The document outlines the startup order of operations for a VESDA system, including setting the date and time, options like language and temperature units, assigning detectors to zones by dragging them onto a zone address, rebuilding the zone list, and verifying the programmer is in zone 0 before establishing airflow.
The document outlines the startup order of operations for a VESDA system, including setting the date and time, options like language and temperature units, assigning detectors to zones by dragging them onto a zone address, rebuilding the zone list, and verifying the programmer is in zone 0 before establishing airflow.
The document outlines the startup order of operations for a VESDA system, including setting the date and time, options like language and temperature units, assigning detectors to zones by dragging them onto a zone address, rebuilding the zone list, and verifying the programmer is in zone 0 before establishing airflow.
Order of operations for VESDA startup (Commands ARE in RED CAPS)
1 SET SYSTEM DATE AND TIME DST 1451
LOGIN to VSC ADM 1413 Click on (highlight) VESDAnet USR 1111 Select DEVICE Select SET SYSTEM DATE AND TIME Change time as needed 2 SET OPTIONS Click on VESDA Laser Plus in "tree view" Select VIEW Select OPTIONS Select ENGLISH and FAHRENHEIT 3 SET ZONE ASSIGNMENT LOGIN Select VESDAnet in "tree view" Select VESDA Laser Plus in "device view" DRAG AND DROP detector into desired zone (ADDRESS) Select DISPLAY DRAG AND DROP display directly onto detector 4 REBUILD ZONE LIST Select VESDA Laser Plus in "tree view" Select DEVICE Select REBUILD ZONE LIST 5 Verify that PROGRAMMER is in zone 0 6 Establish AIRFLOW Focus DST 7244 Login Passwords VFT-15 ADM 693 ECO ADM 0999