ITEM DESCRIPTION QTY. UNIT
I. Roofing Works
#14 x 50mm x 100mm x 6.00m G.I. C-Purlins 12 pcs. 2.00
0.4mm thk x 800mm x 2.57m Corrugated 915 Galvalume 19 pcs.
(Aluminum-zinc Alloy Coated Steel) Roofing Sheet
#12 x 35mm Tekscrew w/ Neoprene Washer 418 pcs.
0.4mm thk x 0.40m x 2.40m Prepainted Galvalume Ridge roll 4 pcs.
II. Trusses Work
38mm x 6.00m G.I. Pipe, Sch. 40 (ASTM-53, Standard) 6 pcs.
19mm x 6.00m G.I. Pipe, Sch. 40 (ASTM-53, Standard) 5 pcs.
Lateral Truss
19mm x 6.00m G.I. Pipe, Sch. 40 (ASTM-53, Standard) 13 pcs.
10mm x 100mm Standard Turnbuckle 4 pcs.
10mm x 6.00m Plain Round Bar 4 pcs.
III. Steel Column/Column Footing
75mm x 6.00m G.I. Pipe, Sch. 40 (ASTM-53, Standard) 3 pcs.
Portland Cement 9 bags
Washed Sand 0.5 cu.m.
Gravel 1 cu.m.
16mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 12 pcs.
10mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 10 pcs.
#16 G.I. Tie-wire 2 kgs.
IV. Concrete Flooring
Portland Cement 16 bags
Washed Sand 1 cu.m.
Gravel 2 cu.m.
10mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 17 pcs.
#16 G.I. Tie-wire 1 kg.
V. Waiting Shed Railing
50mm x 6.00m G.I. Pipe, Sch. 40 (ASTM-53, Standard) 3 pcs.
6mm thk x 50mm x 6.00m Flat Bar 5 pcs.
16mm x 6.00m Plain Round Bar 19 pcs.
COST
COST
GOV. RAMOS PAY CENTER
ITEM DESCRIPTION QTY. UNIT
I. Footing-Column
F1-C1 2.00
Portland Cement 10 bags
Washed Sand 0.5 cu.m.
Gravel 1 cu.m.
16mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 4 pcs.
#16 G.I. Tie-wire 0.5 kg.
Column
Portland Cement 9 bags
Washed Sand 0.5 cu.m.
Gravel 1 cu.m.
16mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 16 pcs.
10mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 22 pcs.
#16 G.I. Tie-wire 5 kgs.
II. Wall Footing 28.12 m
Portland Cement 12 bags
Washed Sand 0.5 cu.m.
Gravel 1 cu.m.
12mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 10 pcs.
10mm x 6.00m Def. Reinforcing Steel Bars (Grade 20) 7 pcs.
#16 G.I. Tie-wire 3 kgs.
III.
3 pcs.
9 bags
0.5 cu.m.
1 cu.m.
12 pcs.
10 pcs.
2 kgs.
IV.
16 bags
1 cu.m.
2 cu.m.
17 pcs.
1 kg.
V. Waiting Shed Railing
3 pcs.
5 pcs.
19 pcs.