You are on page 1of 19

10/29/2014 Steppe Cement Ltd.

http://www.steppecement.com/line5/apr2013.php 1/19
Home Introduction Corporate Info Board of Directors Corporate Governance Investors Line 5 Contact
April 2013 update
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 2/19
Kiln outlet end sealing pipe been positioned
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 3/19
View from Kiln outlet end with side walkway platforms
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 4/19
Kiln Hood with TAD & Heat Exchanger
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 5/19
Girth gear radial & axial run out dial gauge alignment work was completed.
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 6/19
Level-66 structural works in progress Pre calciner top duct to be joined
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 7/19
2nd cyclone roof ready for lifting
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 8/19
Cooler inside grate covered with wooden plank- Ready for refractory
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 9/19
Cooler TAD Guillotine Damper ready for lifting
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 10/19
Cooler back end Blasters in position
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 11/19
Raw mill-2 gas duct with supports on axis- 7 & 8
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 12/19
Gas duct to silo top- Thermal insulation work was initiated
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 13/19
Kiln feed Bucket Elevator drive assembly been positioned
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 14/19
Raw meal silo-1 Cones in position and air slide boxes are being positioned
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 15/19
Raw mill -1 feed belt roller supports been positioned
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 16/19
Schenck Coal Hopper on load cell bracket
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 17/19
Pre calciner refractory work was initiated
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 18/19
Water pump system being positioned
10/29/2014 Steppe Cement Ltd.
http://www.steppecement.com/line5/apr2013.php 19/19
Limestone Crusher Jaw Crusher being revamped
Home | Introduction | Corporate Info | Board Of Directors | Corporate Governance
Investors: Announcements , Financials , AIM Rule 26 , Analyst Coverage , Links | Contact
2006 - 2008 Steppe Cement Ltd
Website Design and Development by Inscribe Webmedia

You might also like