Professional Documents
Culture Documents
Swat Calibration Techniques Slides
Swat Calibration Techniques Slides
Calibration/Validation Periods
Flow
Time
Setup
Calibration
Validation
Model Configuration
)
Subwatersheds
location, physical characteristics/soils, gaging station
locations, topographic features, management questions.
Reaches
topographic features, stream morphology, cross-section
data available
Calibration Issues:
individual land use parameter determination
location of gaging station data
location of water quality monitoring information
available information on stream systems
Model Configuration
Calibration Points Example
LEGEND
Calibration/Validation
Procedures
Hydrology - first and foremost
Sediment - next
) Water quality - last (nitrogen, phosphorus,
pesticides, DO, bacteria)
)
)
sequence
series plot
duration curve
frequency
baseflow
overall time series
Calibration/Validation
Statistics
Mean and standard deviation of the
simulated and measured data
Slope, intercept and regression
coefficient/coefficient of determination
Nash-Suttcliffe Efficiency
Calibration/Validation
Common Problems
)
)
)
)
)
)
Calibration/Validation
Suggested References
)
Neitsch, S. L., J. G. Arnold, J. R. Kiniry and J. R. Willams. 2001. Soil and Water
Assessment
Tool
Manual,
USDA-ARS
Publications.
pp:
341-354.
http://www.brc.tamus.edu/swat/manual.
Hydrology Calibration
Summary
) Key
considerations
Water balance
overall
amount
among hydrologic components
distribution
Storm sequence
time
lag or shifts
of hydrograph
peak
recession
consider antecedent conditions
Simulated
350
250
200
150
100
50
Time
1994
1992
1996
1988
1990
1982
1986
1984
1980
1976
1974
1978
1970
1972
1968
1964
1962
0
1966
300
Hydrologic Calibration
Scenario 1
Flow (cfs)
Simulated
Observed
Time (hours)
Hydrologic Calibration
Model failed to simulate some peak
flows
)
)
Simulated
Observed
Flow (cfs)
Time (hours)
Solutions
)
)
Hydrologic Calibration
Scenario 2
Flow (cfs)
Simulated
Observed
Time (hours)
Hydrologic Calibration
Model consistently over predicts the
flow
High Surface flow
Simulated
Observed
Flow (cfs)
Time (hours)
Solutions
)
)
)
Hydrologic Calibration
Model consistently over predicts the
flow
)
Solutions
)
)
)
Simulated
Observed
Flow (cfs)
Time (hours)
Hydrologic Calibration
Scenario 3
Flow (cfs)
Simulated
Observed
Time (hours)
Hydrologic Calibration
Simulated flow follows the observed pattern
but lags the actual flow consistently
)
)
Simulated
Observed
Flow (cfs)
Time of concentration is
too long
Less than actual slope
for overland flow
Over estimated surface
roughness
Time (hours)
Solutions
)
)
)
Hydrologic Calibration
Scenario 4
Flow (cfs)
Simulated
Observed
Time (hours)
Hydrologic Calibration
Simulated flow over predicts peak flows but
under predicts all other times
Simulated
Observed
Flow (cfs)
Time (hours)
Solutions
)
)
)
Adjust infiltration
Adjust interflow
Adjust base flow recession parameter
considerations
from HRUs/Subbasins
degradation/deposition
amount
loading
Seasonal
Sediment Calibration
Scenario 1
Sediment
0.60
Observed
Sediment tons/ha
0.50
Simulated
0.40
0.30
0.20
0.10
0.00
1
Tim e in Months
Sediment Calibration
Model consistently under predicts the
sediment
Sediment
0.60
Observed
Simulated
Sediment tons/ha
0.50
0.40
0.30
0.20
0.10
Solutions
0.00
1
Tim e in Months
considerations
from HRUs/Subbasins
processes
amount
loading
Seasonal
Org N kg/ha
2.00
1.50
1.00
0.50
57
53
49
45
41
37
33
29
25
21
17
13
0.00
Months(93-97)
Mineral N
Min N kg/ha
0.60
0.40
0.20
57
53
49
45
41
37
33
29
25
21
17
13
0.00
Months(93-97)
Mineral N kg/ha
0.50
Simulated
0.40
0.30
0.20
0.10
0.00
1
Tim e in Months
0.60
Observed
Mineral N kg/ha
0.50
Simulated
0.40
0.30
0.20
0.10
Solutions
0.00
1
Tim e in Months
O rg a n ic N k g /h a
0.50
Simulated
0.40
0.30
0.20
0.10
0.00
1
Tim e in Months
Organic Nitrogen
0.60
Observed
0.50
O rg a n ic N k g /h a
Simulated
0.40
0.30
0.20
0.10
0.00
Solutions
)
Tim e in Months
Soluble P kg/ha
0.50
Simulated
0.40
0.30
0.20
0.10
0.00
1
Time in Months
Soluble Phosphorus
0.60
Observed
0.50
S o lub le P kg/ha
Simulated
0.40
0.30
0.20
0.10
Solutions
)
0.00
1
Time in Months
Organic P kg/ha
0.50
Simulated
0.40
0.30
0.20
0.10
0.00
1
Time in Months
Organic Phosphorus
0.60
Observed
O rg anic P kg/ha
0.50
Simulated
0.40
0.30
0.20
0.10
Solutions
)
0.00
1
Time in Months