Professional Documents
Culture Documents
Schedule of Rates Nashik Region
Schedule of Rates Nashik Region
SCHEDULE OF RATES
FOR THE YEAR - 2012-2013
NASHIK REGION
( Effective from
24-12-2012 )
Name of Section
Government Resolutions
General Notes
Materials
Transportation
Excavation
Misellaneous Works
Pipes
I
C.I./D.I.Pipes
II
A.C. Pipes
III
P.V.C.Pipes
IV
G.I.Pipes
Stoneware Pipes
VI
R.C.C.Pipes
VII
P.S.C.Pipes
VIII
IX
G.R.P.Pipes
XI
P.C.C.P.Pipes
XII
Pipe Appurtenances
XIII
Mechanical Joints/Fittings
XIV
M.S.Pipes
XV
XVI
M.S.Pipes Laying
XVII
XIX
R.C.C. E.S.Rs
XX
XXI
Trial Run
Drawings
Page Nos.
From
To
GOVERNMENT RESOLUTIONS
, .
1090/-163/39-, . 7 1990
- 1
1
1
2
1.
2.
3.
4.
5.
6.
2.
50
3
-- " --- " --- " --- " --
7.
-- " --
8.
9.
10.
11.
12.
13.
14.
15.
16.
----------
"
"
"
"
"
"
"
"
"
----------
4
(1)
20
50
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(2)
2
17.
18.
3
-- " --- " --
4
(15)
3.
19.
20.
21.
22.
23.
24.
-------
"
"
"
"
"
"
-------
(16)
(17)
(18)
(19)
(20)
(4)
4.
25.
26.
27.
28.
29.
30.
-------
"
"
"
"
"
"
-------
31.
32.
33.
34.
35.
36.
37.
()
--------
"
"
"
"
"
"
"
--------
(27)
(28)
(29)
(30)
(31)
(32)
(32)
38.
39.
40.
41.
5.
6.
7.
(3)
(21)
(22)
(23)
(24)
(25)
(5)
(33)
(34)
(35)
(36)
42.
43.
()
(37)
(38)
44.
45.
46.
(39)
(40)
(41)
8.
2
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
3
-- "
-- "
-- "
-- "
-- "
-- "
-- "
-- "
-- "
-- "
-- "
-- "
-------------
4
5
6
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)
(6)
(7)
,
,
,
9.
10.
11.
60.
-- " --
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
--------------
"
"
"
"
"
"
"
"
"
"
"
"
"
--------------
(53)
(54)
(55)
(56)
(57)
(58)
(59)
(60)
(61)
(62)
(63)
(64)
(65)
(8)
2
74.
75.
76.
77.
3
-- " --- " --- " --
4
(66)
(67)
(68)
(9)
-
78.
-- " --
(10)
79.
-- " --
(11)
80.
-- " --
(12)
-- " --
81.
-- " --
(13)
-- " --
82.
-- " --
(14)
83.
84.
85.
86.
-- " --
15.
16.
87.
88.
-- " -
17.
89.
-- " --
-- " --
(19)
-- " --
(20)
(72)
12.
13.
14.
18. 90.
91.
92.
(69)
(70)
(15)
(16)
(71)
(17)
(18)
2
93.
3
-- " --
4
-
5
(21)
19.
94.
-- " --
(22)
95.
-- " --
(23)
, .
1090/-163/39-, . 7 1990
- 2
1)
1) 2) 3) 4) 5) 6) 7) 8)
1) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27) 28) 29)
30) 31) 32) 33) 34) 35) 36) 37)
2)
1) 2) 3) 4) 5) 6)
7) 8) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19)
20) 21) 29) 30) 31) 32)
33) 35) 36) 37) 38) 39)
40)
3)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15)
16) 17) 18) 19) 20) 21) 22)
23) 24) 25) 26) 27) 28) 29)
4)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15) 16)
17) 18) 19) 20) 21) 22) 23)
24) 25) 26) 27) 28) 29) 30)
31) 32) 33) 34) 35) 36) 37) 38)
39) 40) 41) 42) 43)
Page 1
5)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15)
16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27) 28)
6)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15)
16) 8) 19) 20) 21) 22) 23)
24) 25) 26) 27) 28) 29)
30) 31) 32) 33) 34) 35)
36) 37) 38) 39) 40)
41) 42) 43) 44) 45) 46) 47)
48) 49) 50) 51) 52) 53) 54)
55) 56) 66) 67) 68) 69) 70)
71) 72) 73) 74) 75) 76)
77) 78) 79) 80) 81) 82)
7)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) .
8)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) 22) 23) 24)
9)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26) 27)
10)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17)
Page 2
11)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14)
15) 16) 17) 18)
12)
1) 2) 3) 4) 5) 6) 7)
8) 9)
13)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
14)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12)
15)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14) 15)
16) 17) 16) 17) 18) 19) 20)
21) 22)
16)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13)
14) 15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26) 27)
28) 29)
17)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26)
27) 28) 29) 30)
18)
1) 2) 3) 4) 5) 6) 7) 8) 9)
10) 11) 12) 13) 14) 15) 16)
17) 18) 19) 20) 21) 22) 23)
24) 25) 26) 27) 28) 29) 30)
31) 32) 33) 34) 35) 36) 37) 38)
39) 40) 41) 42) 43) 44)
45) . 46) 47) 48)
Page 3
19)
1) 2) 3) 4) 5) 6) 7) . 8)
9) 10) 11) 12) 13) 14) 15)
16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27) 28)
29)
20)
1) 2) 3) 4) 5) 6) 7) 8) 9)
10) 11) 12) 13) 14) 15)
16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27) 28)
29) 30) 31) 32) 33) 34) 35)
36) 37) 38) 39) 40) 41) 42)
43) 44) 45) . 46) 47) 48)
49) 50) 51) 52) 53) 54)
55) 56) 57) 58) 59) 60) 61)
62) 63) 64) 65) 66)
21)
1) 2) 3) 4) 5) 6) 7) 8)
9) 10) 11) 12) 13) 14) 15)
16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27)
28) . 29) 30) 31) 32) 33) 34)
35) 36) 37) 38) 39) . 40)
41) 42) 43) 44) 45) 46) 47)
48) 49) 50) 51) 52) 53) 54)
55) 56)
22)
1) 2) 3) . 4) 5) 6) 7) 8)
9) 10) . 11) 12) 13) 14)
15) 16) 17) 18) 19) 20)
21) 22) 23) 24) 25) 26)
27) 28) 29) 30) 31) 32)
Page 4
23)
1) 2) 3) 4) 5) 6) 7)
8) 9) 10) 11) 12) 13) 14)
15) 16) 17) 18) 19) 20) 21)
22) 23) 24) 25) 26) 27) 28)
29) 30) 31) 32) 33) 34) 35)
36) 37) 38) 39) 40)
Page 5
dated 24.12.2012
2 Item of excavation is inclusive of normal manual dewatering, however, seperate item for
work is required to be carried out on emergency basis, the rate should be adopted as per
the actual rate analysis which shall be approved by concerned S.E. for that particular
work only.
4 Rates for all items are inclusive of all taxess levied by Central Government, State
Government or Local Bodies.Labour rates are inclusive of EPF 12.5 % . These rates are
applicable only for tendered works,these rates should be reduced by 12.50 % of labour part when
works are to be carried out on piecemeal works and other small works without tendering.
5 As per Government Notification No. 25/2012/service tax dated 20 June 2012 point no. 12 E
Service tax exempted for pipeline, conduit or plant for i) Water supply ii) Water treatment or iii)
Sewerage treatment or disposal
6 For all completed items, initial lead of 5 kms. is considered for collection of materials like
sand, bricks, metal, stone etc. Appropriate addition for lead charges excluding loading ,
unloading for these materials shall be done while estimation.
7 These rates are applicable to water supply and sewerage schemes and its allied works
only. Rates for Items required for general construction, buildings, roads, Irrigation Works etc.
shall be adopted from the current schedule of rates of P.W.D. or Irrigation Deptt. in
respective areas. For bore wells, CSR. of GSDA shall be followed. Increase in percentage
over normal schedule of rates will also be as per norms of respective C.S.R.
8 For mechanical and electrical items related to water supply and sewerage schemes, CSR
% Increase
5%
2%
10%
5%
15%
20%
10%
10%
10 In case more than one percentage increase on basic rates becomes admissible, instead
of adding both, the higher percentage only be taken. (e.g. if any Municipal Council falls in
hilly area, then additional percentage in rates will be only 10 % and not with 2 % + 10 %).
This additional percentage is only on completed item of work and not applicable to items
of providing of materials like steel, pipes, valves, specials etc
11 For hilly and inaccessible areas / Tribal areas approved by Government, Planning
followed.
13 Whenever basic rates of completed items are increased by percentage given at Sr. No. 9,
the issue rates of materials to be supplied by the Department ( if any) shall be increased
by same percentage.
14 This schedule of rates is based on following basic rates for important materials.
a
b
c
d
e
f
Material
Cement
Mild Steel
Tor Steel/CTD bars
Structural Steel
Corrosion Resistant Steel (Fe 500)
M.S.Plate
15 Details of standard cement consumption and standard weight of various pipes are
duty, central sales tax and VAT, third party inspection charges, storage charges, overhead
charges and transportation of materials upto divisional stores and stacking.
17 Cost of carting of pipes and valves from departmental stores to site of work is not
considered in rate analysis, hence this item must be incorporated in each scheme. While
inviting tenders if supply is from departmental store, then this item shall appear in the
tender, and if the supply is by contractor then this item shall not appear in the tender,
even though same is provided in sanctioned scheme, because the contractor is supposed
to bring the pipes and valves directly at site.
18 Though the contractor is required to do refilling before hydraulic testing to avoid traffic
hurdle, no payment for refilling of the trenches of pipeline shall be payable till satisfactory
hydraulic testing is given. Re-excavation required if any, during testing, shall be done by
the contractor at his own cost.
19 10 % of cost of items of water retaining structures, such as GSR/ESR/MBR shall be
21 In case of supply of pipes / valves etc. by contractor, only 85% payment shall be released
23 Provision for octroi charges for pipes specials and valves is not considered in the CSR 2012-
2013. Provision of 4 % of cost for pipes specials and valves to be used in corporation area
shall be made while framing the estimate for works included in corporation limit. Octroi
charges shall be reimbursed to contractor on production of receipt for payment for
materials actully to be used in corporation area, if there specific provision to that effect in
the contract.
24 For use of ready mix cement concrete, prior permission of the Chief Engineer must be
obtained.
25 For Dams , Balancing Tanks , Aerated Lagoons and similar structures, the rates for Film
on higher side i.e. if required capacity is 1,23,570 litre, it shall be rounded to 1,24,000
litre. Similarly, if required capacity is 8,26,070 litre, it shall be rounded to 8,27,000 litre.
Mld- always on higher side i.e. if WTP of 2.37 Mld is required; it shall be rounded to 2.5
Mld. For WTP having capacity less than 0.5 mld, package type WTP should be
considered.
28 Provision for insurance at 1% is considered in Rate analysis of CSR 2012-2013. These rates are
applicable only for tendered works,these rates should be reduced by 1 % of total rate when works
are to be carried out on piecemeal works and other small works without tendering.
Pumping main / Rising main and WTP should be from approved makes of M.J.P .
31 Mechanical CSR rates for respective items shall be followed while estimation and the list of
pipes of more than 100 mm Dia are exampted from excise duty. However, necessary certificate
from project authority I.e. Distrct Collector / Dy. Commissioner shall be obtained.Also examption
from excise duty is applicable for following conditions.
1) All items of machienery, including instruments, apparatus & applicances, auxillary equipments
& their
components/parts required for setting of water treatment plant;
2) Pipes needed for delivery of water from its source to the plant (including the clear treated water
reservoir, if any, thereof) and from there to the first storage point;
3) Pipes of outer diameter exceeding 100 mm, when such pipes are integral part of the wtaer
supply project;
However, necessary certificate from Project Authority i.e. District Collector /Dy.Commissioner
shall be obtained.
33 The royalty charges are considered in the rate analysis of CSR 2012-13 As per Government
Resolution No. Rev and forest Dept Gaukhani 10/1009/ Pra.Kra.309/Kha. Mantralaya
dt.11.2.2010.
34 As per Govt.Circular No.DSR-1090/CR-6453/PLN-3, Dated 14.7.1993 1% for labour amenities is
not considered in the DSR except concrete item while arriving the rates.
35 As per Govt. in Industries & Power G.R. No.BCA-2009/CR-108/Labour 7-A, Dated 17.6.10, 1%
cess on labour welfare is not considered in the DSR while arriving the rates.
SECTION - A : MATERIALS
Sr.No.
Description
Unit
Rate ( in Rs.)
2012-2013
Acetylene Gas
Cylinder
MT.
8000.00
Binding wire
Kg
60.00
Ltr.
187.00
No
5.50
RMT.
187.00
Cum.
72000.00
Cement in bags
Bag
310.00
Cement
M.T.
6200.00
10
M.T.
6600.00
11
Charcol
Kg.
12
Coarse sand
13
MT
48875.00
14
Diesel
Ltr.
52.35
15
Epoxy paint
Kg.
435.00
16
Fuse
No
14.30
17
Gunpowder
Kg
110.00
18
Cum
19
MT.
1092.00
14715.00
20
Lubricant oil
Ltr.
241.50
21
Kg.
48.30
22
M.S.Bars
M.T.
48000.00
23
M.S.Bars
Kg.
48.00
24
Kg.
48.30
25
M.S. plates
Kg.
49.00
26
Kg.
69.00
27
Kg.
69.00
28
Mobile oil
Ltr.
225.00
29
Murum
Cum
275.00
30
Nails
Kg.
31
Nut-bolts
Kg.
85.00
32
No
340.00
33
Sqm.
730.00
34
Polling boards
Cum.
19800.00
35
R.S. joists,channels,etc.
MT.
48875.00
36
Cum
Cum.
650.00
22.00
800.00
65.00
1035.00
Sr.No.
Description
Unit
Cum.
Rate ( in Rs.)
2012-2013
37
38
Ltr.
195.00
39
Ltr.
231.00
40
Ltr.
154.00
41
Kg.
94.00
42
Rubble
Cum
385.00
43
Sand
Cum
977.00
44
Spun yarn
45
Cum
850.00
46
Cum
800.00
47
Cum
48
Structural Steel
MT
48875.00
49
Kg.
25.00
50
Teak wood
Cum.
72000.00
51
Tor steel
M.T.
48300.00
52
Walling(100mm X 100mm)
Cum.
16500.00
53
Box
1370.00
54
White cement
Kg.
30.00
55
White lead
Kg.
150.00
56
Wire
Kg.
65.00
kg.
1035.00
95.00
747.00
Description
Unit
Rate ( in Rs.)
2012-2013
Assistant fitter
No
327.00
Bandhani
No
327.00
No
260.00
No
303.00
Breaker
No
315.00
Carpenter ( 1 st class)
No
394.00
Carpenter ( 2 nd class)
No
327.00
Chaiseller
No
315.00
No
424.00
10
Electrcian
No
363.00
11
Excavator
No
278.00
12
Fitter ( 1 st class)
No
375.00
13
Glazier
No
278.00
14
Helper
No
260.00
15
Hole driller
No
285.00
16
Mali
No
260.00
17
Mason ( I st class)
No
394.00
18
Mason ( II nd class)
No
285.00
19
Mazdoor (female)
No
260.00
20
Mazdoor (heavy)
No
285.00
21
Mazdoor ( light)
No
260.00
22
Mazdoor (male)
No
260.00
23
Maistry
No
315.00
24
Mukadam
No
315.00
25
No
315.00
26
Painter
No
303.00
27
No
327.00
28
Plumber
No
339.00
29
Polisher
No
315.00
30
Pump driver
No
303.00
31
No
339.00
Sr.No.
Description
Unit
Rate ( in Rs.)
2012-2013
32
Tile layer
No
399.00
33
Tile turner
No
303.00
34
No
339.00
35
Welder
No
394.00
36
No
290.00
37
White washer
No
303.00
38
Wireman
No
285.00
MACHINERY
Sr.No.
Description
Unit
Day
Day
3
4
5
Day
Rate ( in Rs.)
2012-2013
2400
3000
Day
BHP/Day
1250
510
170
Day
2500
Day
900
Plate belnder
Day
1000
Day
1200
10
Day
2400
11
Day
2550
12
Day
2750
13
HR
2300
14
HR
1400
15
HR
1100
16
Day
2650
17
Day
2400
18
Day
2150
SECTION - C : TRANSPORTATION
STATEMENT I
Sr.
No.
Item of work
Unit
Collecting the
railway receipt
etc & unloading
the consignment
from railway
wagon & keeping
on railway
platform
consignment
booked in.
M.T.
2012-2013
Loading
the material
into truck
from
department
al store or
site of
work.
Unloading
the material
from truck
including
stacking in
department
al stores or
site of
work.
297.00
365.00
94.00
94.00
M.T.
297.00
365.00
94.00
94.00
M.T.
M.T.
M.T.
157.00
157.00
297.00
221.00
221.00
365.00
56.00
56.00
94.00
56.00
56.00
94.00
M.T.
M.T.
187.00
91.00
253.00
137.00
141.00
70.00
141.00
70.00
M.T.
201.00
254.00
181.00
181.00
Lifting the
material
from
railway
platform,
loading
Unloading
into truck.
1)The above rates in col. 1 to 5 are applicable only for Railway clearence purpose and not for other carting.
2) The rates given in col. 6 to 7 shall be adopted for estimate purpose only, however actual quotations / D- tender will
prevail.
3) Irrespective of supply of C.I./D.I. Pipes as per rate contract when pipes are directly supplied by the firms by road
railway freight upto destination station and carting as per schedule from Railway Station to work site is allowed In such
cases rate of Mathadi Kamgar shall not be applicable for carting and normal loading, unloading carting shall be
allowed.
STATEMENT II
1
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
Av.
Speed
2
15
16
16.5
17
17.25
17.5
17.75
18
18.25
18.5
18.75
19
19.183
19.6
20
25
25
25
25
30
30
30
30
30
30
30
30
40
No. of
Trips(N)=
8/ ((2L/S)
+1)
3
7.5
7.11
6.77
6.48
6.2
5.96
5.74
5.54
5.36
5.19
4.88
4.61
4.36
4.17
4
3.64
3.08
2.67
2.35
2.4
2.18
2
1.85
1.6
1.41
1.26
1.14
1.33
Km.
Done
(2NL+6)
4
13.5
20.22
26.31
31.92
37
41.76
46.18
50.32
54.24
57.9
64.56
70.54
75.76
81.06
86
115.2
129.2
139.5
147
174
180.4
186
191
198
203.4
207.6
211.2
272
Litres of
diesel
cons
umed
5
4.5
6.74
8.77
10.64
12.33
13.92
15.39
16.77
18.08
19.3
21.52
23.51
25.25
27.02
28.67
38.4
43.07
46.5
49
58
60.13
62
63.67
66
67.8
69.2
70.4
90.67
cost of
diesel @
52.35 / lit
6
235.58
352.84
459.11
557
645.48
728.71
805.67
877.91
946.49
1010.36
1126.57
1230.75
1321.84
1414.5
1500.87
2010.24
2254.71
2434.28
2565.15
3036.3
3147.81
3245.7
3333.12
3455.1
3549.33
3622.62
3685.44
4746.57
Lit. of
Mobile
oil consumed
7
0.096
0.144
0.188
0.228
0.264
0.298
0.33
0.359
0.387
0.414
0.461
0.504
0.541
0.579
0.614
0.823
0.923
0.996
1.05
1.243
1.289
1.329
1.364
1.414
1.453
1.483
1.509
1.943
cost of
M.Oil @
225/lit
cost of 6
mazdoor
/day
8
21.6
32.4
42.3
51.3
59.4
67.05
74.25
80.78
87.08
93.15
103.73
113.4
121.73
130.28
138.15
185.18
207.68
224.1
236.25
279.68
290.03
299.03
306.9
318.15
326.93
333.68
339.53
437.18
9
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
1923.75
Hire
charges
of truck
Rs. Per
day
10
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2400
2400
2400
2400
2400
2400
2150
2150
2150
2150
2150
11
4830.93
4958.99
5075.16
5182.05
5278.63
5369.51
5453.67
5532.44
5607.32
5677.26
5804.05
5917.9
6017.32
6118.53
6212.77
6769.17
7036.14
6982.13
7125.15
7639.73
7761.59
7868.48
7963.77
7847
7950.01
8030.05
8098.72
9257.5
12
13
483.09 5314.02
495.9 5454.89
507.52 5582.68
518.21 5700.26
527.86 5806.49
536.95 5906.46
545.37 5999.04
553.24 6085.68
560.73 6168.05
567.73 6244.99
580.41 6384.46
591.79 6509.69
601.73 6619.05
611.85 6730.38
621.28 6834.05
676.92 7446.09
703.61 7739.75
698.21 7680.34
712.52 7837.67
763.97
8403.7
776.16 8537.75
786.85 8655.33
796.38 8760.15
784.7
8631.7
795 8745.01
803.01 8833.06
809.87 8908.59
925.75 10183.25
cost per
trip
(13/3)
14
708.54
767.21
824.62
879.67
936.53
991.02
1045.13
1098.5
1150.76
1203.27
1308.29
1412.08
1518.13
1614
1708.51
2045.63
2512.91
2876.53
3335.18
3501.54
3916.4
4327.67
4735.22
5394.81
6202.13
7010.37
7814.55
7656.58
Lead
in km
Av.
Speed
125
150
175
200
250
300
400
500
600
700
800
900
1000
Note:
No. of
Trips(N)=
8/ ((2L/S)
+1)
40
40
40
40
40
45
45
45
45
45
45
45
45
1.1
0.94
0.82
0.73
0.59
0.56
0.43
0.34
0.29
0.25
0.22
0.2
0.18
Km.
Done
(2NL+6)
281
288
293
298
301
342
350
346
354
356
358
366
366
Litres of
diesel
cons
umed
93.67
96
97.67
99.33
100.33
114
116.67
115.33
118
118.67
119.33
122
122
cost of
Lit. of
diesel @ Mobile
52.35.0 / lit oil consumed
4903.62
5025.6
5113.02
5199.93
5252.28
5967.9
6107.67
6037.53
6177.3
6212.37
6246.93
6386.7
6386.7
2.007
2.057
2.093
2.129
2.15
2.443
2.5
2.471
2.529
2.543
2.557
2.614
2.614
cost of
M.Oil @
225/lit
cost of 6
mazdoor
/day
451.58
462.83
470.93
479.03
483.75
549.68
562.5
555.98
569.03
572.18
575.33
588.15
588.15
1923.75
1808.33
1577.48
1404.34
1135.01
1077.3
827.21
654.08
557.89
480.94
423.23
384.75
346.28
Hire
Total cost Add 10%
Total
cost per
charges
(6+8+
overhead 11+12
trip
of truck
9+10)
charges
(13/3)
Rs. Per
day
2150 9428.95
942.9 10371.85 9428.95
2150 9446.76
944.68 10391.44 11054.72
2150 9311.43
931.14 10242.57 12490.94
2150
9233.3
923.33 10156.63 13913.19
2150 9021.04
902.1 9923.14 16818.88
2150 9744.88
974.49 10719.37 19141.73
2150 9647.38
964.74 10612.12 24679.35
2150 9397.59
939.76 10337.35 30403.97
2150 9454.22
945.42 10399.64 35860.83
2150 9415.49
941.55 10357.04 41428.16
2150 9395.49
939.55 10335.04 46977.45
2150
9509.6
950.96 10460.56 52302.8
2150 9471.13
947.11 10418.24 57879.11
1)
2)
3)
4)
5)
6)
STATEMENT III
1
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
Av.
Speed
2
15
16
16.5
17
17.25
17.5
17.75
18
18.25
18.5
18.75
19
19.183
19.6
20
25
25
25
25
30
30
30
30
30
30
30
30
No. of
Trips(N)=
8/ ((2L/S)
+1)
3
7.5
7.11
6.77
6.48
6.2
5.96
5.74
5.54
5.36
5.19
4.88
4.61
4.36
4.17
4
3.64
3.08
2.67
2.35
2.4
2.18
2
1.85
1.6
1.41
1.26
1.14
Km.
Done
(2NL+6)
4
13.5
20.22
26.31
31.92
37
41.76
46.18
50.32
54.24
57.9
64.56
70.54
75.76
81.06
86
115.2
129.2
139.5
147
174
180.4
186
191
198
203.4
207.6
211.2
Litres of
diesel
cons
umed
5
4.5
6.74
8.77
10.64
12.33
13.92
15.39
16.77
18.08
19.3
21.52
23.51
25.25
27.02
28.67
38.4
43.07
46.5
49
58
60.13
62
63.67
66
67.8
69.2
70.4
cost of
diesel @
52.35 / lit
6
235.58
352.84
459.11
557
645.48
728.71
805.67
877.91
946.49
1010.36
1126.57
1230.75
1321.84
1414.5
1500.87
2010.24
2254.71
2434.28
2565.15
3036.3
3147.81
3245.7
3333.12
3455.1
3549.33
3622.62
3685.44
Lit. of
Mobile
oil consumed
7
0.096
0.144
0.188
0.228
0.264
0.298
0.33
0.359
0.387
0.414
0.461
0.504
0.541
0.579
0.614
0.823
0.923
0.996
1.05
1.243
1.289
1.329
1.364
1.414
1.453
1.483
1.509
cost of
M.Oil @
225/lit
cost of 6
mazdoor
Hire
charges
of truck
Rs. Per
day
/day
8
21.6
32.4
42.3
51.3
59.4
67.05
74.25
80.78
87.08
93.15
103.73
113.4
121.73
130.28
138.15
185.18
207.68
224.1
236.25
279.68
290.03
299.03
306.9
318.15
326.93
333.68
339.53
9
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2650
2400
2400
2400
2400
2400
2400
2150
2150
2150
2150
11
2907.18
3035.24
3151.41
3258.3
3354.88
3445.76
3529.92
3608.69
3683.57
3753.51
3880.3
3994.15
4093.57
4194.78
4289.02
4845.42
5112.39
5058.38
5201.4
5715.98
5837.84
5944.73
6040.02
5923.25
6026.26
6106.3
6174.97
12
290.72
303.52
315.14
325.83
335.49
344.58
352.99
360.87
368.36
375.35
388.03
399.42
409.36
419.48
428.9
484.54
511.24
505.84
520.14
571.6
583.78
594.47
604
592.33
602.63
610.63
617.5
13
3197.9
3338.76
3466.55
3584.13
3690.37
3790.34
3882.91
3969.56
4051.93
4128.86
4268.33
4393.57
4502.93
4614.26
4717.92
5329.96
5623.63
5564.22
5721.54
6287.58
6421.62
6539.2
6644.02
6515.58
6628.89
6716.93
6792.47
cost per
trip
(13/3)
14
426.39
469.59
512.05
553.11
595.22
635.96
676.47
716.53
755.96
795.54
874.66
953.05
1032.78
1106.54
1179.48
1464.27
1825.85
2083.98
2434.7
2619.83
2945.7
3269.6
3591.36
4072.24
4701.34
5330.9
5958.31
Lead
in km
100
125
150
175
200
250
300
400
500
600
700
800
900
1000
Av.
Speed
No. of
Trips(N)=
8/ ((2L/S)
+1)
40
40
40
40
40
40
45
45
45
45
45
45
45
45
1.33
1.1
0.94
0.82
0.73
0.59
0.56
0.43
0.34
0.29
0.25
0.22
0.2
0.18
Km.
Done
(2NL+6)
272
281
288
293
298
301
342
350
346
354
356
358
366
366
Litres of
diesel
cons
umed
90.67
93.67
96
97.67
99.33
100.33
114
116.67
115.33
118
118.67
119.33
122
122
cost of
diesel @
52.35 / lit
4746.57
4903.62
5025.6
5113.02
5199.93
5252.28
5967.9
6107.67
6037.53
6177.3
6212.37
6246.93
6386.7
6386.7
Lit. of
Mobile
oil consumed
1.943
2.007
2.057
2.093
2.129
2.15
2.443
2.5
2.471
2.529
2.543
2.557
2.614
2.614
cost of
M.Oil @
225/lit
cost of 6
mazdoor
/day
437.18
451.58
462.83
470.93
479.03
483.75
549.68
562.5
555.98
569.03
572.18
575.33
588.15
588.15
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Hire
Total cost Add 10% Total
charges
(6+8+
overhead 11+12
of truck
9+10)
charges
Rs. Per
day
2150 7333.75
733.38 8067.13
2150
7505.2
750.52 8255.72
2150 7638.43
763.84 8402.27
2150 7733.95
773.4 8507.35
2150 7828.96
782.9 8611.86
2150 7886.03
788.6 8674.63
2150 8667.58
866.76 9534.34
2150 8820.17
882.02 9702.19
2150 8743.51
874.35 9617.86
2150 8896.33
889.63 9785.96
2150 8934.55
893.46 9828.01
2150 8972.26
897.23 9869.49
2150 9124.85
912.49 10037.34
2150 9124.85
912.49 10037.34
cost per
trip
(13/3)
6065.51
7505.2
8938.59
10374.82
11797.07
14702.76
17025.61
22563.23
28287.82
33744.69
39312.04
44861.32
50186.7
55763
STATEMENT IV
Including loading, unloading and stacking
Lead in km Cost / trip
1
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
Manure or
sludge
2
3
4
5
Pay load
6.0 cum
4.8 cum
5.52 cum
708.54
118.09
147.61
128.36
767.21
127.87
159.84
138.99
824.62
137.44
171.8
149.39
879.67
146.61
183.26
159.36
936.53
156.09
195.11
169.66
991.02
165.17
206.46
179.53
1045.13
174.19
217.74
189.34
1098.5
183.08
228.85
199
1150.76
191.79
239.74
208.47
1203.27
200.55
250.68
217.98
1308.29
218.05
272.56
237.01
1412.08
235.35
294.18
255.81
1518.13
253.02
316.28
275.02
1614
269
336.25
292.39
1708.51
284.75
355.94
309.51
2045.63
340.94
426.17
370.59
2512.91
418.82
523.52
455.24
2876.53
479.42
599.28
521.11
3335.18
555.86
694.83
604.2
3501.54
583.59
729.49
634.34
3916.4
652.73
815.92
709.49
4327.67
721.28
901.6
784
4735.22
789.2
986.5
857.83
5394.81
899.14
1123.92
977.32
6202.13
1033.69
1292.11
1123.57
7010.37
1168.4
1460.49
1269.99
Excavated Sand
rock
stone
aggregate
40 mm &
below
6
7
3.0 cum
5.75 cum
236.18
123.22
255.74
133.43
274.87
143.41
293.22
152.99
312.18
162.87
330.34
172.35
348.38
181.76
366.17
191.04
383.59
200.13
401.09
209.26
436.1
227.53
470.69
245.58
506.04
264.02
538
280.7
569.5
297.13
681.88
355.76
837.64
437.03
958.84
500.27
1111.73
580.03
1167.18
608.96
1305.47
681.11
1442.56
752.64
1578.41
823.52
1798.27
938.23
2067.38
1078.63
2336.79
1219.19
Aggregate Soling
40 mm & stone
above
Concrete
block
(form)
Timber
8
9
10
11
5.5 cum
4.7 cum
6.0 cum
5.0 cum
128.83
150.75
118.09
141.71
139.49
163.24
127.87
153.44
149.93
175.45
137.44
164.92
159.94
187.16
146.61
175.93
170.28
199.26
156.09
187.31
180.19
210.86
165.17
198.2
190.02
222.37
174.19
209.03
199.73
233.72
183.08
219.7
209.23
244.84
191.79
230.15
218.78
256.01
200.55
240.65
237.87
278.36
218.05
261.66
256.74
300.44
235.35
282.42
276.02
323.01
253.02
303.63
293.45
343.4
269
322.8
310.64
363.51
284.75
341.7
371.93
435.24
340.94
409.13
456.89
534.66
418.82
502.58
523.01
612.03
479.42
575.31
606.4
709.61
555.86
667.04
636.64
745.01
583.59
700.31
712.07
833.28
652.73
783.28
786.85
920.78
721.28
865.53
860.95
1007.49
789.2
947.04
980.87
1147.83
899.14 1078.96
1127.66
1319.6
1033.69 1240.43
1274.61
1491.57
1168.4 1402.07
90
100
125
150
175
200
250
300
400
500
600
700
800
900
1000
7814.55
7656.58
9428.95
11054.72
12490.94
13913.19
16818.88
19141.73
24679.35
30403.97
35860.83
41428.16
46977.45
52302.8
57879.11
1302.43
1628.03
1276.1
1595.12
1571.49
1964.36
1842.45
2303.07
2081.82
2602.28
2318.87
2898.58
2803.15
3503.93
3190.29
3987.86
4113.23
5141.53
5067.33
6334.16
5976.81
7471.01
6904.69
8630.87
7829.58
9786.97
8717.13 10896.42
9646.52 12058.15
Manure or
sludge
1415.68
1387.06
1708.14
2002.67
2262.85
2520.51
3046.9
3467.7
4470.9
5507.97
6496.53
7505.1
8510.41
9475.14
10485.35
Excavated Sand
rock
stone
aggregate
40 mm &
below
2604.85
1359.05
2552.19
1331.58
3142.98
1639.82
3684.91
1922.56
4163.65
2172.34
4637.73
2419.69
5606.29
2925.02
6380.58
3329
8226.45
4292.06
10134.66
5287.65
11953.61
6236.67
13809.39
7204.9
15659.15
8169.99
17434.27
9096.14
19293.04 10065.93
Aggregate Soling
40 mm & stone
above
1420.83
1392.11
1714.35
2009.95
2271.08
2529.67
3057.98
3480.31
4487.15
5527.99
6520.15
7532.39
8541.35
9509.6
10523.47
1662.67
1629.06
2006.16
2352.07
2657.65
2960.25
3578.49
4072.71
5250.93
6468.93
7629.96
8814.5
9995.2
11128.26
12314.7
Concrete
block
(form)
Timber
1302.43 1562.91
1276.1 1531.32
1571.49 1885.79
1842.45 2210.94
2081.82 2498.19
2318.87 2782.64
2803.15 3363.78
3190.29 3828.35
4113.23 4935.87
5067.33 6080.79
5976.81 7172.17
6904.69 8285.63
7829.58 9395.49
8717.13 10460.56
9646.52 11575.82
STATEMENT V
Lead in
km
Cost / trip
Cement
stone block,
GI CI CC AC
Pipes below
120 mm dia
Steam coal
Tar
bitumenn
Asphalt
roofing felt
& Flooring
Asphalt
etc.
Matting
thatching
bambu
ceiling
board
rubber
PVC pipes
fittings
Sheet &
plate glass
in packs
Paints &
Distemper
s AC
Sheets &
fittings
iron
fittings
and iron
sheets
Bricks
modular
bricks &
Traditional
bricks
Tiles half
round tiles
& Roofing
tiles
cement
flooring
tiles
Glass
blocks
(hollow)
200x200
x120 mm
2
Pay load
3
7.0 Mt
4
4.5 MT
5
5.5 MT
6
3.0 MT
7
7.0 MT
8
3500 No.
9
3200 No.
10
11
1000 0No. 2000 No.
per 1 M.T.
per 1 M.T.
per 1 M.T.
per 1 M.T.
per 1 M.T.
per 1000
Nos.
per 1000
Nos.
per 1000
Nos.
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
708.54
767.21
824.62
879.67
936.53
991.02
1045.13
1098.5
1150.76
1203.27
1308.29
1412.08
1518.13
1614
1708.51
2045.63
2512.91
2876.53
101.22
109.6
117.8
125.67
133.79
141.57
149.3
156.93
164.39
171.9
186.9
201.73
216.88
230.57
244.07
292.23
358.99
410.93
157.45
170.49
183.25
195.48
208.12
220.23
232.25
244.11
255.72
267.39
290.73
313.8
337.36
358.67
379.67
454.58
558.42
639.23
128.83
139.49
149.93
159.94
170.28
180.19
190.02
199.73
209.23
218.78
237.87
256.74
276.02
293.45
310.64
371.93
456.89
523.01
236.18
255.74
274.87
293.22
312.18
330.34
348.38
366.17
383.59
401.09
436.1
470.69
506.04
538
569.5
681.88
837.64
958.84
101.22
109.6
117.8
125.67
133.79
141.57
149.3
156.93
164.39
171.9
186.9
201.73
216.88
230.57
244.07
292.23
358.99
410.93
202.44
219.2
235.61
251.33
267.58
283.15
298.61
313.86
328.79
343.79
373.8
403.45
433.75
461.14
488.15
584.47
717.97
821.87
221.42
239.75
257.69
274.9
292.67
309.69
326.6
343.28
359.61
376.02
408.84
441.28
474.42
504.38
533.91
639.26
785.28
898.92
70.85
76.72
82.46
87.97
93.65
99.1
104.51
109.85
115.08
120.33
130.83
141.21
151.81
161.4
170.85
204.56
251.29
287.65
per 1000
Nos.
354.27
383.61
412.31
439.84
468.27
495.51
522.57
549.25
575.38
601.64
654.15
706.04
759.07
807
854.26
1022.82
1256.46
1438.27
1
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
400
500
600
700
800
900
1000
2
3335.18
3501.54
3916.4
4327.67
4735.22
5394.81
6202.13
7010.37
7814.55
7656.58
9428.95
11054.72
12490.94
13913.19
16818.88
19141.73
24679.35
30403.97
35860.83
41428.16
46977.45
52302.8
57879.11
3
4
476.45
741.15
500.22
778.12
559.49
870.31
618.24
961.7
676.46
1052.27
770.69
1198.85
886.02
1378.25
1001.48
1557.86
1116.36
1736.57
1093.8
1701.46
1346.99
2095.32
1579.25
2456.6
1784.42
2775.76
1987.6
3091.82
2402.7
3737.53
2734.53
4253.72
3525.62
5484.3
4343.42
6756.44
5122.98
7969.07
5918.31
9206.26
6711.06 10439.43
7471.83 11622.84
8268.44 12862.02
5
606.4
636.64
712.07
786.85
860.95
980.87
1127.66
1274.61
1420.83
1392.11
1714.35
2009.95
2271.08
2529.67
3057.98
3480.31
4487.15
5527.99
6520.15
7532.39
8541.35
9509.6
10523.47
6
1111.73
1167.18
1305.47
1442.56
1578.41
1798.27
2067.38
2336.79
2604.85
2552.19
3142.98
3684.91
4163.65
4637.73
5606.29
6380.58
8226.45
10134.66
11953.61
13809.39
15659.15
17434.27
19293.04
7
476.45
500.22
559.49
618.24
676.46
770.69
886.02
1001.48
1116.36
1093.8
1346.99
1579.25
1784.42
1987.6
2402.7
2734.53
3525.62
4343.42
5122.98
5918.31
6711.06
7471.83
8268.44
8
952.91
1000.44
1118.97
1236.48
1352.92
1541.37
1772.04
2002.96
2232.73
2187.59
2693.99
3158.49
3568.84
3975.2
4805.39
5469.07
7051.24
8686.85
10245.95
11836.62
13422.13
14943.66
16536.89
9
1042.24
1094.23
1223.88
1352.4
1479.76
1685.88
1938.17
2190.74
2442.05
2392.68
2946.55
3454.6
3903.42
4347.87
5255.9
5981.79
7712.3
9501.24
11206.51
12946.3
14680.45
16344.63
18087.22
10
333.52
350.15
391.64
432.77
473.52
539.48
620.21
701.04
781.46
765.66
942.9
1105.47
1249.09
1391.32
1681.89
1914.17
2467.94
3040.4
3586.08
4142.82
4697.75
5230.28
5787.91
11
1667.59
1750.77
1958.2
2163.84
2367.61
2697.41
3101.07
3505.19
3907.28
3828.29
4714.48
5527.36
6245.47
6956.6
8409.44
9570.87
12339.68
15201.99
17930.42
20714.08
23488.73
26151.4
28939.56
STATEMENT VI
Including loading, unloading and stacking
Lead in km Cost / trip
R.C.C. STEEL CYLINDER, R.C PIPES, C.I. PIPES,, UNREINFORCED CEMENT PIPES, PRECAST COCRETE PIPES
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
300 & 400 450 & 500 600, 700 800, 900
mm
mm
& 750 mm & 1000
mm
Pay load in R
292.8
219.6
183
109.8
80.52
62.22
54.9
29.28
18.30
15
1
2
3
4
5
6
7
8
9
10
11
12
T PER 100 RMT
0.5
708.54
241.99
322.65
387.18
645.3
879.96
1138.77
1290.6
2419.88
3871.8
4723.6
1
767.21
262.03
349.37
419.24
698.73
952.82
1233.06
1397.47
2620.25
4192.4 5114.73
1.5
824.62
281.63
375.51
450.61
751.02
1024.12
1325.33
1502.04
2816.33 4506.12 5497.47
2
879.67
300.43
400.58
480.69
801.16
1092.49
1413.81
1602.31
3004.34 4806.94 5864.47
2.5
936.53
319.85
426.47
511.77
852.94
1163.1
1505.19
1705.88
3198.53 5117.65 6243.53
3
991.02
338.46
451.28
541.54
902.57
1230.77
1592.77
1805.14
3384.63 5415.41
6606.8
3.5
1045.13
356.94
475.92
571.11
951.85
1297.98
1679.73
1903.7
3569.43 5711.09 6967.53
4
1098.5
375.17
500.23
600.27
1000.46
1364.26
1765.51
2000.91
3751.71 6002.73 7323.33
4.5
1150.76
393.02
524.03
628.83
1048.05
1429.16
1849.5
2096.1
3930.19 6288.31 7671.73
5
1203.27
410.95
547.94
657.52
1095.87
1494.37
1933.9
2191.75
4109.53 6575.25
8021.8
6
1308.29
446.82
595.76
714.91
1191.52
1624.8
2102.68
2383.04
4468.2 7149.13 8721.93
7
1412.08
482.27
643.02
771.63
1286.05
1753.7
2269.5
2572.09
4822.68 7716.28 9413.87
8
1518.13
518.49
691.32
829.58
1382.63
1885.41
2439.94
2765.26
5184.87 8295.79 10120.87
9
1614
551.23
734.97
881.97
1469.95
2004.47
2594.02
2939.89
5512.3 8819.67
10760
10
1708.51
583.51
778.01
933.61
1556.02
2121.85
2745.92
3112.04
5835.08 9336.12 11390.07
15
2045.63
698.64
931.53
1117.83
1863.05
2540.52
3287.74
3726.1
6986.44 11178.31 13637.53
20
2512.91
858.23
1144.31
1373.17
2288.62
3120.85
4038.75
4577.25
8582.34 13731.75 16752.73
25
2876.53
982.42
1309.9
1571.87
2619.79
3572.44
4623.16
5239.58
9824.21 15718.74 19176.87
30
3335.18
1139.06
1518.75
1822.5
3037.5
4142.05
5360.3
6075.01 11390.64 18225.03 22234.53
35
3501.54
1195.88
1594.51
1913.41
3189.02
4348.66
5627.68
6378.03 11958.81 19134.1 23343.6
40
3916.4
1337.57
1783.42
2140.11
3566.85
4863.88
6294.44
7133.7 13375.68 21401.09 26109.33
45
4327.67
1478.03
1970.71
2364.85
3941.41
5374.65
6955.43
7882.82 14780.29 23648.47 28851.13
50
4735.22
1617.22
2156.29
2587.55
4312.59
5880.8
7610.45
8625.17
16172.2 25875.52 31568.13
60
5394.81
1842.49
2456.65
2947.98
4913.31
6699.96
8670.54
9826.61
18424.9 29479.84 35965.4
70
6202.13
2118.21
2824.29
3389.14
5648.57
7702.6
9968.06 11297.14 21182.14 33891.42 41347.53
80
7010.37
2394.25
3192.34
3830.8
6384.67
8706.37 11267.07 12769.34 23942.52 38308.03 46735.8
1200 &
1800 MM
5
13
14170.8
15344.2
16492.4
17593.4
18730.6
19820.4
20902.6
21970
23015.2
24065.4
26165.8
28241.6
30362.6
32280
34170.2
40912.6
50258.2
57530.6
66703.6
70030.8
78328
86553.4
94704.4
107896.2
124042.6
140207.4
1
90
100
125
150
175
200
250
300
400
500
600
700
800
900
1000
R.C.C. STEEL CYLINDER, R.C PIPES, C.I. PIPES,, UNREINFORCED CEMENT PIPES, PRECAST COCRETE PIPES
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
300 & 400 450 & 500 600, 700 800, 900
mm
mm
& 750 mm & 1000
mm
Pay load in R
292.8
219.6
183
109.8
80.52
62.22
54.9
29.28
18.30
15
2
3
4
5
6
7
8
9
10
11
12
7814.55
2668.9
3558.54
4270.25
7117.08
9705.1 12559.55 14234.15 26689.04 42702.46
52097
7656.58
2614.95
3486.6
4183.92
6973.21
9508.92 12305.66 13946.41 26149.52 41839.23 51043.87
9428.95
3220.27
4293.69
5152.43
8587.39 11710.07 15154.21 17174.77
32202.7 51524.32 62859.67
11054.72
3775.52
5034.03
6040.83 10068.05 13729.16 17767.15
20136.1 37755.19 60408.31 73698.13
12490.94
4266.03
5688.04
6825.65 11376.08 15512.84 20075.44 22752.17 42660.31 68256.5 83272.93
13913.19
4751.77
6335.7
7602.84 12671.39 17279.17 22361.28 25342.79 47517.73 76028.36 92754.6
16818.88
5744.15
7658.87
9190.64 15317.74 20887.83 27031.31 30635.48 57441.53 91906.45 112125.9
19141.73
6537.48
8716.63
10459.96 17433.27 23772.64 30764.59 34866.54 65374.76 104599.6 127611.5
24679.35
8428.74 11238.32
13485.98 22476.64 30649.96 39664.66 44953.28
84287.4 134859.8
164529
30403.97
10383.87 13845.16
16614.19 27690.32 37759.53 48865.27 55380.64 103838.7 166141.9 202693.1
35860.83
12247.55 16330.07
19596.08 32660.14 44536.55 57635.54 65320.27 122475.5 195960.8 239072.2
41428.16
14148.96 18865.28
22638.34 37730.56 51450.77 66583.35 75461.13 141489.6 226383.4 276187.7
46977.45
16044.21 21392.28
25670.74 42784.56 58342.59 75502.17 85569.13 160442.1 256707.4
313183
52302.8
17862.98
23817.3
28580.77 47634.61 64956.28 84061.07 95269.22 178629.8 285807.7 348685.3
57879.11
19767.46 26356.61
31627.93 52713.21 71881.66 93023.32 105426.4 197674.6 316279.3 385860.7
1200 &
1800 MM
5
13
156291
153131.6
188579
221094.4
249818.8
278263.8
336377.6
382834.6
493587
608079.4
717216.6
828563.2
939549
1046056
1157582
STATEMENT VII
Including loading, unloading and stacking
STONEWARE PIPES
Lead in
km
Cost/trip
100 mm
150 mm
200 mm
230 mm
250 mm
300 mm
350 mm
400 mm
Lead in
km
1
60
70
80
90
100
125
150
175
200
250
300
400
500
600
700
800
900
1000
Cost/trip
100 mm
150 mm
200 mm
230 mm
250 mm
300 mm
Pay Load
480 m
240 m
135 m
105 m
84 m
66 m
2
5394.81
6202.13
7010.37
7814.55
7656.58
9428.95
11054.72
12490.94
13913.19
16818.88
19141.73
24679.35
30403.97
35860.83
41428.16
46977.45
52302.80
57879.11
3
1123.92
1292.11
1460.49
1628.03
1595.12
1964.36
2303.07
2602.28
2898.58
3503.93
3987.86
5141.53
6334.16
7471.01
8630.87
9786.97
10896.42
12058.15
4
2247.84
2584.22
2920.99
3256.06
3190.24
3928.73
4606.13
5204.56
5797.16
7007.87
7975.72
10283.06
12668.32
14942.01
17261.73
19573.94
21792.83
24116.30
5
3996.16
4594.17
5192.87
5788.56
5671.54
6984.41
8188.68
9252.55
10306.07
12458.43
14179.06
18281.00
22521.46
26563.58
30687.53
34798.11
38742.81
42873.41
6
5137.91
5906.79
6676.54
7442.43
7291.98
8979.95
10528.30
11896.13
13250.66
16017.98
18230.22
23504.14
28956.16
34153.17
39455.39
44740.43
49812.19
55122.96
7
6422.39
7383.49
8345.68
9303.04
9114.98
11224.94
13160.38
14870.17
16563.32
20022.48
22787.77
29380.18
36195.20
42691.46
49319.24
55925.54
62265.24
68903.70
350 mm
400 mm
43 m
27 m
8
9
10
8173.95 12546.07 19980.78
9397.17 14423.56 22970.85
10621.77 16303.19 25964.33
11840.23 18173.37 28942.78
11600.88 17806.00 28357.70
14286.29 21927.79 34922.04
16749.58 25708.65 40943.41
18925.67 29048.70 46262.74
21080.59 32356.26 51530.33
25483.15 39113.67 62292.15
29002.62 44515.65 70895.30
37392.95 57393.84 91405.00
46066.62 70706.91 112607.30
54334.59 83397.28 132817.89
62769.94 96344.56 153437.63
71177.95 109249.88 173990.56
79246.67 121634.42 193714.07
87695.62 134602.58 214367.07
STATEMENT VIII
Including loading, unloading and stacking
Lead in
km
Cost per
trip
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
6
7
8
9
10
15
20
25
30
35
40
45
50
60
70
80
90
100
125
150
175
200
250
300
400
500
600
700
800
900
1000
708.54
767.21
824.62
879.67
936.53
991.02
1045.13
1098.5
1150.76
1203.27
1308.29
1412.08
1518.13
1614
1708.51
2045.63
2512.91
2876.53
3335.18
3501.54
3916.4
4327.67
4735.22
5394.81
6202.13
7010.37
7814.55
7656.58
9428.95
11054.72
12490.94
13913.19
16818.88
19141.73
24679.35
30403.97
35860.83
41428.16
46977.45
52302.8
57879.11
Sand
5.75 cum
70.85
76.72
82.46
87.97
93.65
99.10
104.51
109.85
115.08
120.33
130.83
141.21
151.81
161.40
170.85
204.56
251.29
287.65
333.52
350.15
391.64
432.77
473.52
539.48
620.21
701.04
781.46
765.66
942.90
1105.47
1249.09
1391.32
1681.89
1914.17
2467.94
3040.40
3586.08
4142.82
4697.75
5230.28
5787.91
70.85
76.72
82.46
87.97
93.65
99.10
104.51
109.85
115.08
120.33
130.83
141.21
151.81
161.40
170.85
204.56
251.29
287.65
333.52
350.15
391.64
432.77
473.52
539.48
620.21
701.04
781.46
765.66
942.90
1105.47
1249.09
1391.32
1681.89
1914.17
2467.94
3040.40
3586.08
4142.82
4697.75
5230.28
5787.91
157.45
170.49
183.25
195.48
208.12
208.12
232.25
244.11
255.72
267.39
290.73
313.80
337.36
358.67
379.67
454.58
558.42
639.23
741.15
778.12
870.31
961.70
1052.27
1198.85
1378.25
1557.86
1736.57
1701.46
2095.32
2456.60
2775.76
3091.82
3737.53
4253.72
5484.30
6756.44
7969.07
9206.26
10439.43
11622.84
12862.02
70.85
76.72
82.46
87.97
93.65
99.10
104.51
109.85
115.08
120.33
130.83
141.21
151.81
161.40
170.85
204.56
251.29
287.65
333.52
350.15
391.64
432.77
473.52
539.48
620.21
701.04
781.46
765.66
942.90
1105.47
1249.09
1391.32
1681.89
1914.17
2467.94
3040.40
3586.08
4142.82
4697.75
5230.28
5787.91
123.22
133.43
143.41
152.99
162.87
172.35
181.76
191.04
200.13
209.26
227.53
245.58
264.02
280.70
297.13
355.76
437.03
500.27
580.03
608.96
681.11
752.64
823.52
938.23
1078.63
1219.19
1359.05
1331.58
1639.82
1922.56
2172.34
2419.69
2925.02
3329.00
4292.06
5287.65
6236.67
7204.90
8169.99
9096.14
10065.93
STATEMENT IX
Excluding loading, unloading and stacking
Lead in
Cost per
Cement Steel pay
Bulk
km
trip
pay load load 10.00 Asphalt in
10.00 MT
MT
Bouzer pay
load 4.50
MT
1
2
3
4
5
0.5
42.64
42.64
94.75
426.39
1
46.96
46.96
104.35
469.59
1.5
51.21
51.21
113.79
512.05
2
55.31
55.31
122.91
553.11
2.5
59.52
59.52
132.27
595.22
3
63.60
63.60
132.27
635.96
3.5
67.65
67.65
150.33
676.47
4
71.65
71.65
159.23
716.53
4.5
75.60
75.60
167.99
755.96
5
79.55
79.55
176.79
795.54
6
87.47
87.47
194.37
874.66
7
95.31
95.31
211.79
953.05
8
103.28
229.51
1032.78 103.28
9
110.65
110.65
245.90
1106.54
10
117.95
117.95
262.11
1179.48
15
146.43
325.39
1464.27 146.43
20
182.59
405.74
1825.85 182.59
25
208.40
463.11
2083.98 208.40
30
243.47
243.47
541.04
2434.7
35
261.98
582.18
2619.83 261.98
40
294.57
654.60
2945.7 294.57
45
326.96
726.58
3269.6 326.96
50
359.14
359.14
798.08
3591.36
60
407.22
904.94
4072.24 407.22
70
470.13
1044.74
4701.34 470.13
80
533.09
1184.64
5330.9 533.09
90
595.83
1324.07
5958.31 595.83
100
606.55
1347.89
6065.51 606.55
750.52
750.52
1667.82
125
7505.2
150
893.86
1986.35
8938.59 893.86
175
1037.48
2305.52
10374.82 1037.48
200
1179.71
2621.57
11797.07 1179.71
250
1470.28
1470.28
3267.28
14702.76
300
1702.56
1702.56
3783.47
17025.61
400
2256.32
5014.05
22563.23 2256.32
500
2828.78
6286.18
28287.82 2828.78
600
3374.47
3374.47
7498.82
33744.69
700
3931.20
3931.20
8736.01
39312.04
800
4486.13
9969.18
44861.32 4486.13
900
5018.67 11152.60
50186.7 5018.67
1000
5576.30 12391.78
55763 5576.30
Section - E- Excavation
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
(Bd-A-1/259)
Cu.m
134.00
Cu.m
151.00
Lift 0 to 1.5 M
Cu.m
169.00
Add for every additional lift of 1.5 M beyond initial lift of 1.5 M for Item
Nos. 1 to 3
Excavation for foundation / pipe trenches in soft rock and old cement
and lime masonry foundation asphalt road including removing the
excavated material upto a distance of 50 M beyond area and lifts as
below, stacking as directed by Engineer-in-charge, normal
dewatering, preparing the bed for foundation and excluding
backfilling, etc. complete.
Cu.m
13.00
Cu.m
449.00
Cu.m
575.00
Cu.m
749.00
Lift 0 to 1.5 M
4
5
( Bd-A-4/259)
Lift 0 to 1.5 M
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
Lift 0 to 1.5 M
Cu.m
322.00
Add for every additional lift of 1.5 M beyond initial lift of 1.5 M for Item
Nos 5 to 9
HEAD WORKS
Cu.m
22.00
10
a)
For Head Works on river or dam submergence for initial lift of 0 to 1.5
M
For Head works on nalla or any other site of GSDA for initial Lift of 0
to 1.5M
Add for every additional lift of 1.5 M beyond initial lift of 1.5 M
Cu.m
369.00
Cum
259.00
Cu.m
24.00
Cu.m
779.00
Cum
551.00
Cu.m
24.00
671.00
599.00
599.00
b)
c)
11
a)
For Head Works on river or dam sub mergence for initial lift of 0 to 1.5
M
For Head Works on nalla or any other site of GSDA for initial lift of 0
to 1.5 M
Add for each additional lift to 1.5 M beyond initial lift of 1.5 M
b)
c)
12
a)
Cu.m
b)
Cu.m
Desilting the Supply Well, Intake Well / Head Works, sump of water
supply/ sewerage works etc. in wet or dry condition including lifts upto
15 M and lead upto 150 M as required beyond the work site, stacking,
spreading, including necessary guarding, etc. complete, as directed
by Engineer-in-charge.
Cu.m
13
Add for every additional lift of 1.5 M beyond initial lift of 15.0 M
14
Cu.m
Bhp/Hr
20.00
60.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
15
Refilling the trenches with available excavated stuff with soft material
first over pipeline and then hard material in 15 cm layers with all leads
and lifts including consolidation, surcharging, etc. complete.
Cu.m
60.00
16
Cu.m
60.00
17
Cu.m
629.00
Cu.m
869.00
Cu.m
869.00
Sq.m
197.00
Sq.m
Sq.m
28.00
216.00
Sq.m
24.00
18
19
20
a)
b)
Note:- For the trenches with more than 1.5 M depth shoring if
required from G.L. is to be done and is payable from GL.
Rate
( in Rs.)
2013-2014
Item Description
Unit
Sq.m
1537.00
Sq.m
2327.00
(Bd-C-3 /275)
Providing stuctural steel work in single stanchions composed of RSJ,
channel, etc, with caps, bases, mild steel plates, angles, brackets,
cleats, gusset plates, anchor bolts, etc. as per detailed design and
drawing or as directed by Engineer-in-charge including cutting,
fabrication, hoisting, erecting, fixing in position, making riveted/ bolted
/ welded connections and one coats of anticorrosive paint and over it
two coats of oil painting, etc. complete.
(Bd-C-6 /277)
Providing structural steel work in rolled sections like joists, channels,
angles, tees, etc. as per detailed designs and drawings including
fixing in position without connecting plates, braces, etc. and one coat
of anticorrosive paint and over it two coats of oil painting, of approved
quality and shade, etc. complete.
(Bd-C-2 /275)
Providing structural steel work in trusses, other similar trussed purlins
and members with all bracing, gusset plates, etc. as per detailed
design and drawing or as directed by Engineer-in-charge including
cutting, fabricating, hoisting, erecting and fixing in position, making
reveted / bolted / welded connections and one coat of anticorrosive
paint and over it two coat of oil painting, etc. complete.
(Bd-C-8 /278)
Rate
( in Rs.)
2012-2013
M.T
59583.00
M.T
58719.00
M.T
61655.00
M.T
72957.00
Rate
( in Rs.)
2013-2014
Section G - P.C.C.
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
Cum
3561.00
2 PCC M 150
Cum
4010.00
Rate
( in Rs.)
2013-2014
Item Description
Unit
Rate
( in Rs.)
2012-2013
In RCC M-150
Cu.m
In RCC M-200
Cu.m
In RCC M-250
Cu.m
In RCC M-300
Cu.m
Providing
and
casting
in
situ
Cement
Concrete
of
trap/granite/quartzite/ gneiss metal of approved quality for RCC work
as per detailed drawings and designs or as directed by Engineer-incharge including normal dewatering, plywood form work,bully/steel
prop ups, compaction, finishing the formed surfaces with CM 1:3 of
sufficient minimum thickness if special finish is to be provided and
curing, etc. complete. (By weigh batching and mix design for M-250
and M-300 only. Use of L&T, A.C. C., Ambuja, Birla Gold, Manikgad,
Rajashree, etc. cement is permitted )
Cu.m
Cu.m
4828.00
4931.00
5477.00
5716.00
Cu.m
Cu.m
Deleted
6522.00
7068.00
7277.00
Cu.m
Cu.m
Cu.m
Cu.m
Deleted
6491.00
7037.00
7277.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
For RCC M-150 grade Slabs / Landings / Vertical Walls / Waist Slabs
/ Steps for Staircase
For RCC M-200 grade Slabs / Landings / Vertical Walls / Waist Slabs
/ Steps for Staircase
For RCC M-250 grade Slabs / Landings / Vertical Walls / Waist Slabs
/ Steps for Staircase
For RCC M-300 grade Slabs / Landings / Vertical Walls / Waist
Slabs / Steps for Staircase
Providing and casting in situ C. C. of trap/granite/quartzite/ gneiss
metal of approved quality for RCC work as per detailed drawings and
desingns or as directed by Engineer-in-charge including normal
dewatering,plywood form work,bully/steel prop ups, compaction,
finishing the formed surfaces with CM 1:3 of sufficient minimum
thickness to give a smooth and even surface wherever necessary or
roughening if special finish is to be provided and curing, etc.
complete. (By weigh batching and mix design for M-250 and M-300
only. Use of L&T, A.C. C., Ambuja, Birla Gold, Manikgad, Rajashree,
etc. cement is permitted .)
Cu.m
Deleted
Cu.m
7062.00
Cu.m
7608.00
Cu.m
7848.00
Cu.m
Deleted
Cu.m
7163.00
Cu.m
7709.00
Cum
7949.00
Deleted
7488.00
8034.00
8273.00
Cu.m
Cu.m
Cu.m
Cu.m
Rate
( in Rs.)
2013-2014
Unit
Rate
( in Rs.)
2012-2013
Mild Steel
M.T.
Tor Steel
M.T
57087.00
57087.00
61786.00
7128.00
Sr No
Item Description
a
b
c
M.T
M.T
(a)
8 mm dia.
M.T
10 mm dia.
M.T
12 mm dia.
M.T
16 mm dia.
M.T
20 mm dia.
M.T
25 mm dia.
M.T
28 mm dia.
M.T
32 mm dia.
M.T
(b)
18160.00
16022.00
14618.00
14084.00
12947.00
11744.00
11209.00
10407.00
M.T.
M.T.
sqm
15166.00
11120.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
Rate
( in Rs.)
2013-2014
Item Description
Unit
Providing and fixing G.I. pipe railing having 1.0 M height consisting 50
x 50 x 6 mm thick M. S. angles as verticals at 1.5 M c/c, and additional
posts at every corner with 3 rows of 25 mm dia G.I. pipes of medium
class variety as horizontal and painting 3 coats of oil paint over 1 coat
of anticorrosive paint of approved colour and shade including cost of
all labour, transporting bends to curved shape, etc. complete.
RMT
876.00
RMT
686.00
i) conjusted area.
Litres
Litres
1.97
1.19
1A
2
a
b
c
d
e
Rate
( in Rs.)
2012-2013
Litres
Litres
Providing and fixing M.S. gate 2.5 M wide for compound with 40 mm
dia M.S.black pipe medium class, approved grill work, RCC M - 150
side pillars of 25 cm x 40 cm x 2.5 M height, its foundation, finishing,
painting etc. complete.
Proividing and fixing Wicket gate 1.0 M wide for compound with 40
mm dia M.S.black pipe medium class, approved grill work, RCC M150 side pillars of 25 cm x 40 cm x 2.5 M height, its foundiaion,
finishing painting, etc. complete.
Taking Trial Bore (Core Bore Sampling) by Calyxe machine with
TCT/NX bits together undisturbed strata samples for investigation in
all types of strata soft soil, murum, hard murum with boulders, soft
rock hard rock & quartizite etc. The item includes all Hire & running
cost of Callyx Machine conveying all materials to site of work
excluding conveyance of callyx, machine and back sampling all over
burden strata in glass jar and core samples serially numbered at site
in a wooden Core Box, Samples to be taken at 1.0 m interval and
conveying to the place as directed by Engineer-in-charge, The
diameter of bore in overburden shall be 100 mm and of NX size
(50mm) in other strata. The item shall also include M.S. casing pipe of
2.5 mm thick plate in overburdern only and shall be 1.0 m above GL
with cap over it.
No.
1.54
1.07
26087.00
No.
15620.00
RMT
RMT
RMT
RMT
RMT
1156.00
4548.00
2324.00
3110.00
6760.00
Rate
( in Rs.)
2013-2014
Unit
Rate
( in Rs.)
2012-2013
Sr No
Item Description
1
2
7
Bag
Bag
RMT
828.00
838.00
730.00
Litre
3.92
Sq.m
278.00
10
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
1676.00
1896.00
2104.00
2360.00
2510.00
2978.00
3620.00
4412.00
5143.00
5943.00
7338.00
12441.00
15413.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
19475.00
24902.00
14
750 mm
No
15
800 mm
No
16
900 mm
No
17
1000 mm
No
11
A
1
Note : Only 75% rate shall be payable till satisfactory hydraulic testing
is given.
Dismantling dead pipeline of M.S./R.C.C./ C.I./ P.S.C. and G.I./ A. C. /
P. V. C. / S. W. / H. D. P. E. pipe including cost of necessary
excavation and refilling of trenches, breaking the joints, lifting the
pipes and stacking to the place as directed by Engineer-in-charge with
all leads and lifts including cleaning the surface, etc. complete.
For M.S./R. C. C./ C.I./ P. S. C.
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
750 mm
RMT
B
1
32768.00
45587.00
126.00
139.00
141.00
144.00
158.00
174.00
188.00
211.00
229.00
260.00
273.00
335.00
380.00
438.00
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
750 mm
RMT
76.00
83.00
84.00
85.00
95.00
105.00
113.00
126.00
138.00
157.00
164.00
201.00
235.00
264.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
12
Providing and constructing two taps standpost as per type design wih
excavation 15 cm thick PCC 1:3:6 bedding 20 mm thick PCC 1:2:4
concrete for platform of 1.75 M dia. with side curb and bucket rest, 80
mm dia, heavy duty GI pipe central post duly filled therein with C. C.
1:2:4, 5 M long, 20 mm dia. medium G.I. pipe from point of tapping to
standpost additional 20 mm dia G.I. pipe fixed vertically upto 15 mm
dia self closing water taps, one brass ferrule etc. complete together
with all labour and material charges as per drawing and as directed by
Engineer-in-charge when good foundation is available. Rate
includes draining arrangemment by excavating open gutters.
No
6843.00
No.
2566.00
No
7484.00
No
4633.00
14
13
a
b
Rmt
Rmt
Rate
( in Rs.)
2012-2013
Rate
( in Rs.)
2013-2014
Item Description
Unit
2
WATER TREATMENT PLANT ( W.T.P.)
Designing (aesthetically), providing and constructing high rate
Unconventional Water Treatment Plant i.e. Simplified Water
Treatment Plants consisting of Civil Works, including cost of
providing and applying Epoxy paint to inside surface of water
retaining structures in contact with Chlorine and providing antitermite treatment to entire structure below ground level,
Mechanical and Electrical components of variours sub-works
as given below : including necessary hydraulic testing,
structural testing and trial run for 3 months, etc. complete as
directed
by
Engineer-in-charge
.
( turn-key job ).
1) Aeration fountain
2) Inlet arrangements
3) Mixing channel with ventury flume and flow measuring
arrangement.
4) Inlet channel
5) Flocculator- Confirming to I.S. 7208-1974 ( Type-C )
with detention period of 30 minutes.
6) Tube Settlers " Designing, fabricating and construct
Tube Settlers with square or any other shaped tube like
Circular, Cheveron, Hexagonal etc. having proven
7) Rapid sand gravity filters.
8) Filter house
9) Chemical house
10) Alum tanks 2 Nos. with mixing, carrying and dosing
arrangement with piping.
11) Gravity feed gas chlorinator with 100% standby.
12) TCL solution tank with mixing, carrying and dosing
arrangement with piping.
13) Bye-pass arrangement
14) External and internal electrification
15) Laboratory equipments
16) Wash water tanks of capacity equal to 2% of designed
quantity of filtered water in a day ( + ) 10%
17) Wash water pumps with 100%standby
18) Pure water sump capacity equal to 1 hour pumping
capacity
19) Pure water pump house over the sump / by the side of
sump
20) Drainage arrangements
21) Alum store
22) Sanitary block with necessary water supply and drainage
arrangement and internal WBM roads
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
23) These rates are applicable for seismic zones 2, 3, and
4
Rate
( in Rs.)
2012-2013
4
Unit
Rs. In
Lakhs
---
53.46
Per MLD
23.76
---
77.22
Per MLD
17.82
--Per MLD
---
130.68
14.26
201.98
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
6) Rapid Sand Filters and Filter House Filter designed for
filteration rate of 5,000 liters per squre metre per hour,
minimum 2 beds for plant upto 10MLD for larger plants as
specified , filters house with roof slab, pipe gallery and plat
form minimum 5.5 metre in width
a) Filter Sand : Effective size 0.45 to 0.70mm, uniformity
coefficient not more than 1.7, nor less than 1.3 , depth of water
over sand 0.75M , free board 50 cm , gravel 0.45 M depth,
sand and gravel confirming to I.S. 849 (I)-77 back wash by air
wash, Standard appurtenances ( to be specificed), rate of flow
controller, filler guage, sand expansion guage etc.
10
15
20
27 & above
Cylinders
45
67
Tonners
6.35
9.50
110
10.75
14.50
18.70
16.10
21.24
28.12
130
254
315
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
c) Chlorinator equipment and container room : to confirm
to I.S. 10553 Part-I 1983
d) 100% standby shall be provided
11) By pass arrangement - C.I. Or M.S. pipes
12) Drainage arrangement : RCC pipes upto plot boundry.
Upto 5 MLD
Cost of 5 MLD Treatment Plant
Add for capacity above 5 MLD upto 10 MLD
Cost of 10 MLD Treatment Plant
Add for capacity above 10 MLD upto 20 MLD
Cost of 20 MLD Treatment Plant
Add for capacity above 20 MLD upto 50 MLD
Cost of 50 MLD Treatment Plant
Add for capacity above 50 MLD upto 100 MLD
Cost of 100 MLD Treatment Plant
Add for capacity above 100 MLD
Designing (aesthetically), providing, fabricating, Package
Water Treatment Plant. At the shop, transporting to site,
installing, testing and commissioning at the site, giving
necessary one months free test and trial run with guarantee
for one year, etc. complete.
Prefabricated Package Water Treament Plant comprising
following
1. Rapid mixing Channel in M.s.Sheets and M.S. baffle.
2. Flocculator not less than 10 minutes detention, in M.S.
prefabricated box, flocculation being achived either by glass
pebbles of graded size or PVC tetrapod or equivalvent
arrangement to ensure good floc formation.
Unit
MLD
-MLD
-MLD
-MLD
-MLD
-MLD
Rate
( in Rs.)
2012-2013
4
Rs. In
Lakhs
33.26
166.30
23.76
285.10
15.44
439.50
14.26
867.30
11.88
1461.30
9.50
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
3. Plate or tube settlers of not less than 30 minutes
detention, in M.S. prefabricated box, plates/ tubes mounted in
the settler basin with inclination of not less than 60 degree to
horizontal
4. Rapid sand gravity filter in M.S. prefabricated box with
filter sand not less than 500mm thick, supported on false
floor below with polypropylene nozzles spaced at not more
than 500mm centres in either direction.
5.Backwashing, inlet facilities
inlet facilities shall be
provided.
5.1 Air Blowers : Capacity of delivering 600 LMP per sq.mtr.
Of free air of filter area 0.4 Kg./Cm2 at under drain ( 100%
5.2 Wash) water tank of capacity equal to 2 % of designed
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
a) Velocities in channels not to exceed 0.6 M/Second.
b) Velocities in filter outlet pipes and valves not to excess
1 M/Seconds
c) Velocities interconnecting pipe and control not to exceed
1 M/ Seconds.
4,A
Sr. No.
1
2
3
4
5
6
7
8
Each
Each
Each
Each
Each
Each
Rate
( in Rs.)
2012-2013
4
Rs. In
Lakhs
27.44
33.69
37.78
47.40
56.14
72.35
Upto 10 MLD
Cost of 10 MLD plant
Add for capacity above 10 MLD upto 20 MLD
Cost of 20 MLD plant
Add for capacity above 20 MLD upto 50 MLD
Cost of 50 MLD plant
Add for capacity above 50 MLD upto 100 MLD
Cost of 100 MLD plant
MLD
-MLD
-MLD
-MLD
--
Rs. In
Lakhs
47.52
475.20
41.58
891.00
35.64
1960.20
29.70
3445.20
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing (aesthetically), providing, and constructing
,hydarulic testing ,commissioning and giving satisfactory trials
of modernised Sewage Treatment Plant consisting of inlet
chamber, screen
chamber ,Detritus Tanks, Partial
flume, primary settling tanks, Aeration tanks, Secondary tanks,
Sludge sump and pump house, Sludge thickner, Primery
digester, SST sump and pump house, chlorine contact tank
Chlorinators, Chlorinator room, sump cum blending tank
(SCBT) PST sludge sump cum blending tank, Pump House
Sludge Centrifuge gas holder, necessary piping work with
required valves , gates, drains, pathways, Administrative
Building cum Laboratory, Laboratory equipments, tools and
plants, Spare parts etc. complete as tunkey job with all
involved civil electrical and mechanical works inclusive of
following items units as per detailed specification for civil,
electrical and mechanical components with all duties and
taxes etc complete.
4,B
Inlet Chamber:
Designing, providing and constructing RCC (m:300) Inlet
chamber designed for the peak flow 2 DWF including
necessary excavation in all types strata including walkway
around the periphery. Each compartment will have phosper
bronze, steel gate with extension rod, head stock, operating
wheel, G.I. pipe railing etc. The work includes providing and
making necessary arrangements to connect the flow to screen
chamber by approach channel as directed and as per
specifications.
Screen Chambers:
Designing, Providing and constructing and testing
commissioning screen chamber, designed for average 1 DWF
and maximum 2 DWF in RCC ( M-300), including inlet pipe/
Channel from inlet chamber outlet pipe/Channel to detritus
tank, free board of 0.50 M minimum RCC walkway 1.2 M wide
with G.I. pipe railing. RCC stair case of 1.2m width from G.L.
to screen chamber.
Detritus Tank:
Designing , Providing and constructing continuously grit
removal type of Detritus Tank, mechanically operated inRCC (
M 300) capable of removing 100% 0.20mm size particle and
above, having specific gravity 2.30 designed for one peak 2
DWF with suitable arrangement of separation of grit from
putrescible solids including providing and making necessary
arrangement of JB-1 inlet and outlet channels of required
sizes as may be required to connect the flow to parshall flume
etc. complete. including hydrualic testing for water tightness of
the structure having minimum free board of 0.30m washout
arranement to grit chamber and platform 1.20m wide RCC
walkway with G.I. pipe hand railing shal be provided. A pit for
collecting grit conveyed by conveyor shall be provided. It
should be suitable to handle the grit for carting. All
arrangements shall be as per detailed specifications and as
directed
Parshall Flume.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, Providing and constructing Parshall, Flume
Channel in RCC (M300) for measuring quantity of sewage
received at the treatment works, max flow of 2 DWF and
minimum flow of 1/2 DWF including providing and making
necessary arrangement of approach channel as may be
required to connect the flow having minimum velocity of 0.3 m
per second to Distrubution Box ( DB-1) The unit shall be
provided with walkway & RCC staircase having width of 1.20m
each etc. complete, including hydraulic testing for water
tightness of the civil structure having free board of 0.6 m
including electrically operated, flow indicating and flow
integrating devices having standby of float operated ROF
meter. All arrangement as per specifications.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Desiging, Providing and constructing in RCC mix ( M-300)
Aeration Tank in compartments to handle combined flow of 1
DWF incoming flow and recirculation flow including
construction of inlet, outlet and distribution chamber DB-3 and
providing 1.20 M wide clear peripherial and approach
walkways, expansion joints wherever necessary, including
foundation etc. as per specification. Peak factor shall be 2,
F/M ration shall be 0.40 low speed aerator speed between 20
to 100 RPM recirculation flow @ 50% and free board 0.60m,
Depth ( SWD) 3.50m ,minimum D.O. level at A.T. 2 Mg/Lit
MLVSS concentration shall be 2500mg/Lit and MLVSS
concentration shall bw 2000 Mg/Lit, HRT shall be 4 to 6 hours
and STR 6-8 days. It should have compartents for washing
oxygen transfer capacity of mechanical aerator shall not be
less than 1.5 Kg/KWH, BOD of effluent 20mg/lit with input to
aerator 0.15, to 0.30 Kwh/ 1000 cum of Aeration tank. All
related works shall be as per detailed specification.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Sludge Thickner with equipments:
Designing providing and constructing water tight of Sludge
Thickner (Gravity type) including foundation inRCC (M-300)
with inlet and outlet chamber, influent well, inlet and outlet
pipes, with sludge pit and lsudge removal arrangement,
grouting wherever necessary with walkway all around of 1.20m
width, G.I. pipe railing interconnecting CI pipes all complete as
per specification Detention time 24 hours. SWD shall be 4.25
metre with necessary fixed bridge scraper arrangment as per
detailed specification and necessary inlet and outlet
arrangement. All other arrangement as per detailed
specification.
Primary Digestor with mixer equipment( Fixed Cover)
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, Providing and Constructing Chlorine Contract
chamber of adequate capacity to deal with 1 DWF. Average
flow. The chlorine contact tank should be of 30 minutes
capacity during average flow to achieve 99.99% coliform
reduction. Chlorine dose shall be maintained as per standard
provision including provisions including designing, providing
and constructing water supply arrangment for chlorination,
including providing dewatering and bypass arrangments
joiting to final efluent main and outlet weir etc. complete The
effluent quality should match with the standard laid donw my
Maharashtra Water Pollution Control Board and as per the
obligatory provision and detailed specification and as directed
by Engineer-incharge.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Sludge Centrifuge Room with Centrifuges:Designing, providing and constructing and installing including
foundation etc. Sludge Centrifuge to handle the sludge flow of
one day in one hour per unit with sludge dewatering unit drain
etc. complete as per specification. Sludge centrigure with all
necessary arrangement as per detailed specifications
mentioned in Volume-II and Volume-III of tender and
obligatory provisions, be provided with satisfactory functioning.
Gas Hoder:
Designing, Providing and constructing gas holder having gas
collection system gas flow meter and gas burner with floating
dome arrangment and storage time 6 hrs. to be constructed in
M-300 having appropriate diameter as per detailed
specification and obligatory provisions. The flating dome shall
be of 8mm thick M.S. plate minimum and shall be provided
with two coats of anticorrosive epoxy coating from both faces.
Outfall Sewer :
Designing providing and constructing approprate Outfall
Sewer of RCC NP-2 pipe to discharge treated effluent,
untreated effluent from outlet chamber ( after secondary
clarifier) to the local nalla at a point shown on the drawing
including necessary chambers for inspection/ cleaning
including necessary excavtion dewatering refilling, concrete
encasing/ bedding ,concrete steps to reach the nalla bed level.
pitching and energy dissipation chamber in the nalla portion
etc. complete upto 50 m length RCC NP-2 pipe line and
inclding all above items
Piping work in C.I.L.A. class including Sluice valves,
Reflux valves M.S.Gate.
Providing laying and jointing pipe other than those already
included in the above items for interconnection by-pass drains
etc. ofall units including adequate numbers of manhole
chambers. The item includes excavation, refilling and
hydraulic testing of pipes, valves, gates, accessories and cost
of jointing material . The item includes required channels with
gates for interconnection of units by pass drains etc. for all
units and as directed etc. complete. as per detailed
specification.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Administrative Building Cum Laboratory ( G+ 1)
Designing, providing and constructing Administrative
Building office cum Laboratory including stores. This shall be a
building having appropriate Carpet area at ground floor and at
first floor complete as per specifications including necessary
excavation , foundation in RCC M-200 framed structure, B.B.
Masonary ( II-Class inC.M. 1:6) 20mm cement plaster in C.M.
1:3, inside and outside painting ,Alluminium door and window
with glass pannels mosaic tile flooring and skirting and all
other allied items, fixtures fastening electrification arrangement
water supply arrangement etc. complete. The building will
have laboratory on upper flor of administrative building and
should be so centralised that it should not be attached with
any units but should have complete control of every unit as per
Laboratory Equipment, beautification, telephone and intercom
arrangement and wireless system etc. complete.
Sr. No.
1
2
3
4
5
6
7
8
4D
INLET CHAMBER
Unit
MLD
-MLD
-MLD
-MLD
--
Rate
( in Rs.)
2012-2013
4
Rs. In lakhs
57.02
570.20
49.90
1069.20
42.77
2352.30
35.64
4134.30
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing and constructing commissioning and
hydraulic testing Inlet chamber for the peak flow of 2 DWF
including necessary excavation in all types of strata including
walkway1.2 m wide all round the periphery.
CIVIL ITEM- All component of inlet chamber shall in RCC M30
only
MECHANICAL ITEM - CI Gates with phosphor bronze
sealing face /strips with extension rod, head stock, operating
wheels. Pipe railing shall be in GI pipe with MS angle post
.etc.
The work includes providing and making
necessary arrangements to connect the flow to screen
chamber by approach channel as directed and as per
specifications.
SCREEN CHAMBER
Designing, providing, constructing, testing and commissioning
of screen chamber, designed for average 1 DWF and
maximum peak flow of 2 DWF. This unit shall be provided free
board of 0.5 m minimum, RCC walkway 1.2 m wide with GI
pipe railing, RCC stair case of 1.0 m width from GL to screen
chamber.
CIVIL ITEM All component shall be in RCC M-30 only,
MECHANICAL ITEM - All screens provided
(Mechanical/Manual) with MOC SS 304 with belt conveyor
mechanism , Piping of CI/DI/MS .
DETRITUS TANK
Designing, providing ,constructing, testing and commissioning
continuous grit removal type Detritus tank, mechanically
operated capable of removing 100% of 0.2 mm size particle
and above, having specific gravity 2.30 designed for one peak
flow of 2 DWF with suitable arrangement of separation of grit
from putrescible solids. Inlet and outlet channels of required
sizes as may be required to connect the flow to connecting
unit etc. Complete including hydraulic testing for water
tightness of structure having minimum FB of 0.3 m, wash out
arrangement to grit chamber and platform 1.2 m wide RCC
walkway with GI wide RCC walkway with GI pipe handling
shall be provided. Item to include closed Chute of GI sheet to
convey the grit to the hand cart placed below it and two hand
carts . All arrangements shall be as detailed specifications
and as directed.
CIVIL ITEM :- All component shall be in RCC M30 only.
MECHANICAL ITEM:- All component of grit mechanism
shall of MSEP and approved make with adequate HP
electrical motor to run the mechanism .
BIOTOWER
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing , constructing, testing and commissioning
in RCC (M-30), BIOTOWER according to drawings' received
from technology provider , for biological removal of BOD in
compartments to handle combine flow of 2 DWF and to be
checked for peak flow incoming flow including construction of
Tower with Media , rotating arm with sprayers and providing
1.2 m wide clear approach walkways, wherever necessary,
including foundations etc. as per specifications.,including PVC
Media , sprinkler system with rotating arm / equipment and FB
0.5 m and SWD as required.
Peak factor shall be 2
Biotower recycle sump of adequate capacity including
pumpsnshall be provided to maintain the wetting rate of biotower
to lean flow conditions
CIVIL ITEM :- All component shall be in RCC M30 only.
MECHANICAL ITEM:- PVC Media , Sprinkler system in MS
pipes epoxy painted, recirculation system &required piping of
CI /MS epoxy painted etc.
4A
MIXING CHAMBER
Designing, providing , constructing, testing and commissioning
in RCC (M-30), MIXING CHAMBER to handle flow of 1 DWF
and recirculation flow including construction of baffel walls ,
foundations etc. as per specifications., to ensure complete
mixing of raw sewage received from Bio-tower and
recirculation flow from SST , capacity of mixing chamber shall
be
as
per
designer
requirement.
CIVIL ITEM :- All component shall be in RCC M30 only.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
CIVIL ITEM :- All component shall be in RCC M30 only
Suitable Air blower room shall be provided near aeration tank
with
acoustic
arrangement.
MECHANICAL ITEM :- Diffusers of EPDM material , air
blowers with VFD, air piping of MS. epoxy lined and out
coated up to water level and PVC inside water & accessories
shall be provided as per detailed specification.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing and constructing chlorine contact
chamber of adequate capacity to deal with 1 DWF average
flow. The chlorine contact tank should be 30 min capacity,
during average flow to achieve colliform reduction to the level
of MPN 1000/100ml. Chlorine dose shall be maintained as
per standard provisions, including designing, providing and
constructing water supply provision for chlorination including
providing dewatering pump and byepass arrangement,
dechlorination arrangement jointing to final effluent mains and
outlet weir, etc. complete. the effluent quality should match
with the standards laid down by Maharashtra pollution control
board and as per obligatory provision and as detailed
specification and as directed by Engineer-in-charge.
10
Sludge Thickener
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing ,constructing, commissioning and testing
of sludge thickener -gravity type with inlet & Outlet pipes ,
Central feed well , sludge pit & sludge removal arrangement ,
with necessary walkway all around of 1.20m wide with GI
railing inter connecting piping all complete with necessary
fixed bridge scraper arrangement as per detailed specification
.CIVIL ITEM - All component shall be in RCC M-30only,
MECHANICAL ITEM - fixed bridge shall be in MS and All
component in contact water shall be MSEP/CI.Piping shall be
of CI.
CENTRFUGE UNIT
Designing, providing, constructing , installing ,commissioning
and testing centrifuge unit to handle the sludge flow of 1 day
in 20 hours per unit with sludge dewatering unit drain etc.
complete as per specification. Sludge feed pumps with the
necessary arrangement, as per detailed specification
mentioned in tender and obligatory provisions to be provided
with satisfactory functioning. CIVIL ITEM - All component
shall be in RCC M-30only, MECHANICAL ITEM -all
mechanical items shall be provided as per specification
confirming to Relevant IS, and Piping shall be of CI/HDPE.
Chute in GI , Decanted water piping in PVC .
11
12
Outfall Sewer
Designing, providing and constructing appropriate outfall
sewer of RCC NP2 pipe, to discharge treated effluent from
outlet chamber after chlorination tank to the local Nallah at the
point shown on the drawing including necessary chamber for
inspection and cleaning including necessary excavation,
dewatering, refilling concrete encasing / bedding concrete
steps to reach the nallah bed level, pitching and energy
dissipation chamber in nallah portion etc. complete up to 50 m
length RCC NP2 pipe line and including all above items.
13
14
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing and constructing administrative building,
office cum laboratory including stores. This shall be a building
having apropriate carpet area . at ground floor and at first
floor complete as per specifications including necessary
excavation, foundation in RCC M-200 framed structure B. B
Masonry ( II -class in C.M. 1:6) 20 mm thk cement plaster in
CM 1:3 inside and outside painting. Aluminum door and
window with glass panels, ceramic tile flooring and skirting
and all other allied items, fixtures fastening electrification
arrangement water supply arrangement etc. complete. The
building will have laboratory on upper floor of administrative
building and should be so centralized that it should not be
attached with any unit but should have complete control of
every unit as per laboratory equipment, beautification,
telephone arrangements PLC Panel & Computer housing,
Tool room, workshop etc.
15
MLD
Cost of 10 MLD
Above 10 to 20
MLD
Cost of 20 MLD
Above 20 to 35
MLD
Cost of 35 MLD
Above 35 to 50
MLD
Cost of 50 MLD
Above 50 to 75 MLD
MLD
Cost of 75 MLD
Above 75 to 100
MLD
Notes :The rates for civil work, RCC M30 grade for water retaining
structures and M20 Buildings
( partition walls of biotower
shall be in BB masonry in CM 1;6,with smooth cement
plaster inside in CM 1;4 and sand faced plaster in CM 1;6
outside) ,Misc works.
MLD
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
OPC cement and steel Fe 415 has been considered for
casting purpose
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
2
The dead biomass generated will be separated in the
CLARISETTLER TANK wherein tube media is provided for
providing additional surface area for settlement of bio mass &
thereby reducing the space requirement. The solid-liquid
separation is achieved in this tank and clear supernatant will
flow by gravity.
The treated wastewater will be disinfected with Chlorine and
allowed to react in CHLORINE CONTACT TANK prior to
suitable disposal.
A typical sketch of bio reactor showing various components is
given below.
The MMBR/FAB Technology has following advantages over
Conventional Systems like :
1
2
3
4
5
6
7
8
II
340 mg/l
30 mg/l
106 to 107 per 100 ML
6.5-8.5
< 30 mg/l
< 20 mg/l
< 100 mg/l
< 10 mg/l
< 1000 per 100 ML
Unit
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing, construction, hydraulic testing,
commissioning and giving satisfactorily trials of STP consisting
of Inlet Chamber, screen chamber, Grit Separator, MMBR /
FAB (Based on technologies providing attached growth on
plastic meddi kept suspended in the waste water due to low
density of plastic & provided with compressed air for aeration
with very high MLSS of greater than 15,000 mg/lit.) tank,
Secondary Clari settler, Sludge sump, Sludge Thickener,
Chlorine Contact Tank, Chlorinator room/Shed, sludge
Centrifuge, associated piping work with required valves,
gates, drains, pathways, Administration Block cum
Laboratory, Laboratory Equipments, spares parts for 2 years
of operation, etc. complete as turnkey job with all involved
civil, electrical and mechanical works inclusive of following
items, units as per detailed specifications for civil, electrical
and mechanical components with all duties and taxes etc.
complete. Treated sewage can be used for irrigation,
horticulture purposes.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing & constructing in RCC (M-25) biological
reactor tank for removal of BOD along with nutrient removal to
handle the average flow & having hydraulics suitable to handle
peak flow conditions with suitable 1.2 m wide walk way,
expansion joints as required, including foundation etc as per
specifications. The tank shall be equipped with inlet & outlet
arrangement, air blowers for supply of air, coarse bubble
diffusers & aeration grid in SS 304, PP carrier bio media etc.
FB of 0.5 m & SWD as required should be complete as per
detailed specifications.
5. Secondary Clarisettler
Designing, providing & constructing in RCC (M-25) water tight
secondary clarisettler having SWD of 3.75 m + 0.5 m FB & has
tube media in the clarification zone to provide additional
surface area for settling. The settler shall be provided with a
scraper mechanism in MS with epoxy painting for collecting
the settled solids at the bottom (bottom slope 1:12). The
central feed well shall be made of MS with epoxy painting from
both faces & well stiffened. The sewage will be admitted in the
feed well & then will move outwards towards periphery slowly
& continuously over a weir & will be collected in a launder.
6. Chlorine Contact Tank
Designing, providing & constructing chlorine contact tank of
adequate capacity to deal with average flow. The contact time
provided is 30 mm to achieve 99.99 % reduction in coliform
during average flow condition. Chlorine dosage will be as per
standard provisions including designing, providing &
constructing water supply provisi9n for chlorination, including
providing dewatering & by pass arrangement for joining to final
effluent mains & outlet weir etc complete. The effluent quality
should match with the standards laid down by Maharashtra
Pollution Control Boars & as per obligatory provision & as
detailed specification & as directed by engineer in charge.
7. Chlorinator & Chlorinator Room / Tonner Room
Designing, providing & constructing vacuum type chlorinators
having adequate capacity for dosage of adequate chlorine to
ensure 99.99% coliform reduction as per obligatory provisions
detailed specifications with necessary provision of having
chlorinator room of adequate size. The chlorinator equipment
shall include chlorine cylinders I tonners, piping, valves,
measuring controlling equipments, safety devises, lifting
equipment etc. complete as per IS 10553 (Part II) 1982. The
tonner room should have mm 3 MT capacity crane for loading
& unloading facility. Tonner storage should be distinctly
isolated and should have min. storage space as per the
detailed specifications & as per gas law 1981 & factory act
shall be provided. All other matching amenities shall be
provided, 5 MT gantry rail shall be provided for full length of
tonner room a 6 m Ht from level of tonner room with outlet.
8. Sludge Sump
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing & constructing of sludge sump and pump
for discharging sludge to sludge thickener using MS pipe
complete as per detailed specification.
9. SIudge Thickener
Designing, providing & constructing water tight of sludge
thickener - gravity type in RCC (M-25) with inlet & outlet pipes,
central feed well, sludge it & sludge removal arrangement,
grouting wherever necessary with walkway all around of 1.20
m with GI pipe railing interconnecting CI pipes all complete as
per specifications, having bottom slope 1:8 & 3 m SWD with
necessary fixed bridge scraper arrangement as per detailed
specifications & necessary inlet & outlet arrangement. All
other arrangement as per detailed specifications.
10. Sludge Centrifuge Platform with Centrifuge
Designing, providing, constructing & installing including
foundation etc. Sludge centrifuge to handle the sludge flow of
1 day in 18 hrs per unit with sludge dewatering unit drain etc
complete is per specification. Sludge centrifuge with
necessary arrangements as per detailed specification
mentioned in tender and obligatory provisions to be provided
with satisfactory functioning.
11. Outfall sewer
Designing, providing, constructing appropriate outfall sewer of
RCC NP2 pipe to discharge treated effluent, untreated effluent
from outlet chamber (after basin / chlorination tank) to the local
Nallah at the point shown on the drawing including necessary
chambers for inspection & cleaning including excavation,
dewatering, refilling, concrete encasing I bedding concrete.
12. Pining work in CI- LA class including sluice valves,
reflux valves, MS Gates
Providing, laying & jointing pipes other than hose already
included in the above items for interconnection by pass drains
etc. of all units including adequate numbers of manhole
chambers. The item includes excavations, refilling & hydraulic
testing of pipes, valves, gates, accessories & cost of jointing
materials. The item includes required channels with gates or
interconnection of units, by pass drains etc. for ill units as
directed etc complete as per detailed specifications.
13. Administrative Building cum Laboratory (G+1)
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
III
1
2
Item Description
2
Designing, providing & constructing administrative building,
office cum laboratory including stores. This shall be building
having appropriate carpet area & ground floor & at first floor
complete as per specifications including necessary
excavation, foundation in RCC M 20 framed structure, BB
masonry (II class in CM 1:6) 20 mm cement plaster in CM 1:3
inside & outside painting, aluminum door & window with glass
panels, mosaic tile flooring & skirting & all other allied items,
fixtures, fastening, electrification arrangement, water supply
arrangement etc complete. The building will have laboratory
on upper floor of administrative building & should have
complete control of every unit as per laboratory equipment,
beautification, telephone & intercom arrangement & wireless
system.
PRICE SCHEDULE
Capacity of the Plant
1
600
3
900
5
1200
8
2000
10
2300
13
2700
15
3200
18
3600
20
3900
25
4750
NOTES
Screen chamber & grit separator up to 5 MLD Capacity are
manual type.
Up to 5 MLD Capacity STP chlorination is done by using
sodium hypochlorite solution. Above 5 MLD capacity gas
chlorinator is provided.
Sludge thickener is not provided up to 3 MLD capacity STP.
Sludge will be collected into sludge sump & pumped directly to
sludge dewatering system
8
9
Unit
10
11
12
.
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
13
14
Item Description
2
Peak factor considered for design for plants up to 3 MLD is 3,
4 to 15 MLD is 2.5,16 to 20 MLD is 2.0.
IV
S.No.
1
Description
Centrifugal Pumps
Screw Pumps
Air Blower
Dosing Pumps
15
16
Unit
Rate
( in Rs.)
2012-2013
4
Make
Kirloskar / Jhonson /
Kishor / Eqv.
Roto / Tushaco / Eqv.
Usha / Swam / Kay /
Kulkarni / Eqv.
Milton Roy / VK Pumps
/ Positive /
Minimax / Eqv.
Agitators / Flocculators
To be fabricated as per
Screens
Grit Separator
To be fabricated as per
MJP approved design /
make
Chlorinator
10
Chlorine Tonner
11
12
Motors
13
Cables
14
MS pipes
Toshcon Jesco /
Banaco / Perfect
Chloro /
Chlorocontrol / Metito /
Eqv.
Meenakshi / Eqv.
Alfa Laval / Humbolt /
Wedag/ Hiller/ Eqv.
Crompton/ Siemens/
Lakshmi
Finolex/ Polycab
Mahalakshmi
Seamless/
Maharashtra
Seamless/
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
15
CI Pipes
16
Valves
17
Clarisettler Media
18
Unit
Rate
( in Rs.)
2012-2013
4
Suryaroshni/ Jindal/
Eqv.
Truform/ Electrosteel/
Kejriwal/ Eqv.
Intervalve/ BDK/
Procon/ Tyco/
AV valves/ Eqv.
4F
Cooldeck/ Munters
As per MJP approved
design / make
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing and constructing continuous grit removal
type of Detritus Tank, mechanically operated in RCC (M 250)
capable of removing 100% of 0.2 mm size particle and above,
having specific gravity 2.30 designed for one peak 2 DWF with
suitable arrangement of separation of grit from putrescible
solids. Inlet and outlet channels of required sizes as may be
required to connect the flow to connecting unit etc. Complete
including hydraulic testing for water tightness of structure
having minimum FB of 0.3 m, wash out arrangement to Grit
chamber and platform 1.2 m wide RCC walkway with GI pipe
handling shall be provided. A pit for collecting grit conveyed by
conveyor shall be provided. It should be suitable to handle the
grit for carting. All arrangements shall be as detailed
specifications and as directed.
4. CASP Basins
Designing, providing and constructing in RCC (M:250), CASP
basins for biological removal of BOD along with nitrification,
denitrification, Bio-P removal in compartments to handle
combine flow of 1 DWF incoming flow and recirculation flow
including construction of selector compartments and providing
1.2 m wide clear approach walkways, expansion joints
wherever necessary, including foundations etc as per
specifications. Peak factor shall be 2, F/M ration shall be 0.15,
complete with air blowers, fine diffused aeration grid /
equipment and FB 0.5 m and SWD as required. DO level in
basin to be minimum 2 mg/l complete with "Oxygen Uptake
Rate" control system and all related instruments. Stainless
steel decanters and automation works. MLSS concentrations
shall be 2000-5500 mg/l or more, MLVSS to MLSS ratio to be
0.8. HRT shall be between 12 to 13 hrs and SRT suitable for
fully disgested sludge. It should have all other related works as
per detailed specification. In Case CASP is designed to
achieve N, P removal HRT shall be between 15-18 hrs and
SRT shall be suitably provided to achieve N, P removal.
5. Chlorine Contact Tank
Designing providing and constructing chlorine contact
chamber of adequate capacity to deal with 1 DWF average
flow. The chlorine contact tank should be 30 min capacity,
during average flow to achieve 99.99% coliform reduction.
Chlorine dose shall be maintained as per standard provisions,
including designing, providing and constructing water supply
provision for chlorination including providing dewatering and
by pass arrangement jointing to final effluent mains and outlet
weir, etc complete. The effluent quality should match with the
standards laid down by Maharashtra water pollution control
board and as per obligatory provision and as detailed
specification and as directed by Engineer-in-charge.
6. Chlorinator and Chlorinator Room / Tonner Room
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Designing, providing and constructing chlorinators vacuum
type 2 Nos. with auto switchover facility and having capacity
for dosage of adequate chlorine to ensure 99.99% coliform
reduction as per obligatory provisions and detailed
specifications with necessary provision of having chlorinator
room of adequate size. The chlorinator equipment shall
include cost of chlorine cylinders / tonner piping, valves,
measuring and controlling equipments, safety devices, lifting
euipments, etc. complete as per IS-10553 (part II) 1982. The
tonner room should have minimum 3 MTcapacity Hoist for
loading and unloading facility. Tonner storage should be
distinctly isolated and should be for minimum storage space
as directed in the design specification and as per gas laws
1981 and factory act shall be provided. All other matching
amenities shall be provided, 5 MT gantry rail shall be provided
for full length of tonner room at 6 m height from level of tonner
room, with outlet chamber and treated effluent outlet channel
etc. complete as per detailed specification.
7. Sludge Sump
Designing, providing and constructing of sludge sump and
pump house of appropriate size with pumps, ceiling height
minimum 6 m over sump for discharging sludge to centrifuge
using CI pipe complete as per detailed specification.
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
Unit
2
Providing laying and jointing pipes other than those already
included in the above items for interconnection by - pass
drains etc. of all units including adequate numbers of manhole
chambers. The item includes excavations, refilling and
hydraulic testing of pipes, valves, gates, accessories and cost
of jointing materials. The items includes required channels
with gates for interconnection of units by pass drains etc for all
units as directed etc complete as per detailed specifications.
No. of Basins
2
2
2
2
2
4
4
4
4
4
4
4
6
6
6
NOTES
These Rates are for Civil Works, in M30 grade RCC.
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
MLD
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Item Description
2
OPC has been considered for costing purposes.
Unit
Rate
( in Rs.)
2012-2013
4
Rate
( in Rs.)
2013-2014
5
Sr No
Rate
( in Rs.)
2012-2013
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
10
11
12
13
14
15
16
17
18
19
20
21
Unit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
Per Lit
12.26
306500.00
7.13
484750.00
5.94
633250.00
5.35
767000.00
5.04
1019000.00
4.75
1256500.00
4.16
1672500.00
3.56
2384500.00
2.97
3869500.00
2.38
5059500.00
1.78
Rate
( in Rs.)
2013-2014
Item Description
1
Notes:
1. The design of the structure be in accordance with relevent
(I.S.3370 - 1965 or revised)
2. The design shall satisfy the stipulation as per IS 1893-1984 and
I.S. 13920/1993 for seismic focrce and I.S.- 11682/1985 for R.C.C.
staging of overhead tanks.
3. For design having more than 6 columns, Providing of internal
bracing is obligatory,. External bracking is also obligatory.
4.. The entire structure shall be in M 300 mix only.
5. Plain round mild steel bars grade - I confirming to I.S,432 Part-I or
high yield strengh deformed bars confirming to I.S. 1786 or I.S. 1139
shall be used, grade-II mild steel bars will not be allowed.
6. Irrespective of the type of foundation proposed in the design, one
set of bracing be provided at the gound level.
7. These rates include providing, M.S. ladder for E.S.R's upto 2 lakhs
liters capacity and providing sprial staircase for E.S.R. above 2 lakhs
liters capacity.
8. Stagging shall have to be designed with stresses of M-200 for
ESR. However all RCC construction should be done in M-250
9. These rates are including the cost of uplift pressure if any and
entire dewatering during execution. In case of water logging area
where water is struck at shallow depth extra provision of dewatering
shall be made as per site condition.
10. All condition given in the Member Secretary"s Circular
No.MJP/TS-I/350/1668 dt. 2.8.97 and MJP/S-I/350/2127 dt. 13.7.99
shall be strictly followed and additional cost, if any due to these
conditions is included in the rates mentioned below.
Unit
Rate
( in Rs.)
2012-2013
Rate
( in Rs.)
2013-2014
Sr No
Item Description
11.. 75% part rate shall be payable for reinforced cocnrete and
plastering items of containers of E.S.R. till satisfactory hydraulic
testing for water tightness is given ; and till that work shall be treated
as incomplete.
12. The rates indicated in the table are excluding the cost of pipes,
specials and valves required for inlet, outlet washout overflow and bypass arrangement. The scope of work, however inclueds cost of
erecting, laying and jointing of pipes and valvews including cost of
jointing materials upto 5M beyond outer face of outermost column.
13. For ESR upto 500cum capacity C.I.D. double flanged pipes upto
300mm dia shall be provided and C.I.Specials shall be used.For ESR
above 500 cum capacity C.I./M.S. pipes assembly with minimum
8mm thick ness up to 500mm dia. And minimum 10mm thickness
above 500mm dia can be used with proper anti-corrosive epoxy
teratment from inside and outside.
14. Below mentioned rates are for foundation, with individuals footing
with bearing capacity of 30 tonnes per square metre. For raft
foundations, these rates shall be increased by 7.5%
wheresafebearing capacity ( SBC) is 5 M.T. per Sq.m and by 5%
where SBC is more than 5 MT/Sqm. and upto 10MT/Sq.m. This
percentage of 5% or 7,5% is applicable for estimation of amount of
L.S. items ESR for Extra item due to change from individual footing
foundation to raft actual increase in concrete and steel quantities be
paid as per relevent DSR Item.
15. The rates shall be increase by 30% for brearing piles upto depth
of 10m and for further increased in depth by 5M each it shall be
increased by another 10% These rates are applicable where raft is
not reasible for pile foundation sulfate resistant cement shall only be
used. Single pile for the column is not permitted Group of piles shall
be designed with pile cap for each column of ESR.
16. These rates are applicable for staging height of 12 M These
rates shall be increased or decreased for per metre variation in the
staging height as below
12 to 16 M staging
2% per metre
16 to 20m staging
3% per meter
20 M and abovd - 4% per metre
I.e. for 17m stagging height
percentage calculation will be like below
12 to16m = 4 x 2
= 8%
16 to 17 m x 1 x 3
= 3%
Total
= 11 %
For 21 m stagging height
Percentage calculation will be like below
12 to 16m = 4 x 2
= 8%
16 to 20m = 4 x 3
= 12%
20 to 21m = 1 x 4
= 4%
Total
= 24%
17. Following rates are for seismic zone-III for Zone-IV these rates
shall be increased by 5% and for Zone-II, these rates shall be
decreased by 5% concerned Executive Engineer shall confirm the
seismic zone for the scheme from seismic zones plan before
estimation and adopt appropriate rates as per actual seismic zones(
Seismic maps attached in this C.S.R.)
Unit
Rate
( in Rs.)
2012-2013
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
Unit
for Seismic
Zone- III Rate
in Rs.
23.76
594000.00
13.07
920750.00
9.50
1158250.00
8.32
1366250.00
7.13
1722750.00
5.94
2019750.00
5.64
2301750.00
5.35
2569250.00
5.04
3073250.00
4.75
3548250.00
4.45
4660750.00
4.16
5700750.00
3.86
7630750.00
3.56
9410750.00
Capacity in litres
Litre
------
Litre
------
Litre
------
Litre
------
Litre
10
------
11
Litre
12
------
13
Litre
14
------
15
Litre
16
------
17
Litre
18
------
19
Litre
20
------
21
Litre
22
------
23
Litre
24
------
25
Litre
26
------
27
Litre
------
28
Rate
( in Rs.)
2013-2014
Item Description
1
Unit
Rate
( in Rs.)
2012-2013
B.
C.
D.
E
G.
No
4227.00
893.00
6232.00
1069.00
6779.00
1157.00
8129.00
1337.00
6145.00
30cm depth
1038.00
No
30cm depth
No
30cm depth
No
30cm depth
F.
No
30cm depth
No
30cm depth
No
30cm depth
10922.00
1699.00
15961.00
2100.00
B.
C.
D.
E.
As above of 1.2 x 1.2M internal size and depth upto 1.2 M with 53 cm
dia CI manhole frame and cover of 90 kg fixed in R.C.C. Slab
a). Add for every increase in depth of 30cm or part thereof
No
30cm depth
No
30cm depth
7182.00
893.00
9048.00
1069.00
10392.00
1157.00
14694.00
1337.00
16985.00
1699.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
F.
As above of 1.5 x 1.5 M internal size and depth upto 1.5 M with 53
cm dia CI manhole frame and cover of 90 kg fixed in R.C.C. Slab
No
30cm depth
Rate
( in Rs.)
2012-2013
21509.00
2100.00
(Note : Wall thickness : 0.23 M for depth of 1.2 M and 0.35 M for
balance depth exceeding 1.2 M)
No
30cm depth
No
30cm depth
No
C.
30cm depth
No
D.
30cm depth
As above of 1.2 x 1.2M internal size and depth upto 1.2 M with
S.F.R.C. frame and cover of size 540 mm dia fixed in R.C.C. Slab
E.
F.
No
30cm depth
No
2100.00
No
b)
No
1935.00
2714.00
Providing and fixing C.I. road box including loading, unloading and
carting to site of work including all necessary excavation in all types
of strata and fixing in murum packing, etc. complete.
a)
No
b)
No
1700.00
18944.00
Providing and fixing in position M.S. Air valve boxes fabricated with 2 30cm depth
mm thick M.S. plate, 30 x 30 x3 mm size M.S. angle frame, concreting in M-150 for fixing the box in position,applying two coats of oil
paint, painting chainage, locking arrangement, etc. complete as
directed by Engineer-in-charge.
a)
6214.00
893.00
8755.00
1068.00
9518.00
1157.00
11424.00
1337.00
14150.00
No
50cm depth
1426.00
2665.00
18014.00
2332.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
No
50cm depth
No
a)
a)
A.
C.
D.
E.
F.
48924.00
4849.00
103601.00
6130.00
50cm depth
Rate
( in Rs.)
2012-2013
No
50cm depth
No
50cm depth
No
50cm depth
No
50cm depth
No
50cm depth
No
50cm depth
15629.00
2226.00
23721.00
3437.00
36503.00
4324.00
24355.00
2972.00
31852.00
4474.00
48440.00
5608.00
Rate
( in Rs.)
2013-2014
Sr No
10
Item Description
Unit
No
1792.00
50cm depth
610.00
2346.00
730.00
2796.00
907.00
3396.00
988.00
4768.00
1461.00
6454.00
1778.00
8396.00
1961.00
a). Extra for every 0.5 M depth beyond initial depth of o.60 M
11
12
13
14
15
16
17
a)
b)
No
50cm depth
No
50cm depth
No
50cm depth
No
50cm depth
No
50cm depth
No
50cm depth
No
No
c)
90 x 45 cm size
No
d)
90 x 60 cm size
No
e)
60 x 60 cm size
No
f)
60 x 45 cm size
No
Rate
( in Rs.)
2012-2013
2632.00
3271.00
2632.00
2853.00
2606.00
2258.00
Rate
( in Rs.)
2013-2014
Item Description
Unit
Cu.m
Rate
( in Rs.)
2012-2013
499.00
Note: Pay line maximum - Top width payble shall be 2 mtr. and
maximum payble side slopes shall be 1.5 Horizontal to
1
Vertical, if the constructed top width of the side slopes are less, then
the measurements at actual are payble. Extra top width or flatter
slopes are not payble. Contractor is free to use ballies, plastic sheets,
piles, pipes, C.G.I. sheets for supporting hearting materials instead of
impervious/ semipervious hearting materials for which no extra
payments shall be payble. 30% payment shall be withheld for
dismentaling of coffer dam. this foot note shall appear in tender
condition. ( Type section is shown on last page of type design section
of CSR. )
Kg
Cu.m
229
Providing and filling around the well boulders filling of selected variety
and size of boulders including cost of all materials, labour,
transportation, etc. complete with all leads and lifts.
Cu.m
683.00
RMT
175.00
82.00
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
a)
6 mm thick
Sq.m
b)
8 mm thick
Sq.m
RMT
b)
RMT
600 mm dia
Rate
( in Rs.)
2012-2013
3623.00
4633.00
3294.00
5108.00
450 mm dia
RMT
b)
600 mm dia
RMT
178.00
238.00
40 mm pebbles
Cu.m
b)
12 mm to 20 mm pebbles
Cu.m
c)
6 mm to 12 mm pebbles
Cu.m
d)
Cu.m
1129.00
1366.00
1557.00
772.00
No
300.00
Kg
91.00
12
Providing and fixing in position C.I. /M.S. rose pieces in intake wells
including cost of all materials and labour, painting with three coats of
anti-corrosive oil paint, etc.complete as directed by Engineer-incharge.
Note : This type of pipe anchorage shall be provided at 30 M centre to
centre on alternate side of pipeline for full width of nalla or river.
Kg
90.00
13
Sq.m
20.35
14
RMT
5203.00
69391.00
44681.00
4170.00
208161.00
10
11
b)
No
c)
No
d)
Connecting main
e)
RMT
No
Rate
( in Rs.)
2013-2014
Sr No
Item Description
f)
Approach Bridge
Unit
Rate
( in Rs.)
2012-2013
RMT
701.00
Day
Day
2720.00
2705.00
15
Rate
( in Rs.)
2013-2014
Item Description
i)
ii)
Rebate / Extra rate per metre length or part thereof over and
above initial length of 10M
Providing and fixing in position copper lightening conductor including
copper rod of 20 mm dia as per upper terminal 1.5M long with a knob
at end and with conical spike at top, aluminium tape conductor 20 x 3
mm size copper earth plate of 3 mm thick and 0.81 sqm. in area,
clamps at 1 M centre to centre including, necessary excavation,
laying and fixing the conductor, providing & fixing 40 mm G.I pipe
upto 3 M height from ground and 0.5 M below ground including
making all connections, filling the earthing pit with charcoal, salt, etc.
and refilling and watering, etc. complete as per specifications laid
down in relevent I.S. codes.
For Tape of 10M length
Unit
No
Mtr
No
Rate
( in Rs.)
2012-2013
10464.00
276.00
Mtr
9331.00
117.00
No
1725.00
No
ii)
Kg
2660.00
76.00
RMT
1400.00
571.00
642.00
ii)
Rebate / Extra rate per metre length or part thereof over and
above initial length of 10M
Providing, hoisting and fixing in position inverted J type 100 mm dia.
C.I. cowl type ventilators with mosquitoproof aluminium mesh at top
including applying 2 coats of anti-corrosive paint, etc. complete as
directed by Engineer-in-charge, weighing not less than 35 kg.
Rate on weight basis for any size and type of frame and cover
Sq.m
b)
Sq.m
Rate
( in Rs.)
2013-2014
Sr No
Item Description
Unit
RMT
10
i)
No
ii)
No
iii)
Rate
( in Rs.)
2012-2013
6415.00
Providing and installing mercury water level indicator for RCC ESR
and wash water tank site as per instructions of Engneer-in-charge at
ground level of the tank or nearing pump house or room for RCC
ESR having 15 mtrs. staging height and 5 mtrs. water storage height
with indication of water height in storage tank in metre and 1/10th of
meter including providing and installing 15 mm dia class B G.I.
piping with necessary accessories from bottom of the tank upto the
instrument as per instructions of Engineer-in-charge.
No
6882.00
8748.00
13997.00
16872.00
For Extra stage height over 15M or part thereof and water depth
over 5 M or part thereof
Providing and Erecting, installing and commissioning Barometric Leg
Chlorination system for water treatment plant upto 5 MLD. capacity
as per manufacturers specifications with all required materials viz. 15
Kg. pressure yellow PVC pipe, specially prepared chamber, mixing
chamber, scrubber unit, gas pressure flexible pipe, brass nozzle
nipple, electronic alarm unit, PPM dose, indicator of 25 mm dia. 4mm
thick glass tube (Borosil), gas ubit opening spanner 3 hole type,
instruction board, aluminium pipe upto sump ( Maximum length 15
Mtr.) etc. including civil works wherever required for above material
fittings, including satisfactory test and trial at work site etc. complete.
( Item do not include construction of chlorine Gas Room of 3.0 x 3.0
Mtr. or adequate size).
Mtr
907.00
i)
ii)
No
1No. per
unit
per MLD
100000.00
11
No
3500.00
8678.00
12
No
5249.00
Rate
( in Rs.)
2013-2014
Item Description
Unit
Job
Rate
Rate
( in Rs.)
2012- ( in Rs.)
2013
2013-2014
b) For regional scheme upto 3 villages with raw water pumping, one
treatment plant with pumps, raw water pumping main, leading main,
ESR, BPT and distribution system etc.
( 6 months)
Job
48572.00
201115.00
c) For regional scheme upto 3 villages with raw water pumping, one
treatment plant with pumps, raw water pumping main, leading main,
ESR, BPT and distribution system etc. ( 6 months) (Without WPT).
Job
130081.00
Job
407997.00
Job
264105.00
Month
Month
5996.00
9867.00
Section - I- ( I )- C.I./D.I.Pipes
Sr
No
Item Description
2012-
Without ED
Providing and supplying ISI mark C.I. S&S pipes (push on joints
pressure pipes of C.I.of following class and diameters confirming to
the I.S. specification inclusive cost of jointing materials (Rubber
gasket of EPDM Quality) including all statutory duties and taxes levied
by GoI and GoM in all respect, Education cess,VAT, Third party
inspection charges of TPI Agency approved by MJP including Transit
insurance, Railway freight unloading from railway wagon, loading into
trucks, transportation to departmental stores / site of work, unloading
stacking etc. completed as directed by Engineer- incharge(IS:1536/2001 for pipes and IS 158/1969 and IS 12820/1989 or
latest edition/ revision with amendments for Rubber Gasskets.
a
1
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
10
RMT
11
RMT
12
RMT
13
RMT
14
RMT
15
RMT
16
RMT
17
RMT
900
1128
1425
1831
2636
3555
4594
4537
5522
6658
7696
10253
13232
14820
16589
20206
24274
844
1058
1270
1718
2484
3348
4317
3948
4806
5794
6698
8921
11514
12897
14435
17582
21122
956
1193
1552
1912
2763
3735
4833
6043
7410
8976
10292
13744
17911
852
1063
1383
1703
2461
3327
4306
5384
6602
7998
9170
12245
15958
b
1
Class "A" - 80 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
10
RMT
11
RMT
12
RMT
13
RMT
Sr
No
Item Description
14
RMT
15
RMT
16
RMT
17
RMT
Without ED
19896
22241
27072
32562
17725
19815
24119
29010
1016
1272
1670
2058
2987
4039
5237
6554
7567
9689
11136
14671
19165
21583
24058
29330
35189
905
1134
1489
1834
2661
3598
4666
5840
6742
8631
9921
13070
17085
19229
21435
26132
31352
c
1
Class "B" - 80 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
10
RMT
11
RMT
12
RMT
13
RMT
14
RMT
15
RMT
16
RMT
17
RMT
2012-
Lowering laying and jointing with SBR ruber gaskets C.I. S/S pipes of
various classes with CI / MS specials of following diameter in proper
position, grade and alignment as directed by Engineer-in-charge
including conveyance of material from stores to site of work, including
cost of jointing materials and rubber rings labour, giving hydraulic
testing etc. complete.
Without
Rubber Ring
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
44
53
66
70
94
123
133
166
199
199
230
With
Rubber
Ring
50
59
73
79
104
135
152
186
230
243
280
Sr
No
Item Description
12
600 mm
RMT
13
700 mm
RMT
14
750 mm
RMT
15
800 mm
RMT
16
900 mm
RMT
17
1000 mm
RMT
2012-
Without ED
303
390
437
535
639
756
373
525
574
674
846
1026
46
56
71
78
102
133
145
179
201
211
249
329
423
475
561
676
789
56
66
79
86
110
146
163
200
231
245
298
398
556
610
698
882
1058
50
60
77
87
110
144
157
193
225
228
268
355
457
516
602
714
814
59
71
86
96
124
164
175
225
255
262
316
423
588
650
737
918
1082
C.I. "A"CLASS
b
1
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
750 mm
RMT
15
800 mm
RMT
16
900 mm
RMT
17
1000 mm
RMT
C.I. "B"CLASS
c
1
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
750 mm
RMT
15
800 mm
RMT
16
900 mm
RMT
17
1000 mm
RMT
NOTE : Only 85% rate shall be payble till satiafactory hydraulic testing is given.
Sr
No
Item Description
Providing and supplying ISI mark D.I. S&S pipes (push on joints
pressure pipes of D.I.of following class and diameters confirming to
the I.S. specification inclusive cost of jointing materials (Rubber
gasket of EPDM Quality) including all statutory duties and taxes levied
by GoI and GoM in all respect, Education cess,VAT, Third party
inspection charges of TPI Agency approved by MJP including Transit
insurance, Railway freight unloading from railway wagon, loading into
trucks, transportation to departmental stores / site of work, unloading
stacking etc. completed as directed by Engineer- incharge(IS:8329/2000 for pipes and IS 158/1969 and IS 12820/1989 or
latest edition/ revision with amendments for Rubber Gasskets.
D.I. K - 9
100 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
10
600 mm
RMT
11
700 mm
RMT
12
750 mm
RMT
13
800 mm
RMT
14
900 mm
RMT
1000 mm
RMT
15
2012-
With ED
Without ED
With ED
Without
ED
1145
1670
2076
2768
3519
4405
5208
6288
7308
9664
12403
14102
15339
18933
22098
1041
1518
1888
2516
3200
4010
4730
5716
6644
8773
11276
12819
13949
17212
20089
977
1434
1692
2242
2826
3480
4143
5000
5859
7717
10409
12097
13989
16779
19646
888
1304
1538
2038
2569
3164
3766
4545
5326
7015
9463
10997
12717
15264
17860
D.I. K-7
100 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
10
600 mm
RMT
11
700 mm
RMT
12
750 mm
RMT
13
800 mm
RMT
14
900 mm
RMT
15
1000 mm
RMT
Sr
No
Item Description
2012-
Without ED
NOTE : 1) D.I. K-7 pipes shall not be used for Distribution System for dia. Less than & including 250mm.
NOTE : 2)For lowering laying & jointing D.I. K-9 / K-7 pipes rates shall be adopted as per C.I."LA" Class pipe.
4
1
Providing and making lead caulked joint with molten lead to Cast Iron
pipes and / or specials of all classes and fitting of following dia
including cost of lead and all jointing material, labour, hydraulic testing
etc. complete.
80 mm
Joint
100 mm
Joint
125 mm
Joint
150 mm
Joint
200 mm
Joint
250 mm
Joint
300 mm
Joint
350 mm
Joint
400 mm
Joint
10
450 mm
Joint
11
500 mm
Joint
12
600 mm
Joint
13
700 mm
Joint
14
750 mm
Joint
15
800 mm
Joint
16
900 mm
Joint
17
1000 mm
Joint
657
812
968
1200
1750
2126
2564
2906
3389
4707
5060
6501
7637
8675
9316
9936
10594
NOTE : Only 85% payment shall be payble till satiafactory hydraulic testing is given.
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
750 mm
RMT
1419
1753
2284
2849
4371
5890
7573
9885
12053
14473
16986
24162
32371
35221
Sr
No
Item Description
D/F Specials
KG
KG
KG
2
3
73.60
78.20
83.90
71.30
75.90
80.50
KG
KG
Kg
76.50
Only flanges with machining and drilling holes, etc. complete more KG
than 40 mm thick
Double flanged specials of all diameters
KG
74.30
3
4
5
6
80 mm
Joint
100 mm
Joint
125 mm
Joint
150 mm
Joint
200 mm
Joint
250 mm
Joint
300 mm
Joint
350 mm
Joint
400 mm
Joint
10
450 mm
Joint
69.00
75.90
80.50
72.10
72.10
72.10
70.00
174
301
314
603
626
897
931
1213
1511
1848
2012-
Without ED
Sr
No
Item Description
11
500 mm
Joint
12
600 mm
Joint
13
700 mm
Joint
14
750 mm
Joint
15
800 mm
Joint
16
900 mm
Joint
17
1000 mm
Joint
1912
2052
3093
3179
4398
4560
4721
NOTE : Only 85% payment shall be payble till satiafactory hydraulic testing is given.
and hoisting in position and jointing, testing M.S./ C.I. D/F
9 Erecting
pipes and specials in vertical position including cost of all jointing
materials (rubber packing, nut bolts, etc.) labour, scaffolding,
hydraulic testing etc. complete.
1
80 mm
Joint
100 mm
Joint
125 mm
Joint
150 mm
Joint
200 mm
Joint
250 mm
Joint
300 mm
Joint
350 mm
Joint
400 mm
Joint
10
450 mm
Joint
11
500 mm
Joint
12
600 mm
Joint
13
700 mm
Joint
14
750 mm
Joint
800 mm
900 mm
1000 mm
Joint
15
16
17
Joint
Joint
193
326
344
640
680
970
1025
1331
1655
2022
2115
2323
3445
3576
4843
5098
5373
NOTE : Only 85% payment shall be payble till satiafactory hydraulic testing is given.
10
Providing and supplying ISI standard D.I. specials & fittings with
sealing rubber gasket of S.B.R.,complete with Cast iron follower gland
and M.S. nut & bolts coated or otherwise protected from rusting and
suitable for D.I. pipes including cost of all labours and materials and
transportation to stores / site, loading , unloading including all taxes ,
etc. complete.As per IS 9523
For all types of specials , bends,tees etc.
a
b
11
80 to 300 mm dia.
Kg.
Kg.
107.00
130.00
2012-
Without ED
Sr
No
Item Description
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1863
2530
3238
4394
5531
7203
8720
10419
12110
15946
21457
26228
32555
38225
2012-
Without ED
Section - I - ( ii )A.C.Pipes
Sr No
Item Description
1
2
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
1
2
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
1
2
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
3
4
5
6
3
4
5
6
3
4
5
6
7
Unit
Rate ( in Rs.)
2012-2013
With ED
RMT
RMT
RMT
RMT
139
179
214
376
RMT
RMT
RMT
RMT
RMT
RMT
RMT
139
208
244
431
612
906
1119
190
317
367
658
173
288
334
598
789
1184
1298
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1
2
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
126
162
194
341
497
719
1052
153
229
269
475
RMT
RMT
Without ED
300
380
510
636
960
1204
1650
Sr No
Item Description
Unit
b
1
2
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
1
2
80 mm
No
100 mm
No
125 mm
No
150 mm
No
39
50
69
84
b
1
2
80 mm
No
100 mm
No
125 mm
No
150 mm
No
42
56
72
98
1
2
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
325
425
550
659
886
1250
1790
Rate ( in Rs.)
2012-2013
31
43
46
57
73
92
113
1
2
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
32
46
50
63
83
104
129
Sr No
Item Description
Unit
1
2
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
Rate ( in Rs.)
2012-2013
21
28
33
42
58
74
96
1
2
80 mm
RMT
100 mm
RMT
125 mm
RMT
150 mm
RMT
200 mm
RMT
250 mm
RMT
300 mm
RMT
22
33
37
48
69
86
113
NOTE : 1) Only 85% payment for lowering laying jointing shall be payble till satiafactory hydraulic testing is given.
NOTE : 2) Without any extra cost every pipe in the factory shall be hydraulically tested for 1 higher class I.e. when class 15 is
ordered every pipe shall be tested for 20 Kg./Sqcm at factory but pipe shall be branded & paid as class 15. This foot note
shall appear in tender condition.
NOTE : 3) Whenever manufacturer & contractor for lowering laying jointing is separate the principle contractor shall enter into
an aggrement with A.C.pipe manufacturer for satisfactory manufacturing ,transporting ,lowering ,laying jointing & testing of
pipe.This foot Note shall appear in tender conditions
Item Description
Unit
Rate ( in Rs.)
2012-2013
Note ; 1) 10% of cost of pipe shall be considered for cost of P.V.C. specials for estimate purpose only.
Note ; 2) One coupler & required cement solvent shall be provided with each full length pipe, cost of
which is included in rates below.
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
400 mm
RMT
Without
ED
46
65
91
124
208
274
372
460
589
719
953
1213
1626
2074
41
58
81
110
184
243
331
408
522
638
847
1078
1445
1844
66
93
133
185
307
397
528
673
851
1061
1401
1786
2384
3046
58
83
119
164
273
353
469
599
755
944
1244
1587
2118
2706
14
With ED
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
14
400 mm
RMT
Sr No
Item Description
Unit
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
400 mm
RMT
14
91
129
183
257
427
557
740
931
1181
1478
1946
2464
3315
4293
80
114
162
229
379
496
658
827
1050
1313
1729
2191
2945
3814
108
154
223
315
508
666
915
1131
1445
1826
2294
2916
3920
4999
96
138
197
278
452
590
813
1005
1283
1621
2039
2590
3484
4442
138
195
281
399
648
851
1164
1446
1837
2322
2920
3724
4977
6449
123
173
250
354
575
757
1035
1284
1632
2063
2596
3310
4423
5730
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
14
400 mm
RMT
Rate ( in Rs.)
2012-2013
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
14
400 mm
RMT
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Note ; One Rubber Ring shall be provided with each full length pipe, cost of which is included in rates
below.
RMT
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
RMT
10
225 mm
RMT
11
250 mm
RMT
12
280 mm
RMT
13
315 mm
RMT
2
3
4
5
6
7
RMT
RMT
RMT
RMT
RMT
RMT
RMT
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
125 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
10
225 mm
RMT
11
250 mm
RMT
12
280 mm
RMT
13
315 mm
RMT
48
69
96
131
181
219
291
395
487
623
763
1011
1287
43
60
85
117
161
195
257
350
434
554
678
899
1142
69
98
142
197
271
325
421
560
714
902
1126
1484
1892
61
88
126
173
239
290
373
498
634
800
1001
1319
1682
95
137
193
272
376
454
591
785
988
1252
84
122
171
243
334
402
526
697
877
1113
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
125 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
10
225 mm
RMT
Sr No
Item Description
Unit
11
250 mm
RMT
12
280 mm
RMT
13
315 mm
RMT
1565
2063
2613
1390
1834
2323
114
165
236
333
460
538
705
969
1199
1531
1935
2432
3090
103
146
209
296
406
478
626
862
1065
1360
1720
2161
2746
146
207
297
424
584
687
903
1235
1531
1946
2462
3096
3946
129
183
265
376
518
611
801
1097
1361
1730
2186
2751
3507
d
1
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
125 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
10
225 mm
RMT
11
250 mm
RMT
12
280 mm
RMT
13
315 mm
RMT
e
1
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
125 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
10
225 mm
RMT
11
250 mm
RMT
12
280 mm
RMT
13
315 mm
RMT
Rate ( in Rs.)
2012-2013
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
16
21
25
29
34
38
42
46
53
57
Sr No
Item Description
Unit
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
14
400 mm
RMT
Rate ( in Rs.)
2012-2013
63
70
77
84
63 mm
RMT
75 mm
RMT
90 mm
RMT
110 mm
RMT
140 mm
RMT
160 mm
RMT
180 mm
RMT
200 mm
RMT
225 mm
RMT
10
250 mm
RMT
11
280 mm
RMT
12
315 mm
RMT
13
355 mm
RMT
14
400 mm
RMT
22
29
33
37
44
47
53
58
63
69
78
87
96
106
NOTE : 1) Only 85% payment for lowering laying jointing shall be payble till satiafactory hydraulic testing is given.
NOTE : 2) Third party inspecting agency shall invarably carry out Specific gravity Test , Ash Content test and confirm in writing
that those are within prescribed limits. This condition shall appear in tender conditions.
NOTE : 3) After receipt of pipes at site concerned Deputy Engineer shall confirm that weight of pipe for every class and dia is
not less than the prescribed standard weight as per IS 4985/1998 ( Which is given in CSR ) underweight pipes shall be
rejected .This condition shall appear in tender conditions.
Section -I ( IV ) - G.I.Pipes
Sr No
Item Description
Unit
Rate ( in Rs.)
2013
2012-
Providing ISI mark G.I. pipe of following class and dia. Including all
local and central taxes, octroi, inspection charges, transportation to
stores, etc. complete .as per IS 1239/2004
Note ; 2) One coupler shall be provided with each full length pipe, cost of which is included
in rates below.
With ED
LIGHT
15 mm
RMT
20 mm
RMT
25 mm
RMT
32 mm
RMT
40 mm
RMT
50 mm
RMT
65 mm
RMT
80 mm
RMT
100 mm
RMT
71
106
146
183
229
288
397
477
680
65
95
131
166
208
255
349
420
596
85
108
165
209
240
342
424
556
820
1097
1311
77
98
150
189
218
301
384
503
719
978
1151
96
125
196
246
285
395
508
649
936
1159
1396
87
113
177
223
259
359
461
589
849
1052
1266
MEDIUM
15 mm
RMT
20 mm
RMT
25 mm
RMT
32 mm
RMT
40 mm
RMT
50 mm
RMT
65 mm
RMT
80 mm
RMT
100 mm
RMT
10
125 mm
RMT
11
150 mm
RMT
Without
ED
HEAVY
15 mm
RMT
20 mm
RMT
25 mm
RMT
32 mm
RMT
40 mm
RMT
50 mm
RMT
65 mm
RMT
80 mm
RMT
100 mm
RMT
10
125 mm
RMT
11
150 mm
RMT
Sr No
Item Description
Unit
Rate ( in Rs.)
2013
23.00
26.00
32.00
37.00
46.00
55.00
80.00
89.00
106.00
15 mm
RMT
20 mm
RMT
25 mm
RMT
32 mm
RMT
40 mm
RMT
50 mm
RMT
65 mm
RMT
80 mm
RMT
100 mm
RMT
MEDIUM
15 mm
RMT
20 mm
RMT
25 mm
RMT
32 mm
RMT
40 mm
RMT
50 mm
RMT
65 mm
RMT
80 mm
RMT
100 mm
RMT
10
125 mm
RMT
11
150 mm
RMT
HEAVY
15 mm
RMT
20 mm
RMT
25 mm
RMT
32 mm
RMT
40 mm
RMT
50 mm
RMT
65 mm
RMT
80 mm
RMT
100 mm
RMT
10
125 mm
RMT
150 mm
RMT
11
25.00
28.00
34.00
39.00
50.00
59.00
86.00
97.00
106.00
113.00
119.00
27.00
30.00
36.00
43.00
54.00
67.00
94.00
113.00
106.00
118.00
128.00
Note : Only 85 % Payment shall be payable till satisfactory hydraulic testing is given
2012-
Section -I ( V ) - S.W.Pipes
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
122
167
223
269
300
352
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
Note : Only 85 % Rate shall be payable till satisfactory hydraulic testing is given
64
105
131
143
156
183
Section - I- ( Vi )- R.C.C.Pipes
Sr No
Item Description
Unit
Collar Joints
Rubber Ring
Joints
Note ; One Collar shall be supplied with each full length plain
ended R.C.C.pipe, cost including in rates below.One rubber
ring shall be supplied with each full length socketted pipe , cost
including in rates below.
With Third Party Inspection
Class P-I
80 mm
RMT
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
800 mm
RMT
15
900 mm
RMT
16
1000 mm
RMT
17
1100 mm
RMT
18
1200 mm
RMT
Class P-II
80 mm
RMT
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
309
324
339
396
452
494
632
681
864
1064
1280
1615
2103
2428
3056
3580
4068
4887
281
294
309
360
411
449
575
619
785
966
1163
1466
1910
2205
2775
3252
3694
4438
273
293
304
355
407
443
567
613
782
962
1153
1456
1892
2184
2751
3225
3662
4402
247
267
275
322
369
403
514
556
710
873
1046
1322
1719
1983
2498
2928
3326
3998
329
351
420
566
670
725
956
1193
1332
1616
2256
2797
299
319
381
513
608
659
869
1084
1210
1467
2049
2541
293
316
379
513
604
658
914
1080
1213
1450
2056
2521
265
286
344
465
547
598
829
981
1101
1317
1867
2290
Sr No
Item Description
Unit
Collar Joints
13
700 mm
RMT
14
800 mm
RMT
15
900 mm
RMT
16
1000 mm
RMT
Class P-III
80 mm
RMT
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
800 mm
RMT
Rubber Ring
Joints
3811
4583
5163
6249
3461
4163
4689
5675
3466
4177
5202
5626
3148
3794
4724
5109
355
383
437
594
709
829
1151
1502
2067
2372
2895
3719
5305
6738
322
348
397
540
643
753
1046
1364
1878
2155
2630
3378
4819
6119
351
379
438
595
709
830
1151
1502
2067
2373
2896
3720
5305
6738
318
343
397
540
643
752
1045
1364
1878
2156
2629
3378
4818
6119
80 mm
RMT
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
290
298
348
407
454
488
652
293
304
354
415
463
498
665
799
928
1088
1272
1679
2422
2767
3545
4243
5327
5703
6778
7782
10901
815
947
1110
1297
1713
2470
2822
3616
4328
5434
5817
6914
7938
11119
328
372
410
335
379
418
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
800 mm
RMT
15
900 mm
RMT
16
1000 mm
RMT
17
1100 mm
RMT
18
1200 mm
RMT
19
1400 mm
RMT
20
1600 mm
RMT
21
1800 mm
RMT
80 mm
RMT
100 mm
RMT
150 mm
RMT
Sr No
Item Description
Unit
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
800 mm
RMT
15
900 mm
RMT
16
1000 mm
RMT
17
1100 mm
RMT
18
1200 mm
RMT
19
1400 mm
RMT
20
1600 mm
RMT
21
1800 mm
RMT
Class NP-IV
80 mm
RMT
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
800 mm
RMT
15
900 mm
RMT
16
1000 mm
RMT
17
1100 mm
RMT
18
1200 mm
RMT
19
1400 mm
RMT
20
1600 mm
RMT
21
1800 mm
RMT
Collar Joints
Rubber Ring
Joints
612
713
763
868
1537
1722
2047
2274
2996
4072
4851
5603
6855
7930
9304
11180
16292
21550
624
727
778
885
1568
1756
2088
2319
3056
4153
4948
5715
6992
8089
9490
11404
16618
21981
353
414
469
655
774
872
1111
1687
1807
2131
2604
3185
4767
5444
6376
9026
9792
9836
15359
19148
26249
360
422
478
668
789
889
1133
1721
1843
2174
2656
3249
4862
5553
6504
9207
9988
10033
15666
19531
26774
Sr No
Item Description
Unit
Collar Joints
Rubber Ring
Joints
80 mm
RMT
100 mm
RMT
150 mm
RMT
200 mm
RMT
225 mm
RMT
250 mm
RMT
300 mm
RMT
350 mm
RMT
400 mm
RMT
10
450 mm
RMT
11
500 mm
RMT
12
600 mm
RMT
13
700 mm
RMT
14
800 mm
RMT
15
900 mm
RMT
16
1000 mm
RMT
17
1100 mm
RMT
18
1200 mm
RMT
19
1400 mm
RMT
20
1600 mm
RMT
21
1800 mm
RMT
Collar
Joint
Rubber
Ring
Joint
44
53
80
106
124
140
168
173
220
266
290
367
416
482
530
580
806
856
954
1052
1150
31
37
56
75
88
98
118
121
155
185
203
254
289
334
369
404
547
582
652
722
792
Note : Only 85 % rate shall be payable till satisfactory hydraulic testing is given
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
With ED
Providing ISI standard Pre - stressed Cement concrete pipes (Non steel
cylinder ) pipes of following class and diameter including cost of all meterial
and labour required, cost of all taxes(Central and local) , inspection charges,
transportaion to stores/ site, unloading and stacking etc. complete as per IS
784/2001 .
i) Factory test Pressure
a) Site test pressure +0.1 N/mm2 , For working Pressure upto 1
b) Site test pressure +0.2 N/mm2 , For working Pressure above 1
N/mm2
N/mm2
ii) Site test Pressure - 1.5 times working pressure pertaining to the section
for 1.1 times static pressure , whichever is more ( Such a pressure is to be
controlled within 25 % of pump head in case of pumping main)
iii) Working Pressure - The maximum sustained internal pressure excluding
surge to which each portion of pipeline may be subjected when installed.
All test pressure shall be replaced by Factory test pressure
Note : One rubber ring should be supplied with each pipe, cost of which is included in rates below.
Test Pressure 2 kg/Sq.cm
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
1800 mm
RMT
17
3400
3657
3837
4225
5078
5654
6983
8684
10121
11560
13358
15447
16996
19452
21575
23699
25823
3085
3318
3481
3833
4608
5130
6335
7878
9184
10488
12119
14014
15419
17648
19574
21501
23427
3400
3658
3837
4225
5080
3085
3319
3481
3833
4609
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
5656
6984
8685
10124
11562
13358
15451
16998
19455
21578
23703
25825
5131
6336
7879
9186
10490
12120
14017
15420
17651
19577
21504
23430
3404
3678
3847
4255
5148
5851
7242
9027
10529
11988
13888
16044
17652
20220
22456
24693
26929
3089
3338
3490
3861
4670
5310
6570
8189
9552
10877
12599
14555
16014
18344
20373
22402
24432
3411
3705
3871
4315
5321
6146
7548
9409
11004
12590
14576
3094
3362
3513
3915
4827
5577
6848
8537
9983
11423
13226
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
With ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
16861
18637
21355
24097
26838
29579
15299
16909
19376
21861
24348
26836
3428
3757
4007
4489
5550
6396
7933
9886
11577
13285
15392
17821
20144
23092
25733
28372
31012
3110
3407
3635
4071
5035
5802
7197
8969
10505
12053
13964
16168
18275
20951
23347
25742
28138
3512
3855
4134
4642
5771
6683
8309
10333
12105
13879
16357
18944
20960
24004
26746
29490
32232
3185
3498
3750
4211
5235
6064
7539
9375
10984
12592
14842
17089
19017
21777
24266
26754
29243
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
With ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
3598
3957
4262
4792
5993
6972
8688
10827
12915
14840
17205
19860
22633
25936
29004
32072
35141
3263
3591
3866
4348
5437
6326
7882
9823
11717
13464
15610
18018
20534
23531
26315
29099
31883
3675
4064
4391
4950
6213
7266
9063
12030
13539
16249
18754
21585
23826
28302
31744
35186
38627
3335
3687
3985
4492
5637
6592
8222
10915
12283
14740
17015
19584
21617
25677
28800
31923
35044
3761
4176
4518
5105
3412
3788
4099
4631
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
With ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
With ED
6434
7946
9916
12542
14738
17008
19658
22642
29877
33689
37971
42252
46533
5837
7210
8996
11378
13371
15430
17835
20542
27107
30564
34450
38334
42218
3849
4277
4649
5265
6661
8803
11711
13843
16654
19796
24895
27394
32000
36169
40452
44734
49015
3491
3881
4219
4776
6044
7986
10624
12559
15109
17961
22588
24853
29033
32915
36812
40708
44605
J
1
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
105
148
179
203
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
With ED
270
297
334
345
445
585
626
743
784
989
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
ED
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
With ED
1112
1239
1310
Note : 1)Only 85 % Payment shall be payable till satisfactory hydraulic testing is given
NOTE : 2)Whenever manufacturer is separate& contractor for lowering laying jointing & testing is seperate the principal
contractor shall enter into an aggrement with P S C pipe manufacturer for satisfactory manufacturing transporting lowering laying
jointing & testing of pipe.This foot Note shall appear in tender conditions
Item Description
Unit
Rate ( in Rs.)
2012-2013
Without
With ED
ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
1800 mm
RMT
17
3706
4064
4499
5006
6510
7522
8168
11414
13155
18907
21085
24621
26410
28184
30364
32213
34393
3366
3691
4086
4546
5912
6831
7418
10367
11947
17171
19149
22362
23986
25598
27577
29256
31237
3710
4068
3369
3694
350 mm
RMT
400 mm
RMT
Sr No
Item Description
Unit
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
4501
5013
6517
7528
8175
11421
13160
18913
21090
24627
26416
28192
30370
32219
34399
4089
4554
5920
6838
7425
10373
11953
17179
19157
22367
23992
25604
27584
29262
31243
3713
4071
4506
5025
6528
7540
8186
11432
13172
18925
21102
24638
26427
28203
30382
32230
34411
3373
3698
4092
4564
5928
6847
7434
10383
11964
17187
19165
22378
24002
25614
27594
29272
31253
3717
4075
4509
5040
6544
7555
8202
11437
13187
18941
3375
3702
4095
4577
5943
6862
7449
10398
11978
17202
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
Rate ( in Rs.)
2012-2013
Without
With ED
ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
Sr No
Item Description
Unit
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
1800 mm
RMT
17
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
1800 mm
RMT
19180
22392
24016
25629
27608
29286
31268
3720
4079
4513
5059
6564
7575
9368
11448
14231
18960
21138
24675
26464
28538
31570
34171
38004
3379
3704
4099
4597
5961
6880
8507
10398
12925
17221
19200
22411
24036
25921
28673
31036
34516
3724
4083
4526
5152
6683
8695
10196
12574
15138
19037
21130
25286
28572
31792
35451
38923
42585
3383
3707
4110
4679
6069
7898
9259
11420
13750
17291
19191
22965
25951
28874
32197
35351
38678
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
21117
24653
26443
28218
30397
32245
34426
17
Rate ( in Rs.)
2012-2013
Without
With ED
ED
Sr No
Item Description
Unit
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
3728
4087
4684
5525
7173
9254
11090
13717
16673
20080
23418
27896
31490
35119
39052
43349
48369
3386
3712
4255
5018
6515
8407
10073
12458
15143
18238
21269
25337
28601
31896
35470
39371
43932
3732
4148
4833
5691
7444
9785
11550
14275
17415
20957
24417
28992
33132
36595
41512
46039
50958
3391
3767
4389
5168
6761
8888
10491
12966
15817
19033
22177
26333
30092
33237
37703
41816
46283
3719
4380
5004
6065
7935
10317
12595
15551
3379
3979
4544
5509
7207
9371
11439
14125
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
Rate ( in Rs.)
2012-2013
Without
With ED
ED
350 mm
RMT
400 mm
RMT
450 mm
RMT
500 mm
RMT
600 mm
RMT
700 mm
RMT
800 mm
RMT
900 mm
RMT
Sr No
Item Description
Unit
1000 mm
RMT
10
1100 mm
RMT
11
1200 mm
RMT
12
1300 mm
RMT
13
1400 mm
RMT
14
1500 mm
RMT
15
1600 mm
RMT
16
1700 mm
RMT
17
1800 mm
RMT
Rate ( in Rs.)
2012-2013
Without
With ED
ED
19029
22835
26549
31538
36348
40934
45721
51075
56537
17282
20741
24114
28644
33012
37179
41525
46389
51351
Note ; 1) For lowering , laying and pouring of cement mortar in the field on joints ( after laying and
welding ), rates as per P.S.C. pipes lowering, laying and jointing shall be adopted.
Note ; 2) For field welding rates applicable for similar welding in M.S. pipes given in that section
shall be adopted.
NOTE : 3) Whenever manufacturer is separate& contractor for lowering laying jointing & testing
is seperate the principal contractor shall enter into an aggrement with B.W. S C pipe manufacturer
for satisfactory manufacturing transporting lowering laying jointing & testing of pipe.This foot Note
shall appear in tender conditions
NOTE : 4) No negative tolerance shall be accepted for the M.S.shell thickness of B.W.S.C. pipes
over the thickness mentioned in EN 641 or AWW AC 303
Item Description
A
a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
b
1
2
3
4
5
6
7
8
Unit
Rate ( in Rs.)
2012-2013
With ED
Without ED.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1371
1586
1745
1965
2222
2855
3548
4357
5324
6315
7677
8938
10121
11685
13280
15466
18269
19935
22284
24092
26923
28899
31232
33384
1229
1422
1565
1761
1992
2559
3181
3906
4773
5662
6883
8013
9074
10477
11907
13867
16573
18085
20216
21856
24424
26217
28333
30286
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1422
1626
1827
2029
2307
2988
3715
4552
1275
1458
1638
1819
2068
2679
3331
4081
Sr No
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
c
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Item Description
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
1800mm
1900mm
2000mm
2100mm
2200mm
2300mm
2400mm
9 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
1800mm
1900mm
2000mm
2100mm
2200mm
2300mm
2400mm
Unit
Rate ( in Rs.)
2012-2013
With ED
Without ED.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
5545
6595
7992
9249
10583
12109
13814
16111
19038
20715
23181
25033
27987
30159
32504
34710
4972
5913
7166
8293
9489
10857
12385
14445
17271
18793
21029
22710
25389
27360
29488
31489
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1468
1706
1902
2157
2445
3171
3949
4919
6009
7114
8598
9983
11527
13245
15044
17564
20797
22744
25266
27416
30510
32799
35415
38193
1316
1530
1705
1933
2192
2843
3541
4410
5387
6378
7708
8950
10335
11875
13488
15747
18867
20633
22921
24872
27678
29755
32129
34649
Sr No
d
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Item Description
12 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
1800mm
1900mm
2000mm
2100mm
2200mm
15 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
1800mm
Unit
Rate ( in Rs.)
2012-2013
With ED
Without ED.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1556
1796
2000
2613
2264
3407
4225
5234
6418
7650
9377
10936
12378
14246
16289
18892
22414
24573
27200
29580
32976
35587
1395
1610
1793
2342
2029
3054
3788
4693
5754
6859
8406
9805
11097
12772
14604
16938
20334
22293
24676
26835
29916
32284
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1620
1871
2080
2398
2756
3642
4543
5669
6987
8292
10173
11804
13549
15595
17692
20527
24695
26988
1452
1677
1865
2150
2471
3265
4073
5082
6264
7434
9121
10583
12147
13982
15862
18404
22403
24483
Sr No
19
20
B
a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
b
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Item Description
1900mm
2000mm
Class (SN) 5000
3 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
1800mm
1900mm
2000mm
2100mm
2200mm
6 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
Unit
Rate ( in Rs.)
2012-2013
With ED
Without ED.
RMT
RMT
30134
32796
27338
29752
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1470
1724
1965
2234
2472
3222
4033
4999
6155
7321
8874
10401
11843
13612
15533
18058
21385
23454
26105
28394
31611
34120
1317
1546
1761
2004
2216
2889
3616
4482
5519
6564
7956
9325
10618
12204
13926
16190
19400
21277
23682
25758
28677
30954
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1492
1753
1938
2209
2545
3292
4136
5119
6305
7485
9154
10641
12160
13952
15896
18502
1338
1572
1737
1980
2282
2952
3708
4589
5653
6711
8208
9540
10902
12509
14252
16589
Sr No
17
18
19
20
21
22
c
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
d
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Item Description
1700mm
1800mm
1900mm
2000mm
2100mm
2200mm
9 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
1800mm
12 Kg/Sq. cm
300mm
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
1600mm
1700mm
Unit
Rate ( in Rs.)
2012-2013
With ED
Without ED.
RMT
RMT
RMT
RMT
RMT
RMT
21907
24020
26757
29152
32429
35057
19874
21791
24274
26446
29420
31804
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1547
1813
2040
2323
2657
3650
4334
5582
6590
7861
12694
14442
16271
18213
20866
23703
28204
30732
1387
1625
1829
2082
2382
3273
3886
5005
5909
7049
11381
12948
14588
16330
18707
21252
25586
27880
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1591
1887
2086
2415
2758
3642
4591
5666
7076
8322
10229
11886
13623
15698
17831
20607
24516
1426
1692
1870
2165
2473
3265
4116
5080
6344
7461
9170
10657
12214
14074
15986
18476
22241
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With ED
18
19
e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Without ED.
1800mm
26951
24450
RMT
1900mm
29866
27095
RMT
15 Kg/Sq. cm
300mm
RMT
1647
1477
350mm
1962
1758
RMT
400mm
2193
1966
RMT
450mm
2533
2271
RMT
500mm
2890
2591
RMT
600mm
3836
3439
RMT
700mm
4827
4328
RMT
800mm
6040
5415
RMT
900mm
7450
6679
RMT
1000mm
8882
7963
RMT
1100mm
10802
9685
RMT
1200mm
12657
11348
RMT
1300mm
14463
12967
RMT
1400mm
16688
14962
RMT
1500mm
18981
17018
RMT
1600mm
21975
19703
RMT
1700mm
26079
23659
RMT
1800mm
28722
26057
RMT
Note :1) For lowering , laying & jointing rates of G.R.P. pipes 50% rates for lowering , laying &
jointing of P.S.C. Pipes of corrosponding diameter shall be adopted.
Note : 2) Whenever manufacturer is separate& contractor for lowering laying jointing & testing is
seperate the principal contractor shall enter into an aggrement with G.R.P. pipe manufacturer for
satisfactory manufacturing transporting lowering laying jointing & testing of pipe.
This foot Note shall appear in tender conditions
Note :3) Only 85 % Payment shall be payable till satisfactory hydraulic testing is given
Section - I - ( X ) - H.D.P.E.Pipes
Sr No
Item Description
A
a
P.E. 100
6 Kg/Sq. Cm
63 mm
75 mm
90 mm
110 mm
125mm
140 mm
160 mm
180 mm
200 mm
225mm
250 mm
280 mm
315 mm
355mm
400mm
450mm
500mm
560mm
630mm
710mm
800mm
900mm
1000mm
8 Kg/Sq. Cm
63 mm
75 mm
90 mm
110 mm
125mm
140 mm
160 mm
180 mm
200 mm
225mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
b
1
2
3
4
5
6
7
8
9
10
Unit
Rate ( in Rs.)
2012-2013
With E.D.
Without ED
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
91
132
184
267
364
457
592
746
876
1129
1385
1737
2201
2790
3654
4814
5953
7451
9385
11891
14336
18161
22394
84
119
167
242
330
415
538
678
794
1024
1257
1576
1997
2531
3315
4368
5400
6760
8509
10986
13244
16778
20690
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
116
172
231
340
461
576
750
945
1113
1430
105
156
209
308
418
524
680
857
1010
1297
Sr No
11
12
13
14
15
16
17
18
19
20
21
22
23
c
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
d
1
2
3
4
5
6
7
8
Item Description
250 mm
280 mm
315 mm
355mm
400mm
450mm
500mm
560mm
630mm
710mm
800mm
900mm
1000mm
10 Kg/Sq. Cm
63 mm
75 mm
90 mm
110 mm
125mm
140 mm
160 mm
180 mm
200 mm
225mm
250 mm
280 mm
315 mm
355mm
400mm
450mm
500mm
560mm
630mm
710mm
800mm
900mm
1000mm
12.5 Kg/Sq. Cm
63 mm
75 mm
90 mm
110 mm
125mm
140 mm
160 mm
180 mm
Unit
Rate ( in Rs.)
2012-2013
With E.D.
Without ED
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1762
2210
2794
3537
4645
6212
7663
9618
12109
15344
18509
23430
22868
1598
2004
2536
3209
4215
5635
6951
8725
10978
14176
17100
21646
21127
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
145
204
290
428
552
690
895
1136
1331
1704
2129
2628
3376
4236
5643
7509
9280
11161
14659
18618
22441
22710
28067
131
185
264
389
501
625
813
1031
1208
1547
1931
2385
3062
3843
5118
6811
8418
10124
13289
16880
20346
20589
25445
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
169
239
345
508
656
822
1070
1354
154
217
314
461
595
746
971
1228
Sr No
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
e
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Item Description
200 mm
225mm
250 mm
280 mm
315 mm
355mm
400mm
450mm
500mm
560mm
630mm
710mm
800mm
900mm
1000mm
16 Kg/Sq. Cm
63 mm
75 mm
90 mm
110 mm
125mm
140 mm
160 mm
180 mm
200 mm
225mm
250 mm
280 mm
315 mm
355mm
400 mm
450mm
500mm
560 mm
630 mm
710 mm
800 mm
900 mm
1000 mm
Unit
Rate ( in Rs.)
2012-2013
With E.D.
Without ED
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
1591
2053
2525
3166
4007
5089
6688
8938
11015
13808
17623
18175
21902
27748
33795
1443
1862
2290
2872
3636
4617
6068
8108
9994
12528
15978
16478
19857
25156
30639
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
205
288
414
612
790
986
1293
1627
2808
3550
4379
5493
6943
8809
11410
14463
17835
13650
17294
22006
26511
33558
41199
185
262
375
554
717
894
1173
1476
2549
3221
3973
4983
6300
7990
10352
13120
16180
12375
15679
19951
24035
30424
37353
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
160 mm (OD)
175 mm(OD)
200 mm(OD)
250 mm(OD)
315 mm(OD)
i)
ii)
iii)
iv)
v)
160 mm (OD)
175 mm(OD)
200 mm(OD)
250 mm(OD)
315 mm(OD)
Lowering laying and Jointing HDPE pipes by heating to the
ends of pipes with the help of tefflon coated disc & hot flame
blower to the required temparature and then pressing the ends
together against each other , to form a monolithic & leakproof
joint by thermosetting process. The pressing may be required
to be done with jig fixtures etc. complete. with all material
labour as directed by Engineer-in-charge ,including giving
satisfactory hydraulic test.
For All classes
20mm
25mm
32mm
40mm
50mm
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
Rmt
Rmt
Rmt
Rmt
280
320
400
592
840
Rmt
Rmt
Rmt
Rmt
Rmt
304
365
440
840
1056
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
10
15
20
25
30
37
40
55
58
66
89
95
95
106
Rmt
Class SN8
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
Without ED
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
xv)
xvi)
xvii)
xviii)
xix)
xx)
xxi)
xxii)
xxiii)
xxix)
225mm
250mm
280mm
315mm
355mm
400mm
450mm
500mm
560mm
630mm
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
136
141
174
191
209
211
238
308
345
388
Rmt
Rmt
Rmt
Rmt
Rmt
32
36
39
49
60
160MM (OD)
175MM (OD)
200MM (OD)
250MM (OD)
315MM (OD)
Without ED
Section - I - ( X )A - MDPE.Pipes
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
Without
ED
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
vii)
viii)
ix)
x)
xi)
xii)
PN 16 (SDR 9)
20 mm
25 mm
32 mm
40 mm
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
28
40
66
97
148
218
295
426
633
817
1027
1361
1722
2129
2697
3316
4169
5362
26
36
59
87
132
194
262
379
563
727
914
1211
1533
1895
2400
2952
3711
4772
B)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
vii)
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
37
62
90
130
175
245
359
526
684
854
1118
1439
1778
33
55
84
116
158
219
316
468
609
760
995
1291
1581
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
Without
ED
viii)
ix)
x)
xi)
225 mm
250 mm
280 mm
315 mm
Rmt
Rmt
Rmt
Rmt
2248
2770
3471
4400
2001
2479
3089
3916
C)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
PN 10 (SDR 13.6)
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
150
212
305
450
579
727
951
1205
1483
1881
2315
2900
3662
134
189
272
401
516
647
846
1072
1320
1673
2060
2581
3259
D)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xii)
E)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
PN 8 (SDR 17)
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
PN 6 (SDR 21)
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
122
171
247
367
470
589
771
977
1203
1528
1875
2399
3040
108
152
220
327
418
524
686
870
1071
1360
1705
2135
2705
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
94
136
190
284
374
460
602
756
939
84
121
169
258
326
410
536
672
836
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
x)
xi)
xii)
xiii)
225 mm
250 mm
280 mm
315 mm
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
Couplers
19
20
21
22
23
24
25
26
27
28
29
30
Equal
Equal
Equal
Equal
Equal
Equal
Equal
Equal
Equal
Equal
Equal
Equal
20
25
32
40
50
63
75
90
110
125
140
160
180
200
225
250
280
315
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
Tee
20
25
32
40
50
63
75
90
110
125
160
180
Rmt
Rmt
Rmt
Rmt
1189
1452
1836
2309
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
100
100
100
173
217
257
435
476
664
675
1446
1569
2254
2530
3189
4973
5600
6116
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
210
210
210
463
473
775
1135
1620
2250
3104
5380
6758
Without
ED
1058
1293
1634
2055
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
90 Deg.
49
50
51
52
53
54
55
56
57
58
59
60
61
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
Elbow
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
45 Deg.
62
63
64
65
66
67
68
69
70
71
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
Reducer
25X20
32X20
32X25
40X32
50X32
50X40
63X32
63X40
63X50
90X63
No.
No.
No.
10832
12215
17895
20
25
32
40
50
63
75
90
110
125
160
180
200
225
250
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
112
112
113
153
181
252
394
465
641
816
1786
2070
2679
5840
10943
32
40
50
63
75
90
110
125
160
180
200
225
250
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
120
145
172
240
374
442
641
816
1503
1970
2070
2679
5840
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
150
158
165
179
179
179
217
217
217
536
Without
ED
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
72
73
74
75
76
77
78
79
80
Reducer 110X75
Reducer 110X90
Reducer 125X90
Reducer 160X110
Reducer 180X125
Reducer 200X160
Reducer 225X160
Reducer 250X160
Reducer 250X200
No.
No.
No.
No.
No.
No.
No.
No.
No.
697
697
774
1369
1705
2020
2955
4082
4465
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
End Cap
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
40
40
55
60
64
84
308
351
493
624
1021
1106
1286
2055
3530
4550
7527
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
757
757
757
757
757
757
757
757
757
982
982
982
757
757
757
982
20
25
32
40
50
63
75
90
110
125
140
160
180
200
225
250
315
Without
ED
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
3
1
2
3
4
5
6
7
8
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
982
982
757
757
757
1070
1070
1070
1068
1068
1068
1540
1540
1540
1068
1068
1068
1540
1540
1540
1271
1271
1271
1726
1726
1726
No.
No.
No.
No.
No.
No.
No.
No.
68
78
100
184
241
344
73
86
Without
ED
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
108
202
259
365
70
77
98
187
240
347
128
169
169
289
289
374
374
530
130
155
190
312
443
600
78
95
123
197
269
374
89
110
132
257
337
443
155
204
264
436
590
839
40
40
Without
ED
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
53
54
55
56
End Cap 32
End Cap 40
End Cap 50
End Cap 63
No.
No.
No.
No.
55
60
64
84
Without
ED
Item Description
Unit
Rate ( in Rs.)
2012 2013
2012-2013
With E.D.
Without ED
a
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
b
1
2
3
4
5
6
TP 4Kg/Sq
4Kg/Sq.Cm.
Cm
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4464
4909
5390
5965
7213
8334
9382
11499
13280
14870
16349
18890
20511
21993
23476
24958
26440
4054
4457
4896
5417
6551
7569
8522
10445
12062
13505
14849
17156
18628
19975
21321
22668
24014
TP 5.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
RMT
RMT
RMT
RMT
RMT
RMT
4464
4930
5417
6000
7262
8400
4054
4479
4923
5449
6596
7629
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
With t ED
Without
7
8
9
10
11
12
13
14
15
16
17
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
9493
11606
13412
15040
17157
19169
20866
22350
23832
25315
26797
8621
10542
12181
13661
15584
17409
18952
20298
21646
22992
24339
TP 7 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4475
4951
5445
6032
7312
8479
9629
11756
13613
15289
17455
19518
21450
22384
23867
25349
26831
4063
4496
4945
5478
6641
7701
8745
10677
12366
13886
15853
17728
19483
20329
21676
23023
24369
TP 8.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4492
4976
5473
6067
7376
8578
9765
11923
13819
15537
17903
20032
4080
4520
4970
5510
6700
7790
8869
10828
12550
14112
16261
18194
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
d
1
2
3
4
5
6
7
8
9
10
11
12
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
With t ED
Without
13
14
15
16
17
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
21859
22789
24273
25755
27237
19853
20699
22045
23392
24738
TP 10 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4508
4995
5506
6117
7449
8677
9913
12087
14024
15926
18207
20390
22276
23209
24692
26175
27657
4095
4539
5002
5555
6764
7880
9003
10978
12736
14465
16536
18520
20233
21079
22427
23773
25120
TP11.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4527
5027
5550
6169
7523
8774
10188
12254
14228
16181
18513
20751
22699
23631
25113
26596
28078
4111
4567
5039
5602
6833
7968
9254
11131
12922
14696
16814
18848
20617
21462
22809
24155
25502
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
f
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
g
1
2
3
4
5
6
7
8
9
10
TP 13 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4562
5069
5594
6220
7595
8874
10356
12421
14526
16438
With t ED
Without
4143
4604
5081
5649
6898
8058
9407
11281
13193
14930
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
With t ED
Without
11
12
13
14
15
16
17
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
18823
21120
23116
24047
25530
27012
28494
17095
19181
20995
21841
23188
24534
25871
TP 14.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4601
5116
5649
6279
7672
9456
10525
12706
14739
16696
19130
21479
24161
25092
26575
28057
29539
4179
4646
5131
5703
6968
8588
9559
11541
13386
15163
17374
19507
21944
22789
24137
25483
26830
TP17 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4636
5162
5707
6347
7771
9076
10728
12889
14955
16964
19440
21844
24628
25558
27041
28524
4212
4689
5183
5765
7057
8244
9745
11705
13581
15408
17656
19840
22367
23214
24560
25907
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
17
1800mm
RMT
30006
With t ED
Without
27253
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
j
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
k
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
l
1
2
3
With t ED
Without
TP 18.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4674
5209
5765
6417
7870
9189
11082
13113
15211
17231
19752
22892
25266
25671
27153
28635
30119
4245
4731
5236
5828
7148
8347
10064
11910
13814
15649
17940
20793
22948
23314
24662
26009
27355
TP 20 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4711
5257
5822
6489
7968
9416
11349
13415
15564
17638
20785
23387
25824
26227
27710
29192
30674
4278
4775
5288
5894
7237
8552
10306
12182
14135
16019
18878
21241
23453
23821
25168
26514
27861
TP 21.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
RMT
RMT
RMT
4750
5302
5880
4316
4817
5340
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
With t ED
Without
4
5
6
7
8
9
10
11
12
13
14
15
16
17
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
6559
8084
9879
11528
13711
15918
18527
21302
23929
27241
27647
29129
30611
32094
5957
7342
8973
10469
12453
14457
16827
19347
21733
24741
25109
26457
27803
29150
TP 23 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4787
5350
5939
6628
8254
10190
11880
14008
16270
19017
21825
24612
27747
28150
29632
31116
32598
4349
4859
5394
6020
7497
9256
10790
12723
14778
17272
19823
22353
25200
25567
26915
28261
29607
TP 24.5 Kg/Sq.Cm.
350 mm
400 mm
450mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
4825
5398
5997
6699
8586
10331
12097
14244
17036
4382
4902
5447
6084
7798
9383
10986
12938
15472
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
n
1
2
3
4
5
6
7
8
9
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
With E.D.
ED
10
11
12
13
14
15
16
17
1100mm
1200mm
1300 mm
1400mm
1500 mm
1600 mm
1700mm
1800mm
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
With t ED
Without
19508
22354
26559
28276
28677
30159
31642
33124
17718
20305
24122
25682
26045
27392
28738
30085
Note ; 1) For P.C.C.P pipes lowering , laying and pouring of cement mortar in the field on joints
(after laying and welding ), rates as per P.S.C. pipes lowering, laying and jointing shall be
adopted
adopted.
Note ; 2) For field welding rates applicable for similar welding in M.S. pipes given in that
section shall be adopted.
NOTE : 3) Whenever manufacturer is separate& contractor for lowering laying jointing &
testing is seperate the principal contractor shall enter into an aggrement with P C C P pipe
manufacturer for satisfactory manufacturing transporting lowering laying jointing & testing of
pipe.This foot Note shall appear in tender conditions
Item Description
A
a
Unit
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
10
350 mm
No
11
400 mm
No
12
450 mm
No
13
500 mm
No
14
600 mm
No
15
700 mm
No
3308
3873
4078
5694
8130
9844
17694
30194
41374
68478
94273
111059
181880
266900
468495
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
14
750 mm
No
15
800 mm
No
16
900 mm
No
17
1000 mm
No
Rate ( in Rs.)
2012-2013
4709
6708
9134
10848
20224
33057
44373
72752
97627
114222
185408
270477
709220
776307
843396
920068
1073413
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
3227
3486
5718
7323
10203
11419
Sr No
Item Description
Unit
200 mm
No
250 mm
No
300 mm
No
10
350 mm
No
11
400 mm
No
12
450 mm
No
13
500 mm
No
14
600 mm
No
15
700 mm
No
16
750 mm
No
17
800 mm
No
18
900 mm
No
19
1000 mm
No
20
1100 mm
No
21
1200 mm
No
d
1
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
150 mm
No
200 mm
No
250 mm
No
300 mm
No
10
350 mm
No
11
400 mm
No
12
450 mm
No
13
500 mm
No
14
600 mm
No
15
700 mm
No
16
750 mm
No
17
800 mm
No
18
900 mm
No
19
1000 mm
No
20
1100 mm
No
1200 mm
No
A
a
24284
38986
54474
93820
108424
127927
207834
305384
369010
423608
481972
609995
753081
911227
1084436
21
Rate ( in Rs.)
2012-2013
3312
3727
5484
7092
9911
12030
24298
36715
51028
85713
112272
131355
213216
311049
375853
431463
490910
621308
767046
928125
1104545
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
4391
4985
5116
6812
8521
10217
Sr No
Item Description
Unit
200 mm
No
250 mm
No
Rate ( in Rs.)
2012-2013
300 mm
No
10
350 mm
No
11
400 mm
No
12
450 mm
No
13
500 mm
No
14
600 mm
No
15
700 mm
No
16
750 mm
No
17
800 mm
No
18
900 mm
No
19
1000 mm
No
20
1100 mm
No
21
1200 mm
No
19333
29913
37695
53477
72101
88187
113477
167606
300430
342603
427239
550860
814189
1078533
1280269
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
4391
4985
5116
6812
8521
12374
21854
33263
40982
58087
77248
93275
120104
174198
310617
351996
437316
561585
826615
1093680
1293675
5803
6371
7265
9636
12024
11893
24101
37382
49699
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)
xviii)
xix)
xx)
xxi)
b
50 mm
65 mm
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
, Sluice valves without byepass arrangement - PN -1.6
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
Sr No
Item Description
Unit
10
350 mm
No
11
400 mm
No
12
450 mm
No
13
500 mm
No
14
600 mm
No
15
700 mm
No
16
750 mm
No
17
800 mm
No
18
900 mm
No
19
1000 mm
No
20
1100 mm
No
21
1200 mm
No
d)
Rate ( in Rs.)
2012-2013
72811
99720
123737
160146
243982
524772
579078
672599
813137
1183325
1285723
1721030
xx)
1100 mm
No
xxi)
1200 mm
No
5803
6371
7265
9636
12024
14014
26755
40969
53299
77866
105441
129463
167602
251533
538550
589319
682470
823468
1195568
1297614
1734270
No
No
No
5808
7424
8467
i)
50 mm
No
ii)
65 mm
No
iii)
80 mm
No
iv)
100 mm
No
v)
125 mm
No
No
vi)
150 mm
vii)
200 mm
No
viii)
250 mm
No
ix)
300 mm
No
x)
350 mm
No
xi)
400 mm
No
xii)
450 mm
No
xiii)
500 mm
No
xiv)
600 mm
No
xv)
700 mm
No
xvi)
750 mm
No
xvii)
800 mm
No
xviii)
900 mm
No
xix)
1000 mm
No
a)
1
2
3
Sr No
Item Description
Unit
Rate ( in Rs.)
2012-2013
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
1400 mm
1500 mm
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
10944
14586
18230
28844
58665
63023
72811
79947
98727
159784
198334
218214
301378
358723
581758
550499
839367
1042954
b)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
6444
8537
9317
12585
16776
20965
33171
67464
72476
83733
91939
113537
183751
228084
249867
346586
448404
727199
688125
1049209
1294878
Sr No
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
xiv)
xv)
xvi)
xvii)
xviii)
xix)
xx)
xxi)
Item Description
Unit
50 mm
65 mm
80 mm
100 mm
125 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm to 1500 mm
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
689
1036
1440
1881
2342
2957
3076
4008
4158
5124
6182
7354
7616
8083
8714
9598
11438
12136
14307
16521
18153
615
741
1022
1116
1228
1349
12/15 MM
No
2
3
20 mm
No
25 mm
No
32 mm
No
40 mm
No
50 mm
No
Rate ( in Rs.)
2012-2013
12/15 mm
No
20 mm
No
25 mm
No
32 mm
No
40 mm
No
50 mm
No
719
1022
1228
1324
1418
1851
Sr No
Item Description
A
a
Unit
50 mm
No
65 mm
No
80 mm
No
50 mm
No
65 mm
No
80 mm
No
A
a
No
150 mm
No
200 mm
No
100 mm
No
150 mm
No
200 mm
No
Providing and supplying Kinetic Double Orifice type Air Valves as per
MJPs standard specifications combined with screw down isolating
valve, small orifice elastic ball resting on a gun metal orifice nipple,
large orifice vulcanite ball seating on moulded seat ring, inlet face
and drilled, including all taxes (Central and local), insurance, third
party inspection charges, loading, unloading, transportation upto
departmental stores / site, etc. complete.
A
a
14617
20593
34633
40 mm
No
50 mm
No
80 mm
No
9561
17425
29304
1
3
7515
8509
10530
5673
6619
7561
Rate ( in Rs.)
2012-2013
9516
11729
15304
40 mm
No
50 mm
No
80 mm
No
11280
13903
18176
Sr No
Item Description
Unit
Providing and supplying Kinetic Double Orifice type Air Valves as per
MJPs standard specifications having small orifice elastic ball resting
on a gun metal orifice nipple, large orifice vulcanite ball seating on
moulded seat ring,with built-in Kinetic features, isolatintg sluice valve
mounted in horizontal position and operated by wheel gearing, inlet
face and drilled, including all taxes (Central and local), insurance,
third party inspection charges, loading, unloding, transportation upto
departmental stores / site, etc. complete.
No
A
a
100 mm
No
150 mm
No
200 mm
No
100 mm
No
150 mm
No
200 mm
No
10
24427
45993
67161
Lowering, laying and fixing in proper alignment and position all types
of C.I. air valves as directed by Engineer-in-charge including cost of
conveyance from stores to site of work, cost of all material and giving
satisfactory hydraulic testing, etc. complete. (for all class of valves).
Air Valve Single Ball (PN-1 and PN - 1.6)
15 mm
No
20 mm
No
25 mm
No
32 mm
No
40 mm
No
50 mm
No
65 mm
No
80 mm
No
100 mm
No
10
125 mm
No
11
150 mm
No
12
200 mm
No
20610
38804
56659
1
3
Rate ( in Rs.)
2012-2013
110
140
180
199
213
231
243
255
285
345
383
421
15 mm
No
20 mm
No
25 mm
No
32 mm
No
40 mm
No
50 mm
No
65 mm
No
80 mm
No
100 mm
No
10
125 mm
No
11
150 mm
No
12
200 mm
No
120
149
180
205
238
275
317
379
400
441
603
664
Sr No
Item Description
Unit
40 mm
No
50 mm
No
65 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
11
A
a
No
100 mm dia
No
150 mm dia
No
200 mm dia
No
250 mm dia
No
300 mm dia
No
350 mm dia
No
400 mm dia
No
450 mm dia
No
10
500 mm dia
No
11
600 mm dia
No
b).Butterfly Valves
300 mm dia
No
350 mm dia
No
400 mm dia
No
450 mm dia
No
500 mm dia
No
600 mm dia
No
12
Providing erecting Cast Steel D/F Sluice Valves with jointing to pipe
work (including all hardware and packing) water works qualityhaving
non-rising spindle with hand wheel and without bypass arrangement,
spindle of stainless steel as per requirement, excluding C. C.
foundation / structural steel support.
Rate ( in Rs.)
2012-2013
No
100 mm dia
No
150 mm dia
No
200 mm dia
No
250 mm dia
No
273
315
345
379
417
455
652
711
14656
19540
29311
45713
65786
84173
112230
187281
255524
300616
343203
105843
112835
126737
135014
156289
175884
15776
24908
37976
59558
64292
Sr No
Item Description
Unit
300 mm dia
No
350 mm dia
No
400 mm dia
No
450 mm dia
No
10
500 mm dia
No
11
600 mm dia
No
300 mm dia
No
350 mm dia
No
400 mm dia
No
450 mm dia
No
500 mm dia
No
600 mm dia
No
13
No
100 mm dia
No
150 mm dia
No
200 mm dia
No
250 mm dia
No
300 mm dia
No
14
10227
15661
26530
50442
87831
115713
No
100 mm dia
No
150 mm dia
No
200 mm dia
No
250 mm dia
No
300 mm dia
No
129129
137659
154619
164717
190673
214579
Providing erecting Cast Steel D/F Reflux Valves Single door with
jointing to pipe work (including all hardware and packing) water works
quality with jointing to pipe without bypass arrangement, with
gunmetal seat excluding C. C. foundation / structural steel support.
15
108382
182788
266657
321057
500178
756005
Butterfly Valves
Rate ( in Rs.)
2012-2013
15237
21477
35717
63275
114555
139478
Providing erecting Kinetic Double Orifice Cast Steel Air Valves with
an isolating Sluice Valve mounted in horizontal position operated by
wheel gear suitable for working pressure of Class-150 rating (20
kg/cm2).
With Third Party Inspection
80 mm dia
No
100 mm dia
No
150 mm dia
No
200 mm dia
No
29546
41185
78920
102014
Sr No
Item Description
16
Providing erecting Kinetic Double Orifice Cast Steel Air Valves with
an isolating Sluice Valve mounted in horizontal position operated by
wheel gear suitable for working pressure of Class 300 rating (52
kg/cm2)
With Third Party Inspection
Unit
80 mm dia
No
100 mm dia
No
150 mm dia
No
200 mm dia
No
17
No
No
No
No
No
No
No
No
A
a
No
40 mm
No
50 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
5492
6625
12616
15821
Providing and supplying C.I. D/F angle type spring loaded pressure
relief valves of approved make and quality including all taxes (Central
and local), octroi, inspection charges, transportatoin to departmental
stores, etc. complete.
With Third Party Inspection
10
4636
5431
11045
13870
18
35996
41148
96157
116071
Providing and fixing in position air valve shaft including providing and
fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long
over branch flange of air valve tee, providing PCC block of M-150
concrete 150 mm thick around the air valve tee including encasing of
vertical shaft in PCC M-150 as shown in type design together with
providing and making flanged joints wherever required and fixing of
air valve over the shaft excluding cost of air valve and branch flanged
air valve tee. etc. complete as per type design and as directed by
Engineer-in-charge for following diameters of pipe lines (type design
attached.)
Rate ( in Rs.)
2012-2013
4234
5517
7145
10837
15170
20684
23635
52194
73367
96757
25 mm
No
40 mm
No
50 mm
No
80 mm
No
100 mm
No
5294
6893
8914
13543
18958
Sr No
Item Description
Unit
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
10
19
Lowering, laying and fixing in proper alignment and position all types
of C.I. D/F angle type spring loaded pressure relief valves including
all cost of all material, labour, cost of conveyance from stores to site
of work and giving satisfactory hydraulic testing, etc. complete. (For
all class of valves.).
25 mm
No
40 mm
No
50 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
10
300 mm
No
Rate ( in Rs.)
2012-2013
25849
29544
65238
91707
121226
206
273
316
378
415
462
652
712
831
949
Note : Only 85% rate is payable till satisfactiry hydraulic testing is given.
20
80 mm
No
100 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
450 mm
No
10
500 mm
No
11
600 mm
No
12
700 mm
No
13
750 mm
No
14
800 mm
No
15
900 mm
No
16
1000 mm
No
21
33
39
59
76
109
129
131
167
194
232
283
333
398
435
479
521
80 mm
No
100 mm
No
150 mm
No
200 mm
No
11
13
21
22
Sr No
Item Description
Unit
250 mm
No
300 mm
No
350 mm
No
400 mm
No
450 mm
No
10
500 mm
No
11
600 mm
No
22
80 mm
No
100 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
450 mm
No
10
500 mm
No
11
600 mm
No
12
700 mm
No
13
750 mm
No
14
800 mm
No
15
900 mm
No
16
1000 mm
No
80 mm
Set
100 mm
Set
125 mm
Set
150 mm
Set
39
43
60
102
133
187
214
298
325
444
615
1095
1138
1179
1705
2190
32
44
54
61
66
75
86
Providing and supplying I.S.I. mark rubber gasket suitable for C.I. or
D. I. pipe of all class for tyton joints including all taxes (Central and
local) inspection charges, transportation to departmental stores / site,
etc. complete.
S.B.R. Gaskets for C. I. / DI Pipes.
Rate ( in Rs.)
2012-2013
45
53
64
75
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
82
109
129
177
219
307
326
393
487
532
623
838
Sr No
Item Description
23
Providing and fixing and jointing high proformance C I Air valve for
water combination type ( Kinetic Air Valve alongwith automatic air
valve ) double ball , double orifice with stainless steel ball tampar
proof air vent rolling sill machanism for air release and anyivaccum
application design for 16 Kg/Sqcm working pressure and tested for
20 Kg /Sqcm pressure ( Rate include cost of gasket, belt, nut and any
other material required for jointing and its transportation etc and
including all taxes and duties and excluding octroi ).etc complete.
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
50 MM
80 MM
100 MM
150 MM
Unit
No
No
No
No
No
200 MM
Providing and supplying I.S.I. mark EPDM rubber gasket suitable for
C.I. or D. I. pipe of all class for tyton joints including all taxes (Central
and local) inspection charges, transportation to departmental stores /
site, etc. complete.
80 mm.
100 mm.
150 mm.
200 mm.
250 mm.
300 mm.
350 mm.
400 mm.
450 mm.
500 mm.
600 mm.
700 mm.
750 mm.
800 mm.
900 mm.
1000 mm
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Rate ( in Rs.)
2012-2013
9513
13201
21226
35528
43035
46
48
70
117
160
212
247
338
378
500
703
1320
1383
1688
2178
2530
Item Description
Unit
Rate
( in Rs.)
2012-2013
1302
1419
1786
2555
3310
4993
5589
7372
9623
11295
14193
18200
24823
30164
Manufacturing,Suppling
of
C.I
mechanical
compression
flanged/socket Tail Pieces (Popularly known as IT.M flange/socket tail
piece) suitable for making flanged connection with the plain barrel of
C.I. spun pipes (As per I.S. 1536/2001) & D.I. pipes (As per I.S.
8329/2000) The tail piece to be supplied complete with sealing rubber
gasket of S.B.R.cast iron follower glands & mild steel nut-bolts.The
whole assembly should be mechanically & hydraulically tested to the
provision as laid down in I.S. 1538/1993. The rates are inclusive of
cost of material,forwarding charges,saletax, loading, transportation &
unloading at departmental store. etc complete as directed.
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
750 mm
No
14
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
14
750 mm
No
784
841
1121
1512
1726
2767
3541
4364
6792
7626
10422
13000
16984
19928
Sr No
Item Description
Unit
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
14
750 mm
No
80 mm
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
14
750 mm
No
2231
2587
3022
4751
6305
9385
11422
18911
25775
32899
40940
57862
91333
103733
Rate
( in Rs.)
2012-2013
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
2071
2306
2914
4002
5271
7733
9330
15564
19205
26788
29845
41324
58888
77879
1988
2213
2657
3757
4711
Sr No
Item Description
Unit
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
14
750 mm
No
No
100 mm
No
125 mm
No
150 mm
No
200 mm
No
250 mm
No
300 mm
No
350 mm
No
400 mm
No
10
450 mm
No
11
500 mm
No
12
600 mm
No
13
700 mm
No
14
750 mm
No
Rate
( in Rs.)
2012-2013
7124
8599
13576
17404
22017
25658
33998
51142
56318
1969
2162
2348
3672
4522
6685
7407
11689
15834
19985
21784
29863
40258
44912
80x80x80 mm dia
No
100x100x80 mm dia
No
100x100x100 mm dia
No
150x150x80 mm dia
No
150x150x100 mm dia
No
150x150x150 mm dia
No
200x200x80 mm dia
No
200x200x100 mm dia
No
200x200x150 mm dia
No
10
200x200x200 mm dia
No
11
250x250x80 mm dia
No
12
250x250x100 mm dia
No
13
250x250x150 mm dia
No
14
250x250x200 mm dia
No
15
250x250x250 mm dia
No
3016
3243
3596
5037
5108
6335
6075
6142
7316
8050
8555
8744
10435
11025
12366
Sr No
Item Description
Unit
16
300x300x80 mm dia
No
17
300x300x100 mm dia
No
18
300x300x150 mm dia
No
19
300x300x200 mm dia
No
20
300x300x250 mm dia
No
21
300x300x300 mm dia
No
No
100x100x80 mm dia
No
100x100x100 mm dia
No
150x150x80 mm dia
No
150x150x100 mm dia
No
150x150x150 mm dia
No
200x200x80 mm dia
No
200x200x100 mm dia
No
200x200x150 mm dia
No
10
200x200x200 mm dia
No
11
250x250x80 mm dia
No
12
250x250x100 mm dia
No
13
250x250x150 mm dia
No
14
250x250x200 mm dia
No
15
250x250x250 mm dia
No
16
300x300x80 mm dia
No
17
300x300x100 mm dia
No
18
300x300x150 mm dia
No
19
300x300x200 mm dia
No
20
300x300x250 mm dia
No
21
300x300x300 mm dia
No
22
350x350x80 mm dia
No
23
350x350x100 mm dia
No
24
350x350x150 mm dia
No
25
350x350x200 mm dia
No
26
350x350x300 mm dia
No
27
350x350x350 mm dia
No
28
400x400x80 mm dia
No
29
400x400x100 mm dia
No
30
400x400x150 mm dia
No
31
400x400x200 mm dia
No
32
400x400x300 mm dia
No
33
400x400x400 mm dia
No
34
450x450x80 mm dia
No
35
450x450x100 mm dia
No
36
450x450x200 mm dia
No
Rate
( in Rs.)
2012-2013
9381
9591
12301
12708
13455
14849
2954
3241
3429
4892
5013
5970
5741
6124
7053
8087
8108
8532
10125
10595
10970
9519
9705
11205
11300
12470
15283
13314
14159
15234
17752
18187
20812
17404
18449
20541
20955
25253
28915
20758
21805
25573
Sr No
Item Description
Unit
37
450x450x300 mm dia
No
38
450x450x350 mm dia
No
39
450x450x450 mm dia
No
40
500x500x100 mm dia
No
41
500x500x250 mm dia
No
42
500x500x300 mm dia
No
43
500x500x400 mm dia
No
44
500x500x500 mm dia
No
45
600x600x100 mm dia
No
46
600x600x300 mm dia
No
47
600x600x400 mm dia
No
48
600x600x500 mm dia
No
49
600x600x600 mm dia
No
50
700x700x100 mm dia
No
51
700x700x200 mm dia
No
52
700x700x350 mm dia
No
53
700x700x400 mm dia
No
54
750x750x150 mm dia
No
55
750x750x250 mm dia
No
56
750x750x750 mm dia
No
Rate
( in Rs.)
2012-2013
32269
34049
36984
23355
31936
33086
39892
48162
33376
45831
52215
56505
69377
44235
51246
61922
66526
52759
60506
116081
100x80 mm dia
No
150x80 mm dia
No
150x100 mm dia
No
200x100 mm dia
No
200x150 mm dia
No
250x200 mm dia
No
250x150 mm dia
No
300x150 mm dia
No
300x200 mm dia
No
10
300x250 mm dia
No
11
350x200 mm dia
No
12
350x250 mm dia
No
13
350x300 mm dia
No
14
400x250 mm dia
No
15
400x300 mm dia
No
16
400x350 mm dia
No
17
450x300 mm dia
No
18
450x350 mm dia
No
19
450x400 mm dia
No
20
500x350 mm dia
No
21
500x400 mm dia
No
22
500x450 mm dia
No
2092
3292
3485
4011
4387
5994
5848
7372
7384
7510
10612
10646
10520
16029
14200
14295
17751
17740
17519
21339
21014
20483
Sr No
Item Description
Unit
23
600x400 mm dia
No
24
600x450 mm dia
No
25
600x500 mm dia
No
26
700x500 mm dia
No
27
700x600 mm dia
No
28
750x600 mm dia
No
29
750x700 mm dia
No
30
800x450 mm dia
No
31
800x700 mm dia
No
Rate
( in Rs.)
2012-2013
30985
30156
28313
42533
38601
45846
42377
63072
54144
Item Description
Unit
4.80 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.20 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
4.80 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.40 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
1912
2224
2533
2842
3071
3414
3641
1527
1775
2021
2204
2477
2567
2717
2955
Rate ( in Rs.)
2012-2013
2646
3016
3339
3706
3934
4071
4433
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
2909
3317
3672
4077
4480
4880
Sr No
Item Description
Unit
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
4600
5248
5816
6462
7105
7748
8148
4177
4765
5278
5864
6447
7030
7392
3751
4280
4741
5267
5788
6310
6635
3327
3796
4203
4668
5130
5590
5878
Rate ( in Rs.)
2012-2013
5024
5734
6353
7059
7764
8468
8906
10651
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
5439
6209
6881
Sr No
Item Description
Unit
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
6711
7662
8492
9440
10387
11330
11919
14266
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
6288
7178
7955
8842
9727
10610
11161
5863
6693
7417
8244
9069
9892
10405
12449
7646
8411
9172
9648
Rate ( in Rs.)
2012-2013
7135
8146
9030
10038
11045
12048
12675
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
7550
8622
9558
10624
11690
12754
Sr No
Item Description
10.00 mm thick
Unit
RMT
13418
7975
9107
10095
11223
12348
13473
14175
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
9247
10559
11706
13016
14325
15631
16446
5.60 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
8822
10075
11170
12419
13666
14911
15689
8398
9590
10632
11821
13008
14193
14932
17883
Rate ( in Rs.)
2012-2013
9661
11034
12234
13603
14970
16335
17188
6.40 mm thick
RMT
7.10 mm thick
RMT
11519
12772
Sr No
Item Description
Unit
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
9.50 mm thick
RMT
9.98 mm thick
RMT
10.00 mm thick
RMT
6.40 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
9.50 mm thick
RMT
9.98 mm thick
RMT
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
11.90 mm thick
RMT
12.00 mm thick
RMT
15986
17777
19567
21355
22472
26708
26930
10.00 mm thick
RMT
11.00 mm thick
RMT
ab
20637
21672
aa
14910
16581
18250
19917
20957
25114
12487
13846
15397
16946
18492
19459
18141
19049
19087
14201
15629
17055
17945
21498
Rate ( in Rs.)
2012-2013
22858
25127
9.50 mm thick
RMT
10.00 mm thick
RMT
22089
23243
Sr No
ac
Item Description
Unit
7.10 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ad
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ag
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ah
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ai
21013
23131
25247
26569
31846
20427
22485
24542
25826
30956
19841
21840
23837
25084
30065
19254
21194
23132
24342
29175
af
17060
18973
20885
22793
23985
28748
ae
Rate ( in Rs.)
2012-2013
21599
23777
25951
27310
32737
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
22186
24422
26658
28053
33627
Sr No
aj
Item Description
Unit
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ak
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
al
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
25117
27651
30181
31763
38080
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ap
24530
27005
29477
31021
37190
ao
23946
26359
28771
30279
36299
an
23359
25713
28067
29537
35408
am
22773
25068
27362
28795
34517
Rate ( in Rs.)
2012-2013
25703
28297
30887
32505
38970
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
26290
28942
31592
33247
39861
Sr No
Item Description
Unit
aq
1
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
26877
29587
32297
33990
40751
ar
1
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
27462
30233
33002
34731
41643
as
1
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
28049
30879
33707
35474
42533
at
1
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
28635
31525
34413
36215
43424
au
1
7.90 mm thick
RMT
8.70 mm thick
RMT
9.50 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
Rate ( in Rs.)
2012-2013
29222
32170
35117
36959
44314
58990
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
1522
1829
2151
2470
Sr No
Item Description
Unit
9.00 mm thick
RMT
10.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
3376
4060
4748
5439
6131
6828
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
3006
3616
4229
4845
5464
6085
2634
3170
3709
4250
4795
5344
2264
2725
3190
3657
4129
4601
1892
2280
2670
3063
3460
3859
2792
3117
Rate ( in Rs.)
2012-2013
3748
4506
5268
6032
6800
7570
Sr No
Item Description
Unit
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5232
6288
7346
8408
9471
10538
12682
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
4862
5841
6826
7813
8804
9797
11792
4490
5397
6307
7220
8135
9054
10901
4119
4951
5787
6626
7468
8313
Rate ( in Rs.)
2012-2013
5604
6734
7866
9001
10140
11281
13572
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
5974
7179
8384
9595
10807
12024
Sr No
Item Description
12.00 mm thick
Unit
RMT
14463
6346
7624
8905
10189
11475
12765
15353
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7088
8515
9943
11376
12811
14249
17134
6717
8069
9424
10782
12143
13508
16244
Rate ( in Rs.)
2012-2013
7458
8959
10463
11970
13479
14992
18026
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7830
9405
10983
12563
14147
15733
18916
Sr No
Item Description
Unit
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
5.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
6.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
11632
13579
15531
17487
19444
23369
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
11186
13061
14938
16819
18702
22479
8942
10740
12541
14344
16151
17960
21588
8572
10296
12021
13751
15483
17218
20698
8201
9850
11501
13157
14815
16476
19808
Rate ( in Rs.)
2012-2013
14100
16126
18155
20186
24260
Sr No
Item Description
Unit
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ac
7.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ad
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
af
20281
22830
25382
30493
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ag
19688
22161
24640
29602
16697
19094
21495
23898
28712
ae
16178
18501
20826
23156
27822
15659
17907
20159
22414
26931
15138
17313
19490
21672
26041
ab
14619
16720
18822
20928
25150
aa
Rate ( in Rs.)
2012-2013
20875
23499
26124
31384
Sr No
Item Description
Unit
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
ah
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
aj
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
am
24438
27506
30577
36728
49066
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
an
23844
26837
29834
35838
47878
23251
26170
29093
34947
al
22656
25502
28350
34057
ak
22062
24835
27609
33166
21469
24166
26866
32276
ai
Rate ( in Rs.)
2012-2013
25032
28174
31319
37618
50253
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
25625
28842
32061
38509
51440
RMT
26219
ao
1
Sr No
Item Description
Unit
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
ap
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
aq
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
28594
32182
35772
42962
57379
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
au
28001
31514
35029
42072
56190
at
27407
30846
34288
41180
55002
as
26813
30177
33545
40290
53815
ar
29509
32804
39399
52627
Rate ( in Rs.)
2012-2013
29188
32849
36514
43853
58566
8.00 mm thick
RMT
9.00 mm thick
RMT
10.00 mm thick
RMT
12.00 mm thick
RMT
16.00 mm thick
RMT
29782
33517
37257
44743
59753
Item Description
Unit
Fabricating pipes from steel plates supplied free of cost and stacking
the same in the fabricators yard. The rate to include cutting the plate,
rolling, tack welding, assembling in suitable lengths to form pipes,
welding on automatic welding machines and forming V edge for both
ends of pipe.
5 To 8 mm
MT
8 To12 mm
MT
12 To 16 mm
MT
16 To 20 mm
MT
20 To 25 mm
MT
Rate
( in Rs.)
2012-2013
9005.00
7062.00
5297.00
4767.00
4590.00
Fabricating one piece cants, short pipes (shorter than one strake
length) from the steel plates supplied free of cost of and stacking the
same in fabricators yard. The rate to include cutting the plates, rolling,
tack welding either on automatic welding machine or manually and
forming V edge to both ends of pipes.
5 To 8 mm
MT
8 To12 mm
MT
12 To 25 mm
MT
12359.00
8121.00
5827.00
MT
8 To12 mm
MT
12 To 16 mm
MT
16 To 25 mm
MT
Fabricating tapers from the steel plates, supplied free of cost and
stacking the same in the fabricators yard. The rate to include cutting
the plates, rolling, tack welding, welding either on automatic welding
machine or manually and forming V edge to both ends of tapers but
the rate excludes circuferential butt welding required for assembling
drums to form necessary tapers. Circumferential butt welding will be
paid for under Item No. 7 (a). Howerver, the rate under this includes
the longitudinal butt welding to form drums The rate shall also include
the cost of fabrication of stifferner rings and gussets and mounting the
same on tapers, tack and chain welding, etc. as directed by Engineerin-charge.
MT
14830.00
9887.00
7768.00
7239.00
11476.00
Sr No
Item Description
Unit
MT
Rate
( in Rs.)
2012-2013
4590.00
MT
MT
15007.00
16067.00
v). Flat manhole covers. The rate to include cutting, tack welding.
The rate also to include drilling holes including grinding wherever
necessary with supply of bolts, nuts, washers, etc.complete as per
drawing.
vi , a). Flange rings below 40 mm. thick. The rate to include gas :
cutting, tack welding to form ring, drilling holes including grinding
wherever necessary etc. complete.
vi , b). Flange rings 40 mm.and above thick. The rate to include
gas cutting to tack welding to form ring, drilling holes including
grinding wherever necessary etc. complete.
vii , a). Machining of flange ringe for cut upto 2 mm. including
handling, assembling, alignment the ring on machine, etc. complete
as directed by Engineer-in-charge I)for thickness of flange ring below 40 mm.
MT
10417.00
MT
16949.00
MT
22069.00
Sq.m
Sq.m
vii b). Extra over and above (vii) (a) for machining beyond 2 mm.
for every additional cut of 2 mm. or part thereof.
i). Stress relieving of flange rings as specified and directed.
Sq.m
971.00
1483.00
741.00
Sq.m
3531.00
Each
67.00
300mm. dia.
Each
Each
Each
21887
31585
41085
ii). Plug plates 150 mm. dia. and the thickness of plate from 14 mm
to 25 mm as per drawing. The rate to include gas cutting, drilling
holes, cost of G. I. plugs, rolling to raquired curvature and therading,
etc. complete.
Providing, fabricating and fixing expansion joints for pipelines as per
the drawing. The rate to include machining the strakes and steel ring
as shown in the drawing and welding on either automatic welding
machine or manually, Rate includes plates and flats required for
expansion joint and all othr materials such as synthetic rubber, rubber
ring, etc. complete. including packing as per specifications, grease,
bolts and nuts, etc. including local handling, all types of taxes and
duties etc. complete.
9711.00
MT
1
2
3
Sr No
4
5
6
7
8
9
10
11
Item Description
Unit
Each
Each
Each
Each
Each
Rate
( in Rs.)
2012-2013
MT
55084
64711
80556
88773
103312
119952
143629
190757
5827
MT
7945.00
MT
17293
10
Sq.m
77.00
11
Sq.m
77.00
12
Sq.m
91.00
Sq.m
91.00
Sq.m
25.00
Each
Each
Each
Note : Water for this purpose shall be supplied by the department free
of cost at fixed point within 5 Kms. Lead and all arrangements for
filling section and creating hydraulic pressure on polyurethene pig
shall be done by contractor at his own cost.
13
14
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
15
Sq.m
43.00
16
Each
Each
Each
Each
1
2
3
4
5
6
Each
Each
2138
4155
6184
10817
14722
17999
17
Providing and applying primer & one coat of red oxide of iron paint
externally to blast cleaned surface of the pipe etc complete
Sqm
27.50
18
Providing & applying primer and one coat of red oxide of iron paint
externally including cleaning the surface of the pipe with steel
scrapers wire brushes and metel cleaning solution etc complete
Sqm
60.00
19
Sqm
31.00
20
Providing & applying one coat of zinc rich epoxy primer to the internal
surface of pipeline at site.
Sqm
66.00
21
Providing & applying primer first coat of interol 49W emaline 05/58
pipe coat or any other equivalent approved paint to the internal
surface of pipeline at site.
b) Second coat
Sqm
50.00
Sq.m
41.00
c)Third coat
Sq.m
40.00
Item Description
Unit
Rate
( in Rs.)
2012-2013
282
332
381
431
482
a)
5 mm to 8 mm thick.
RMT
RMT
RMT
RMT
RMT
b)
RMT
RMT
RMT
RMT
RMT
RMT
RMT
c)
RMT
RMT
RMT
RMT
RMT
RMT
6
d)
864
932
996
1060
1124
1189
RMT
RMT
RMT
RMT
RMT
RMT
e)
574
640
706
774
840
906
974
1306
1378
1450
1522
1595
1668
RMT
RMT
1778
1880
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
394
462
534
603
673
a)
5 mm to 8 mm thick.
RMT
RMT
RMT
RMT
RMT
b)
RMT
RMT
RMT
RMT
RMT
RMT
RMT
c)
RMT
RMT
RMT
RMT
RMT
RMT
d)
RMT
RMT
RMT
RMT
RMT
RMT
1796
1877
2031
2132
2232
2333
RMT
RMT
1252
1304
1394
1483
1574
1664
e)
804
897
989
1082
1177
1269
1362
2488
2631
a)
5 mm to 8 mm thick.
RMT
RMT
337
396
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
457
517
578
RMT
RMT
RMT
b)
RMT
RMT
RMT
RMT
RMT
RMT
RMT
c)
RMT
RMT
RMT
RMT
RMT
RMT
6
d)
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
5 mm to 8 mm thick.
RMT
RMT
RMT
RMT
RMT
2133
2256
a)
b)
1566
1653
1740
1826
1913
2001
994
1042
1194
1273
1350
1416
e)
689
768
848
928
1009
1089
1167
472
556
639
724
807
RMT
RMT
RMT
RMT
965
1076
1188
1299
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
1412
1525
1635
RMT
RMT
RMT
c)
RMT
RMT
RMT
RMT
RMT
RMT
d)
RMT
RMT
RMT
RMT
RMT
RMT
e)
RMT
RMT
5 mm to 8 mm thick.
RMT
RMT
RMT
RMT
RMT
289
340
391
442
493
RMT
RMT
RMT
RMT
RMT
RMT
RMT
c)
2988
3157
a)
b)
2195
2314
2437
2555
2679
2802
1503
1563
1672
1781
1889
1998
589
656
724
793
860
928
996
RMT
RMT
RMT
RMT
RMT
915
955
1021
1087
1153
Sr No
6
d)
Item Description
Unit
Rate
( in Rs.)
2012-2013
RMT
1219
1334
1408
1483
1558
1632
1708
RMT
RMT
RMT
RMT
RMT
RMT
e)
RMT
RMT
a)
5 mm to 8 mm thick.
RMT
RMT
RMT
RMT
RMT
b)
RMT
RMT
RMT
RMT
RMT
RMT
RMT
824
919
1013
1109
1288
1345
1394
RMT
RMT
RMT
RMT
RMT
RMT
d)
406
475
548
618
691
c)
1817
1922
1282
1387
1428
1521
1616
1708
RMT
RMT
RMT
RMT
RMT
RMT
1855
1972
2078
2181
2286
2391
Sr No
e)
Item Description
Unit
Rate
( in Rs.)
2012-2013
2543
2692
RMT
RMT
a)
4 mm.
RMT
5 mm.
RMT
6 mm.
RMT
7 mm.
RMT
8 mm.
RMT
10mm.
RMT
12mm.
RMT
14mm.
RMT
16mm.
RMT
10
18mm.
RMT
11
20 mm.
RMT
12
22 mm.
RMT
13
25 mm.
RMT
b)
5 mm.
RMT
6 mm.
RMT
8 mm.
RMT
10mm.
RMT
12mm.
RMT
14mm.
RMT
16mm.
RMT
18mm.
RMT
20 mm.
RMT
10
22 mm.
RMT
11
25 mm.
RMT
8
1
131
198
465
519
651
798
854
1018
1232
1334
1599
2008
2725
Shifiting and aligning ring girders including removing tack welds and retacking in the correct position etc. complete as per specification for the
pipes of following diameter.
From 1000 mm, Upto 1250 mm. dia.
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
RMT
10
RMT
183
234
310
347
519
705
776
941
1062
1419
1723
355
435
513
592
670
749
827
908
987
1065
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
1144
1229
11
RMT
12
RMT
Each
Each
Each
Each
Each
Each
Each
Each
Each
10
Each
11
Each
12
Each
10
1299
1405
1511
1617
1723
1829
1935
2041
2147
2253
2378
2463
Transporting within 500 meters and aligning, fixing in position and tack
welding expansion joints suitable for pipeline of diameters.
Each
Each
Each
Each
Each
Each
Each
Each
Each
10
Each
11
Each
12
Each
4395
4558
4723
4887
9238
9445
9650
9793
10063
10270
10474
10682
Sr No
Item Description
11
Transporting within 500 meters aligning and fixing in position and tack
welding only, including marginal cutting, supplying and providing
rubber packing etc. where necessary.
Minor fixtures such as manhole cover, pressure and non-pressure
type blank flanges, loose rings, small pipes to form saddle bypass
arrangement, plug plates, ladders, platform, stiffener rings, etc.
a)
b)
12
Unit
Rate
( in Rs.)
2012-2013
MT
7868
MT
3997
upto 5 mm.
RMT
RMT
RMT
RMT
RMT
Above 22 mm.
RMT
13
59
84
109
124
172
230
5 mm. to 12 mm
No
Above 12 mm
No
Sq.m
65
90
1192
No
2675
16
Supplying transporting, the S.P. fire hydrants including duck foot bend,
S.V. and S.V. road box, painting the hydrant,fixing the saddle piece,
supplying, and laying required lenght of C.I. pipeline and jointing the
same spun yarn, molten lead including caulking, fixing the S.V. road
box in one brick masonry chamber in 1:5 C.M. with 12 mm thick 1:3
cement plaster both inside and outside on 1:3:6: C.C.150 mm thick
etc, complete specified and directed. [As per I.S.900/1965 Revised]
No
13090
17
37248
37303
37389
14
15
Upto 600mm.dia.(I.D.)
Km
Km
Km
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
37518
37646
37899
38272
38898
39354
39809
Km
Km
Km
Km
Km
Km
10
Km
Upto 600mm.dia.(I.D.)
Km
Km
Km
Km
Km
Km
Km
Km
18
Sq.m
189
270
402
531
684
1010
1528
2344
2919
3530
4167
416
19
Sq.m
448
20
Sq.m
363
Km
10
Km
11
Km
Sr No
Item Description
Unit
Rate
( in Rs.)
2012-2013
21
Sq.m
476
22
Providing and making inner cement mortar lining to M.S. pipes with
mechanical devices in cement mortar 1:1 proportion, including cost of
all materials, labour, special sand required, machinery, power
generation, all equipments and taking necessary access openings and
manholes, cuts at suitable intervals as directed by Engineer-in-charge
and rewelding the same after done with doubler plates pipes including
necessary excavation, refilling concerte breaking and remaking if any,
breaking guniting and remaking the same, repainting wherever
required with epoxy paint in 3 coats, all dewatering including emptying
the pipline and refilling the same after done with (water to be supplied
by department free of cost within 5 km. lead at fixed point and all other
arrangements to be done by agency), including carrying out C value
performance test of pipeline, complete job as per the directions of the
Engineer-in-charge.
Sq.m
Sq.m
23
Sq.m
326
377
1057
24
Sq.m
618
25
Sq.m
Sq.m
647
663
1
2
Sr No
Item Description
26
1
2
27
1
2
3
4
5
6
7
8
9
6 mm dia
8 mm dia
10 mm dia
12 mm dia
16 mm dia
20 mm dia
25 mm dia
32 mm dia
40 mm dia
Unit
Rate
( in Rs.)
2012-2013
Sq.m
Sq.m
814
869
MT
MT
MT
MT
MT
MT
MT
MT
MT
29598
22648
17947
14933
11182
9100
7187
5759
4373
Sr No
Item Description
28
Unit
Rate
( in Rs.)
2012-2013
2000
3000
4000
5000
sq.m
sq.m
sq.m
sq.m
1508
1893
2176
2501