Professional Documents
Culture Documents
Machine Oee Calculator
Machine Oee Calculator
Enter your data into the white boxes and click the page to calculate the OEE figure.
Place your cursor over the boxes with the red triangles for more information. Print this out for easy reference.
Period/Equipment
Time
Availability Rate =
Performance Rate =
485
minutes
Scheduled Downtime
45
minutes
Unscheduled Downtime
22
minutes
418
minutes
D/(A-B)
Total Production
12582
33
(E/D)/F
G
Quality Rate =
OEE
86.48%
95.00%
pieces
pieces per minute
91.21%
Reject/Scrap Produced
(E-G)/E
25
pieces
99.80%
Availability Rate
Performance Rate
Quality Rate
95.00%
91.21%
99.80%