Torre de Escalar
Torre de Escalar
1.1
Number: 1
Basic data
1.1.1
Assumptions
1.1.3
: ACI
: ACI 318-11
: without limits
Geometry:
A
B
h1
h2
h4
= 0,50 (m)
= 0,50 (m)
= 5,00 (m)
= 0,02 (m)
= 0,05 (m)
a'
b'
c1
c2
= 18,3 (cm)
= 18,3 (cm)
= 5,1 (cm)
= 5,1 (cm)
a
b
ex
ey
= 0,20 (m)
= 0,20 (m)
= 0,00 (m)
= 0,00 (m)
Materials
Concrete
2457516,07 kG/m2
Longitudinal reinforcement
1.1.4
Loads:
Grade 40
Characteristic
: type
Grade 40
Characteristic
Foundation loads:
Case
Nature
Group
COMB1
design
----
N
Fx
(kG)
(kG)
-2986,31 718,58
Fy
Mx
(kG)
(kG*m)
1153,18 -294,01
Backfill loads:
Case
1.1.5
1.2
Nature
Q1
(kG/m2)
Combination list
Geotechnical design
1.2.1
Assumptions
1.2.2
Soil:
Soil level:
Column pier level:
Minimum reference level:
N1
Na
Nf
= 0,00 (m)
= 0,00 (m)
= -0,50 (m)
1.3
1.3.1
Limit states
RC design
Assumptions
1.3.3
Required reinforcement
Spread footing:
: no
My
(kG*m)
113,95
bottom:
My = 0,00 (kG*m)
Mx = 0,00 (kG*m)
= 0,00 (cm2/m)
top:
A'sx = 0,00 (cm2/m)
A'sy = 0,00 (cm2/m)
As min
Column pier:
Longitudinal reinforcement
A
Asx
1.3.4
A
= 0,00 (cm2)
= 2 * (Asx + Asy)
= 0,00 (cm2)
Asy
Provided reinforcement
2.3.1 Spread footing:
Bottom:
Top:
2.3.2 Pier
Longitudinal reinforcement
Material survey:
Concrete volume
Formwork
= 1,25 (m3)
= 10,01 (m2)
= 0,00 (cm2/m)
A min.
= 0,00 (cm2)
= 0,00 (cm2)