This document contains a report on the load levels in two transformer stations - Station 110/20kV Beceni which has a 10MVA transformer currently absorbing 3340.98kVA at 0.95% load, and Station 110/20kV Metalurgica which has a 16MVA transformer currently absorbing 644kVA at 3.00% load. It provides the transformer capacities, current loads absorbed, and load levels in percentage terms for both stations.
This document contains a report on the load levels in two transformer stations - Station 110/20kV Beceni which has a 10MVA transformer currently absorbing 3340.98kVA at 0.95% load, and Station 110/20kV Metalurgica which has a 16MVA transformer currently absorbing 644kVA at 3.00% load. It provides the transformer capacities, current loads absorbed, and load levels in percentage terms for both stations.
This document contains a report on the load levels in two transformer stations - Station 110/20kV Beceni which has a 10MVA transformer currently absorbing 3340.98kVA at 0.95% load, and Station 110/20kV Metalurgica which has a 16MVA transformer currently absorbing 644kVA at 3.00% load. It provides the transformer capacities, current loads absorbed, and load levels in percentage terms for both stations.