Hazard Identification Risk Assessment Risk Control (HIRARC)


Company:
Location:
Approved by:

FKK, UiTM SHAH ALAM


BUKIT CERAKAH

Conducted by:
Date:
Liason Officer:

Date:
Hazard Identification
No

Work
Activity

Hazard

Which can
cause/effect

CYCLING

FALL

INJURY

Risk Analysis
Existing Risk
Control (if
any)
CYCLING
PAD

2
3
4
5
6
7
8

*Attach this form together with the list of participants

Risk Control

Likelihood
(1-5)

Severity
(1-5)

Risk
(Likelihood x
severity)

Recommended
Control Measures

3 (refer
Table 1)

2 (refer
table 2)

3x2=6

Put if any

PIC (Due
Date/status)

Reference:
Table 1: Likelihood of an occurrence
LIKELIHOOD (L)
EXAMPLE
RATING
Most likely
The most likely result of the hazard/event being realized
5
Possible
Has a good chance of occuring at sometime in future
4
Conceivable
Might be occur at sometime in future
3
Remote
Has not been known to occur after many years
2
Inconceivable
Is practically impossible has never occured
1
Table 2: Severity of hazard
Severity (S)
Example
Catastrophic Numerous fatalities, irrecoverable property damage and productivity
Approximately one single fatality major property damage if hazard is
Fatal
realized
Seroius
Non-fatal injury, permanent disability
Minor
Disabling but not permanent injury
Negligible
Minor abrasions, bruises, cuts, first aid type injury

Rating
5
4
3
2
1

Table 3: Risk Assessment


Risk
Description Action
15-25 High
A HIGH risk requires immediate action to control the hazard as
detailed in the hierarchy of control. Actions taken must be
documented on the risk assessment form including date for completion
5-12
Medium
A MEDIUM risk requires a planned approach to controlling the
hazard and applies temporary measure if required. Actions taken must
be documented on the risk assessment form including date for
completion
1-4
Low
A risk identified as LOW may be considered as acceptable and further
reduction may not be necessary. However, if the risk can be resolved
quickly and efficiently, control measures should be implemented and
recorded