You are on page 1of 1

13.

8KV Bus Bar


13.8KV:120V

1200A
FEEDER
50KVA

Trip to
52MV1
Trip to
52MV2

Phase overcurrent (1) 50/51


Earth fault / Sensitive earth fault (1)
50N/51NG 50G/51
Breaker failure 50BF
Negative sequence / unbalance 46
Thermal overload for cables 49RMS
Directional phase overcurrent (1) 67
Directional earth fault (1) 67N/67NC
Directional active overpower 32P
Undervoltage (L-L or L-N) 27
Positive sequence undercurrent 27D
Remanent undervoltage 27R
Overvoltage (L-L or L-N) 59
Neutral voltage displacement 59N
Negative sequence overvoltage 47
Overfrequency 81H
Underfrequency 81L
Trip Circuit Sup 74
CT/VT sup 60, Temp Mntor 38/49T

PT secc 2

52MV3

Trip to LV1

Square D SEPAM Relay T82-MCS025

Close
52

MVSWGR Secc 1 LV Part

Open/Trip
52

MVSWGR Secc 1 MV Part

T Coil
C Coil

TC
Core 1:
600/5
xxVA
C100

Synchro-check 25 (Not Used)


Latching / acknowledgement 86

Core 2:
600/5
xxVA
C100

Local & remote


Close

Interlocking permisive

Local & remote


Open

13.8KV:120V

Modbus

Local/Remoto
Automatic/Manual
Ext. 50BF MV1,
MV2, 50/51LV1

Communication Port to DCS.


Alarms.
Indications
Commands
Mesurement I,V, P,Q,S,F

To UAT-1
Proyecto: PIGAP II. Ingeniera Bsica Metal CLAD. 13.8KV. Elaborado por: Ing. Diego Quirs Ramos. Fecha Rev1:25-03-2012