Professional Documents
Culture Documents
Fit-Up Dimensional Inspection: No. Location Drawing Dim. Actual Dim. Deviation Tolerance Result Remarks
Fit-Up Dimensional Inspection: No. Location Drawing Dim. Actual Dim. Deviation Tolerance Result Remarks
14/FU
Rev.: 0
Date :
Total Page: 1
Sketch: VKS-LM18-FU-
No.
Location
Drawing Dim.
Actual Dim.
Deviation
Tolerance
L1
1100
L2
400
L3
350
L4
2150
L5
3150
L6
1540
L7
710
L8
2150
L9
2090
10
L10
970
11
L11
970
12
L12
1440
13
L13
645
14
L14
645
15
L15
319
16
L16
3150
17
L17
1500
(attached)
Result
VKS
Inspected/Reviewed
Reviewed/Approved
Sign:
Sign:
Name:
Name:
Page 1/7
Remarks
Code: LLM18-QP-04.14/FU
Rev.: 0
Date :
Total Page: 1
Sketch: VKS-LM18-FU-
No.
Date:
Location
Drawing Dim.
Actual Dim.
Deviation
Date:
Page 2/7
Tolerance
(attached)
Result
Remarks
Code: LLM18-QP-04.14/DI
Rev.: 0
Date :
Total Page: 1
Sketch: VKS-LM18-DI-
No.
Location
Drawing Dim.
Actual Dim.
Deviation
Tolerance
L1
1100
L2
400
L3
350
L4
2150
L5
3150
L6
1540
L7
710
L8
2150
L9
2090
10
L10
970
11
L11
970
12
L12
1440
13
L13
645
14
L14
645
15
L15
319
16
L16
3150
17
L17
1500
(attached)
Result
VKS
Inspected/Reviewed
Reviewed/Approved
Sign:
Sign:
Name:
Name:
Page 3/7
Remarks
Code: LLM18-QP-04.14/DI
Rev.: 0
Date :
Total Page: 1
Sketch: VKS-LM18-DI-
No.
Date:
Location
Drawing Dim.
Actual Dim.
Deviation
Date:
Page 4/7
Tolerance
(attached)
Result
Remarks
Code: LLM18-QP-04.14/VI
Rev: 0
Date:
Total page: 2
Item
No.
A
Acceptance criteria
Intermittent weld
a) Intermittent pitch
b) Weld length
Linear misalignment in
butt weld
4
Irregularity in bead width
5
Overlap
Overlap shall be 1.5 mm. or less per 100
mm long in bead direction.
6
Undercut
7
Crater treatment
8
Pit
10
Slag inclusion
11
Crack
12
Spatter
Acc.
Rej.
Remark
Code: LLM18-QP-04.14/VI
Rev: 0
Date:
Total page: 2
Item
No.
Acceptance criteria
Acc.
Accepted
Conclusion
B
Matching marks:
1) Orientation marks
(00,900,1800,2700)
2) Center line mark
Sign
Inspected/Reviewed
Accepted
Rej.
Rejected
Rejected
VKS
Reviewed/Approved
Remark
Code: LLM18-QP-04.14/VI
Rev: 0
Date:
Total page: 2
Item
No.
Name:
Date:
Acceptance criteria
Acc.
Rej.
Remark