Core Design
design
Case studies
Vertical circulation
Configuration
Floor-plate design
Function of Service Core
Service core types & placement
Service Core & Building Economy
Elevator design & configuration
Population density
Traffic analysis
Quality of ride
Service-core layout & space
requirements
Vertical Circulation
Cores = service cores = risers
Contains:
Elevator shafts
Elevator lobbies
Main & escape stairways
Riser-ducts
Toilets
Other service rooms
Core design
Case studies
Configuration
At initial design stage, designer DETERMINES:
Core design
Case studies
BANKING
CAR PARK
LEVEL
B1 - B3
1
2
3
4 - 18
EFFICIENCY
55%
81%
81%
(15 levels)
LIFT FLOOR
OFFICE
19
20 - 34
(15 levels)
LIFT FLOOR
OFFICE
35
36 - 50
(15 levels)
PENTHOUSE
PENTHOUSE
TOTAL
GROSS
51
52
51
7,769
AVE
12,799
7,769
AVE
12,799
9,27
3,218
438,544
2,231
2,231
2,231
1,585
1,585
1,585
76,21
10 000
78%
AVE
15,03
10 000
85%
78%
AVE
15,03
10,858
4,803
514,754
823,644
695
308,89
89%
85%
67%
85%
Core design
Case studies
Schematic diagram
50
No. of
elevators:
2 levels
penthouse
45
3 carpark
zone lifts
40
6 banking
and lower
offices
zone lifts
35
6 upper
offices
zone lifts
25
15 levels tower
offices
Interchange level
30
20
=
Interchange level
Lift opening
15
10
15 levels above
ground car
parking
5
2 levels banking
Core design
Case studies
Designers consideration:
Core design
Case studies
Case studies
Core design
Case studies
Core design
Case studies
Core design
Case studies
Core design
Case studies
Core design
Case studies
Core design
2 common
performance
criteria:
Average waiting
interval (AWI, in
seconds)
5-minute
handling capacity
(in %)
COMMERCIAL
BUILDING
Up-peak interval
28 secs
5-minute up-peak
handling capacity
14 - 15%
HOTEL BUILDING
2 way lobby traffic
35 - 40 secs
5-minute up-peak
handling capacity
14%
APARTMENT
BUILDING
2 way lobby traffic
50 - 55 secs
5-minute up-peak
7%
CAR-PARK BUILDING
2 way lobby traffic
35 secs
5-minute up-peak
13.5 - 14%
FAIR
SERVICE
30 secs
35 secs
13 - 13.5%
11 - 12%
45 - 50 secs 55 - 60 secs
13%
12%
60 - 65 secs 70 - 75 secs
6%
5%
40 secs
12.5 - 13%
50 secs
11 - 12%
COMMERCIAL
HOTEL
yes
yes
yes
yes
yes
yes
yes
yes
APARTMENT
yes
yes
yes
yes
CAR-PARK
yes
yes
yes
Core design
Case studies
Number of elevators
Types of elevators
Elevator capacities
Arrangement o elevator
Core design
Case studies
THREE-CAR GROUPING
3 cars in a row is
PREFERRABLE
2 cars opposite 1 is acceptable
PROBLEM: location of elevator
call button
Core design
Case studies
FOUR-CAR
GROUPING
commonly in large,
busier buildings
2-opposite-2
arrangement is the
most efficient
EIGHT-CAR
GROUPING
SIX-CAR
GROUPING
found in large office
buildings, public
buildings & hospitals
provide quantity &
quality
3-opposite-3 position
is PREFERRED
dimension of the
LOBBY must not be
less than 3m or 3.6m
if function as a
passageway
Case studies
Core design
Population density
The common performance criteria is based on 5 minute
morning up-peak condition & measure:
Quantity
Quality
Travel Time
Densities of 'sq m of NRA per person' for a diversified commercial office
LOW
MEDIUM
HIGH
SKY
SINGLE SEGMENT
BUILDING
11
N/A
N/A
N/A
TWO-SEGMENT BUILDING
11
N/A
12
N/A
THREE-SEGMENT
BUILDING
11
12
13
N/A
FOUR-SEGMENT
BUILDING
11
12
13
14
Case studies
Core design
Population density
LEVEL OF SERVICE
EXCELLENT
GOOD
FAIR
AWI (SECONDS)
28
30
35
(% OF POPULATION)
14 - 15
13 - 13.5
11 - 12
100
120
<150
Core design
Case studies
Traffic Analysis
General planning
Multiple rises
Multiple entry levels
Car-parking floors
Special purpose floors
Core design
Case studies
Quality of ride
Elevator shaft area should be at least 20% greater than the car
platform area
Guide rails with fixing point s at a maximum of 2.4 m are required to
provide a rigid running surface for the car guides.
Guide-rail alignment must allow for vertical movement
Car guides. Roller type car guides fitted with a tyre compound suited
to local conditions & approx. 30 cm dia. Necessary to achieve
quality of ride
Pendulum car as means to reduce negative effects of poor guide rail
alignment
Core design
Case studies
Core design
Case studies
Core design
Case studies
References
Core design
Case studies
1.
2.
3.
4.
5.
6.
7.
escape stair
service lift
lift lobby
lavatories
service rooms
combi-offices
team offices
service core
1.
2.
3.
4.
5.
6.
4
6
5
escape stair
service lift
lift lobby
stair pressurization duct
document hoist
risers
dry cooler
wet cooler
chiller
plant room
conference rooms
directors office
garden terraces
service core
1.
2.
3.
4.
5.
6.
escape stair
service lift
lift lobby
lavatories
risers
office
5
3
1
6
6
5
1
2
level 43 plan
petronas twin towers by cesar pelli & associates
1.
2.
3.
4.
5.
6.
escape stair
service lift
lift lobby
lavatories
risers
office
5
4
6
2
6
4
level 76 plan
petronas twin towers by cesar pelli & associates