Integrated Truss

Structure
Technical Readiness Review
Aaron Kreutzjans
CP4
11/10/14
ME 597-Intro to Systems Engineering
1

Agenda

Hazard Mitigated by Design


Testing Hazard
Causal Factors and Effects
Testing Resources
Cost Risk

System Hazard and Mitigation Plan


Hazard:

Power shortage (<75kw) induced by damage to


solar arrays by space debris
Designed Mitigation Plan

1)If power drops below 75kw, distribution control software is


enabled in order to prioritize loads and power usage.

2)Lower priority power users will be turned off (disabled) in order


to continue providing power to highest priority users.

Verification Testing

1) Initiate full-scale power generation


2) Disable 1 of the 4 arrays in order to reduce power to 60kw.
3) Power distribution software will be verified in pass/fail test
4) Test repeated with 2 arrays disabled
3

Testing Hazard
Verification Event: Power distribution pass/fail test
Hazard: Power disconnection device fails to break circuit during
power shortage logic test
Causal Factors

1) Overheating
2) Supplier failure to verify test equipment
3) FOD

Mitigation Plan

Effects

1)All 4 arrays have independently operating devices.


2)Test can be alternatively performed with through manual disconnection
1) Test delay
2) Safety risk to person performing manual disconnection
3) Equipment damage due to human error

System Hazard Mitigation

Test Resources
Set-Up
1. Assemble integrated truss structure
2. Mount system into test stand
Facilities
3. 600ft x 600ft floor space
4. Mount
5. UV simulation bulbs
6. Control Room
6

Test Resources
Data Collection

1.Digital oscilloscopes

a)Channel 1 will measure voltage


b)Channel 2 will measure current
c) Third trace will be created from multiplying current and voltage (P=I*V) and
converting to kilowatts (kw)

2.Realtime load usage logger


Personnel
3. Truss assembly & Installation of hardware on mount (25)
4. Lighting specialists (5)
5. Control room operators (10)
6. Data analysts (5)
Total~45 people

Verification Status

Risks
Cost Risk:

Reduction in power generation


capabilities results in unplanned storage of spares
costs and potential implementation costs.
Mitigation Plan

1)Propose budget increase in yearly budget planning


meetings

a) Storage facility construction


b)Missions to add arrays

2) Propose budget increase in order to repair original


arrays.

Update: Budget approved and allocated

Contingency Plan

1)Use funds allocated as other for unplanned costs.