You are on page 1of 1

Overall Equipment Effectiveness Calculator

Enter your data into the white boxes and click the page to calculate the OEE figure.
Place your cursor over the boxes with the red triangles for more information. Print this out for easy reference.

Period/Equipment

Time

Availability Rate =

Performance Rate =

Enter Date / Time Period / Equipment

Total Time Available

485

minutes

Scheduled Downtime

45

minutes

Unscheduled Downtime

22

minutes

Operating Time (A-B-C)

418

minutes

D/(A-B)

Total Production

12582

Ideal Run/Cycle Time

33

(E/D)/F

G
Quality Rate =

OEE
86.48%

95.00%

pieces
pieces per minute

91.21%

Reject/Scrap Produced

(E-G)/E

25

pieces

99.80%

Availability Rate

Performance Rate

Quality Rate

95.00%

91.21%

99.80%

You might also like