You are on page 1of 55

Variant Configuration

What is Variant Configuration?


It is a tool which helps to simplify the
complex manufacturing of final product
with more varieties and Variation of the
input material.
e.g. Automobile manufacturing
Furniture manufacturing
Visit www.sap-topjobs.com for more info

Variant Configuration..contd
Variant configuration helps
To ensure right choice is delivered
Easy for the sales person to select
Communication is fast and clear
Ensures production of right item

Variant Configuration-super
BOM

Super BOM:-

containing all the components for producing


all variants of the product.
Advantage:No need to create a separate BOM
One configurable material to cover variants.

Variant Configuration-super
Routing

Super Routing:-

containing all the operations for producing


all variants of the product.
Advantage:No need to create a separate Routing
One configurable material to cover variants.

Configurable Material - BOM


configurable material BOM contains all the
components that are required to manufacture
the material.
The BOM contains components that are
only used in specific variants (variant parts),
as well as components that are used in all
variants (non-variable parts)

Configurable Material - Routing


A routing (or task list) for a configurable
material contains all the operations,
operation sequences, and production
resources/tools (PRTs) that are required to
manufacture all variants of a configurable
material

Variant Configuration-Class
To define the features of a configurable
material, use characteristics. To
enable to use characteristics to configure a
material, assign the material to a class of
class type 300. The customer can choose
from among different options for each
characteristic (values).

Classification & Characteristic


Various characteristics of the material can be
Defined and these characteristics are attached
To the class. Class is attached to the
Material master.
e.g Variant class class type 300
Batch class -- class type 022

Item selection from super BOM


Enter the variant part as a BOM item
and assign object dependency to it.
Classify the variant part in a class and
enter the class as a class item in the BOM.
Use the classification data of a material
as a selection condition.

Object Dependency
Selection of item, Restricting the selection &
changing the quantity of an item in the
BOM are done through Object dependencies
select condition, Precondition and
Procedure respectively

Select Condition
Super BOM contains all the required and
Variable items. From the variable items
required items will be selected which are
Matching the characteristic value.

Select Condition e.g.


Items in the super BOM are :
1. 70hp engine
2. 85hp engine
3. 95hp engine
Characteristic: Power
Char.Values: 70hp,85hp & 95hp
select Condition : power = 70
Result:- item 70hp engine will be selected.

Pre Condition e.g.


Items in super BOM related to emission are :
1. DPCpump
2. DPAMpump
3. HYDpump
Characteristic1:
Characteristic2:
Char.2 Values :

Constrains:-

Engine_Power
Emission_level
euro1,euro2 & euro3

70hp can go with euro1 only;


85hp can go with all euro1,euro2 and euro3;
95hp can go with euro3 only.

Procedure e.g.
If there is a change in quantity depends on any
Characteristic value, then Procedure is used.
i.e Depends on number of wheel character, item
Fastner required quantity per engine may be
8 times the number of wheel.
If no of wheel is 4 then fastner qty should be 32
Per product.

Creating Sales Order


When creating a sales order & enter the
configurable material as an order item.
see the configuration editor, where assign
values to the characteristics of the material.
when entering characteristic values,
dependencies for the characteristics and
values are processed.

Class item in super BOM


Another way to simplify the BOM creation
Process is through class item in the BOM

Creation of class
Characteristics are created and attached with
Class of class type 300(variant class).
Class will be assigned to the material master
With characteristic values
Enter this class as a class item (K) in the BOM

Link between class,item & BOM


Link is established as class attached to the
material master and the same class is entered
As class item (K) in the BOM.

Item selection via class item


When the particular class is assigned to the
Material master and the same class is
Entered as a class item in the BOM, while
Creating the sales order

Control on class and


characteristics
Classes can be created through Engineering Change
Management so that the better control can be
Imparted to it.
Changes to the characteristic & its effective from
dates can be triggered through Engineering change
Management.

Variant Configuration - Pricing


You can make the price of a variant
dependent on the characteristic values
assigned (Pricing). You can use
variant conditions to define surcharges
and discounts for a variant

Variant Pricing steps


Create condition record
create a procedure where you enter the
reference from the characteristic
Assign the procedures to either the
characteristic values
configure the material in the sales order
The net price for the material is displayed

Pricing steps - process


If a value that triggers a variant condition is
selected when configuring a material in a
sales order, the price of the material
displayed under Net value is automatically
increased or reduced.
In addition, the Conditions pushbutton is
displayed. On pressing this pushbutton,
One can see which conditions have
influenced the price.

Making variant make to stock


For variants that are required frequently,
you can create material variants, which
can be produced without a sales order
and kept in stock. When you receive a
sales order, you can check whether the
variant required is in stock, so that you can
deliver immediately.

Variant matching in the SO


If material variants already exist for a
configurable material, the configurable
material can be replaced in the sales order
by a material variant.
Material variants that only partly match the
configuration of the material in the
sales order are ignored
Note:-The configuration of the material must
match the material variant Exactly

Simulating configuration
configuration simulation to check
configuration model.
In the configuration simulation, one can test
whether it has created the objects
correctly and whether dependencies
work.

Simulating costing
Use the configuration simulation functionality
to determine the costs for manufacturing a
specific variant of the configurable material.
Please note that this configuration is only a
simulation the costing data for a variant is
not saved.
use the function to simulate the costing for
different characteristic values

Material Accounting
Relevant items are selected from the
Super BOM through object dependency.
The selected items form the BOM specific to
SO.
Items are copied to Plnd.order,prod.order
And issued against the production order.

Example of VC
Finished Material : Bolerojeep
Raw Material :- Many items

Characters
(structure options)
Engine Power
Emission Level
Seating Capacity
Body Material Thickness & colour
Number of wheels

Character value & constraints


Engine Power
70hp, 85hp, 95hp
Emission Level
Euro1, Euro2, and Euro3
Matching
70hp can go with Euro1 only
80hp can go with all
95hp can go with Euro3 only

Character value
Seating Capacity
6 ,7 and 8
Body Material Thickness & colour -0.5mmwhite;0.6mmwhite;0.7mmwhite
0.5mmred;0.6mmred;0.7mmred
0.5mmblack;0.6mmblack;0.7mmblack
No.of Wheels 4 or 5
This is to select the qty of fastner

Sales Order Creation

Assigning characteristic values

Selecting characteristic values

Selecting characteristic value for constrain

Selecting characteristic value for constrain-85hp

characteristic values for 85hp Engine Power

Complete characteristic values

View the Sales Order

MRP result Planned order with selected items

Planned order detail

View of Super BOM

View of Super BOMcontd

View of Super BOMcontd

Planning for standard variant


Planning of fast moving product as a
standard item and Matching at the time
of creating the sales order automatically.

Planning for standard variant


example
95Hp,Euro3,6seater,0.6mmred colored
Product is fast moving and it needs to be
Planned and produced in advance.
When the order is received, at the time
Of configuring, it will pickup this
Preconfigured item in the sales order.

Planning for standard variant


example
Item code Beuro36seat0.6red for
85Hp,Euro3,6seater,0.6mmred colored
product
Item code beuro37seat0.6redfor
95Hp,Euro3,7seater,0.6mmred colored
product

Example-preconfigured..

Configuring in the SO

Automatic replacement in SO

Item available in SO

MRP and Result

Planned order view

Component Accounting
From Planned orders components are
Copied to production order and issued.
All the items are accounted for consumption

Visit www.sap-topjobs.com for more info

You might also like