Professional Documents
Culture Documents
Annex V - Bills of Quantities
Annex V - Bills of Quantities
BILL NO.
1/12
AGONY P.S
ITEM
REF.
ITEM DESCRIPTION
PAGE NO.
QUANTITY
UNIT
UNIT
RATE
TOTAL PRICE
1.0
Excavation
Clear the site, cut bushes and grub up roots to prepare for
construction
1.1
1.00
Item
2
471.00
76.00
Fillings
34.00
81.00
42.00
341.00
26.00
251.00
94.00
7.00
55.00
1.2
G
1.3
2.0
Disposal
Cart away any surplus excavated material to deposit as directed by
the engineer
Anti-termite treatment
Anti - termite treatment to stabalized compacted floor area, fillings
and tops of foundation walls: as " Aldrex" or equal and approved
insecticide treatment: applied in accordance with the manufacturer's
printed instructions : include for 10 years warranty period.
CONCRETE WORKS
Reinforcements shall be paid separately unless otherwise
specified in the item description
In Situ Concrete
Unless otherwise stated the rate shall include the supply of all
materials and labour to achieve the specified quality of
concrete including all mixing, vibrating, transporting and
placing
Concrete class 25/20(1:2:4) in:
Strip footings
230x230mm lintols
To collection
3
2
2
3
BILL OF QUANTITIES
BILL NO.
AGONY P.S
PAGE NO.
2/12
ITEM
REF.
2.2
2.2.1
ITEM DESCRIPTION
QUANTITY
UNIT
TOTAL PRICE
Formwork
25mm thick sawn cypress formwork to:
2
194.00
138.00
2.3
UNIT
RATE
Reinforcement
Rate to include for supplying, cleaning, cutting, bending,
fabricating, placing and the provision of all necessary
temporary fixings and supports etc. including binding wires,
bends, hooks, tying wires, chairs, distance blocks, steel
separators/spacers (designed laps and m.s. chairs if any
included in quantities)
214.00
Kg
703.00
Kg
425.00
Kg
341.00
2.3.1
M
2.4
3.0
1.00
Item
1.00
Item
MASONRY WORKS
Rate shall include for delivering, lifting, handling, weighting all rough
and fair cutting, plumbing angles, normal straight cutting, forming
rebated reveals and raking out joints for plastering.
3.1
3.1.1
A
3.1.2
B
3.2
3.2.1
C
3.2.1
D
Note
Brick Work
Sub-structure Walls
230mm thick solid furnace brick walls: bedded and jointed in cement
and sand (1:4 ) mortar strip foundations
94.00
345.00
137.00
341.00
Super-structure Walls
230mm thick walls in standard furnace bricks in cement sand (1:5)
mortar: reinforced with hoop iron wall ties laid horizontally at every
200mm spacing
To Collection
BILL OF QUANTITIES
BILL NO.
4.0
QUANTITY
3/12
UNIT
4.1
Roof structures
All steel members shall be applied priming backs & two coats
of an approved gloss paint before fixing.
572.00
146.00
69.00
93.00
41.00
429.00
41.00
144.00
40.00
4.2
4.2.1
4.2.1.1 Ridges
H
4.3
4.4
PAGE NO.
Supply & fix uPVC half round eaves gutters of size section dia.
160mm: nailed or bolted to timber valance (ms )board: internal
support brackets: to manufacturer's specifications.
Supplying & fixing of 110 dia uPVC rain water down pipes: fixed
sloping to feed rainwater harvest uPVC tank (2000Litres
capacity)measured separately; including all necessary accessories
to complete the installation
2.00
No.
2.00
No.
To Collection
UNIT
RATE
TOTAL PRICE
BILL OF QUANTITIES
BILL NO.
4.5
N
QUANTITY
4/12
UNIT
Extra Over
11.00
No.
6.00
No.
1.00
No.
5.0
5.1
PAGE NO.
Steel Doors
To Collection
UNIT
RATE
TOTAL PRICE
BILL OF QUANTITIES
BILL NO.
5.2
QUANTITY
5/12
UNIT
Windows
3.00
No.
4.00
No.
28.00
No.
6.0
FINISHES
The contractor is advised to refer to the specification prior to pricing
of this section of work
The rate shall include for all temporary rules, screeds, grounds etc.
for raking out joints of new brick work or hacking new concrete for
key, internal & curved angles, joints between different surfaces
arisses quirks, inter sections between curved or irregular surfaces,
etc. and all making good around pipes, sanitary fittings & the like.
All samples of materials to be used shall be provided for approval by
the Engineer.
6.1
Wall Finishes
210.00
456.00
6.2
C
6.3
D
6.4
E
7.0
Extra Over
4.00
No.
Floor finishes
40mm thick cement and sand (1:3) screed laid horizontally on the
surface of floor slab (MS) and finished with cement slurry steel float
finished
341.00
49.00
49.00
666.00
Plinth Plaster
20mm Thick cement and sand (1:3) render : wood floated hard and
smooth to plinths: externally
7.1
PAGE NO.
Wall Painting
Prepare and apply one priming coat and two coats of black
bitumastic paint to rendered plinths
Prepare and apply one coat of primer and two coats of interior quality
emulsion paint of approved colour and quality to plastered/rendered
surfaces of walls and concrete.
To Collection
UNIT
RATE
TOTAL PRICE
BILL OF QUANTITIES
BILL NO.
6/12
AGONY P.S
ITEM
REF.
ITEM DESCRIPTION
QUANTITY
UNIT
1.0
Excavation
1.1
36.00
7.00
Fillings
3.00
4.00
4.00
16.00
3.00
16.00
1.00
Disposal
Anti-termite treatment
2.0
CONCRETE WORKS
Reinforcements shall be paid separately unless otherwise
specified in the item description
In Situ Concrete
Unless otherwise stated the rate shall include the supply of all
materials and labour to achieve the specified quality of
concrete including all mixing, vibrating, transporting and
placing
Concrete class 25/20(1:2:4) in:
Strip footings
PAGE NO.
To Collection
3
2
3
UNIT
RATE
TOTAL PRICE
BILL OF QUANTITIES
BILL NO.
7/12
AGONY P.S
ITEM
REF.
PAGE NO.
ITEM DESCRIPTION
QUANTITY
UNIT
UNIT
RATE
TOTAL PRICE
Formwork
25mm thick sawn cypress formwork to:
Sides of groundbeams
7.00
16.00
Reinforcement
Tor steel reinforcement (to BS 4449 and characteristic strength
2
fy = 460N/mm ) and Mild steel reinforcement ( to BS 4449 and
2
characteristic strength fy = 250N/mm )
60.00
Kg
30.00
Kg
16.00
MASONRY WORKS
Rate shall include for delivering, lifting, handling, weighting all rough
and fair cutting, plumbing angles, normal straight cutting, forming
rebated reveals and raking out joints for plastering.
3.1
3.1.1
A
3.1.2
B
Note
Brick Work
Sub-structure Walls
230mm thick solid furnace brick walls: bedded and jointed in cement
and sand (1:4 ) mortar strip foundations
7.00
14.00
16.00
16.00
Super-structure Walls
230mm thick walls in standard furnace bricks in cement sand (1:5)
mortar: reinforced with hoop iron wall ties laid horizontally at every
200mm spacing
4.0
To Collection
BILL OF QUANTITIES
BILL NO.
4.1
ITEM DESCRIPTION
QUANTITY
8/12
UNIT
Roof structures
All steel members shall be applied priming backs & two coats
of an approved gloss paint before fixing.
39.00
21.00
13.00
3.00
9.00
34.00
5.00
24.00
6.00
No.
4.2
4.2.1
Roof Covering
Supplying & fixing of gauge 28 pre-painted Super Five profiled
roofing sheets ( 0.32mm ) of approved colour: fixed with J-bolts to
100 x 50 x 2mm zed purlins ( measured separately) and rubber
capping to tops of bolts
Ridges
J
5.0
PAGE NO.
To Collection
UNIT
RATE
TOTAL PRICE
BILL OF QUANTITIES
BILL NO.
ITEM DESCRIPTION
QUANTITY
9/12
UNIT
5.1
Steel Doors
1.00
No.
1.00
Item
29.00
6.00
16.00
8.00
8.00
29.00
6.0
FINISHES
The contractor is advised to refer to the specification prior to pricing
of this section of work
The rate shall include for all temporary rules, screeds, grounds etc.
for raking out joints of new brick work or hacking new concrete for
key, internal & curved angles, joints between different surfaces
arisses quirks, inter sections between curved or irregular surfaces,
etc. and all making good around pipes, sanitary fittings & the like.
All samples of materials to be used shall be provided for approval by
the Engineer.
6.1
Wall Finishes
Supply and fix prepainted V-profile sheet cladding fixed with rivets to
steel roof frames at the gable ends.
Floor finishes
40mm thick cement and sand (1:3) screed laid horizontally on the
surface of floor slab (MS) and finished with cement slurry steel float
finished
Plinth Plaster
D
7.0
20mm Thick cement and sand (1:3) render : wood floated hard and
smooth to plinths: externally
7.1
PAGE NO.
Wall Painting
Prepare and apply one priming coat and two coats of black
bitumastic paint to rendered plinths
Prepare and apply one coat of primer and two coats of interior quality
emulsion paint of approved colour and quality to plastered
internal/external surfaces of walls and concrete.
To Collection
UNIT
RATE
TOTAL PRICE
BILL OF QUANTITIES
BILL NO.
10/12
AGONY P.S
ITEM
REF.
ITEM DESCRIPTION
QUANTITY
UNIT
1.0
78.00
166.00
2.0
CONCRETE WORK
Concrete class 15/20 (1:3:6)in:
2
16.00
23.00
3.00
230x230mm Lintols
2.00
2.2
Formwork
25mm thick sawn cypress formwork to:
2
20.00
48.00
4.00
2.3
Reinforcement
Tor steel reinforcement (to BS 4449 and characteristic strength
2
fy = 460N/mm ) and Mild steel reinforcement ( to BS 4449 and
2
characteristic strength fy = 250N/mm )
30.00
Kg
77.00
Kg
48.00
Kg
115.00
Kg
184.00
16.00
131.00
15.00
3.0
MASONARY WORK
3.1
Sub-structure Walls
3.2
Super-structure Walls
PAGE NO.
UNIT
RATE
TOTAL PRICE
To Collection
BILL OF QUANTITIES
BILL NO.
11/12
AGONY P.S
ITEM
REF.
ITEM DESCRIPTION
4.0
ROOF WORK
4.1
Roof structures
QUANTITY
UNIT
17.00
25.00
36.00
33.00
6.00
Nr
6.00
Nr
30.00
4.2
D
Roof covering
Supply & fixing of gauge 28 Corrugated GI sheet roofing with
required accessories
5.0
5.1
Doors
5.2
6.0
FINISHES
6.1
Floor finishes
A
6.2
Windows
Supply and fixing of window(vents) units comprising
50x50x1.2mm RHS frames, steel louvres as infilling panel;
including painting all complete as detailed on drawings,
specification and to Engineer's approval as type F.
Wall finishes
114.00
70.00
Prepare and apply one coat of primer and two coats of interior quality
emulsion paint of approved colour and quality to plastered/rendered
surfaces of walls and concrete.
63.00
6.3
Plinth finishes
20mm Thick cement and sand (1:3) render : wood floated hard and
smooth to plinths: externally
12.00
Prepare and apply one priming coat and two coats of black
bitumastic paint to rendered plinths
12.00
3.00
Nr
6.4
G
PAGE NO.
UNIT
RATE
TOTAL PRICE
To Collection
BILL OF QUANTITIES
ITEM DESCRIPTION
BILL NO.
QUANTITY
UNIT
SUMMARY
UNIT
RATE
(SUMMARY)
Total Amount
Signature
PAGE NO.
GENERAL
Company Stamp
12/12
TOTAL PRICE