You are on page 1of 6

FIT-UP DIMENSIONAL INSPECTION

REPORT
Report No.: FU-

Code: LLM18-QP-04.14/FU
Rev.: 0
Date :
Total Page: 2

Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-FU-

Item: AIR COOLED COOLING CHAMBER

Drawing No.: AJ-2429-Z41-123

No.

Location

Drawing Dim.

L1

922

L2

1100

L3

400

L4

350

L5

350

L6

916

L7

916

L8

916

L9

916

10

L10

916

11

L11

916

12

L12

916

13

L13

916

14

L14

916

15

L15

916

16

L16

922

17

L17

1156

18

L18

9207

10

19

L19

750

20

L20

750

21

L21

750

22

L22

750

23

L23

750

24

L24

750

25

L25

750

26

L26

750

27

L27

750

28

L28

750

29

L29

144

Actual Dim.

Page 1/6

Deviation

Tolerance

(attached)

Result

Remarks

Code: LLM18-QP-04.14/FU
Rev.: 0
Date :
Total Page: 2

FIT-UP DIMENSIONAL INSPECTION


REPORT
Report No.: FUClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-FU-

Item: AIR COOLED COOLING CHAMBER

Drawing No.: AJ-2429-Z41-123

No.

Location

Drawing Dim.

30

L1
L30

56

31

L31

54

32

L32

21

33

L33

9357

10

34

L34

321

35

L35

335

36

L36

9036

10

37

L37

150

38

L38

179

39

L39

192

40

L40

820

41

L41

10

42

L42

800

43

L43

670

44

L44

800

45

L45

118

46

L46

55

47

L47

40

48

L48

30

49

L49

160

Actual Dim.

Deviation

Tolerance

Result

Note: Application standard EN ISO 13920:1996 class B.


Measurement implement: Metal tape.
LILAMA 18
Prepared

VKS
Reviewed

Reviewed

Sign:

Sign:

Name:

Name:

Date:

Date:

Page 2/6

(attached)

Remarks

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.: DI-

Code: LLM18-QP-04.14/DI
Rev.: 0
Date :
Total Page: 2

Client: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: AIR COOLED COOLING CHAMBER

Drawing No.: AJ-2429-Z41-123

No.

Location

Drawing Dim.

L1

922

L2

1100

L3

400

L4

350

L5

350

L6

916

L7

916

L8

916

L9

916

10

L10

916

11

L11

916

12

L12

916

13

L13

916

14

L14

916

15

L15

916

16

L16

922

17

L17

1156

18

L18

9207

10

19

L19

750

20

L20

750

21

L21

750

22

L22

750

23

L23

750

24

L24

750

25

L25

750

26

L26

750

27

L27

750

28

L28

750

29

L29

144

Actual Dim.

Page 3/6

Deviation

Tolerance

(attached)

Result

Remarks

Code: LLM18-QP-04.14/DI
Rev.: 0
Date :
Total Page: 2

FINAL DIMENSIONAL INSPECTION


REPORT
Report No.: DIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Sketch: VKS-LM18-DI-

Item: AIR COOLED COOLING CHAMBER

Drawing No.: AJ-2429-Z41-123

No.

Location

Drawing Dim.

30

L1
L30

56

31

L31

54

32

L32

21

33

L33

9357

10

34

L34

321

35

L35

335

36

L36

9036

10

37

L37

150

38

L38

179

39

L39

192

40

L40

820

41

L41

10

42

L42

800

43

L43

670

44

L44

800

45

L45

118

46

L46

55

47

L47

40

48

L48

30

49

L49

160

Actual Dim.

Deviation

Tolerance

Result

Note: Application standard EN ISO 13920:1996 class B.


Measurement implement: Metal tape.
LILAMA 18
Prepared

VKS
Reviewed

Reviewed

Sign:

Sign:

Name:

Name:

Date:

Date:

Page 4/6

(attached)

Remarks

Code: LLM18-QP-04.14/VI

VISUAL INSPECTION RECORD

Rev: 0
Date:
Total page: 2

Record No.: VIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Drawing No.: AJ-2429-Z41-123

Item: AIR COOLED COOLING CHAMBER

Test & Inspection


procedure

Item
No.
A

Acc.

Rej.

VISUAL CHECK FOR WELD


Fillet weld (leg length or throat
depth)

Acceptance criteria

Intermittent weld
a) Intermittent pitch
b) Weld length

Linear misalignment in
butt weld

Leg length and throat depth shall not be


less than design dimensions on drawing.
When not specified on drawing, throat
depth shall be minimum 0.7t. Where t:
thickness of a thinner plate at welded
plates
Intermittent pitch shall be between +/-10
mm of design values on drawing.
Weld length shall be between -5 and
+10 mm of design values on drawing.
Linear misalignment shall be not excess
10% of plate thickness at welds, but
maximum 3.0mm

Unevenness in bead surface


Depth D shall be 2 mm or less for
50mm long weld.

4
Irregularity in bead width
5

Difference in bead widths (a - b) shall be


5 mm
or less for 50 mm long weld.
a b < 3 mm

Overlap
Overlap shall be 1.5 mm. or less per 100
mm long in bead direction

6
Undercut

Depth of undercut shall be 1.0 mm or


less.

7
Crater treatment
8

Craters shall have been treated.

Pit

No pits shall exist

10

Slag inclusion

No included slag shall exist.

11

Crack

No cracks shall exist.

12

Spatter

Spatters shall be removed.


Conclusion

Accepted

Rejected

Remark

Code: LLM18-QP-04.14/VI

VISUAL INSPECTION RECORD

Rev: 0
Date:
Total page: 2

Record No.: VIClient: VINA KYOEI STEEL LTD.

Job No.: LLM18-QP-04.14

Project: VINA KYOEI EXPANSION PLAN

Drawing No.: AJ-2429-Z41-123

Item: AIR COOLED COOLING CHAMBER

Item
No.

Test & Inspection


procedure

Acceptance criteria

VISUAL CHECK FOR SHAPE/SIZE

Contused wound, hammer


wound, irregularity, etc.

These wounds shall be ground for


inconspicuous and smooth surfaces.

Finished conditions after


removing temporary jigs used
during manufacture.

Smoothing shall reach the base


metal. Concave portions shall
be repaired

Contamination, stuck foreign


Cleaning has been done. No foreign
materials, and foreign materials
materials shall exist.
left in equipment.

Inclination, bend and deflection.

These defects shall not been visually


detected.

Matching marks:
1) Orientation marks
(00,900,1800,2700)
2) Center line mark

Marking shall be made.

Finished conditions at convex


and corner portions (for lined
products).

Finish shall be smooth (min. 2R).

Finished conditions at concave


and corner portions (for lined Finish shall be smooth (min. 5R).
products).

Corners in bolt holes mounting


strainers for water collecting
plates, lining attaching internal Parts to be lined shall have corners
parts, external surfaces of
chamfered (min. 1C).
flanges, and bolt holes in
flanges.
Conclusion
LILAMA 18
Prepared/Inspected

Sign
Name:
Date:

Inspected/Reviewed

Accepted

Acc.

Rej.

Rejected

VKS
Reviewed/Approved by

Remark