Civil Drawing Status for Khara SHP

S. No.

Drawing Description

1.0

PROJECT PLAN

1.1

GENERAL ARRANGEMENT OF PROJECT

1.2

SOIL INVESTIGATION REPORT

1.3

L SECTION OF WATER CONDUCTOR SYSTEM

KEY :
Drawing No.

Currently in
progress

Approved

Not yet
started

Date of Submission

R-2

Status /Remarks

R-0

R-1

R-3

UPJVNL/APE/KHARA/CIVIL/P015/001 SHEET 1 OF 1

xxxxx

3/2/2014

4/21/2014

10/20/2014

Approved on 21-10-2014

APE/PROJ/HYDEL/UPJVNL-KHARA/13-14-028

01/01/2014

UPJVNL/APE/KHARA/CIVIL/P015/003 SHEET 1 OF 3

xxxxx

3/2/2014

4/21/2014

10/20/2014

Approved on 21-10-2014

Approved

2.0

FOREBAY

2.1

HEAD RACE CHANNEL AND FOREBAY - CONCRETE OUTLINE DETAILS

UPJVNL/APE/KHARA/CIVIL/002 SHEET 1 OF 4

xxxxx

02/03/2014

2.2

HEAD RACE CHANNEL AND FOREBAY - REINFORCEMENT DETAILS

UPJVNL/APE/KHARA/CIVIL/004 SHEET 1 OF 4

24/05/2014

29/10/2014

Approved

2.3

HEAD RACE CHANNEL AND FOREBAY - REINFORCEMENT DETAILS

UPJVNL/APE/KHARA/CIVIL/004 SHEET 2 OF 4

24/05/2014

29/10/2014

Approved

2.4

HEAD RACE CHANNEL AND FOREBAY - REINFORCEMENT DETAILS

UPJVNL/APE/KHARA/CIVIL/004 SHEET 3 OF 4

24/05/2014

29/10/2014

Approved

2.5

HEAD RACE CHANNEL AND FOREBAY - REINFORCEMENT DETAILS

UPJVNL/APE/KHARA/CIVIL/004 SHEET 4 OF 4

24/05/2014

29/10/2014

Approved

Covered under forebay drawings

----

21/04/2014

16/10/2014

Approved

SPILLWAY
Spillway Plan And Section

3.0

POWERHOUSE

3.01

PROPOSED POWERHOUSE SITE PLAN

UPJVNL/APE/KHARA/CIVIL/005 SHEET 1 OF 1

3.02

POWERHOUSE BUILDING - EXCAVATION PLAN OF COLUMNS


FOUNDATIONS AND MACHINE FOUNDATION

UPJVNL/APE/KHARA/CIVIL/006 SHEET 1OF 1

3.03

PLAN OF POWERHOUSE

3.04

CROSS SECTION OF POWERHOUSE

3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15
3.16

POWERHOUSE BUILDING -DETAILS OF COLUMN AND BEAM CONCRETE


OUTLINE
POWERHOUSE BUILDING -DETAILS OF COLUMN AND BEAM CONCRETE
OUTLINE
POWERHOUSE BUILDING -DETAILS OF COLUMN,FOUNDATIONS AND
BEAM REINFORCEMENT
POWERHOUSE -COOLING WATER SUMP AND TAILRACE CONCRETE
BLOCKOUT DETAILS
POWERHOUSE -COOLING WATER SUMP AND TAILRACE
REINFORCEMENT DETAILS
DETAILS OF POWERHOUSE STEEL ROOF TRUSS
DETAILS OF POWERHOUSE STEEL ROOF TRUSS
DETAILS OF POWERHOUSE STEEL ROOF TRUSS
DETAILS OF POWERHOUSE STEEL ROOF TRUSS
CONCRETE BLOCKOUT DETAILS OF MACHINE AND GENERATOR
FOUNDATION
REINFORCEMENT DETAILS OF MACHINE AND GENERATOR
FOUNDATION
REINFORCEMENT DETAILS OF MACHINE AND GENERATOR
FOUNDATION

Approved

UPJVNL/APE/KHARA/CIVIL/007 SHEET 1 OF 2
UPJVNL/APE/KHARA/CIVIL/007 SHEET 2 OF 2
UPJVNL/APE/KHARA/CIVIL/008 SHEET 1 OF 3
UPJVNL/APE/KHARA/CIVIL/008 SHEET 2 OF 3
UPJVNL/APE/KHARA/CIVIL/008 SHEET 3 OF 3
UPJVNL/APE/KHARA/CIVIL/009 SHEET 1 OF 2
UPJVNL/APE/KHARA/CIVIL/009 SHEET 2 OF 2
UPJVNL/APE/KHARA/CIVIL/010 SHEET 1 OF 4
UPJVNL/APE/KHARA/CIVIL/010 SHEET 2 OF 4
UPJVNL/APE/KHARA/CIVIL/010 SHEET 3 OF 4
UPJVNL/APE/KHARA/CIVIL/010 SHEET 4 OF 4
UPJVNL/APE/KHARA/CIVIL/011 SHEET 1 OF 3
UPJVNL/APE/KHARA/CIVIL/011 SHEET 2 OF 3
UPJVNL/APE/KHARA/CIVIL/011 SHEET 3 OF 3

3.17

CONCRETE BLOCKOUT DETAILS OF POWERHOUSE CABLE TRENCHES

UPJVNL/APE/KHARA/CIVIL/012 SHEET 1 OF 2

3.18

REINFORCEMENT DETAILS OF POWERHOUSE CABLE TRENCHES

UPJVNL/APE/KHARA/CIVIL/012 SHEET 2 OF 2

These drawings are not yet


drawn as powerhouse
layout is still to be approved
from E&M .
The
calculations are done
manually and are completed

POWERHOUSE Excavation Plan

UPJVNL/APE/KHARA/CIVIL/005

7/30/2014

POWERHOUSE Excavation Section

UPJVNL/APE/KHARA/CIVIL/005

7/30/2014

POWERHOUSE Excavation Section

UPJVNL/APE/KHARA/CIVIL/005

7/30/2014

POWERHOUSE Excavation Section

UPJVNL/APE/KHARA/CIVIL/005

7/30/2014

UPJVNL/APE/KHARA/CIVIL/P015/002 SHEET 4 OF 4

xxxxx

UPJVNL/APE/KHARA/CIVIL/006 sheet 1 of 3

8/20/2014

4.0

PENSTOCK

4.1

Penstock Bellmouth Details Plan And Section

5.0

ANCHOR AND SADDLE BLOCKS

5.1

CONCRETE BLOCKOUT & REINFORCEMENT DETAILS OF ANCHOR BLOCK


A1 & SADDLE BLOCK

5.2

CONCRETE BLOCKOUT DETAILS OF ANCHOR BLOCK A2

UPJVNL/APE/KHARA/CIVIL/006 sheet 2 of 3

8/20/2014

5.3

REINFORCEMENT DETAILS OF ANCHOR BLOCK A2

UPJVNL/APE/KHARA/CIVIL/006 sheet 3 of 3

8/20/2014

5.4

CONCRETE BLOCKOUT DETAILS OF ANCHOR BLOCK A3 AND THRUST


BLOCK

UPJVNL/APE/KHARA/CIVIL/007 sheet 1 of 2

12/9/2014

5.5

REINFORCEMENT DETAILS OF ANCHOR BLOCK A3 AND THRUST BLOCK

UPJVNL/APE/KHARA/CIVIL/007 sheet 2 of 2

12/9/2014

6.0
6.1
6.2
6.3

These drawings are likely to


be commented as
redundant / nullified and
excavation to be kept site
specific
22/04/2014

20/10/2014

Approved on 21-10-2014

Approved on 15-10-2014

10/5/2014
14-11-2014
,resubmitted on
09-12-2014
14-11-2014
,resubmitted on
09-12-2014

Likely to be approved by 12
Dec
Likely to be approved by 12
Dec
Likely to be approved by 12
Dec
Likely to be approved by 12
Dec

OTHERS
CONCRETE BLOCKOUT AND REINFORCEMENT DETAILS OF KHARA
FEEDER CHANNEL
SWITCHYARD FOUNDATION PLAN , SECTION AND REINFORCEMENT
DETAILS
SWITCHYARD STRUCTURAL DETAILS OF CT,PT,LA,DO FUSE

UPJVNL/APE/KHARA/CIVIL/003 SHEET 1 OF 1
pending switchyard
equipment GTP approval

UPJVNL/APE/KHARA/CIVIL/013 SHEET 1 OF 2
UPJVNL/APE/KHARA/CIVIL/013 SHEET 2 OF 2

Sr. No. DESIGN CALCULATIONS


1

Forebay-Hydraulic Design

Powerhouse-Steel Roof Truss Structural Design as per SP 38

3
4
5
6

Spillway-Hydraulic Design
Forbay Structural Design
Approach Channel-Structural Design
Road Subgrade Design

APE/PROJ/HYDEL/UPJVNL-KHARA/13-14-018

xxxxx

APE/PROJ/HYDEL/UPJVNL-KHARA/13-14-018

xxxxx
xxxxx
xxxxx

02/03/2014
02/03/2014

21/04/2014
21/04/2014

16/10/2014
16/10/2014

Approved on xxxx
Will be prepared after
Powerhouse layout approval
from E&M
Approved on xxxx
Approved
Approved
Manual Calculations are
done but cannot be
submitted officially until
powerhouse gets E&M
clearance.
Will follow after GTP
approval of switchyard
Approved on 15-10-2014
Likely to be approved by 12
Dec
Likely to be approved by 12
Dec
Approved on 15-10-2014
Likely to be approved by 12
Dec

Powerhouse - Structural Design

Switchyard Foundation and superstructure structural design

Anchor block A1 structural design

8/20/2014

10/5/2014

10

Anchor block A2 structural design

8/20/2014

11/14/2014

11

Anchor block A3 structural design

8/20/2014

11/14/2014

12

Saddle Block structural design

8/20/2014

13

Thrust block structural design

8/20/2014

14

Tailrace and tailpool structural design

Acan proceed after


Powerhouse design is over
after getting E & M clearance

15

Machine foundation structural design

GTP of generator and


turbine needs approval

10/5/2014
11/14/2014

1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.0
2.1
2.2

3.0
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15
4.0
4.1
4.2
4.3
4.4
4.5

Sr. No.
1.1
1.2

1.3
1.4
1.5
1.6
1.7

INTAKE CHANNEL AND FOREBAY INTAKE GATE


INTAKE CHANNEL AND FOREBAY INTAKE GATE Ist Stage Embedded Parts & Details
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE 2nd Stage Embedded Parts & Details
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE 2nd Stage Embedded Parts & Details
INTAKE CHANNEL AND FOREBAY INTAKE GATE 5T ELECTRIC WIRE ROPE HOIST
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE - DETAIL OF GATE LEAF
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE - DETAIL OF WHEEL ASSEMBLY
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE - GUIDE DETAILS
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE - DETAIL OF SEAL
HEAD RACE CHANNEL AND FOREBAY INTAKE GATE - ASSEMBLY DETAILS
FOREBAY
FOREBAY TRASH RACKS EMBEDDED PARTS AND DETAILS
FOREBAY TRASH RACK PANEL

PENSTOCK
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A1
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A1
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A2
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A2
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A3
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A3
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A4
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A4
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A5
GENERAL ARRANGEMENT AND DEVELOPMENT OF BEND NO A5
GENERAL ARRANGEMENT AND DEVELOPMENT OF Y PIECE
GENERAL ARRANGEMENT AND DEVELOPMENT OF Y PIECE
GENERAL ARRANGEMENT AND DEVELOPMENT OF Y PIECE
PENSTOCK MANHOLE DETAIL
PENSTOCK EXPANSION JOINT DETAIL
DRAFT TUBE GATE
DRAFT TUBE GATE Ist Stage Embedded Parts & Details
DRAFT TUBE GATE 2nd Stage Embedded Parts & Details
DRAFT TUBE GATE 2nd Stage Embedded Parts & Details
DRAFT TUBE GATE hoisting system details
DRAFT TUBE GATE FABRICATION DETAILS

DESIGN CALCULATIONS
DESIGN CALCULATIONS FOR INTAKE CHANNEL AND FOREBAY INTAKE GATE
INTAKE CHANNEL AND FOREBAY INTAKE GATE 5T ELECTRIC WIRE ROPE HOIST

DESIGN CALCULATIONS FOR FOREBAY TRASH RACK


COMPUTATIONS FOR BEND GEOMETRY OF PENSTOCK BENDS
DESIGN CALCULATIONS FOR DRAFTTUBE GATE
DESIGN CALCULATION FOR DRAFTTUBE GATE HOISTING MECHANISM
COMPUTATIONS FOR THICKNESS OF PENSTOCK STEEL