Report by Type of
work
1 Biaxis

Description

Bored pile Boring in rock

2 SINOMAS Pilecaps

Excavation of
pilecaps

Matter

Contractor claim for extra over from toe level to rock


level
Boring soil from boring in soil works for bored pile not
proper dispose.
P6D*=3nos (P54,P63 & P235) but don't have P6D*(1)
Block B-P106 is P2A & P107 is P1A
P4J-Block A=P220(A)-1no & Block B=P289-1no

Solution

Paid
Bore pile contractor must
responsible to dispose soil out
from working site.
Change