WAgUAons! MIG ML | Bol RIT dead
Pe RAYMOND SAUDI ARABIA LTD.
An A ILALCoGRU BBs Co dpe sol eee
CIVIL AFTER CARE REQUIREIVIENTS
INUERNAL CEMENT MORTAR LINING OF PIPES AND
FITTINGS FOR STORAGE CONDITION ON SITE SHALI. BE
IMPLEMENT AS FOLLOWS:
1, Plastic end cover shall be securely fastened to the Pipes or
Pipe spool ends for protection of the Cement Mortar Lining
Plastic End Cover must be maintained in place until the time.
of installation,
2, For further storage, the water content inside the Cement
Mortar Lining Pipes or pipe spool with Fittings is to be
monitored regularly to ensure a inoist and humidity
‘atmosphere until the time of installation
3. The Cement Mortar Lining Pipes or Pipe spool with Fittings
shall not become empty of water or dry during storage
period. Should required additional potable water to avoid
shrinkage cracked of the Cement lined.
4, Damage Plastic and cover or torn caps shall be replaced
immediately to avoid drastic dehydration of moist.
We hope this reminder will follow to avoid damage of our Cement
inortar Lining Pipes or Pine spoal with Fittings