PROJECT :
_________________________________
Adress :
_________________________________
_________________________________
_________________________________
_________________________________
_________________________________
_________________________________
Autodesk
08/01/2015 - 1/7
Bill of materials
Notations
Element
Notation
Slab
Beam
Thickness
Si
Surface openings
Se
Section
H&l
Column
H
l&L
Wall
Isolated footing
Autodesk
08/01/2015 - 2/7
Diameter
Section
Perimeter
Height
Thickness
Si
Surface openings
l&L
Continuous footing
Complete label
Dimensions
Height
Width
Bill of materials
Height
Calculation conventions
Element
Material(m3)
Formwork(m2)
Slab
e * (Se-Si)
Se-Si
Beam
S*L
L * (h+h+b)
Column
S*h
P*h
(l * L * h)-(Si*l)
2*(L*h)-Si
Isolated footing
L*l*h
2 * (L + l) * h
Continuous footing
L*l*h
L * h*2
Wall
Autodesk
08/01/2015 - 3/7
Bill of materials
Details of elements
Slab
Column
Wall
Total by model
Level 1 (+3000mm)
Total
This table contains the details of selected structural elements. The selection is partial.
Autodesk
08/01/2015 - 4/7
Bill of materials
CONCRETE
Detailed list
Level 1 (+3000mm)
Element
Number
Dimensions
Slab
S1
(H) or (e)
180
Column
C2
Wall
(l)
(L)
CONCRETE
Formwork
(m3)
(m2)
3000
200
300
0.2
C3
3000
200
300
0.2
W4
3000
200
3000
18
Sums
Element
Slab
Autodesk
CONCRETE
Formwork
(m3)
(m2)
1
08/01/2015 - 5/7
Bill of materials
Column
0.4
Wall
18
Total
31
Ratios
Element
Formwork/CONCRETE
(m2/m3)
Slab
Column
17
Wall
10
Total
Price
CONCRETE
Element
Slab
Autodesk
Quantity
Unit price
Price
(m3)
(Pound/m3)
(Pound)
1
08/01/2015 - 6/7
100.62
100.62
Bill of materials
Column
0.4
121.96
48.78
Wall
97.57
195.14
Total
344.54
Formwork
Element
Quantity
Unit price
Price
(m2)
(Pound/m2)
(Pound)
Slab
19.82
138.74
Column
47.26
283.56
Wall
18
15.24
274.32
Total
31
Autodesk
08/01/2015 - 7/7
696.62