PROJECT : LAMBINGAN BRIDGE

LOCATION : BRGY. CONCEPCION, MALABON CITY


SUBJECT : SOIL CLASSIFICATION (ACTUAL DRILLED RESULT)

TOP OF PCCP

TOP OF PCCP

0.60

TOP OF PCCP

0.60
1.60

1.80

TOP OF PCCP

0.60

TOP OF PCCP

0.60

1.60

TOP OF PCCP

0.60

1.80

0.60

LEGEND:

1.90
3.00

AVERAGE WATER LEVEL


2.00

3.00
4.00

4.00
3.00

DARK SOFT CLAY

6.60
3.50

4.50
3.80

3.70

BROWN STICKY CLAY

BROWN SAND
24.50
25.50

25.50

25.50

12.40

26.50

26.50

10.00
12.60

11.20

10.40

HARD CLAY

9.90

ESCOMBRO (Backfill)

2.50

3.00

2.00

2.60

NOTE:
ALL DIMENSIONS ARE IN METERS

3.00
2.40

3.00
3.50
2.60

2.50
3.50

3.50

ABUTMENT B (Left & Right Side)


BORED PILE 1 (Right Side)

BORED PILE 2 (Right Side)

PREPARED BY:

BORED PILE 4 (Right Side)


BORED PILE 3 (Right Side)

BORED PILE 5 (Right Side)

ENGR. LOUIE A. PASCUA


ASST. PROJ. ENGR.