
i
c
a
l


F
i
l
t
e
r

c
h
a
n
g
e
s


P
a
r
t
s

w
a
s
h
i
n
g


P
i
s
t
o
n
/
l
i
n
e
r

r
e
p
l
a
c
e
m
e
n
t


L
u
b
e

o
i
l


G
l
y
c
o
l


C
o
n
d
e
n
s
a
t
e


M
D
E
A
/
D
E
A


F
r
a
c

O
i
l
/
I
n
v
e
r
t

M
u
d
s


V
a
r
s
o
l


G
a
s
o
l
i
n
e
/
D
i
e
s
e
l


V
i
l
t
o
n


N
i
t
r
i
l
e


V
i
t
o
n
/
N
e
o
p
r
e
n
e

F
l
u
i
d

a
t

r
o
o
m

t
e
m
p

F
l
u
i
d

a
t

h
o
t
/
c
o
l
d

t
e
m
p


A
n
s
e
l
l

E
d
m
o
n
t

S
o
l
v
e
x

S
o
f
t

L
i
n
e
d

C
h
e
m
i
c
a
l

R
e
s
i
s
t
a
n
t

G
l
o
v
e
s

N
i
t
r
i
l
e

(
A
N
L

3
7
-
1
7
5
)


M
A
P
A

S
t
a
n
s
o
l
v

N
i
t
r
i
l
e

H
e
a
v
y

W
e
i
g
h
t

Z

G
r
i
p

(
P
I
P

4
8
0
4
2
0
)

(
g
o
o
d

f
o
r

s
o
l
v
e
n
t

w
a
s
h
)


M
A
P
A

S
t
a
n
s
o
l
v

K
n
i
t

L
i
n
e
d

N
i
t
r
i
l
e

G
l
o
v
e
s


c
o
l
d
/
h
o
t

t
e
m
p

(
P
I
P

3
8
1
4
1
0
)


M
e
t
h
a
n
o
l

1
.

V
i
l
t
o
n

2
.

B
u
t
y
l

N
a
t
u
r
a
l

R
u
b
b
e
r

(
l
a
t
e
x
)

F
l
u
i
d

a
t

h
o
t
/
c
o
l
d

t
e
m
p


A
n
s
e
l
l

E
d
m
o
n
t

L
i
n
e
d

N
a
t
u
r
a
l

L
a
t
e
x

C
h
e
m
i
c
a
l

r
e
s
i
s
t
a
n
t

G
l
o
v
e
s

(
A
N
L

2
0
8
-
1
0
)

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
248
Standard Safety Practices Manual
249
PIGGING OF PIPELINES AND FLOWLINES
PURPOSE:
To provide safe practices for pigging operations of pipes,
pipelines, and fowlines for the removal of wax, other solid
deposits, and trapped fuids.
APPLICATION:
All BP Canada Field operations are afected.
POTENTIAL HAZARDS:
Combustible/Toxic Fluids
May have Toxic Vapour [See: Benzene, Hydro-
gen Sulphide]
May have NORM, depending on product line
[See: Radioactive or Normal Occurring Radioac-
tive Materials (NORM)]
High Pressure
Static Electricity [See: Grounding and Bonding]
Hydrates [See: Hydrates]
PROCEDURES:
1. A safe work permit must be issued before pigging
begins.
2. Pigging operations in gas and oileld operations
represent a serious hazard.
3. In all areas a site-specifc procedure must be used
and it must address the following:
4. Characteristics of the fuid to be pigged.
5. Proper isolation and depressurization.
6. Draining and ventilation.
7. Te hazard of potential plugging of the bleed-of
valves and gauges.
8. Proper receiving and launching techniques,
P
i
g
g
i
n
g

o
f

P
i
p
e
l
i
n
e
s
Standard Safety Practices Manual
248
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
249
stressing potential hydraulic shock.
9. Routine inspection of the cap, barrel and seals.
10. Individual marking or identication of pigs and
logging with respect to launching and receiving
times.
11. Purging [See: Purging]
NOTE: Proper disposal methods must be used for pigging
wax and fuids. [See: BP Environmental Guidelines]
PRECAUTION:
a. Where the receiver is vented to a proper drain
or fare system, the barrel must be vented to
atmosphere prior to opening the receiver or
launcher. Ensure vent valve is free and clear by
some means.
b. No worker shall position themselves in front of
the pig launchers or receiver at any time during
the pigging operation. All quick opening closures
on pig launchers and receivers must be equipped
with a pressure interlocking warning device with
a safety catch.[See: ASME Code VIII, Paragraph
UG .35]
POSITIVE AIR SHUT-OFF REQUIREMENTS (PASO)
PURPOSE:
To provide guidelines for the requirement of positive air
shut-ofs on diesel powered equipment.
APPLICATION:
All diesel powered equipment, Contractor or BP
owned, including those used to load or unload
fammable liquids or gases at all BP Canada sites.
All diesel powered equipment includes pick up
P
o
s
i
t
i
v
e

A
i
r

S
h
u
t
-
o
f
f
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
250
Standard Safety Practices Manual
251
trucks, and diesel powered heavy machinery
used within 25m of a wellhead OR where there
are piping, process vessels or tanks containing
combustible fuids or gasses that may release
hydrocarbons to atmosphere within 25 m of
diesel powered equipment. (E.g. they are open or
being worked on or with)
POTENTIAL HAZARDS:
Uncontrolled engine operation resulting in an
explosion.
Personal injury from exploding engines or
exploding hydrocarbon mixtures.
Equipment damage because of engine overspeed.
DEFINITION:
A positive air shut of (PASO) is a device that cuts the
air supply to diesel engines resulting in immediate engine
shut down.
PROCEDURES:
When loading or unloading fammable liquid
or gas products at all BP facilities using diesel-
powered equipment, this equipment must be
equipped with a PASO.
All positive air shut ofs must be in good work-
ing condition and tested monthly.
PASO operation may be either automatic or
manual.
Manual PASOs must have the capability to be
operated from normal workstations around the
vehicle, e.g. pump control panels.
Requirements for PASOs should be included in
pre job meetings.
P
o
s
i
t
i
v
e

A
i
r

S
h
u
t
-
o
f
f
Standard Safety Practices Manual
250
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
251
RESPONSIBILITIES:
Responsibility for installation, maintenance and
testing of PASOs lies with the owner of the
equipment with a PASO.
Accountability for verifcation is with the BP site
supervisor or designate.
PRACTICE FOR WORKING IN A COMBUSTIBLE
GAS ENVIRONMENT
1.0 Scope and Applicability
1.1 Tis practice applies to all BP Canada Energy
Canada Gas Performance Unit (CGPU) employees,
contracted employees, contractors and other visiting
personnel doing work on CGPU premises and work
sites.
1.2 Tis practice applies to any work area where person-
nel have the potential to be exposed to combustible
gas.
1.3 Te purpose of this practice is to:
1.3.1 To establish practices for providing a safe work
environment while working with or around
combustible gas.
1.3.2 Provide requirements for the training and
qualications of personnel conducting com-
bustible gas tests, as well as regulatory require-
ments for the maintenance and calibration of
portable gas test equipment.
2.0 Scope of Denitions
2.1 Competent person - one who has completed
training, as per manufacturer specications and site
specic procedures.
2.2 Function (Bump) Test - A test conducted by
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
252
Standard Safety Practices Manual
253
introducing a known concentration of gas (Pentane)
to the sensor of the combustible gas detector. Te
detector must read within +or-20% of known con-
centration and to ensure that the 10% LEL alarm on
the detector is functioning properly.
2.3 LEL - Te Lower Explosive Limit (LEL) is the
lowest concentration of combustible gas in air at
which an explosion could occur. Te percentage
of LEL represents the amount of combustible gas
present between 0 and 100, 100% being the Lower
Explosive limit. With Methane approximately 5% in
air is equal to 100% of the LEL.
2.4 Atmospheric Release - For the purpose of this Prac-
tice an atmospheric release is defned as 20 % LEL
8 inches (20 cm) from the source as per the GCBU
Reporting Practice gHSSEr MS430.
3.0 Scope of Responsibility
3.1 A proper functioning approved combustible gas
detector will be used for every task being performed
on a BP CGPU site that has potential exposure to a
combustible gas environment.
3.2 Te on-site BP representative in charge or designate
must ensure that:
Regular documented surveys (sweeps) are
conducted annually of all facilities including
wells and pipeline risers to detect excessive
LEL levels and meet EUB Directive 60 LDAR
requirements.
Any excessive atmospheric release greater than
or equal to 10% is detected, roped of and
will be repaired as soon as possible following a
proper risk assessment
For any LEL reading greater than or equal
to 20%, the equipment should be shutdown
until repaired
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
Standard Safety Practices Manual
252
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
253
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
Any LEL reading exceeding 20% LEL is an
incident classied as an Atmospheric Release
under CGPU Reporting Practice gHSSEr
MS430 and followed up with an incident
investigation to prevent re-occurence. Oth-
erwise, any gas release exceeding 10% LEL is
reported as an HSSE opportunity
All workers have read and follow a safe build-
ing\lease entry procedure. (See Sample Lease
entry procedure)
All workers have received instruction in the
use of combustible gas detection equipment
and understand the hazards associated with
combustible gases. (Appendix 2 Training and
Exposure sections of this document)
4.0 Scope of General Expectations
4.1 Only personnel who are trained or have received
instruction may conduct gas tests.
4.2 Te person conducting the gas testing for permiting
must sign or initial the permit and the results must
be kept on le for a minimum of 1year (see Permit to
Work Practice gHSSEr MS 880).
4.3 Only CSA approved combustible gas detection
equipment (see appendix 1) shall be used.
4.4 Continous gas tests will be conducted where ever
CGPU employees, contracted personnel, contractors
and other visiting personnel will be entering an area
that has the potential for the atmosphere to contain
combustible gas.
4.5 Te gas detection devices must have a documented
Function (Bump) Test at the beginning of each shift.
If the detector fails the bump test, the detector must
be taken out of service, tagged as defective and sent
for calibration. Te detector must have a current
calibration sticker to be in use. Detectors must be
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
254
Standard Safety Practices Manual
255
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
calibrated as per manufacturers specications.
4.6 Combustible Gas Monitoring must be conducted
before any work taking place within 8 meters of any
well, process buildings, vessel, tank or related equip-
ment, where combustible gas is, or may be present.
4.7 Portable Combustible Gas Detector alarms must be
set at: Low alarm 10% LEL and High Alarm 20%
LEL. Fixed combustible gas detectors should alarm
at 10% LEL and shutdown at greater than or equal
to 20% LEL.
4.8 If while working, the combustible gas detector alarms,
personnel must leave the area immediately to
determine the appropriate action.
4.9 Before entering a lease where combustible gas may
be present, a gas test must be done (see attached lease
entry procedures). Te test must also be done before
and during entry into lease buildings. Te detector
is to be kept in the work area while personnel are
conducting their work to ensure that personnel are
not exposed to over 10%
5.0 Scope of Occupational Exposure Limits
LEL (Lower Explosive Limit) Hazards



% of Lower Explosive
Limit
Guidelines
LEL 0% Area may be entered.
Other toxic contaminates such as benzene or H2S may
exist in concentrations above the exposure limits
LEL >0 - <10% Entry into these areas is permitted. A risk assessment must
be conducted to determine appropriate action.

LEL>10% Evacuation of personnel, no entry into area permitted.


Standard Safety Practices Manual
254
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
255
Combustible gas containing light hydrocar-
bons may cause symptoms such as dizziness,
headaches, and errors in judgment and in
some cases loss of consciousness. Tese symp-
toms known as a narcotic efect may occur at
10 % of the LEL
Combustible gas concentrations may contain
other potentially harmful substances such as
hydrogen sulde H2S and benzene. If the
stream concentration is greater than 0.2 0.4
% H2S the greater health risk is H2S as the
exposure limit will be exceeded before the LEL
concentrations reaches 10%. If the stream
concentration is greater than 0.1% benzene
the greater health risk is benzene as the
exposure limit will be exceeded before the LEL
concentration reaches 10%
LEL detection equipment must not be used to
try to determine H2S or benzene concentra-
tions

6.0 Scope of Appendices
APPENDIX 1- Equipment Type and Care
APPENDIX 2- Training
APPENDIX 3- Lease Entry Procedure
7.0 Scope of References
7.1 Alberta General Safety Regulations AR 448/83 as amended
7.2 B.C. Occupational Health and Safety Regulations and
Guidelines 296/97 as amended
7.3 gHSSEr MS880- Permit to Work Practice
8.0 Forms
gHSSEr MF 34004- Pre-job Risk Assessment
gHSSEr MF 88001- BP Canada Energy Company-
Cold Work Permit/Hot Work Permit
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
256
Standard Safety Practices Manual
257
Appendix 1
Equipment Type and Care
Approved Equipment
Gas detection equipment must include a LEL detector and
oxygen sensor and should include a carbon monoxide and
hydrogen sulde sensor.
All gas detection equipment must be CSA approved.
Equipment Testing and Care
Each area must ensure that an inspection and testing
program is implemented whereby all combustible gas
detection equipment is inspected by a qualied technician
on a frequency consistent with manufacturers requirements
and with prevailing regulation requirements (minimum
every three (3) months. A tag must be attached to the gas
detectors showing the latest inspection/due date. Records of
all calibrations must be maintained.
Gas detection devices must be Bump Tested before each
daily use and documented in a bump test log, and after 12
hours of continuous use. A test would also be required if
the detector comes in contact with water is over ranged or
sufers trauma ie: dropping the detector.
Precautions:
Te bump test must be conducted by introducing a known
concentration of gas (Pentane) to the sensor of the combus-
tible gas detector. Te detector must read within +or-20%
of known concentration and to ensure that the 10% LEL
alarm on the detector is functioning properly
All gas detection equipment requires a minimum oxygen
content in order to perform according to manufacturers
specications. Te oxygen reading must be taken prior to
an LEL reading to verify that the monitor can read properly
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
Standard Safety Practices Manual
256
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
257
Appendix 2
Training
All employees and contractors must be knowledgable on
the hazards of combustible gas and the use of detection
equipment being used.
Each area in the CGPU is responsible to ensure that all
BP and Full Time Equivalence workers have a satifactory
course available to teach the proper methods in the use of
combustible gas detection equipment including:
Operation
Calibration
Storage
Limitations
Alarm settings
Site specifc procedures
Personnel training records will be maintained on site.
Training is to be conducted every (3) years and is expected
to include passing a documented test to ensure personnel
are qualied.
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
258
Standard Safety Practices Manual
259
Appendix 3
Lease Entry Procedure
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.




S
t
e
p

H
a
z
a
r
d

C
o
n
t
r
o
l

1
.

V
e
r
i
f
y

p
e
r
s
o
n
a
l

m
o
n
i
t
o
r
i
n
g

e
q
u
i
p
m
e
n
t

i
s

o
p
e
r
a
t
i
o
n
a
l

o
n
c
e

p
e
r

s
h
i
f
t
.

H
2
S

o
r

h
y
d
r
o
c
a
r
b
o
n

e
x
p
o
s
u
r
e
.

-

B
u
m
p

t
e
s
t

p
e
r
s
o
n
a
l

m
o
n
i
t
o
r
i
n
g

e
q
u
i
p
m
e
n
t

p
r
i
o
r

t
o

t
h
e

b
e
g
i
n
n
i
n
g

o
f

t
h
e

s
h
i
f
t
.

-

C
a
l
i
b
r
a
t
e

m
u
l
t
i
-
h
e
a
d

g
a
s

m
o
n
i
t
o
r

a
s

p
e
r

m
a
n
u
f
a
c
t
u
r
e

s

i
n
s
t
r
u
c
t
i
o
n
s

2
.

S
t
o
p

a
t

l
e
a
s
e

e
n
t
r
y

a
n
d

c
o
n
d
u
c
t

a

v
i
s
u
a
l

i
n
s
p
e
c
t
i
o
n

o
f


a
r
e
a

H
i
g
h

H
2
S

o
r

L
E
L

c
o
n
c
e
n
t
r
a
t
i
o
n
s
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s
,

f
i
r
e

o
r

s
p
i
l
l
s

B
e
f
o
r
e

e
n
t
e
r
i
n
g

l
e
a
s
e
:

1
.

V
i
s
u
a
l

i
n
s
p
e
c
t
i
o
n

2
.

C
h
e
c
k

w
i
n
d

d
i
r
e
c
t
i
o
n

3
.


C
h
e
c
k

f
o
r

H
2
S

a
n
d

L
E
L

a
l
a
r
m

a
n
d

f
l
a
s
h
i
n
g

b
e
a
c
o
n

3
.

R
e
g
i
s
t
e
r

p
e
r
s
o
n
n
e
l

e
n
t
e
r
i
n
g

t
h
e

s
i
t
e

t
h
o
u
g
h

t
h
e

u
s
e

o
f

a
n

a
u
t
o
m
a
t
e
d

s
y
s
t
e
m

(
V
M
S
)

o
r

b
y

n
o
t
i
f
y
i
n
g

t
h
e

c
o
n
t
r
o
l

r
o
o
m
.



H
2
S

o
r

h
y
d
r
o
c
a
r
b
o
n

e
x
p
o
s
u
r
e

-

E
n
s
u
r
e

t
h
a
t

s
y
s
t
e
m

a
c
c
e
p
t
s

t
h
e

i
n
p
u
t

o
r

t
h
a
t

c
o
n
t
r
o
l

r
o
o
m

s
t
a
f
f

r
e
c
o
r
d
s

t
h
e

t
i
m
e

o
f

e
n
t
r
y

i
n

t
h
e

l
o
g
.

S
T
O
P
-
T
H
I
N
K
-
G
O

4
.

I
f

s
a
f
e

f
o
r

v
e
h
i
c
l
e

e
n
t
r
y
,

p
r
o
c
e
e
d

t
o

t
h
e

M
C
C

/

R
T
U

(
S
c
a
d
a
)

b
u
i
l
d
i
n
g
.


(
I
F

N
O

R
T
U

O
R

M
C
C

I
S

P
R
E
S
E
N
T

G
O

T
O

S
T
E
P

6
.
)

H
i
g
h

H
2
S

o
r

L
E
L

c
o
n
c
e
n
t
r
a
t
i
o
n
s
,

f
i
r
e
,

e
x
p
l
o
s
i
o
n
s

o
r

s
p
i
l
l
s

B
e
f
o
r
e

e
n
t
e
r
i
n
g

l
e
a
s
e
:

1
.

V
i
s
u
a
l

i
n
s
p
e
c
t
i
o
n

2
.

C
h
e
c
k

w
i
n
d

d
i
r
e
c
t
i
o
n

3
.

C
h
e
c
k

f
o
r

H
2
S

a
l
a
r
m


a
n
d

f
l
a
s
h
i
n
g

b
e
a
c
o
n

L
E
A
S
E

E
N
T
R
Y

P
R
O
C
E
D
U
R
E

Standard Safety Practices Manual
258
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
259
Lease Entry Procedure
C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.


S
t
e
p

H
a
z
a
r
d

C
o
n
t
r
o
l

5
.

U
s
e

m
u
l
t
i
-
h
e
a
d

g
a
s

d
e
t
e
c
t
o
r

t
o

c
h
e
c
k

f
o
r

h
i
g
h

L
E
L

o
r

H
2
S

g
a
s

l
e
v
e
l
s

i
n

t
h
e

v
i
c
i
n
i
t
y

o
f

M
C
C
/
R
T
U
.

E
v
a
l
u
a
t
e

r
i
s
k

o
f

o
t
h
e
r

a
t
m
o
s
p
h
e
r
i
c

h
a
z
a
r
d
s

s
u
c
h

a
s

b
e
n
z
e
n
e
,

s
u
l
f
u
r

d
i
o
x
i
d
e

o
r

c
a
r
b
o
n

m
o
n
o
x
i
d
e
.



H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e
.

H
2
S

>

1
0

p
p
m

L
E
L

>

1
0
%

1
9
.
5

%

>

O
2

>

2
3
%

S
O
2

>


2

p
p
m

C
O

>

2
5

p
p
m

B
e
n
z
e
n
e

>

1

p
p
m

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)


-

B
e
n
z
e
n
e
,

S
O
2
,

C
O

m
o
n
i
t
o
r
i
n
g

e
q
u
i
p
m
e
n
t

(
i
f

a
p
p
l
i
c
a
b
l
e
)

6
.

I
f

H
2
S

o
r

L
E
L

g
a
s

l
i
m
i
t
s

a
r
e

w
i
t
h
i
n

P
r
a
c
t
i
c
e
s
,

v
e
h
i
c
l
e
s

m
a
y

n
o
w

p
r
o
c
e
e
d

o
n
t
o

t
h
e

l
e
a
s
e

a
n
d

p
a
r
k

a
p
p
r
o
p
r
i
a
t
e
l
y
.


H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f

a
p
p
l
i
c
a
b
l
e
)

-


p
a
r
k

v
e
h
i
c
l
e

f
a
c
i
n
g

t
h
e

l
e
a
s
e

e
x
i
t

f
o
r

e
a
s
e

o
f

e
g
r
e
s
s

-

t
h
e

v
e
h
i
c
l
e

c
a
n

b
e

d
r
i
v
e
n

d
i
r
e
c
t
l
y

o
f
f

t
h
e

s
i
t
e
-

c
o
m
p
l
y

w
i
t
h

t
h
e

8

m
e
t
e
r

r
u
l
e


f
r
o
m

p
r
o
c
e
s
s

e
q
u
i
p
m
e
n
t

a
n
d

p
i
p
i
n
g

-

C
h
e
c
k

w
i
n
d

d
i
r
e
c
t
i
o
n

a
n
d

p
a
r
k

u
p
w
i
n
d


-

C
h
e
c
k

b
e
a
c
o
n
s

o
r

a
l
a
r
m
s

L
E
A
S
E

E
N
T
R
Y

P
R
O
C
E
D
U
R
E

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
260
Standard Safety Practices Manual
261
Lease Entry Procedure


C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.

S
t
e
p

H
a
z
a
r
d

C
o
n
t
r
o
l

7
.

W
h
e
n

e
x
i
t
i
n
g

v
e
h
i
c
l
e
,

s
t
a
t
i
c

e
l
e
c
t
r
i
c
i
t
y

s
h
o
u
l
d

b
e

c
o
n
s
i
d
e
r
e
d

a
n
d

p
e
r
s
o
n

s
h
o
u
l
d

g
r
o
u
n
d

t
h
e
m
s
e
l
v
e
s

t
o

m
e
t
a
l

o
b
j
e
c
t

b
e
f
o
r
e

o
p
e
n
i
n
g

b
u
i
l
d
i
n
g
s
.


H
i
g
h

l
e
v
e
l
s

o
f

H
2
S

o
r

L
E
L
'
s

r
e
s
u
l
t
i
n
g

i
n

e
x
p
l
o
s
i
o
n


-

G
r
o
u
n
d

b
a
r
e

h
a
n
d

t
o

m
e
t
a
l

s
u
r
f
a
c
e

t
o

d
i
s
c
h
a
r
g
e

s
t
a
t
i
c

e
l
e
c
t
r
i
c
i
t
y
.

8
.

O
p
e
n

b
u
i
l
d
i
n
g

d
o
o
r

w
h
i
l
e

u
s
i
n
g

m
u
l
t
i
-
h
e
a
d

m
o
n
i
t
o
r
.


O
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

L
E
L

o
r

H
2
S
,

e
x
p
o
s
u
r
e

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

A
p
p
r
o
a
c
h

b
u
i
l
d
i
n
g

u
s
i
n
g

c
a
u
t
i
o
n

&

t
a
k
e

h
e
s
i
t
a
t
i
o
n

s
t
e
p

a
f
t
e
r

o
p
e
n
i
n
g

d
o
o
r
s

-

c
h
e
c
k

e
n
t
r
a
n
c
e

a
r
e
a

u
s
i
n
g

M
u
l
t
i
-
h
e
a
d

h
e
a
d

m
o
n
i
t
o
r

t
o

e
n
s
u
r
e

r
e
q
u
i
r
e
d

O
2
,

H
2
S

&

L
E
L

l
i
m
i
t
s

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)


9
.

I
f

H
2
S

o
r

L
E
L

l
i
m
i
t
s

a
r
e

e
x
c
e
e
d
e
d

-





D
O

N
O
T

E
N
T
E
R
.


H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)


-

o
p
e
n

d
o
o
r
s

a
n
d

v
e
n
t
s

u
s
i
n
g

c
a
u
t
i
o
n

1
0
.

I
f

l
e
v
e
l
s

d
o

n
o
t

c
l
e
a
r

c
o
n
t
a
c
t

b
a
c
k

u
p

p
e
r
s
o
n
n
e
l

a
n
d

n
o
t
i
f
y

s
u
p
e
r
v
i
s
o
r
.




H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)


1
1
.

O
n
c
e

b
a
c
k
u
p

h
a
s

a
r
r
i
v
e
d

o
n

l
o
c
a
t
i
o
n
,

g
a
s

l
e
a
k

c
a
n

b
e

i
n
v
e
s
t
i
g
a
t
e
d

a
n
d
/
o
r

r
e
p
a
i
r
e
d

H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

b
r
e
a
t
h
i
n
g

a
i
r

e
q
u
i
p
m
e
n
t


d
o
n
n
e
d

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)

L
E
A
S
E

E
N
T
R
Y

P
R
O
C
E
D
U
R
E

Standard Safety Practices Manual
260
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
261
Lease Entry Procedure

C
o
m
b
u
s
t
i
b
l
e

G
a
s

E
n
v
i
r
.







S
t
e
p

H
a
z
a
r
d

C
o
n
t
r
o
l

1
2
.

I
f

g
a
s

l
e
v
e
l
s

c
a
n

n
o
t

m
e
e
t

P
r
a
c
t
i
c
e

r
e
q
u
i
r
e
m
e
n
t
s

a
f
t
e
r

i
n
v
e
s
t
i
g
a
t
i
o
n

a
n
d
/
o
r

r
e
p
a
i
r
,

e
q
u
i
p
m
e
n
t

s
h
o
u
l
d

b
e

s
h
u
t
-
i
n
.

H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)


-

s
h
u
t

i
n

u
s
i
n
g

s
i
t
e

s
p
e
c
i
f
i
c

s
h
u
t

d
o
w
n

p
r
o
c
e
d
u
r
e
s
.

1
3
.

I
f

n
o

g
a
s

l
e
v
e
l

p
r
e
s
e
n
t

p
r
o
c
e
e
d

i
n
t
o

b
u
i
l
d
i
n
g

u
s
i
n
g

c
a
u
t
i
o
n
,

w
h
i
l
e

m
o
n
i
t
o
r
i
n
g

g
a
s

l
e
v
e
l
s

w
i
t
h

m
u
l
t
i
-
h
e
a
d

g
a
s

m
o
n
i
t
o
r
.

P
r
o
c
e
e
d

t
h
r
o
u
g
h

t
h
e

e
n
t
i
r
e

b
u
i
l
d
i
n
g

s
w
e
e
p
i
n
g

f
o
r

g
a
s

b
e
f
o
r
e

c
o
m
m
e
n
c
i
n
g

w
o
r
k
.


H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

P
e
r
s
o
n
a
l

m
o
n
i
t
o
r

-

M
u
l
t
i
-
h
e
a
d

G
a
s

M
o
n
i
t
o
r

-

C
o
n
t
i
n
u
o
u
s

G
a
s

M
o
n
i
t
o
r

(
i
f


a
p
p
l
i
c
a
b
l
e
)

1
4
.

W
h
e
n

l
e
a
v
i
n
g

l
e
a
s
e

n
o
t
i
f
y

B
P

p
e
r
s
o
n
a
l

a
n
d

l
o
g

o
u
t

o
f

a
u
t
o
m
a
t
e
d

o
r

o
f
f

v
m
s

s
y
s
t
e
m
.

R
e
g
i
s
t
e
r

p
e
r
s
o
n
n
e
l

e
x
i
t
i
n
g

t
h
e

s
i
t
e

t
h
o
u
g
h

t
h
e

u
s
e

o
f

a
n

a
u
t
o
m
a
t
e
d

s
y
s
t
e
m

(
V
M
S
)

o
r

b
y

n
o
t
i
f
y
i
n
g

t
h
e

c
o
n
t
r
o
l

r
o
o
m
.




H
2
S

o
r

L
E
L

e
x
p
o
s
u
r
e
,

o
x
y
g
e
n

d
e
f
i
c
i
e
n
c
y
,

e
x
p
l
o
s
i
o
n
s

o
r

f
i
r
e

-

e
n
s
u
r
e

V
M
S

o
r

m
a
n
u
a
l

l
o
g
i
n

s
y
s
t
e
m

c
l
e
a
r
s

p
e
r
s
o
n
n
e
l

f
o
r

s
i
t
e

L
E
A
S
E

E
N
T
R
Y

P
R
O
C
E
D
U
R
E

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
262
Standard Safety Practices Manual
263
PRESSURE SAFETY VALVES
PURPOSE:
To provide instructions for adequately protecting all pres-
sure systems.
APPLICATION:
All pressure systems.
POTENTIAL HAZARDS:
System Overpressure.
Toxic/Combustible fuids.
Pressure on fare system (where applicable).
Explosion: Air in fare system and/or piping.
PREPARATIONS:
Site-specifc procedures are required for
removal and installation of all PSVs. Te pro-
cedures must be discussed and documented
prior to carrying out the work, and before the
applicable work permit is issued. [See: Permits
and BP PSV handling and servicing procedure
(Part of owner inspection program)]
All block valves on the upstream and/or
downstream side of a PSV must be sealed or
padlocked in the open position.
All pressure safety valves (PSVs) must be
maintained in operable condition, in accor-
dance with Provincial Regulations (Ref: Qual-
ity management system for Boilers, Pressure
Vessels and pressure piping Section 6).
All PSVs will be checked as per provincial
regulations.
P
r
e
s
s
u
r
e

S
a
f
e
t
y

v
a
l
v
e
s
Standard Safety Practices Manual
262
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
263
PROCEDURES:
Pressure safety valve repair shops require certication ap-
proval from applicable government agency per CSA B51.
All PSVs are to remain in service while the equipment that
they are protecting is in service, except for repair as noted
in ASME Code.
PRECAUTIONS:
Taking a PSV out of Service for Repair on equipment in
operation:
1. No PSV may be taken out of service at any time
without approval from the Supervisor responsible
for that facility.
2. No PSV may be taken out of service unless
adequate protection is maintained by adjacent
equipment, or by being continuously manned
by a designated Operator to control the working
pressure of the equipment as per ASME Section
VIII Div.1 Appendix M.
3. All PSVs removed from service must be im-
mediately logged and documented on the PSV
handling and servicing procedure tracking sheet.
4. Repairs to the PSV must be made as quickly as
possible with an emergency priority designation.
5. Te PSV must be replaced immediately after the
repair is complete.
6. When transporting a PSV for service or return-
ing it to the facility the PSV must be transported
in the vertical position. [See: Energy Isolation]
7. Returning a Pressure Safety Valve to Service
8. After Repair on Operating Equipment:
9. All block valves must be opened, sealed or
padlocked.
10. Te Supervisor in charge, or his designate, must
witness the installation of the seals or padlocks
on the block valves connected to the pressure
safety valve.
11. It is then to be logged that the PSV is in service.
P
r
e
s
s
u
r
e

S
a
f
e
t
y

v
a
l
v
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
264
Standard Safety Practices Manual
265
RESPONSIBILITY:
Te BP Canada Representative in charge of the job is
responsible for ensuring that safe work procedures are
developed and followed.
REFERENCE:
BP Quality management system for Boilers
and Pressure Vessels and process piping.
ASME Code Section VIII, latest edition.
CSA B51 Boiler, Pressure Vessel and Pressure
Piping Code.
BP PSV Handling and servicing Procedure.
PRESSURE AND LEAK TESTING
PURPOSE:
To establish pressure and leak testing safe work practices for
vessels, piping, and pipelines.
APPLICATION:
New installations, repairs and replacements of
vessels, piping, and pipelines.
DEFINITION:
Tere are two types of pressure tests of which
hydrostatic is the preferred method. Pneumatic testing
is only permitted under special conditions, Engineering
Authority (EA) and Regulatory Approval is Required.
PREPARATIONS: [See: Purging]
POTENTIAL HAZARDS:[See purging]
Overpressure operating above the system
MAWP.
P
r
e
s
s
u
r
e

S
a
f
e
t
y

v
a
l
v
e
s
Standard Safety Practices Manual
264
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
265
Leaks Test medium leaking during test, envi-
ronmental, stored energy and combustible issues.
Explosion Trough overpressure or ignition of
fammable gas.
Methods:
Hydrostatic:
Tis is the preferred method because energy release
causes minimal concern:
Water/glycol preferred hydrostatic test medium
(minimum danger).
Hydrocarbon based fuid the potential for
explosion, re, toxicity, environment damage
must be assessed and documented.
Pneumatic:
When leaks or ruptures occur energy release can be
extremely dangerous and prolonged:
Inert gas preferred pneumatic test medium
Air/Flammable Gas mixing these two test
mediums can result in explosion and re.
Pneumatic testing is not recommended
Leak Check:
Combustible Gas can be used for Leak Check test on
piping, equipment or vessels only after the system has been
properly purged.
PROCEDURES:
1. All mechanical/integrity work on the system
should be complete before the system pressure
test commences.
2. When pressure testing, a low pressure test must
be performed before the high pressure test to
prevent failure of a component at high pressure
and the resultant danger of this situation. Te
P
r
e
s
s
u
r
e

S
a
f
e
t
y

v
a
l
v
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
266
Standard Safety Practices Manual
267
pressure set points for these tests should be stated
in the procedure along with the systems MAWP.
3. Site-specifc procedures should be developed for
all hydrostatic pressure tests.
4. An approved site-specifc procedure must be
developed for all pneumatic pressure tests.
SIGNS:
Warning signs must be positioned prohibiting the presence
of workers in the immediate area of the vessel or lines while
pressure testing.
Consideration of the following sections may be required:
WHMIS
Purging
Blinding and Blanking (Energy Isolation)
Draining and Depressuring
Pre-job Safety Meeting
Permit to Work
PRECAUTIONS:
1. All non essential personnel should be removed
from the area being tested.
2. Pressures intended for hydrostatic test must not
be used for pneumatic tests. When changing
from hydrostatic to pneumatic testing, the test
pressure must be recalculated.
3. Disposal of test mediums should be in accor-
dance with environmental guidelines.
RESPONSIBILITIES:
Te BP Canada Representative in-charge is responsible for
ensuring that safe pressure testing practices are followed.
NOTE: For pressure test design, [See: Applicable Govern-
ment Regulations:]
ASME Pressure Vessel Code
Provincial Boilers Branch or equivalent
EUB or equivalent
P
r
e
s
s
u
r
e

S
a
f
e
t
y

v
a
l
v
e
s
Standard Safety Practices Manual
266
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
267
PURGING
PURPOSE:
To provide guidelines for safely removing combustible,
chemical, toxic or other hazardous materials from vessels
and piping systems.
APPLICATION:
Any vessels or piping systems being prepared for inspection,
construction, repair, or returning to service.
DEFINITION:
Purging is the removal of any undesirable medium from
vessels or piping systems.
POTENTIAL HAZARDS:
Leaks from uncontrolled points.
Toxic vapor /Inert gas oxygen defciency:
simple/chemical asphyxiation
Combustible material: explosion the system
contents could be in the zone between the
LEL and UEL
Static Electricity:
Displaced fuids
Explosion due to combustible material being
vented to atmosphere
Operating the system outside its design condi-
tions (Pressure/Temperature/Combustible gas
in inert systems)
PREPARATIONS:
a. All mechanical/integrity work should be com-
plete before the purging operation commences.
b. Steam, nitrogen, carbon dioxide, or water or
combustible gas may be used as a purging me-
dium. If using combustible purge medium, the
explosive risk associated with the transition zone
P
u
r
g
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
268
Standard Safety Practices Manual
269
of incomplete purge must be recognized, and all
potential ignition sources must be eliminated. If
combustible gases are used for the purge medium
the Engineering Authority (EA) must approve
the procedure.
c. Te worker must know where the displaced
fuids (i.e., combustible, toxic) are going, and the
condition area is suitable to receive the fuids.
d. A site-specic procedure must be developed for
each purging operation.
Safety Equipment:
a. Te necessary safety equipment must be on hand
(e.g. breathing apparatus, fre extinguishers, etc.)
b. Purge warning signs should be posted as
required.
Isolating:
a. Vessels or piping must be isolated before purg-
ing.[See: Energy Isolation, Golden Rule]
b. Associated instrumentation must also be isolated.
c. Flare pilots/igniters might have to be isolated.
PROCEDURES:
a. Purge gas should be introduced into the system
very slowly. Inert gas should be used where pos-
sible. Velocities should be kept very low to sweep
the undesirable medium out of the system with
as little mixing as possible, and should be done
at atmospheric pressure. Low point drains should
be checked periodically for water removal. When
purging for start-up, air must be completely
displaced from the system to a level that the
system is no longer operating in the fammable/
explosive zone, before attempting to pressure up
the system.
b. If the hydrocarbon is heavier than the purge
medium, purging should be from top to bottom.
If it is lighter, from bottom to top.
P
u
r
g
i
n
g
Standard Safety Practices Manual
268
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
269
PRECAUTIONS:
a. All non-essential personnel should be removed
from the purge area.
b. Some combustible gas detectors require oxygen
for analysis of the sample, and therefore will not
give a true indication when a vessel or piping
is checked for the removal of hydrocarbons, if
the detector is inserted in an oxygen-decient
atmosphere.
c. Creating or pulling a vacuum on piping or vessel
(i.e., introducing air), when using steam.
d. Make sure there are no dead legs in the vessel or
piping to be purged.
e. Tests must always be made to determine if purg-
ing has eliminated the undesirable medium from
the vessel or piping system. SCBA/SABA must
be worn when performing atmospheric monitor-
ing prior and during Confned Space Entry.[See:
Confned Space Entry], [See: Atmospheric
Monitoring]
f. Vessels or equipment may still contain toxic and/
or combustible sludge or scales after purging.
Consideration should be given to the removal
of this material to maintain and ensure a safe
atmosphere.
g. Purge medium temperatures must be considered
for afect on the system to be purged.
RADIOACTIVE OR NATURALLY OCCURRING
RADIOACTIVE MATERIALS (NORM)
PURPOSE:
To establish the requirements for the safe handling of Natu-
rally Occurring Radioactive Materials (NORM).
Contact your PU Industrial Hygienist.
R
a
d
i
o
a
c
t
i
v
e

(
N
O
R
M
)
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
270
Standard Safety Practices Manual
271
APPLICATION:
All worksites where NORM contamination may occur.
POTENTIAL HAZARDS:
Exposure to NORM.
PREPARATIONS:
a. An ENFORM trained and qualifed NORM
Control Coordinator must be assigned for all
worksites where there is or likely to be NORM
contamination.
b. All personnel performing work that involves
NORM contaminated equipment must be
trained in personal protection and safe handling.
Refer to the Code of Practice and contact your
NORM Control Coordinator, Safety Coordina-
tor or Industrial Hygienist for advice on training,
specifc monitoring and PPE.
Survey:
All sites that may have NORM contamination
must have completed a NORM survey of the applicable
equipment performed before work planning commences to
ensure all hazards are identied.
Work Planning:
Work Planning for NORM contaminated
equipment must include provisions to ensure
the personnel are trained
the necessary equipment and PPE is available
the need for personnel decontamination facilities
possible facilities for equipment decontamination
ventilation
fltering exhausted air or waste water and
waste storage, recordkeeping, analysis and
disposal of NORM materials and/or NORM
contaminated equipment and PPE
R
a
d
i
o
a
c
t
i
v
e

(
N
O
R
M
)
Standard Safety Practices Manual
270
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
271
Pre-Job Safety Meeting:
Must be conducted prior to commencement
of operation. Te NORM Control Coordina-
tor must attend all pre-job safety meetings.
[See: Safety Meetings], [See: TDG-Packaging
and Safe Transport of Radioactive Material,
[See: Canadian Guidelines for the Manage-
ment of NORM; Guidelines for the Handling
of NORM in Western Canada]
Contact the NORM Control Coordinator,
Safety Coordinator or Industrial Hygienist for
advice before any work proceeds.
PROCEDURES:
Safe handling procedures should include:
Specifc job procedures to be followed
Te expected efuent concentrations and
methods of control if applicable
Te person in charge, responsible for the
operation
Storage, testing and disposal of NORM wastes
Equipment and worksite must be properly
prepared (i.e. isolated, depressured, made
accessible, etc.) Te worksite should be roped
of. Radiation warning signs must be posted,
and unauthorized entry of personnel banned,
in the area afected by the work
All women who are pregnant or are con-
sidering pregnancy must declare this to the
Occupational Health Centre prior to work
commencing so that an exposure risk assess-
ment can be completed. Te risk assessment
may include restricted work with NORM
contaminated materials.
R
a
d
i
o
a
c
t
i
v
e

(
N
O
R
M
)
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
272
Standard Safety Practices Manual
273
PRECAUTION:
Highly energetic NORM may afect some
LEL monitors and fre detection systems.
Station shutdown could result when using
a highly energetic radioactive source in the
vicinity of a detector. A risk assessment must
be performed to determine the scope and risk
from NORM and radioactive sources. Fire
detection systems sensitive to radiation may
have to be by-passed when radioactive sources
are in use in the immediate area. Care must
be taken to reactivate the detection system
when the work is completed.[See: Equipment
Shutdown Systems]
NORM survey meters are not explosion
proof, thus a Hot Work Permit is required.
RESPONSIBILITIES:
Te BP Canada Representative is responsible
for ensuring that all procedures are supplied
and followed.
Te BP NORM Control Coordinator is re-
sponsible for ensuring that all NORM control
procedures meet regulations, the BP Codes of
Practice and that all procedures are followed.
Te Contractor performing work on NORM
contaminated equipment and waste is
responsible for ensuring that safe handling
procedures and contingency plans have been
developed which comply with all government
regulations. He is also responsible for ensur-
ing that all applicable protective equipment,
instruments, rescue and decontamination
facilities are on hand and in operable condi-
tion before the job commences.
R
a
d
i
o
a
c
t
i
v
e

(
N
O
R
M
)
Standard Safety Practices Manual
272
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
273
RAIL CAR LOADING
PURPOSE:
To provide procedures for the safe loading of tank cars.
APPLICATION:
Tank car loading at plant and eld locations.
POTENTIAL HAZARDS:
Static Electricity
Combustible Fluids
Tank Car Movement
PREPARATIONS:
a. Loading racks and loading rack trackage must be
securely and adequately grounded and bonded.
All ground and bond connections should be
frequently inspected.[See: Electrical]
b. Before loading tank cars, the loader shall check
the derail, ensure that it is in a closed position,
and erect the required warning signs.
PROCEDURES:
a. Tank car loading encompasses similar concerns
and problems as transferring fuids by truck.
However, a site-specic procedure is required,
and the following general guidelines apply. [See:
Tank Truck Loading/Unloading]
b. Car wheels must be chocked to prevent the car
from accidentally rolling.
c. Te loader must attach the ground cable to each
car before connecting the loading hoses.
d. Tank cars must be inspected prior to loading.Tank
cars found in bad order must be reported to the
supervisor immediately, and must not be loaded
R
a
i
l

C
a
r

L
o
a
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
274
Standard Safety Practices Manual
275
until repairs have been made.
e. Te loader must label loaded cars with the
proper placards designated for this purpose and
required by regulations. Proper documentation
is also required.[See: TDG]
f. Leaking valves or loading hoses must be repaired
or replaced immediately.
g. Te loading rack must never be left unattended
while loading or ooading a tank car.
h. When using a top loading spout, the spout must
be chained to the tank car during loading.
i. Tank cars must be lled to the proper level as
instructed, and the loader should stand by to shut
of the loading valves when this level is approached.
j. When loading is complete, the block valve on
loading hose and tank car must be closed, and
liquid petroleum gas vented to the vent stack
before loading hoses are disconnected.
k. Te loading hoses must be hooked back to the
loading rack when loading has been completed.
PRECAUTIONS:
a. No part of the body shall be positioned over the
slip tube gauge.
b. Walkways and platforms must be inspected
frequently and kept in good condition.
c. Workmen must refrain from jumping from the
loading rack to the tank car or from car to car.
d. Company employees must stay away from tank
cars when the train crew is coupling, switching,
and spotting cars.
e. All loaders must be familiar with the location of
re-ghting equipment and must be trained in
its use.
f. Extension cords with lights attached must not
be used at the loading rack. Only approved
fashlights for hazardous locations are permitted.
R
a
i
l

C
a
r

L
o
a
d
i
n
g
Standard Safety Practices Manual
274
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
275
RESPONSIBILITIES:
It is the responsibility of the BP Canada
employee in-charge of the operation; to ensure
that safe loading procedures are followed.
Te train crew is responsible for ensuring that
safe tank car coupling, switching and spot-
ting procedures meet applicable government
regulations.
RESPIRATORY PROTECTION
PURPOSE:
To provide safe work practices for workers in areas where
there is a respiratory hazard.
APPLICATION:
All personnel who are required to or may use respiratory
protection to mitigate inhalation risks. Tis also applies to
visitors to eld locations who may use respiratory protec-
tion.
POTENTIAL HAZARDS:
Toxic atmospheres
Oxygen defcient atmosphere
DEFINITION:
*IDLH Immediately dangerous to life or health. Any
atmosphere where the concentration of oxygen, fammable
or toxic air contaminants would cause a person without
respiratory protection to be fatally injured, or cause irrevers-
ible and incapacitating efects to that persons health.
PROCEDURES: [See: BP Canada Respiratory Protection
Program]
Equipment for IDLH* Environment:
R
e
s
p
i
r
a
t
o
r
y

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
276
Standard Safety Practices Manual
277
Self-contained or supplied-air breathing apparatus
(SCBA/SABA) must be worn.
where danger exists from reduced oxygen content
of the air (less than 19.5% oxygen), or toxic contaminants
exceed the allowable exposure limits, Te limitation and use
of SCBA/SABA are outlined in the BP Canada Respiratory
Protection Program and the Canadian Standards Associa-
tion CSA Z94.4-02 (Selection, Use, and Care of Respira-
tors), and CSA Z180.1-00 (Compressed Breathing Air and
Systems).
Equipment for Non-IDLH Environment:
Air-purifying respirators lter and remove specic
contaminants from the air. Tese respirators are never to be
used in oxygen-defcient IDLH atmospheres.
Tere are two main types of air-purifying respirators:
1. Particulates flters (P100 or HEPA High Ef-
fciency Particulate Air flters)
2. Chemical cartridge
Tese respirators are limited to the uses outlined in
the BP Canada Respiratory Protection Program and the
Canadian Standards Association CSA Z94.4-02 (Selec-
tion, Use, and Care of Respirators), and CSA Z180.1-00
(Compressed Breathing Air and Systems). Te BP Canada
Respiratory Protection Program also includes a selection
chart for the type of respiratory equipment required for
specic hazards.
Fitness to Wear Respirators:
All personnel required to wear respirators must be
evaluated by a Health Professional to ensure pre-existing
health conditions are not afected by respirator use. BP Oc-
cupational Health Centre will perform the assessment on
BP employees and full time contactors.
Contract companies must provide documentation
that demonstrates contract employees are t to wear respira-
tors.
R
e
s
p
i
r
a
t
o
r
y

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
276
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
277
Fit Testing:
All BP Canada employees, contracted employees,
contractors, and visitors doing work on BP premises or
operating sites who are required to wear appropriate respira-
tory protective equipment must have quantitative or quali-
tative t testing records available for review. A quantitative
or qualitative t test shall be performed on new employees
and long-term contractors within the rst three months of
commencing work. Repeat testing is recommended annu-
ally thereafter, or not to exceed 2 years.
Individuals who are required to wear respiratory
equipment must be clean-shaven where the face piece of the
respirator seals with the skin of the face. Conditions such
as unusual face contours, scars, skin eruptions, eyeglasses,
facial surgery, injury or missing dentures might interfere
with the seal. For this reason, the seal must be positive and
negative tested and a satisfactory t obtained prior to each
use. Most manufacturers provide instructions for ft testing;
if these are unavailable, refer to BPs Respiratory Protection
Program or contact your Safety Advisor or Industrial Hy-
gienist for guidance on how these tests should be performed
and documented.
Maintenance, Cleaning, and Storage of Respiratory
Protection Equipment:
Immediately after use, the equipment must be
cleaned, the face piece sanitized, and the equipment stored
in the proper location. Te maintenance, cleaning, and
storage of respiratory protection must be consistent with
the BP Canada Respiratory Protection Program. Te user of
the equipment should perform this task.
Inspection:
A competent worker must inspect respiratory protec-
tive equipment that is not used routinely, but is kept ready
for emergency use, at least monthly. Te inspection must
R
e
s
p
i
r
a
t
o
r
y

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
278
Standard Safety Practices Manual
279
ensure that the equipment is in satisfactory working condi-
tion, clean, and in its proper location. Written documenta-
tion of this inspection must be retained at the worksite and
must include the name of the inspector and the date the
inspection was performed. Te supervisor in charge of the
work location must designate a trained worker to complete
the monthly inspection. Te inspection must follow those
established in the BP Canada Respiratory Protection
Program.
Contractors using their own respiratory equipment
on BP sites must have documentation available regarding
the testing, inspection and maintenance of respirators.
PRECAUTIONS:
Compressed breathing air must meet quality
specications for breathing air specied by
CSA Standard Z180.1-00.
Air from respiratory air compressors must
be tested annually by a qualied person to
ensure analysis includes particulate and oil
mists. Tis analysis must be performed on
site. Taking an air sample in a bomb and the
sending the sample to a laboratory for analysis
is prohibited.
TRAINING:
All workers entering a BP Canada eld worksite where a
respiratory hazard may exist must be:
1 Educated on the hazards present.
2 Educated on the reason a particular piece of
respiratory equipment was chosen, and its capa-
bilities and limitations.
3 Trained in the proper use, care, maintenance,
and tting of the respirators they will be using.
Te frequency of training will be determined by the par-
ticular job requirement. Repeat training is recommended
annually, or not to exceed 3 years (see BP Respiratory Pro-
tection Guidelines). Documentation of training frequency,
R
e
s
p
i
r
a
t
o
r
y

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
278
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
279
type, and session attendance must be retained on le at
each area oce.
For each conned-space entry, training in the use of self-
contained, supplied-air respiratory protective equipment
will be a requirement of each site-specic pre-entry safety
meeting.
Task Hazard Assessment:
All tasks requiring respiratory equipment must be
identied and assessed to ensure all hazards have been
identied and mitigated. Te mitigation measures should
be documented in Work Orders and Safe Work Permits.
RESPONSIBILITY:
Te Supervisor in charge of the work location must ensure
that:
Employees and full time Contractors have
been deemed t to wear respirators by the
Occupational Health Centre;
Contractors have performed ft testing and
tness to wear respirators medical assessment
has taken place;
All tasks which have respiratory hazards
are identied, evaluated, documented and
included in work orders or Safe Work Permits;
personnel are trained in the use, maintenance
and inspection of the respiratory equipment,
ADDITIONAL INFORMATION:
1. Industrial Hygiene Manual
2. Respiratory Protection Program
3. Site specifc code of practice
R
e
s
p
i
r
a
t
o
r
y

P
r
o
t
e
c
t
i
o
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
280
Standard Safety Practices Manual
281
HSSE MEETINGS
PURPOSE:
To describe the composition, responsibilities, and meetings
of the Joint Worksite Safety, Health and Environment
Committee; describe meetings; and identify the require-
ments of the pre-job meetings, to be attended by both
contractor and BP Canada personnel before any potentially
hazardous activity is started.
APPLICATION:
Worksites and workers within a Department/Area as desig-
nated by the Department/Area Manager.
PROCEDURES:
Joint Worksite Health, Safety, Security and Environment
Committee:
1. A Joint Worksite Safety, Health and Environ-
ment Committee is a group of worker employee
representatives working together to identify and
solve safety, occupational health, and environ-
mental problems at the worksite. Te Operating
Centre Manager is responsible for the formation
of the committee at each worksite. Te commit-
tees will hold regular meetings.
2. Te committee shall consist of an adequate num-
ber of members to provide representation for all
workers, and shall include at least one supervisor
or equal numbers of workers and supervisors.
Te term of a committee member will usually be
a minimum of one year.
3. Te committee will address the safety, occupa-
tional health and environmental concerns of
both management and workers. Te committee
members will either address these concerns
immediately or bring them to the attention of
the committee at a meeting. Members of the
H
S
S
E

M
e
e
t
i
n
g
s
Standard Safety Practices Manual
280
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
281
committee will inspect the worksites regularly
and report their ndings to the committee.
4. Committee concerns and recommendations
must be documented and led.
Committee Meetings:
Te committee will hold meetings on a regular
basis, at least once a month. A suggested meeting format is
included at the end of this section.
General Meetings:
Te BP Canada Supervisor in-charge of the work
area is responsible for ensuring safety, health and environ-
ment meetings are held. In most areas, there will be one
meeting per month. Employees should attend all health,
safety, security and environment meetings but must attend
a minimum of four meetings a year. An attendance record
must be signed by the attendants and retained at the work-
site with the minutes of the meeting.
Te agenda will follow that of a regular business meeting:
1. Discussion of all incidents and near misses
within the area.
2. Discussion of incidents, and near misses
throughout company and industry.
3. Health, Safety, Security and Environment com-
mittee concerns and recommendations.
4. Discussion of all bulletins and safety information.
Education programs such as:
Review of regulations
Review of safety practices and site-specifc
procedures
Seminars on new equipment
Hazard identifcation and training.
(e.g. WHMIS)
H
S
S
E

M
e
e
t
i
n
g
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
282
Standard Safety Practices Manual
283
Te minutes of the meetings must be recorded and
distributed, as follows:
A copy posted at the facility
A copy sent to appropriate personnel
Copy posted on the gHSSEr web site
Pre-Job risk assessment:
1. Where any personnel are to undertake an activity
deemed to be potentially hazardous, a pre-job
risk assessment shall be held.
2. Te BP Canada representative in charge of the
pre-job risk assessment must review gen-
eral HSSE requirements emphasizing checks,
procedures and hazards. Tese include the
requirements for personnel protective equip-
ment, site hazards, emergency procedures and
job-specic safety requirements. Where the
job is complex or involves hot work, a detailed
site-specic procedure must be prepared prior
to, and reviewed at this meeting. Te minutes of
the pre-job risk assessment must be recorded. All
personnel involved in the work task must sign
the minutes of the meeting. Tis documentation
must be retained on le at the worksite oce for
a minimum of one year.
3. Where the pre-job risk assessment is being held
as part of ongoing rig operations, the pre-job
safety meeting will involve all personnel on the
lease and be noted in the morning report, and
tower report.
HSSE Opportunity/Near Miss Reporting:
When a worker has reason to believe that an unsafe condi-
tion or practice may exist, he/she shall take immediate
corrective action where practical, and report the condition/
practice to his supervisor.
HSSE Opportunity/Near Miss reports will be flled out and
returned to the onsite HSSE representative.
H
S
S
E

M
e
e
t
i
n
g
s
Standard Safety Practices Manual
282
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
283
Suggested format for recording the minutes of joint
worksite Health, Safety, Security and Environment com-
mittee meetings:
1. Date, time, and location of meeting.
2. Chairperson of Meeting.
3. List of attendees.
4. Consecutive days since last Lost Time Accident.
5. Consecutive days since last Preventable Vehicle
Accident.
6. Old safety concerns reported but not corrected
(including specifc details).
7. Old safety concerns reported and corrected.
8. New safety concerns and recommendations.
9. Safety concerns corrected but not reported.
10. Discussion of accidents, incidents and near
accidents (in area, throughout the company and
the industry).
11. Safety topics discussed and/or education
program.
12. Distribution list for minutes.
13. Must complete a full work place level one
inspection per year.
14. Tis can be split into smaller monthly ones.
SAFETY STANDBY
PURPOSE:
To provide procedures for a safety standby person to be
used as an observer and back-up during specic work
procedures.
APPLICATION:
Conned-space entry, and other work tasks as specied by
site-specic procedures.
S
a
f
e
t
y

S
t
a
n
d
b
y
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
284
Standard Safety Practices Manual
285
DEFINITION:
A safety standby person is an employee or designate used
as an observer and back-up, whenever the above work
applications are being carried out. Tis person is not part of
the work crew, and is only concerned with the safety of the
workers. Safety standby personal will be identied by some
type of measure as identied in the pre-job risk assessment.
PROCEDURES:
Qualications:
Te safety standby person must have up-to-date knowledge
of the following:
Site-specifc job procedures
Operating procedures for the safety equip-
ment required for the job in progress
Te location of the Operator and Supervisor
in charge and be able to communicate with
either Potential hazards. Training
First Aid
CPR
H2S, if applicable
Fire extinguisher use, if applicable
Rescue procedures
Applicable Golden Rule of Safety
BP Indoctrination
Confned Space if applicable Pre-entry or rescue
Atmospheric monitoring if applicable
Duties of the Safety Standby:
1. A safety standby is a person who observes a work
task for the purpose of: Fire suppression
2. Monitoring atmospheric conditions from outside
the confned space Ensuring the air supply to
supplied-air units that are being used. [See Sec-
tion: Atmospheric Monitoring]
S
a
f
e
t
y

S
t
a
n
d
b
y
Standard Safety Practices Manual
284
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
285
3. Providing communication between workers and
other operation or rescue personnel in the event
of an emergency
4. Execution of emergency rescue plan and activation
of rescue team
5. Maintaining entry log and tool log to ensure all
personnel and tools are accounted for.
6. Ensuring unsupervised entry points are fagged
of indicating DO NOT ENTER or made
inaccessible by other means.
7. Ensuring that all workers involved in the task
have the proper training certication in place.
8. Other duties as identied in the pre-job safety
meeting.
Note: Safety standby personnel can not leave their assigned
post unless personal safety is jeopardized.
Equipment Required:
Te safety standby equipment must be designated in
the site-specic job procedure.
Emergency Actions:
In the event of any emergency, the safety standby
must perform the following:
(a) Communicate the emergency to the appropriate
back-up support. Te call shall give the lease
location, shall be concise and specifc: e.g., Man
Down, Fire, Explosion.
(b) If there is no immediate response, repeat the
message, and proceed with appropriate action.
Example: In the case of a Man down:
Call for help from a safe area and confrm call
S
a
f
e
t
y

S
t
a
n
d
b
y
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
286
Standard Safety Practices Manual
287
has been acknowledged
Assess the hazard
Put on (don) respiratory protective equipment
(SCBA) as per provincial requirements
Remove the victim to a safe area
Perform emergency frst aid as appropriate
Report all incidents immediately and arrange
for the victim to be transported to the nearest
medical support
Entry to Sour Worksites:
[See: Hydrogen Sulde Safety]
[See: Respiratory Protection]
RESPONSIBILITIES:
It is the responsibility of the BP Canada Employee in
charge and/or contractor to address the need for a Safety
Standby during specic work procedures, and to ensure that
a properly trained person is used where required.
SAND BLASTING / ABRASIVE BLASTING
PURPOSE:
Provide general guidelines for safe sand blasting operations.
APPLICATION:
All BP Canada Plant and Field sites.
POTENTIAL HAZARDS:
Dust created by blasting operations (i.e., silica
sand, walnut shells)
Dust from material removed
(i.e., lead base paints)
Sparks caused by the blasting operation
S
a
n
d

B
l
a
s
t
i
n
g
Standard Safety Practices Manual
286
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
287
Static electricity build-up
Possibility of physical injury from the blasting
operation
Noise exposure
Heat stress
PREPARATIONS:
Work area should be checked for combustible
gas prior to commencing operation and as
required throughout.
[See: Working in a Combustible Atmosphere Standard]
A Safe Work Permit and Pre-Job Safety
Meeting may be required, depending on the
proximity to the production facilities and the
complexity of the job.
[See: Safe Work Permits]
[See: HSSE Meetings]
[See: Personal Protective Equipment]
[See: Confned Space Entry]
[See: Noise and Hearing Conservation]
PROCEDURES:
Te compressor, hose, nozzle and operator must be properly
grounded to prevent build-up of static electricity.
Ventilation requirements for the work area must be
considered.
Te equipment operator must be able to stop the fow of
material immediately, i.e., shut-of device located at nozzle.
PRECAUTIONS:
If conducting abrasive blasting ensure that
crystalline silica is replaced with a less harmful
substance.
Minimize any release of dust (nuisance particu-
lates, silica, lead, etc.).
Approved respiratory protection must be used to
S
a
n
d

B
l
a
s
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
288
Standard Safety Practices Manual
289
guard against inhalation of air borne contaminants.
[See: Respiratory Protection]
Safe handling requirements for sand blasting
material, or material removed from surfaces must
be addressed.
[See: MSDS]
Consult Safety Coordinator or Industrial Hy-
gienist for advice on working with silica, lead or
other toxic fumes, vapors or particulates.
Approved personal protective equipment must be
used to guard against injury to the operator.
[See: Personal Protective Equipment]
RESPONSIBILITIES:
Te BP Canada Representative, or his designate, is
responsible for ensuring that safe sand blasting procedures
are followed.
Te Contractor is responsible for ensuring:
Tat all personnel are properly trained in the safe
use of the equipment
Tat the material hazards are identifed
Tat approved respiratory protection and per-
sonal protective equipment are used.
SECURITY
PURPOSE:
To protect the public, BP Canada, and contractor person-
nel, property and assets from injury, loss or damage.
APPLICATION:
All BP Canada locations, including plants, compressor sta-
tions, oces, warehouses, batteries, wellsites, pipelines etc.
S
e
c
u
r
i
t
y
Standard Safety Practices Manual
288
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
289
DEFINITION:
Security included:
Manned 24 hr. daily operation
Unmanned 8 hr. daily operation
Assets included:
Product
Equipment
Legal Liability
PROCEDURES:
Physical Security:
1. Properly maintained public protection security
systems contribute to visitor safety, and minimize
exposure to possible litigation resulting from
incidents/accidents involving non-employees on
locations.
2. Where the possibility exists for theft, vandalism
or unauthorized entry, facilities shall be evaluated
and secured as required. Livestock entry shall be
a consideration.
Te following are general physical security practices:
Perimeter Protection:
1. Control access to company facilities. Post
appropriate signs at ALL entrances to guide
legitimate visitors and warn-of potential tres-
passers. Utilize gates and barriers to prevent the
casual and/or curious from wandering or driving
into facilities.
[For appropriate signs, See: Lease Design]
2. Where locks are required, approved heavy-duty/
industrial shackle padlocks (7/16 inch diameter)
and chains will be used. (For approved padlocks,
S
e
c
u
r
i
t
y
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
290
Standard Safety Practices Manual
291
contact Corporate Security.)
3. Fencing, for security purposes, BP standards are
2.4 meters high, chain linked and topped with
three strands of barbed wire angled outward.
4. Fencing requirements for sour facilities or facili-
ties near populated areas can be found in Alberta
Oil & Gas Regulations - 8.170, 8.180 & EUB
IL 90-19.
(If other than Alberta, see applicable government regula-
tions.)
Building Protection:
1. Install approved heavy-duty, deadbolt locks on
the doors and heavy security screening (mesh) or
bars over the windows of buildings containing
vital controls and sensitive or valuable equip-
ment. Overhead doors may require additional
protection.
2. Buildings, oces, etc. containing vital controls,
large quantities of valuable equipment and/or
supplies may, in addition, require electronic re
and intrusion detection systems. Corporate Secu-
rity can provide recommendations and assistance
as required.
Lighting:
Areas should have sucient illumination
for security purposes, and be in accordance with BP
Canada General Specications and applicable government
regulations.
Identication:
Valuable equipment and other theft-prone items should be
engraved or stamped with a company-issued, computer-
registered, identication number. (Corporate Security shall
issue numbers specifc to each operating facility/area during
S
e
c
u
r
i
t
y
Standard Safety Practices Manual
290
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
291
security surveys and/or on management request.)
RESPONSIBILITIES:
All employees must report incidents involving criminal ac-
tion or loss to Corporate Security, Local Management and
Police (if required).
EMERGENCY PLANS:
Refer to Emergency Response Plan Guide.
Forms:
48-220 Security Incident Report
C1121 Bomb Treat/Anonymous Telephone
Call Record
SERVICE RIG SAFETY
PURPOSE:
To review the major areas of concern in regard to service
rig safety to ensure compliance of service rigs with all appli-
cable government and BP Canada regulations and practices.
APPLICATION:
All BP Canada operated service rig operations.
PREPARATIONS:
Pre-employment Meeting:
A Pre-employment meeting should be held with the service
rig contractor to ensure compliance with Service Rig Safety
requirements.
[See: Contractor Safety Program]
Controlled Areas:
Where service rig operations are required in a controlled
S
e
r
v
i
c
e

R
i
g

S
a
f
e
t
y
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
292
Standard Safety Practices Manual
293
area, that is, adjacent to airports or populated areas, ad-
ditional equipment and/or procedures may be required to
meet government regulations.
[See: Applicable Government Agency, E.U.B. in Alberta]
Notication:
Te applicable government agency should be notied of all
rig moves.
Signs:
Post appropriate signs at the lease entrance advising H2S,
hard-hat area, overhead power lines, restricted access, etc.
PROCEDURES:
Detailed Rig Inspection Report:
Form C-79 (88-08)
Must be flled out and sent to the appropriate supervisor
according to the following schedule:
When using a service rig that has not worked for
BP Canada before, or
When a service rig has not worked for BP
Canada for a signicant length of time (several
jobs), or
Once every three months during continuous
operation for BP Canada, or
When it is deemed necessary by BP Canada
Wellsite Leader
Note:
Tis inspection must be reported on the daily
report and service rig tour sheets
For critical wells, this inspection should be
completed within the 24 hour period prior to
initiating operations
Weekly Rig Inspection Report:
S
e
r
v
i
c
e

R
i
g

S
a
f
e
t
y
Standard Safety Practices Manual
292
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
293
Form C-125 (88-08)
In addition to the detailed Rig Inspection, service rig
inspections must be carried out each week, or once per
well, whichever is more frequent. Te report must be lled
out and sent to the appropriate supervisor, and must be
reported on the daily report and service rig tour sheets.
Daily Inspections:
A walk around inspection must be done on a daily basis
with the contractor representative. Tis should be done
rst thing in the morning and reported on the daily report
and service rig tour sheets. Ideally this inspection could be
carried out in conjunction with the daily mechanical testing
of the BOP equipment.
Service Rig Blow-Out Prevention Drill Report:
Form C-125 (88-08)
Blow-out drills must be performed by each rig crew every
7 days, or once per well, whichever is more frequent.
Performance and certication of the rig crew and supervi-
sors must be recorded on the form. Drills should be done
at various stages of activity (i.e. tripping, drilling, out of
hole, etc.)
Blow-out Preventers:
1. When BOPs require winterizing, the heat source
must be suitable for the electrical area classica-
tion in which it is used.
[See: Electrical Protection Regulations]
2. Whenever bolts are loosened or fanges broken,
that section of the BOP system must be pressure-
tested as if it had just been hooked up.
Accumulator:
Lines shall be tested to the maximum operating pressure of
the accumulator for 5 minutes prior to commencing opera-
tions. Hose couplers within 7.0 meters of the wellbore must
S
e
r
v
i
c
e

R
i
g

S
a
f
e
t
y
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
294
Standard Safety Practices Manual
295
be lock-type or Hammer Union type.
BOP Remote:
Must be shielded from the wellhead and may be located at
the accumulator.
Kill and Bleed O System:
Wellhead casing valves must not be used as part of this
system. Tese valves are reserved for emergency use only.
Treaded BOP ports are not acceptable because of potential
thread damage.
If re sheathed hoses are used, they shall be shop serviced in
three year cycles and service reports made available.
Rig Savers/Shut-Os:
All diesel engines within 25 meters of a wellhead or a tank
must be equipped with a positive air shut-of valve (PASO),
either automatically or manually operated. Tis valve must
be function tested prior to commencing operations and at
least once a week thereafter. Tests shall be recorded on daily
reports.
Vehicles, without air intake shut-ofs, essential to operations
may operate within this distance, provided the BP Canada
Representative in-charge or his designate assesses the on-site
safety, i.e. Gas detection. Tis does not apply to where a
vehicle is performing an operation on the well.
Lighting:
All rig lights must be enclosed in vapor-proof glass covers
and should be controlled by an explosion-proof switch
within reach of the driller while at the brake.
Rig Cleaning:
Te rig should be kept clean using rigwash chemicals and
water. Gasoline must not be used.
S
e
r
v
i
c
e

R
i
g

S
a
f
e
t
y
Standard Safety Practices Manual
294
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
295
Hydrogen Sulde and Combustible Gas (L.E.L.)
Monitors:
Ensure Drager or Gastec H2S sampling devices are available
with an adequate range of dated sampling tubes. H2S elec-
tronic monitors, complete with audible and visual alarms,
are required on critical sour wells. Te monitor must be
capable of detecting H2S at 10 PPM. Te monitor should
provide alarms as follows:
Low Alarm 10 PPM H2S
High Alarm 20 PPM H2S
Monitors must be routinely calibrated and tested by a
qualied person. A minimum of two detectors are required;
one located as close to the return line in the rig/mud tank
as possible, and the other placed under the rig foor.
[See: Standard for Working in a Combustible Gas Environ-
ment]
Equipment Placement:
On initial set-up, the rig should be upwind of the wellhead,
based on the prevailing wind direction. Te line from the
tank to the wellhead should run at 90 degrees to the wind,
and the pump must be upwind of the tank.
[See: E.U.B. Equipment Spacing Diagram included at the
end of this section.]
NOTE: If the lease is too small to position equipment
according to the applicable regulations, approval for exemp-
tion must be obtained from the appropriate regulatory
agencies prior to performing the work. (e.g. EUB and/or
OH&S).
Power Line Spacing:
Guy lines must not cross under or over any existing power
line. For minimum clearances from overhead power lines,
[See: Electricity].
S
e
r
v
i
c
e

R
i
g

S
a
f
e
t
y
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
296
Standard Safety Practices Manual
297
Wind Direction:
A method of determining wind direction shall be used. Tis
should be supplemented by streamers in the derrick, guy
wires and rig tank to ensure that a correct wind direction is
always available.
Access and Parking:
Te parking area should be as far away from the wellhead as
possible, but in no case closer than 25 meters. Access to and
from this area should be outside the 25 meter radius.
Sump, Swab Tank and Flare Stack:
Te sump, swab tank and fare stack must be located 50
meters downwind of the rig based on the prevailing wind
direction. On sour wells, the fare stack must be equipped
with a continuous Pilot. For critical sour wells, continuous
ignition is suggested as a back-up to the continuous pilot.
Anchors:
All underground piping, cable and cathodic protection beds
must be located prior to driving in anchors.
[See: Ground Disturbance Practice]
Anchors must be properly spaced and pull tested according
to the rig manufacturers specications.
[See: BPs Completion Operations Manual for further
details]
Safety Trailer Requirements:
Safety trailers are required where the H2S concentration
in the vapor phase is equal to or greater than 1 percent. A
safety trailer and safety supervisor is required on all wells
where the H2S concentration in the vapor phase is equal to
or greater than 5 percent.
For wells where the H2S concentration is low and risk to
personnel associated with an H2S release is minimal, the
non-requirement for a safety trailer can be addressed in the
work plan.
S
e
r
v
i
c
e

R
i
g

S
a
f
e
t
y
Standard Safety Practices Manual
296
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
297
Electrical Grounding/Bonding:
All electrical systems must be properly grounded. Ground
electrodes must have a resistance of no more than 10 ohms.
Ground the service rig, pumps, pump trucks and rig tanks,
etc. Te electrode resistance should not exceed 7 ohms.
Cathodic protection must be shut of and the pipeline
properly bonded to the wellhead and service rig before it is
disconnected.
[See: Electricity]
When ground electrodes are to be used, these will be driven
rods or pipes.
RESPONSIBILITIES:
Te BP Canada representative in-charge is responsible for
ensuring that all personnel on-site fully understand the
safety considerations and service rig safety requirements.
He is also responsible for ensuring that service rig inspec-
tions are performed, and that all service rigs that work for
BP meet the applicable requirements.
Te service contractor is responsible for ensuring that
his equipment and personnel comply with the applicable
government regulations and BP HSSE Policies.
SIGNS AND BARRICADES
PURPOSE:
To provide safe work practices to reduce hazards by the use
of signs or barricades.
APPLICATION:
All BP plant and eld roads and facilities.
PROCEDURES:
Road Hazards:
Where a hazard exists on a road, e.g., closure, bridge
out, or culvert out, proper signs and barricades must be
S
i
g
n
s

&

B
a
r
r
i
c
a
d
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
298
Standard Safety Practices Manual
299
used to ensure public safety. Road signs addressing dust
hazards, ice, curves, hills, speed limits, etc. should also be
considered. Local management should assess the need on all
company roads.
Road Maintenance:
Whenever road maintenance (i.e., sanding, grading, gravel-
ling, etc.) is being conducted on BP Canada roads, all signs
required by Provincial Transportation must be used. BP
Canada roads are open to public use and must be treated
as such.
Temporary Hazards:
Wherever a temporary hazard exists during maintenance
or operating activities, (i.e. open ditches, spills, wet foors,
etc.) the necessary signs or barricades must be in place to
ensure the safety of uninvolved personnel.
RESPONSIBILITIES:
All employees and contractors are responsible to identify
hazards and ensure that proper and adequate signs and
barricades are used as required. Use of refective vests are
required for people involved in setting, manning signs and
barricades on roadways.
SIMULTANEOUS OPERATING PROCEDURE
1.0 Purpose/Scope
1.1 Te intent of this document is to provide procedures
to facilitate safe operations during simultaneous
Well, Operations, and Construction activities. Te
Canada Gas BU team is committed to maintaining a
safe and environmentally sound workplace.
1.2 Pre-job planning, cooperation and communica-
tion between all groups and departments during
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
298
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
299
simultaneous operations are crucial to ensuring safe
operations. Simultaneous operations (SIMOPS)
referenced herein apply to interactions between Op-
erations, Wells, and Construction activities. Federal,
provincial, and local regulations are to be followed
during all operations and activities.
2.0 Key Responsibilities
2.1 Te following is a list of the key Canada Gas PU
Field based positions and their roles with respect to
Simultaneous Operations planning. As the project
develops, roles and responsibilities will change.
Tese changes will be clearly identied and com-
municated at the daily coordination meetings.
2.2 Operating Centre Manager (or designee such as
Plant or Field Foreman for a site within the OC) is
responsible for the overall safety of personnel on site.
On a continuous basis they will communicate with
the operating groups to learn of the days activities.
Tey will decide which activities take precedence af-
ter assessing the priorities associated with each opera-
tion. Te OCM (or designee) has the obligation and
authority to shutdown any or all activities necessary
to ensure the safety of personnel and the facility. He
is responsible for organizing communications meet-
ings with the respective Person in Charge from Wells,
Construction and Operations for SIMOPS activities.
2.3 Person in Charge (PIC) will be a designated
Contractor, Alliance partner, or BP employee who
is singularly accountable for compliance with this
SIMOPS Procedure at a given work location. Teir
accountabilities under this procedure will include
notifcation/training of the work location depart-
ment staf outlined in this procedure, develop-
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
300
Standard Safety Practices Manual
301
ment of any location specic notication lists, and
ongoing reporting of any HSSE incidents or near
miss incidents. Tere shall be a PIC identied for
each major work group on the site (e.g. Construc-
tion, Wells, and Operations) wherever simultaneous
operations can occur. As the project progresses, the
PIC role may be transferred to diferent personnel.
As these roles change, it is important that the PICs
are clearly identied to all personnel onsite through
training/orientations and posting on the SIMOPS
Notice Board.
2.4 Wells Representative is the BP Wellsite Leader and is
accountable for all drilling and rig related activities
and operations. He/she is the Wells PIC and reports
to the Wells Team Leader in Calgary.
2.5 Special Projects / Construction Foreman - this can be
any person who has responsibilities for construction
or special project activities including WARTHOG.
He/she is accountable for all project-associated
contractors to provide a SIMOPS Work Plan for all
construction projects that involve SIMOPS (concur-
rent activity among Projects, Wells, and Operations).
2.6 Operations Lead/or Area Authority is accountable
for facility operations and all non-drilling remedial
well operations as well as all activities on the site
outside of the drilling rig after Production Opera-
tions begin. He/she is the Operations PIC and is
accountable for Operations SIMOPS Work Plans
that involve activities that impact drilling operations
or project/construction activities. Depending on the
particular OC / Site organization this may be a Fore-
man, Senior Operator or Plant / Field Operator.
2.7 Issuing Authority is accountable for the overall
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
300
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
301
control of work on the work site. He / she will issue
Work Permits. In cases where the Issuing Authority
has been transferred from existing operations the
Issuing Authority must ensure the requirements for
handing over a lease and changing Issuing authority
have been met. On larger sites it may be appropriate
to designate more than one Issuing Authority. In that
case the designated areas for each Issuing Authority
must be clearly dened with a marked up plot plan
and on site (e.g. snow fencing). Note in many cases
the Issuing Authority will also be a PIC.
2.8 Site HSSE Coordinator will be responsible for site
safety programs. Te Site HSSE Coordinator
will assist the PIC in the facilitation of SIMOPS
communication meetings and provide support to all
departments in the preparation of SIMOPS Plans
and hazards analysis reviews.
3.0 Denitions
3.1 Simultaneous operations referenced herein apply
to interactions between Operations, Wells, and
Construction activities. Federal, provincial, and local
regulations are to be followed during all operations
and activities. Tese activities as well as other termi-
nology are dened as follows:
Operations: facilities operation and maintenance,
well production and maintenance, pipeline
operation and maintenance
Wells: drilling rig, workover rig, and/or comple-
tion rig operations including abandonments,
and rig maintenance
Construction: civil/gravel work, facilities installa-
tion and construction, pipeline construction, site
decommissioning and abandonment and general
construction
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
302
Standard Safety Practices Manual
303
Simultaneous Operations (SIMOPS): concurrent
activities of producing, processing, or injection
of hydrocarbons (and associated water); drilling;
completion; remedial operations; well mainte-
nance/service; or any construction activity
Site Control: Ultimate control and account-
ability for a development work site by one of the
three departments shall be established for each
phase of the individual program development
4.0 Procedure
4.1 Communications
Communications is the key to excellent HSSE per-
formance and safe Simultaneous Operations. Every
group must be keenly aware of what the other groups
are doing to avoid conficts. Coordination meetings
will be held daily through the various phases of con-
struction, drilling, and operations activities. A rep-
resentative from each major work group will attend
these meetings and exchange information about their
respective groups activities for the day. Potential
work conficts will be resolved between the various
groups before any work will commence. SIMOPS
activities planned for the next day will be discussed
in detail and the various PICs will pass on SIMOPS
information to afected supervisors, foreman and
workers at the following days HSSE meetings. At
this meeting, information relative to future work
will also be shared to allow adequate planning for all
afected departments.
A SIMOPS Notice Board shall be established at a
designated location on the work site. It is critically
important during Simultaneous Operations that all
personnel involved know how to communicate an
emergency situation.
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
302
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
303
Tis SIMOPS Notice Board will display, as a
minimum:
Site specifc Emergency Notifcation Number(s)
Site specifc Emergency Notifcation Procedure
Authority or Department in charge of the loca-
tion (Site control), name of Issuing Authority
(IA), and contact information for Work Permits
SIMOPS Work Plans
Emergency Response Plan (ERP)
Name and contact information for the site
specifc Person in Charge (PIC) for Construc-
tion, Wells, and Operations
Date of last Notice Board information change
or review
Te location of the notice board and the minimum
information above shall be part of the initial site
specifc HSSE orientation. As part of the site orien-
tation, the site specic emergency notication proce-
dure and the muster location(s) will be reviewed.
Crew supervisors are accountable for reviewing
the SIMOPS Notice Board and ensuring that any
operation which afects another groups activity be
discussed at the next appropriate tour or shift change
tool box safety meeting, pre-tour safety meeting, or
pre-job safety meeting.
Te SIMOPS Notice Board shall be updated as con-
ditions or development phases change. It must be
reviewed weekly for accuracy. Te Issuing Authority
in charge of the site shall be accountable for review-
ing and updating the SIMOPS Notice Board.
4.2 Work Permits
Te Canada Gas PU Permit to Work (PTW) Practice
(MS880) will be used. Work Permits will be issued
by the Issuing Authority and posted on the SIMOPS
Notice Board.
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
304
Standard Safety Practices Manual
305
4.3 Simultaneous Operations (SIMOPS) Work Plans
SIMOPS Work Plans shall be developed for any
work groups activity that directly or indirectly afects
the safe performance of another work groups activity
or operation. (i.e., a SIMOPS Work Plan is required
of all activities that may impact wells, production
operations or construction operations.) Responsibil-
ity for SIMOPS Work Plan preparation lies with the
work group initiating the activity. Te Site HSSE
Coordinator will assist each department in the devel-
opment of SIMOPS Plans and hazards analysis and
will facilitate SIMOPS interface meetings between
departments.
Te work activity requiring the SIMOPS Plan
should be clearly identifed on the SIMOPS Plan
form, gHSSEr MF36201.
Te plan must include but is not limited to the follow-
ing key points:
A description of the job, project, operation, or
activity to be conducted including the number
of personnel involved, equipment involved, site
resources required, etc.
Designated PIC for the job and the communica-
tion plan for contacting the PIC by radio and/or
phone
Expected duration of the work
Hazard Analysis profle for the job
Work Permit Plan for that given job
Clarity on which activities cannot occur simul-
taneously or what special controls are required if
the activities are to take place simultaneously
Every SIMOPS Work Plan must be approved and
signed by the PIC for the operation(s) impacted.
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
304
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
305
For example, when a construction activity impacts
a Wells operation by proximity to the wells opera-
tion, the PIC for Construction is accountable for
communication with the Wells PIC, reviewing the
SIMOPS Work Plan, and obtaining the Wells PICs
approval before the work begins. However work can
only begin when a Permit to Work has been issued
by the Issuing Authority who has also reviewed the
SIMOPS Work Plan.
Examples of work requiring SIMOPS Work Plans
include but are not limited to the following:
On a well site, Construction work adjacent to a
drilling or well service rig
On a plant site, Construction work adjacent to
live operating plant
Te Issuing Authority or PIC can require a SIMOPS
Work Plan before the new job, project, operation, or
activity can begin.
A copy of every approved SIMOPS Work Plan shall
be posted on the SIMOPS Notice Board. Upon
completion of the SIMOPS activity, the Plan may be
removed from the SIMOPS Notice Board.
5.0 Reference Documents
Project Management Plan gHSSEr MS 363
gHSSEr MS 880 - Permit to Work and Hazard
Assessment Practice
NAG SPU Control of Work Policy http://docs.
bpweb.bp.com/NAG:/content/hse/onshore/
documents/K0000002586
6.0 Forms
HSSEr MF36201 SIMOPS Work Plan Form
S
i
m
u
l
t
a
n
e
o
u
s

O
p
e
r
a
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
306
Standard Safety Practices Manual
307
STRESS RELIEVING
PURPOSE:
To provide guidelines for safe stress relieving practices.
APPLICATION:
All BP Canada Facilities.
POTENTIAL HAZARDS:
Fire, Explosion, Electrical Shock, Burns
PREPARATIONS:
Te stress relieving unit and associated equipment are both
potential ignition sources, and therefore necessitates the
need for extreme caution and proper procedures to elimi-
nate the safety hazards.
[See: Permit to work] [See: HSSE Meetings]
PROCEDURES:
Whenever stress relieving is performed on piping or vessels
in place, site-specic procedures must be developed.
[See: Welding Practices - General]
Refer to BPs Welding Quality Control Manual for stress
relieving requirements and techniques.
Signs:
Appropriate signs should be erected around the work
area to warn of the hazard and to keep out non-essential
personnel.
RESPONSIBILITIES:
Te BP Canada Representative in charge of the
operation is responsible for ensuring that safe
stress relieving procedures are followed
It is the responsibility of the qualifed engineer
S
t
r
e
s
s

R
e
l
i
e
v
i
n
g
Standard Safety Practices Manual
306
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
307
in charge to ensure that the appropriate stress
relieving requirements and techniques are met
Te contractor is responsible for the safe opera-
tion and use of his equipment while on an BP
Canada worksite
SWABBING
PURPOSE:
To provide a general guide for safe swabbing operations.
APPLICATION:
All swabbing operations conducted by service rigs, swab-
bing units and wireline units.
DEFINITION:
Routine Work:
Frequently performed swabbing operations on wells of
similar set-up. Does not include swabbing operations on
sour wells.
POTENTIAL HAZARDS:
Combustible Fluids:
As excessive gas becomes evident, production must be
switched through testers and gas fared. Wind indicators
must be present at all locations.
Toxic return uids:
[See: WHMIS for Fluid Handling Requirements]
[See: H2S Safety]
[See: Static Electricity]
Swabbing Unit, wireline unit, service rig and associated pip-
ing and equipment must be properly bonded to wellhead
and grounded.
S
w
a
b
b
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
308
Standard Safety Practices Manual
309
[See: Bonding and grounding]
PREPARATIONS:
Non-Routine Work:
A Work Permit must be issued and a pre-job safety meeting
conducted, prior to commencing operation. If swabbing is
part of service rig operations, only a pre-job safety meeting
needs to be conducted.
[See: Permits To Work]
[See: HSSE Meetings]
Routine Work:
Swabbing procedures must be developed for all routine
swabbing operations where a work permit and pre-job
safety meeting are not issued or conducted.
Te procedure must cover all pertinent safety and opera-
tion considerations and emergency plans. Tis procedure
must be reviewed with all pertinent contract personnel.
Procedures reviewed and individuals trained must be
documented.
PROCEDURES:
Company Representative:
A properly trained BP Canada Representative, or his
designate, must be on-site for all swabbing operations. An
BP Canada Representative must be on-site when swabbing
operations involve sour wells.
Cathodic Protection:
If fowline is to be disconnected, or swab return line is to
be connected to fowline, cathodic protection must be shut
of. Te wellhead, swabbing unit and swab return line must
then be electrically bonded to the fowline to eliminate any
electrical potential before disconnecting.
Fluids should be swabbed through a poorboy degasser into
a rig tank, only if the Hydrogen Sulde concentrations are
less than the occupational exposure limit.
S
w
a
b
b
i
n
g
Standard Safety Practices Manual
308
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
309
[See: H2S Safety]
If the H2S concentrations exceed the occupational exposure
limit, all fuid should be swabbed through proper testing
equipment, which may include a separator, fare stack,
continuous fare pit, gas boot, and vented tanks. Two quali-
ed personnel should supervise the equipment, congured
appropriately for the specic well.
[See: BPs Completion Operations Manual]
Swab Return Vent Lines:
Must be equipped with block valves, which are closed when
running in the hole with the swab mandrel.
Swabbing Unit:
Must be securely anchored according to manufacturers
specications.
Swab Tank:
Must be spaced as per rig tank spacing requirements.
Swabbing with service rig or swabbing unit must not be
done after dark. A wireline truck equipped with adequate
lighting and a meterage wheel may be used with the ap-
proval of the supervisor, or his designate and the appropri-
ate government agency.
Diesel Engine Shut-Os:
[See: PASO]
Oil Savers:
Lubricator oil savers must be equipped with controls which
can be readily operated.
Tank Trucks:
If swabbing to a tank truck, the engine must be shut of,
and the driver must not be in the cab.
Swab Cable:
S
w
a
b
b
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
310
Standard Safety Practices Manual
311
Should be fagged and well maintained.
PRECAUTIONS:
Swab tank should be externally gauged. If external gauging
is not possible, suspend swabbing operations and ensure
that the swab return line block valve is closed prior to
any personnel going up on the tanks. Fluid must not be
unloaded from the swab tank while a swab is being pulled.
[See: Tank Gauging]
RESPONSIBILITIES:
It is the responsibility of the BP Canada Representative
in charge of the operation to ensure that safe swabbing
procedures are followed.
Te service contractor is responsible for the safe operation
of his equipment, and for the adherence to all applicable
government and BP Canada regulations and practices.
TRAINING:
[See: Training]
TANK GAUGING
PURPOSE:
To provide a guide for safe gauging of tanks.
APPLICATION:
All plant and eld operations.
POTENTIAL HAZARDS:
Gauging operations present a hazard to the worker due
to the presence of toxic or fammable gases and the tank
height.
PRECAUTIONS:
Tanks installed on a permanent basis should have
gauge boards or an external gauging mechanism.
T
a
n
k

G
a
u
g
i
n
g
Standard Safety Practices Manual
310
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
311
All tank ladders shall conform to applicable
government regulations and BP Specications.
[See: Ladders Fixed]
No person should stand on a tank roof.
Where tanks are handling toxic fuids, the
worker may require breathing apparatus and a
safety standby person.
[See: Respiratory Protection]
[See: Tank Truck Loading/Unloading]
Consult Safety Coordinator or Industrial
Hygienist for advice on specic respiratory
protection.
When gauging a tank from a ladder at a height
greater than 2.0 meters, where a hoop, guardrail,
platform or cage has not been supplied, a fall
arresting device must be worn.
[See: Working at Heights Standard and Golden Rule]
TANK TRUCK LOADING /UNLOADING
PURPOSE:
To provide guidelines for loading and unloading products
and fuids safely.
APPLICATION:
Movement of fuids at plant and feld operations via bulk
truck transport.
POTENTIAL HAZARDS:
Combustible/Toxic Fluids
[See: WHMIS]
[See: MSDS]
[See: Hydrogen Sulphur Safety]
[See: Atmospheric Monitoring]
[See: Respiratory Protection]
T
a
n
k

T
r
u
c
k

L
o
a
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
312
Standard Safety Practices Manual
313
Static Electricity
[See: Electrical Bonding and Grounding]
Elevated Worksite Top of Tank
[See: Working at Heights]
Fluid temperature, i.e., Sulfur, LPG.
PREPARATIONS:
Where caustic, acids, or extremely volatile, corrosive, or
sour fuids are being transported, site-specifc procedures
must be followed. Tese will address the unique hazards
and safeguards required.
PROCEDURES:
Before loading or unloading, all trucks must be suitably
grounded. Te grounding cable connection should be made
at the Tank Truck to eliminate any possible spark at the
ignitable source.
All trucks must be parked at least 25 meters from any
combustible source, and pointed of the lease for quick exit.
All diesel engine vehicles working within 25 meters must be
equipped with a positive inlet air shut-of.
While loading or unloading, the truck must be located
a minimum of 8 meters from the production tanks and
outside of any tank dykes. In areas where spacing relaxation
has been approved by the necessary government agencies,
the distances so approved shall be maintained.
[See: Service Rig Safety for Spacing Diagrams]
All trucks must be equipped to allow determination of levels
in the tank without the driver being on top of the tanks.
When loading has started the driver must walk around the
unit to ensure that the product is not leaking from hoses,
connections, valves, or pump seals. If a leak is spotted,
the driver will immediately stop the activity, and if safe to
do so, correct the problem. Unless specic safety related
considerations require otherwise, the driver will remain
outside the vehicle at all times during loading and unload-
T
a
n
k

T
r
u
c
k

L
o
a
d
i
n
g
Standard Safety Practices Manual
312
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
313
ing operations to continuously monitor tank levels and
connections. No truck maintenance shall take place during
these operations. Prior to loading and unloading a vehicle,
the wheels must be chocked.
Te appropriate personal protection must be worn.
[See: Personal Protective Equipment]
Tank trucks must be equipped with at least 1-30# LTK
Fire extinguisher, placed ready to use, during loading and
unloading operations.
Special Precautions for Handling Sour Fluids:
When handling fuids containing H2S, where the potential
exists for H2S to exceed the occupational exposure limits,
truck operators must wear breathing equipment while
connecting or disconnecting load lines, gauging tanks, and
checking truck compartments during loading or unload-
ing operations. Tis equipment must be supplied and
maintained by the contractor. A safety standby should also
be considered. In systems with low H2S content and/or the
risk to worker exposure is minimal, the non-requirement
for a safety standby can be addressed by a site-specic
procedure.
[See: Hydrogen Sulde Safety]
[See: Respiratory Protection]
[See: Safety Standby]
RESPONSIBILITIES:
It is the responsibility of the BP Canada employee in-charge
to ensure that safe loading and unloading procedures are
conveyed and followed.
Te service contractor is responsible for ensuring that safe
loading/unloading procedures are followed
While loading or unloading, the truck must be located
a minimum of 8 meters from the production tanks and
outside of any tank dykes. In areas where spacing relaxation
has been approved by the necessary government agencies,
T
a
n
k

T
r
u
c
k

L
o
a
d
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
314
Standard Safety Practices Manual
315
the distances so approved shall be maintained.
[See: Service Rig Safety for Spacing Diagrams]
All trucks must be equipped to allow determination of lev-
els in the tank without the driver being on top of the tanks.
When loading has started the driver must walk around the
unit to ensure that the product is not leaking from hoses,
connections, valves, or pump seals. If a leak is spotted,
the driver will immediately stop the activity, and if safe to
do so, correct the problem. Unless specic safety related
considerations require otherwise, the driver will remain
outside the vehicle at all times during loading and unload-
ing operations to continuously monitor tank levels. No
truck maintenance shall take place during these operations.
Prior to loading and unloading a vehicle, the wheels must
be chocked.
Te appropriate personal protection must be worn.
[See: Personal Protective Equipment]
Tank trucks must be equipped with at least 1-30# LTK
Fire extinguisher, placed ready to use, during loading and
unloading operations.
Special Precautions for Handling Sour Fluids:
When handling fuids containing H2S, where the potential
exists for H2S to exceed the occupational exposure limits,
truck operators must wear breathing equipment while
connecting or disconnecting load lines, gauging tanks, and
checking truck compartments during loading or unload-
ing operations. Tis equipment must be supplied and
maintained by the contractor. A safety standby should also
be considered. In systems with low H2S content and/or the
risk to personnel associated with an H2S release is minimal,
the non-requirement for a safety standby can be addressed
by a site-specic procedure.
[See: Hydrogen Sulde Safety]
[See: Respiratory Protection]
[See: Safety Standby]
S
w
a
b
b
i
n
g
Standard Safety Practices Manual
314
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
315
RESPONSIBILITIES:
It is the responsibility of the Canada employee in-charge
to ensure that safe loading and unloading procedures are
conveyed and followed.
Te service contractor is responsible for ensuring that safe
loading/unloading procedures are followed.
TOOLS
All tools must be inspected prior to use and only used if in
safe working condition. Tools must be used as per manufac-
turers recommendation. Tis means all guards must be in
place and no modications made to the tool.
Studs and nuts must be tightened as per manufac-
turers recommendation (i.e. torque wrenches to be used vs.
impact wrenches).
Inspection of Hand Tools prior to use:
Perform a complete inspection of all equipment
and job related tools prior to starting any job. All
tools and equipment used must be clean and in
good working condition prior and during use.
Ensure wooden or fberglass handles used on
hammers and similar tools are not damaged or
have been modied (i.e. taped wooden handles
may hide damage to the handle.) Damaged
handles on hammers, axes and similar equipment
shall be immediately taken out of service and
replaced promptly.
Ensure hand tools such as hammers, chisels and
punches, which develop mushroomed heads
during use, are reconditioned or replaced as
necessary.
Check to ensure that tool handles are wedged
tightly in the head of all tools. Check for tight-
T
o
o
l
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
316
Standard Safety Practices Manual
317
ness at head/handle connection point.
Replace worn or bent wrenches, pliers, etc.
regularly.
Store tools in dry secure locations where they will
not be tampered with.
Never attempt to repair damaged or modifed
tools.
Utilize appropriate eye face and hand protection
while using hand tools or equipment which
might produce fying materials or be subject to
breakage? (See Personal Protection Equipment
for further information)
Preference is to select a tool that will keep your
wrist in neutral position.
TRAINING
PURPOSE:
To describe the safety training courses and certication
required by employees and contractors to ensure safe and
productive on-site operations.
APPLICATION:
Employees and Contractors as required by job function
and/or designated by the Department/Area Manager.
PREPARATIONS:
Pre-Job risk assessment Meeting:
Should provide details of the job and all safety consider-
ations related to the job could include but not limited to;
required training and certication. Tis on-site commu-
nication will provide informal training and open channels
for encouraging awareness and information fow as the
operation progresses.
[See: Safety Meetings]
T
r
a
i
n
i
n
g
Standard Safety Practices Manual
316
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
317
Contractor Safety:
All contractors should have a Safety Program in place which
meets the training requirements of the applicable govern-
ment regulations and BP Canada requirements. Tis should
be reviewed prior to awarding work.
PROCEDURES:
Safety is a function of every job task, however, in several
special safety training areas, certication is a requirement.
Safety training will be instituted to comply with mandatory
requirements and other safety training as deemed necessary
by Management.
Training Courses:
Employees will be trained to a competent level on job tasks,
operating procedures, and mandatory safety training.
Safety Training Records:
A complete record of all safety training must be maintained
by the Local VTA Administration section in the Depart-
ment/Area, and should be retained in the VTA database.
Te Safety and Industrial Hygiene section provides for the
required safety training in-house or through recommended
outside agencies. It also promotes the compliance of all
employees with safety training requirements, by monitoring
changes in regulations and advising the Operating Manage-
ment of the requirements.
Wellsite Training:
Te On-Site BP Representative in charge of any rig opera-
tion must have the following qualications:
Second Line B.O.P. certifcation (for Drilling
Operations)
Well Service B.O.P. certifcation (for Service Rig
Operations)
H2S Alive certifcation (as applicable)
T
r
a
i
n
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
318
Standard Safety Practices Manual
319
Respiratory Protection Training certifcation (as
applicable)
First Aid & C.P.R. (in accordance with appli-
cable government regulations)
Worksite Hazardous Materials Information
System (WHMIS)
Transportation of Dangerous Goods (TDG)
Confned Space (as applicable)
Specifc Training in the type of Operations being
performed.
Te Service Rig/Drilling Contractor/Service
Company personnel must have the following
qualications:
First Line B.O.P. certifcation for Drillers (for
drilling operations)
Second Line B.O.P. certifcation for Toolpush/
Rig Manager (for drilling operations)
Well Service B.O.P. certifcation for Toolpush
and Driller (for service rig operations)
Boiler Tickets certifcation (as applicable)
Basic specifc training in the operation or service
they are to perform.
RESPONSIBILITIES:
Te BP Canada Supervisor/Representative in charge is
responsible for verifying that the required training and
certifcation requirements are met as per the CGPU HSSE
Required Training Matrix. Tis matrix must provide for, at
a minimum, all legislated training requirements. Te Field
Contractor is responsible for ensuring that all workers are
properly trained or under the direct supervision of a worker
who is, in accordance with the applicable government
regulations and BP Canada requirements.
BP and FTE Employees within Operations refer to the
CGPU Field Required Training Matrix for training require-
ments and renewal frequencies located on the gHSSEr
T
r
a
i
n
i
n
g
Standard Safety Practices Manual
318
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
319
website - http://gasiso14001.bpweb.bp.com/index.asp
CONTRACTOR REQUIRED SAFETY TRAINING:
Contractors working on behalf of BP Canada are required
to have the minimum training requirements listed below.
Te Contractor shall be able to provide valid training
certicates to the BP Representative on site prior to work
commencing:
H2S Alive if working in potential H2S atmospheres
WHMIS
Standard First Aid to meet the minimum frst
aider requirements in provincial regulations
TDG if transporting dangerous goods
Level One Indoctrination
References:
Skills Development Web Links:
- NAG SPU: https://wss2.bp.com/EP3/Skills_
Development/default.aspx
- CANADA: https://wss2.bp.com/EP3/Skills_
Development/Canada/Forms/AllItems.aspx
NAG Control of Work Practice Web Link:
http://docs.bpweb.bp.com/NAG:/content/hse/
onshore/documents/K0000002586?docbase=NA
G&ticket=vlinkpass&username=bp_vlink&root
paths=%2Fcontent%2Fhse%2Fonshore%2Fdoc
uments%0A%0D.
WELDING PRACTICES GENERAL
PURPOSE:
To provide safe procedures for welding.
APPLICATION:
All BP Canada Facilities and pipelines.
DEFINITION:
W
e
l
d
i
n
g

P
r
a
c
t
i
c
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
320
Standard Safety Practices Manual
321
Welding includes:
Arc Welding
MIG
TIG
Hot cutting
CAD Welding
Stoppling
Explosion welding and cutting
A pressure piping system includes the pipe, tubes, conduits,
ttings, gaskets, bolting, and other components making up
a system. Te sole purpose of this system is the conveyance
of a fuid under pressure, and the control of the fow of a
fuid under pressure between two or more
A pipeline is a gas line, oil line, fuid line, multiphase line,
solids line, secondary line, distribution line or fowline.
Other jurisdictions may have denitions that vary. Te
appropriate regulations should be checked for their deni-
tions.
POTENTIAL HAZARDS:
Welding within a production area is an activity
which requires extreme caution and proper
procedures
Welding and hot work are not to be considered
routine operations, particularly when the work
involves cutting into, or welding onto, produc-
tion lines
Fire and Explosion
Welding Burns, Radiation and electric shock
Toxic welding fumes, and gases
Compressed fuel cylinders
Noise
Vibration
PREPARATIONS:
W
e
l
d
i
n
g

P
r
a
c
t
i
c
e
s
Standard Safety Practices Manual
320
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
321
All welding and hot work must be done with the permis-
sion of the BP Canada Representative in-charge. Welding
in any production facility requires a Hot Work Permit and
shall require a pre-job safety meeting depending on the
complexity and hazard associated with work.
[See: Permit to work]
[See: HSSE Meetings]
[See: MSDS]
NOTE: Designated welding shops are exempt.
Complete risk assessment to determine if respiratory
protection and emergency back-up personnel are required,
prior to commencing any welding operation.
[See: Safety Standby]
[See: Respiratory Protection]
Te needs for warning signs, to isolate or restrict entry to
the work area to authorized personnel wearing suitable
protection should take into consideration.
Government Regulations:
Before any additions or changes are made to pressure
piping that are classied under the provincial inspection
jurisdictions, proper notication must be made and ap-
proval secured. Te BP Canada welding quality manual and
specication must be consulted.
PROCEDURES:
Site-specic procedure must be developed. Tis may
include, but is not limited, to the following:
Blinding
Purging
Depressuring
Excavations
X-Ray
Stress Relieving
Non-Destructive Testing
W
e
l
d
i
n
g

P
r
a
c
t
i
c
e
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
322
Standard Safety Practices Manual
323
Site-Specic Procedure:
A detailed work plan for any procedure that involves the
use of a cutting torch, welding, or tie-in to existing operat-
ing equipment must be prepared. Te procedure must list
all the activities in sequence required to complete the job.
For each activity, the following areas must be covered:
1. Activity: Describe what has to be done and how
the activity will be carried out.
2. Hazards: Describe the safety hazards present
and how each hazard will be eliminated or
minimized.
3. Personnel: Describe who is responsible for the
activity and who will carry it out.
4. Fire Protection Equipment: Must be located at
the work site, ready to use.
[See: Fire Protection Equipment]
PRECAUTIONS:
Ventilation:
Adequate mechanical ventilation, local fume extraction
equipment or respiratory protection must be used where:
Natural ventilation is obstructed
Toxic metals or fuxes are used
Toxic fumes, gases and ozone are generated.
[See: Confned Space Entry]
[See: Respiratory Equipment]
Note: Consult Industrial Hygienist for advice on appropri-
ate worker exposure controls and respiratory protection.
Respiratory:
Exposure to hazardous fumes, dusts, gases and vapors
may occur in the welding process. To reduce exposure to
hexavalent chromium, beryllium and other metal fumes or
dusts the following respiratory protection guidelines must
be followed:
W
e
l
d
i
n
g

P
r
a
c
t
i
c
e
s
Standard Safety Practices Manual
322
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
323
Protective Equipment:
Welder and Welders helpers must wear approved protective
equipment.
Welding helmet and safety glasses must be worn when
welding, grinding and bung.
If a welder is performing non-welding related tasks, the
Practice PPE requirements shall be followed.
[See: Personal Protective Equipment, FRW Practice and
Hand Protection Practice]
Flash protection screens should be used to protect the
uninvolved workers.
Gas Monitoring:
Work area, equipment and lines shall be checked for com-
bustible and/or toxic gas prior to starting job. Work area
may require continuous monitoring throughout the job.
Re-entry to work area must be accompanied by re-check for
combustible and/or toxic gas.
RESPONSIBILITIES:
It is the responsibility of the BP Canada supervisor in
charge, or his designate, to ensure that safe welding proce-
dures are in place and followed.
Welders are responsible for the proper maintenance and safe
operation of their equipment.
TRAINING:
Only welders ticketed for the applicable weld procedure
shall be used.
W
e
l
d
i
n
g

P
r
a
c
t
i
c
e
s


Task Respiratory Protection
Welding, cutting, gouging & grinding on
stainless steel inside a vessel or in a shop
Half Mask respirator with P100 filters
Welding on carbon steel with chromium or
beryllium containing rods (in shop or
outside)
Half Mask respirator with P100 filters
Welding & grinding on stainless steel using
Inconel rod inside vessels
Powered air-purifying or full-face
respirator with P100 filters

Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
324
Standard Safety Practices Manual
325
All workers must be properly trained and competent to
carry out their required task.
For welding rules and regulations consult the provincial
occupational health and safety references listed below:
Alberta OH & S Manual Part 10 Section
171.1 (1) 174 (1)
British Columbia OH & S Manual Section
12.112 12.124
WELL SERVICING WORK PLAN
PURPOSE:
To provide a guide for developing work plans for well
servicing work.
APPLICATION:
All BP Canada operated wells.
DEFINITION:
A site-specic procedure of the well servicing operations to
be undertaken.
PROCEDURES:
Each well servicing job should have a work plan. Analysis
of the operation and safety conditions will dictate the detail
required.
All well workovers must have an approved work plan.
Te following outlines the information and procedures that
should be included in any approved work plan.
Pertinent Well Data:
Well name and location
W
e
l
l

S
e
r
v
i
c
i
n
g

W
o
r
k

P
l
a
n
Standard Safety Practices Manual
324
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
325
Perforations
Zone
Elevations: KB, Ground or CF
TD
PBTD
Casing details: Surface, intermediate and produc-
tion size, weight, grade, setting depth, cement
type, cement volume
Production tubing details, listed from top to
bottom, including all dimensions (IDs, ODs),
weights, grades, thread size, and accessories
(packers, tubing anchors, etc.)
Bottom hole pressure
Bottomhole temperature
H2S concentration (Is a safety company re-
quired? Is this a critical sour well as dened by
the EUB?)
[See: H2S Safety]
Hole capacities
Wellhead description including details of size,
pressure ratings, fanges, hangers, and manufac-
turers name
Sucker rod and bottomhole pump details includ-
ing polish rod dimensions
Pumping unit details.
Well History:
An outline of the initial completion and a summary of
all previous workovers should be included. Any problems
previously encountered should be referenced and detailed,
particularly those which could lead to further trouble, e.g.,
lost circulation, cementing diculties, pressure test failures,
collapsed casing, etc.
Job Procedure:
W
e
l
l

S
e
r
v
i
c
i
n
g

W
o
r
k

P
l
a
n
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
326
Standard Safety Practices Manual
327
A detailed, step-by step procedure must be written. It can-
not be assumed that the wellsite supervisor will perform any
operation, therefore, every job to be done must be included
in the procedure.
It should begin with the statement of notication, which
details the various regulatory bodies, and the BP Canada
personnel that must be notied before any equipment is
moved on a location.
Applicable Emergency Response Plan should be referenced
and included in work plan package as required.
[See: Emergency Response Plan]
All equipment to be used (packers, profles, etc.), should be
fully identifed by manufacturers name, part number, ID,
OD, and thread connection.
All fuids to be used must be fully detailed, including all
safe handling precautions (Include MSDS), where the fuid
is to be obtained and how it is to be disposed of.
[See: TDG Regulations]
Service Companies:
If specic companies are to be used, they should be named,
and a copy of their program attached. Te service to be
provided and the contact must be listed. If it is necessary to
substitute service companies during the course of the job,
the program must be discussed with a representative of the
substitute company before they arrive at the lease.
Contact List:
Tis should include BP Canada personnel as well as es-
sential contract personnel contacts.
Approvals:
All well workover work plans or programs must be ap-
proved according to the Department/Area policy. EUB
approval is required for critical sour wells.
Down-hole Schematic-Log Sections:
W
e
l
l

S
e
r
v
i
c
i
n
g

W
o
r
k

P
l
a
n
Standard Safety Practices Manual
326
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
327
Down-hole drawings which show present and proposed
down-hole details must be attached. Use Form C-238.
Pertinent open hole and cased hole log sections must be
attached and referenced in the main body of the program,
noting which log is to be used for correlating purposes.
Material Requirements:
Any materials that are not readily available, or must be
specially manufactured, must be listed and the supplier
identied. All special handling tools must be listed.
Other Requirements:
Copies of the following documents or permits must be at-
tached to the program package where appropriate:
1. Flaring Permit
2. Mineral Surface Lease or Landowner Contact
Sheet
RESPONSIBILITIES:
It is the responsibility of the BP Canada Representative on-
site to ensure that a work plan is developed and provided.
WELL TESTING
PURPOSE:
To provide a general guide to safe well testing operations.
APPLICATION:
All BP Canada operated well testing operations.
POTENTIAL HAZARDS:
Explosion: Improper Purging procedures, i.e.
entrained air
High Pressure
Toxic and/or Combustible fuids
W
e
l
l

T
e
s
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
328
Standard Safety Practices Manual
329
[See: WHMIS, H2S Safety]
Static Electricity: All equipment rigged in must
be electrically bonded and grounded.
[See: Electricity]
High Noise:
[See: Noise Exposure & Hearing Conservation]
PREPARATIONS:
Well Test Program:
A work plan must be developed which meets the applicable
regulatory requirements. Procedures may be part of the well
servicing work plan, or may stand alone.
[See: Work Plan]
A work plan should address the following:
Safety Hazards and Considerations
Purpose of the test
Type of reservoir
Test Equipment required
Potential operating difculties and preventative
measures.
When testing wells containing H2S in excess of 5 percent,
prior approval from the EUB, if in Alberta, must be
obtained.
[See: EUB IL 91-2]
Te requirements under IL 91-2 must also be addressed
when faring wells containing 1-5% H2S and should be
followed for wells containing less than 1% H2S.
An Emergency Response Plan must be in place when test-
ing wells containing H2S in excess of 1%. Where the well
is part of an approved Emergency Response Plan for an
existing sour facility, no additional response plan is required
for testing. Otherwise a site-specifc Emergency Response
W
e
l
l

T
e
s
t
i
n
g
Standard Safety Practices Manual
328
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
329
Plan is required.
[See: Emergency Response Plan]
Pre-Job Safety Meeting:
Must be held before commencing operations to discuss
testing procedures and potential hazards.
[See: HSSE Meetings]
Signs:
Warning of the presence of H2S must be posted at the lease
entrance when testing wells with H2S content exceeding
10 PPM.
PROCEDURES:
Te BP Canada representative in charge must be aware of
the regulatory requirements as laid out in the following:
Well Testing Minimum Guidelines for Safety Enhanced
Field Operations, available from most testing companies in
Alberta, or Alberta Occupational Health and Safety.
Equipment Spacing:
[See: Service Rig Safety]
NOTE: In British Columbia, the fare stack must be 50
meters from the separator.
All testing lines must be staked or secured
First Aid Equipment:
Must be available on-site along with means for transporta-
tion of-site.
[See: First Aid Equipment]
Testing Personnel:
A minimum of two (working) qualifed test personnel are
required on-site at all times. Tree (working) qualifed
test personnel are required on-site at all times when the
H2S content of the well is known to be greater than 1%
W
e
l
l

T
e
s
t
i
n
g
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
330
Standard Safety Practices Manual
331
(10,000PPM). It is the responsibility of the BP Canada
representative in charge, to assess the need for additional
personnel and ensure that fully trained and competent
contractor employees are used.
Well site illumination must be adequate to safely perform
any job, and must be approved for use in the hazardous
locations.
[See: Electrical Protection Regulations]
Communications:
Of lease communications and an Emergency Contact List
must be on location at all times.
Breathing:
A minimum of two self-contained breathing apparatus
must be on location at all times. If working on a sour well,
adequate breathing apparatus must be supplied for the full
crew.
Fire Protection:
A minimum of 2 30# LTK BC fre extinguishers must be
on location in accessible areas ready to use.
Purging:
System must be purged of all air with pilot out prior to
commencing operations. Te use of a non-combustible
purge medium is desirable. If using a combustible purge
medium, ignition sources must be eliminated, and speci-
cally the fare must not be lit.
[See: Purging]
Pressure Testing:
All equipment upstream of the choke should be pressure
tested to 1.2 times the maximum working pressure, or to
the wellhead pressure rating, whichever is the lesser. Once
W
e
l
l

T
e
s
t
i
n
g
Standard Safety Practices Manual
330
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
331
the fow test has started, check the entire system for leaks.
PRECAUTIONS:
Safety standby must be utilized for tank gauging when
working with toxic fuids, or when working with fred
equipment.
[See: H2S Safety]
[See: Respiratory Protection]
[See: Safety Standby]
Sour and/or Critical Wells:
Additional safety procedures are required.
[See: OH&S Well Testing guide]
[See: BPs Completion Operations Manual]
RESPONSIBILITIES:
It is the responsibility of the BP Canada Representative
in-charge to ensure that safe well testing operations are
carried out.
Te contractor is responsible for ensuring that all equip-
ment and personnel meet the applicable Government
regulations, BP Canada requirements, and possess sucient
experience to perform the work with minimal supervision.
TRAINING:
All personnel must possess valid First Aid, CPR and WH-
MIS and should have an H2S certifcate. Where H2S is
expected, all personnel must possess a H2S certicate.
[See: Training]
WIRELINE OPERATIONS
PURPOSE:
To provide a general guideline for safe wireline operations.
W
i
r
e
l
i
n
e

O
p
e
r
a
t
i
o
n
s
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
332
Standard Safety Practices Manual
333
APPLICATION:
All BP Canada operated wells where wireline is run for
remedial and/or maintenance requirements (i.e. dewaxing,
pressure survey, fshing, running or pulling plugs/chokes,
and opening or closing sliding sleeves).
DEFINITION:
Routine Work:
Frequently performed wireline operations (i.e. dewaxing)
on wells of similar set-up. Does not include wireline opera-
tions on sour wells.
POTENTIAL HAZARDS:
High Pressure: Well pressure must be checked to
ensure that wireline equipment is rated for the
working pressure.
Static Electricity: Te Wireline and Picker/Mast
unit must be properly bonded and grounded to
the rig and/or wellhead.
[See: Electricity]
Combustible/Toxic Fluids:
[See: H2S Safety]
[See: Respiratory Protection]
PROCEDURES:
All equipment attached to the wellhead must be adequately
supported to prevent lateral movement.
Climbing on the lubricator is not allowed.
[See: Safety Harnesses, Lanyards and Lifelines]
Wireline Unit and Picker/Mast Unit must have wheels
chocked.
Lubricator & B.O.P.s:
At least one line-B.O.P. located between the lubricator and
wellhead must be used. B.O.P.s for sweet wells can be either
W
i
r
e
l
i
n
e

O
p
e
r
a
t
i
o
n
s
Standard Safety Practices Manual
332
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
333
manually or hydraulically operated.
Lubricator and B.O.P.s must be pressure tested to the
lesser of 1.2 times the maximum working pressure or the
wellhead pressure rating, prior to use.
Stung Box:
Rubber/Packing must be maintained in good condition.
At least 2 30# LTK fre extinguishers must be on-site and
ready to use.
PRECAUTIONS:
Critical Wells:
Additional safety procedures are required.
[See: Alberta Recommended Practices Volume 2]
[See: BP Completion Operations Manual]
Equipment approved for use in sour service must be used
(i.e. line, lubricator, B.O.P.s, running tools).
RESPONSIBILITIES:
It is the responsibility of the BP Representative in-charge to
ensure that safe wireline procedures are followed.
Te contractor is responsible for ensuring that all equip-
ment meets all applicable government regulations and BP
requirements, and all personnel are properly trained in safe
wireline procedures.
TRAINING:
(See: Training)
WELL WORK - HAND OVER BETWEEN
OPERATIONS AND WELLS TEAMS
PURPOSE:
To provide standards of safe well turnover between Opera-
tions and the Wells group.
W
e
l
l

W
o
r
k
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
334
Standard Safety Practices Manual
335
APPLICATION:
All BP Canada operated wells.
PROCEDURE:
1) Tere will be a minimum of 36 hr notice (longer
if required by either Operations or the Wells
teams) between the time the program for the well
work is received in the eld and the well work
operation begins. Tis is required to give the ap-
propriate time to plan for the required resources,
and properly co-ordinate activities between Wells
and Operations teams in the eld.
2) Any deviation from the agreed upon time period
requires joint written approval by both Opera-
tions and Wells teams.
3) Prior to starting work on the well bore, the Wells
team will take steps to ensure seal integrity; e.g.
no leaking of the master valves.
4) Operations will take responsibility for the turn
over of the well bore to the Wells team. Te
surface facilities downstream of the master valves
shall be fully de pressured with all process con-
nections; e.g. chemical lines; removed.
5) Te well bore will be locked and tagged by
the Operator until such time as it is ready to
turn over to the Wells team as per BP Canadas
Energy Isolation Golden Rule Practice.
6) Steps 2 and 3 will be documented as part of
BP Canadas Permit to Work Golden Rule
Practice.
WORKING ALONE PRACTICE
1.0 Scope and Applicability
1.1 Te purpose of this practice is to provide safe work
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
334
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
335
requirements for employees, contracted employees
and contractors working or traveling alone on Canada
Gas Performance Unit (CGPU) business, premises
and work sites.
1.2 Tis practice applies to all CGPU employees,
contracted employees and contractors performing
potentially hazardous work alone or traveling alone.
2.0 Denitions
2.1 Working Alone To work alone means to work
or travel alone at a site in circumstances when they
cannot be seen or heard by another worker, they
cannot expect a visit from another worker for some
time and when assistance is not readily available in
the event of an injury, illness or emergency.
2.2 Readily Available Tree assessment factors must be
considered when determining if assistance is readily
available:
Awareness Will other workers capable of pro-
viding assistance be aware of the workers needs?
Willingness Is it reasonable to expect those
other workers will provide helpful assistance?
Timeliness Will assistance be provided within a
reasonable period of time?
Tis assessment must consider the level of risk
associated with the circumstances of the work; for
example, type of work, location and hazards. If the
hazards the worker faces poses a high risk of injury,
readily available may mean immediately avail-
able. Te availability of assistance increases as the
level of risk associated with the work increases.
2.3 Efective Means of Communication Radio, tele-
phone or other electronic communication device.
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
336
Standard Safety Practices Manual
337
2.4 Efective Contact System An alternative to an ef-
fective means of communication that is appropriate
to the hazard. Examples of a contact system include
visiting the worker, scheduling check-ins with other
workers or designated persons, reporting to an oce
or particular person upon completion of a task, and
visual or audible contact with other persons who can
ofer assistance when needed. Te frequency of the
contact is based on a hazard assessment.
2.5 A worker is not working alone if all the following
conditions are met:
Awareness Te worker can get the attention of
someone capable of providing helpful assistance
when the worker requires it; for example, by
maintaining visual contact, staying within hear-
ing range of others, being continuously moni-
tored by a remote surveillance camera, sounding
an alarm, making frequent contact with other
workers or persons throughout the work period
Willingness Persons expected to provide
assistance must be capable and willing to do so
when required. Tere should be a reasonable
expectation that the persons being relied on to
provide assistance can and actually will provide
that assistance. Depending on circumstances,
those persons may need access to communica-
tion devices to trigger emergency response plans
or telephone to call Emergency Services (9-1-1)
Timeliness Te required assistance will be
provided in a reasonable period of time. What is
reasonable depends on factors such as the nature
of the illness, injury or emergency, the physical
location of the work and workers and the type
and level of risk of the work being performed
3.0 Scope of Responsibility
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
336
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
337
3.1 Each functional area manager (Operating Centre
Manager, Wells Manager or HSSE Manager) is ac-
countable for:
Conducting a hazard assessment to identify exist-
ing or potential safety hazards in the work place
associated with working alone
Developing and implementing a written pro-
cedure for checking the well-being of a worker
assigned to work alone
Implementing safety measures to reduce the risk
to workers from the identied hazards
Ensuring workers have an efective means of
communicating with their immediate supervisor
or other designated person in case of an emer-
gency
Ensuring workers have an efective contact
system for checking the well-being of a worker
in the event the worker may not be able to signal
for assistance in the event of an injury or illness
while working alone; and
Ensuring workers are trained and educated so
they can perform their work safely
3.2 Te functional team lead (Area Foreman, Construc-
tion Foreman, Wells Supervisor) is responsible for:
Developing and implementing the site specifc
working alone requirements; and
Providing the required training to allow workers
to perform work safely
3.3 All workers and contractors are responsible for fol-
lowing the working alone procedures developed for a
specic area.
4.0 Requirements for Working Alone while
Performing Potentially Hazardous Work
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
338
Standard Safety Practices Manual
339
4.1 High risk activities such as working at heights, ener-
gy isolation, conned space entry, working in hazard-
ous atmosphere where a safety stand-by is required
(e.g. H2S), or working with hazardous equipment
such as chainsaws must never be conducted alone.
4.2 Prior to commencing work, a work site hazard as-
sessment to identify existing hazards for employees
working alone is required.
4.3 Implement and develop a working alone safe work
procedure that contains:
An efective means of communication to
provide workers with a method of signaling
their need for assistance. Te efective means
of communication is not limited to verbal
communication. Common devices that meet the
intent include: telephones, cellular telephones,
satellite telephones, portable two-way radios,
personal alarms and computer-based systems
that achieve the same results. Te key point is
that the communication system must permit the
worker requiring assistance to send a message or
signal to someone capable of providing assistance
to them
As an alternative to an efective means of com-
munication, an efective contact system that is
appropriate to the hazard can be developed. Te
contact system will:
o Defne the time interval between scheduled
checks and procedures to follow in case the
worker cannot be contacted, including provi-
sions for emergency rescue. Te frequency of
contact for checking the workers well-being
must be based on a hazard assessment and
developed in consultation with the worker
assigned to work alone
o Determine the type of contact required
visual or verbal (e.g. call-in)
o Identify a designated person to establish
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
338
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
339
contact with the worker at pre-determined in-
tervals and the results of this contact recorded
by that person; and
o Ensure a worker checks-in at the end of the
work shift
Examples of contact systems include:
o Visiting the work at pre-determined intervals
o Scheduling check-ins with other workers or
designated persons
o Reporting to an oce or particular person
upon completion of a task; and
o Visual or audible contact with other persons
who can ofer assistance when required
4.4 A worker required to work alone and any person
assigned to check on the well-being of a worker must
be trained in the written site-specic working alone
procedure.
4.5 Te procedure and system for checking a workers
well-being must be reviewed at least annually. Te
procedure and system must be reviewed more
frequently if there is a change in work arrangements
which could adversely afect a workers well-being or
a report that the system is not working efectively.
5.0 Requirements for Traveling Alone
5.1 People traveling alone require a traveling alone plan
that contains the following:
Destination and schedule for arriving at the
destination
Mode of transportation to destination
Contact person for communicating travel plans;
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
340
Standard Safety Practices Manual
341
and
Establish scheduled check-in times with contact
to indicate:
o When starting the journey
o Arrival at pre-determined check points if
deemed necessary
o Arrival at destination
o Changes to travel plans; and
o Procedures and response plan in case the
person traveling does not check-in at pre-
determined times or cannot be contacted
5.2 All aspects of the journey will comply with gHSSEr
MS860 Vehicle Standard including training,
vehicle t for purpose and adequate emergencies
supplies for the trip.
W
o
r
k
i
n
g

A
l
o
n
e
Standard Safety Practices Manual
340
Standard Safety Practices Manual
Everyone has an obligation to stop work that is unsafe.
341
R
e
v
i
s
i
o
n
s
D
a
t
e
R
e
v
i
s
i
o
n

T
y
p
e
/
C
o
m
m
e
n
t

R
e
v
i
s
e
d

B
y
:
R
e
v
i
s
i
o
n
A
u
t
h
o
r
i
t
y
:
D
e
t
a
i
l
s
:
D
e
c

1
0
,

2
0
0
7
M
i
n
o
r

-

N
e
w

V
e
r
s
i
o
n


N
u
m
b
e
r

1
.
1
O
n
l
i
n
e

C
o
n
t
r
o
l
l
e
d


C
o
p
y

R
e
v
i
s
e
d

a
n
d

B
o
o
k
s

P
r
i
n
t
e
d

A
f
t
e
r

O
c
t
o
b
e
r

1
,

2
0
0
7
J
o
a
n
n
e

D
e
z
a
l
l
g
H
S
S
E
r

F
o
r
u
m
M
o
v
e
d

J
e
w
e
r
l
y

s
e
c
t
i
o
n


u
n
d
e
r

P
P
E
,

A
d
d
e
d

t
o

t
a
b
l
e

o
f

c
o
n
t
e
n
t
s
.

R
e
p
l
a
c
e
d

W
o
r
k
i
n
g

a
t


H
e
i
g
h
t
s

P
r
a
c
t
i
c
e

t
o

i
n
c
l
u
d
e

t
h
e

b
o
o
m

l
i
f
t

s
e
c
t
i
o
n
.
A
d
d
e
d

t
h
e

E
y
e

H
a
z
a
r
d


A
s
s
e
s
s
m
e
n
t

C
h
a
r
t

u
n
d
e
r

P
P
E
.
U
p
d
a
t
e
s

t
o

G
r
o
u
n
d


D
i
s
t
u
r
b
a
n
c
e

a
n
d

P
r
a
c
t
i
c
e

f
o
r

W
o
r
k
i
n
g

i
n

a

C
o
m
b
u
s
t
i
b
l
e

G
a
s

e
n
v
i
r
o
n
m
e
n
t
.

You might also like