Professional Documents
Culture Documents
Assignment 3
Instructions:
1. This is an individual work assignment.
2. Answer ALL two questions.
3. Front page MUST be attached with the Assessment Cover Sheet and stamped
with the date of submission. (Stamp available at the FK counter. Please download
the standard format of the Assessment Cover Sheet provided in e-Morpheus).
4. Dateline of submission is on Monday, 29 December 2014 5:00PM.
5. Late submission and submission without stamp date will NOT BE ACCEPTED.
2
2
Question 2
Consider a can as shown in Figure 1 below, which has a capacity of 500 ml. The cost of
manufacture is proportional to the amount of metal used, which in turn is proportional to
the surface area of the can. Ignoring the overlaps necessary for the manufacture of the can,
find the diameter, d and height, h of the can which minimizes its cost of manufacturing.