Overall Equipment Effectiveness

Calculator
Enter your data into the white boxes and the calculator will
automatically calculate the resultant OEE.

Asset: Life Cycle Engineering, Inc.


Date: March 14, 2008
Period March 3 - 9 2008

A Total Time Available 10080 (Minutes)

B Scheduled Downtime 1440 (Minutes)

C Unscheduled Downtime 2880 (Minutes)

D Operating Time (A-B-C) 5760 (Minutes)

Availability Rate = D/(A-B) 66.67%

E Total Production 350000 (Units)

F Best Demonstrated Rate 50 (Units/Minute)

Production Rate = (E/D)/F 121.53%

G Rejects/Scrap Produced 6890 (Units)

Quality Rate = (E-G)/E 98.03%

Availability Rate 66.67%


Production Rate 121.53%
Quality Rate 98.03%

OEE 79.42%