Professional Documents
Culture Documents
SITE MATERIALS
(28 DAYS)
LABORATORY
CYLINDER
Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
380
C40
FC M6
64
CYLINDER
C35
FC IB
511
CYLINDER
C35
FC IB-7
44
CYLINDER
C30
STDV
Rck
N/mm2
N/mm2
N/mm2
45.28
2.6
42.0
STDV
R k
Rck
N/mm2
N/mm2
N/mm2
38.01
2.2
35.2
STDV
Rck
N/mm2
N/mm2
N/mm2
38 75
38.75
2.1
36.1
Cement
Number
Content Concrete
Mix Type
of
class
l
Samples
Kg/m3
300
AVG
y
Cement Type:
42.5N
Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
300
Cement
Number
Content Concrete
Mi Type
T
Mix
off
class
Samples
Kg/m3
330
FC IB-2
F
t t ELIAS H
For th
the contractor:
H.
242
STDV
Rck
N/mm2
N/mm2
N/mm2
33.2
1.7
31.0
Page 2
SITE MATERIALS
(28 DAYS)
LABORATORY
CYLINDER
Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
310
C25
FC JC
103
CYLINDER
C20
FC S
14
CYLINDER
C20
AVG
STDV
Rck
N/mm2
N/mm2
N/mm2
30.9
1.6
28.9
STDV
Rck
R k
N/mm2
N/mm2
N/mm2
25.43
1.9
22.9
y
Cement Type:
42.5N
Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
250
Cement
Number
Content Concrete
Mi Type
T
Mix
off
class
Samples
Kg/m3
250
FC R
18
STDV
Rck
N/mm2
N/mm2
N/mm2
25 89
25.89
2.7
22.5
R K = AVG - 1
RcK
1.28
28 x STDV
F the
For
th contractor:
t t ELIAS H.
H
60.0
50.0
40.0
St. Dev.
30.0
Minimum
Average
20.0
Maximum
10.0
Maximum
0.0
Average
FC S
FC IB 7
Minimum
FC IB 2
FC IB
St. Dev.
FC M6
FC JC
FC R
Page 4
Summary of
SITE MATERIALS
LABORATORY
Sep-10
Date
Casted
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
type
(Kg/m3)
class
Ref.
28 days
90 days
54.8
Note
02-01-10
1334
FC M6
C 40
42.5N
380
25.4
38.6
47.8
PH Unit 1 Lift P4
12-01-10
1382
FC M6
C 40
42.5N
380
26.3
38.8
48.2
15-01-10
1398
FC M6
C 40
42.5N
380
22.9
37.2
46.6
18-01-10
1409
FC M6
C 40
42.5N
380
23.6
39.2
50.9
19-01-10
1415
FC M6
C 40
42.5N
380
21.1
34.4
46.4
20-01-10
1423
FC M6
C 40
42.5N
380
24.0
38.6
47.4
21-01-10
1428
FC M6
C 40
42.5N
380
25.2
38.2
48.5
25-01-10
1453
FC M6
C 40
42.5N
380
24.6
33.7
46.0
25-01-10
1448
FC M6
C 40
42.5N
380
21.7
30.4
49.5
PH Unit 3 Lift P1
46.9
01-02-10
1479
FC M6
C 40
42.5N
380
22.9
31.6
44.7
48.7
18-02-10
1571
FC M6
C 40
42.5N
380
24.7
34.8
43.7
47.9
PH Unit 2 Lift P1
18-02-10
1577
FC M6
C 40
42.5N
380
25.0
35.1
44.0
50.6
03-03-10
1638
FC M6
C 40
42.5N
380
22.2
34.6
44.0
51.4
14-03-10
1692
FC M6
C 40
42.5N
380
22.9
34.8
43.5
47.0
PH Unit 2 Lift P3
15-03-10
1695
FC M6
C 40
42.5N
380
26.5
39.6
47.7
51.6
25-03-10
1742
FC M6
C 40
42.5N
380
22.2
36.3
42.5
48.8
01-04-10
1778
FC M6
C 40
42.5N
380
25.1
34.9
46.6
49.3
17-04-10
1840
FC M6
C 40
42.5N
380
22.2
32.0
43.1
46.8
PH Unit 4 Lift P1
26-04-10
1869
FC M6
C 40
42.5N
380
23.5
33.4
42.7
46.8
27-04-10
1871
FC M6
C 40
42.5N
380
27.1
36.9
44.6
49.8
PH Unit 3 Lift P3
27-04-10
1875
FC M6
C 40
42.5N
380
21.5
33.8
41.2
43.6
PH Unit 1 Lift P6
28-04-10
1877
FC M6
C 40
42.5N
380
22.2
35.6
43.2
46.2
04-05-10
1888
FC M6
C 40
42.5N
380
24.7
35.6
45.0
49.5
01-06-10
1985
FC M6
C 40
42.5N
380
23.8
33.6
44.4
49.8
03-06-10
1991
FC M6
C 40
42.5N
380
25.8
36.7
50.6
57.2
PH Unit 1 Lift 8B
05-06-10
1997
FC M6
C 40
42.5N
380
24.5
36.3
41.6
50.9
06-06-10
2000
FC M6
C 40
42.5N
380
27.0
37.2
46.1
53.2
PH Unit 1 Lift 9B
10-06-10
2013
FC M6
C 40
42.5N
380
24.1
33.1
42.1
50.8
15-06-10
2038
FC M6
C 40
42.5N
380
24.8
33.4
41.1
45.6
Page 5
Summary of
SITE MATERIALS
LABORATORY
Sep-10
Date
Casted
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
16-06-10
2041
FC M6
C 40
42.5N
380
25.8
37.5
47.3
55.3
PH Unit 5 P1
18-06-10
2046
FC M6
C 40
42.5N
380
24.6
32.2
43.7
47.6
PH Unit 1 Lift 92
19-06-10
2054
FC M6
C 40
42.5N
380
21.0
33.6
45.9
54.2
21-06-10
2057
FC M6
C 40
42.5N
380
22.7
37.0
46.3
52.7
25-06-10
2072
FC M6
C 40
42.5N
380
26.2
37.9
49.6
56.9
30-06-10
2093
FC M6
C 40
42.5N
380
21.6
32.2
44.5
47.6
01-07-10
2096
FC M6
C 40
42.5N
380
25.9
36.7
51.0
60.6
PH Unit 4 P4B
09-07-10
2111
FC M6
C 40
42.5N
380
23.4
32.8
44.0
50.3
PH Unit 2 lift P6
10-07-10
2113
FC M6
C 40
42.5N
380
24.8
33.3
42.7
48.5
PH Unit 3 P6A
18-07-10
2135
FC M6
C 40
42.5N
380
22.2
32.5
40.8
47.7
28-07-10
2170
FC M6
C 40
42.5N
380
25.1
37.6
48.6
59.9
30-07-10
2180
FC M6
C 40
42.5N
380
23.9
32.1
43.3
50.4
04-08-10
2187
FC M6
C 40
42.5N
380
23.1
35.6
47.5
53.3
PH Unit 2 P9B
04-08-10
2189
FC M6
C 40
42.5N
380
24.8
33.7
44.9
48.7
08-08-10
2201
FC M6
C 40
42.5N
380
25.5
35.6
43.7
50.9
09-08-10
2204
FC M6
C 40
42.5N
380
24.3
37.1
48.0
11-08-10
2210
FC M6
C 40
42.5N
380
23.2
36.5
45.7
12-08-10
2211
FC M6
C 40
42.5N
380
23.4
32.7
43.3
PH Unit 5 Lift P3
14-08-10
2221
FC M6
C 40
42.5N
380
21.3
37.3
47.1
16-08-10
2222
FC M6
C 40
42.5N
380
23.8
34.6
42.6
18-08-10
2227
FC M6
C 40
42.5N
380
23.2
36.6
46.9
19-08-10
2230
FC M6
C 40
42.5N
380
22.7
31.7
42.8
19-08-10
2228
FC M6
C 40
42.5N
380
25.7
37.3
47.0
G. SPILLWAY SEW- 1 - 5
EMERGENCY WHEEL GATE
22-08-10
2241
FC M6
C 40
42.5N
380
25.3
36.1
44.5
25-08-10
2247A
FC M6
C 40
42.5N
380
23.8
34.6
41.6
26-08-10
2252
FC M6
C 40
42.5N
380
21.3
31.4
41.8
27-08-10
2257
FC M6
C 40
42.5N
380
25.4
38.9
49.3
30-08-10
2266
FC M6
C 40
42.5N
380
22.4
31.4
40.5
02-09-10
2274
FC M6
C 40
42.5N
380
27.8
35.7
44.8
Page 6
Summary of
SITE MATERIALS
LABORATORY
Sep-10
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
Date
Casted
PROJECT, UGANDA
28 days
Note
90 days
02-09-10
2278
FC M6
C 40
42.5N
380
24.8
33.6
44.6
05-09-10
2284
FC M6
C 40
42.5N
380
24.2
34.6
43.0
06-09-10
2286
FC M6
C 40
42.5N
380
26.1
35.6
47.4
14-09-10
2305
FC M6
C 40
42.5N
380
23.4
33.9
43.2
14-09-10
2306
FC M6
C 40
42.5N
380
21.3
37.4
47.5
PH Unit 3 P6
30-09-10
2350
FC M6
C 40
42.5N
380
27.0
36.2
44.9
45.18
40.5
51.0
2.6
Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 25N/mm2
Actual Characteristic Strength of the mix =
Rck
= AVG - K x STD
41.9 N/mm2
K = 1.28
Page 7
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Note
Date
Casted
Sample
Ref.
04-01-10
1343
FC IB
C 35
42.5N
330
17.2
30.1
39.1
06-01-10
1348
FC IB
C 35
42.5N
330
24.0
30.9
41.9
08-01-10
1362
FC IB
C 35
42.5N
330
17.6
29.7
36.2
10-01-10
1371
FC IB
C 35
42.5N
330
18.8
29.3
36.8
10-01-10
1373
FC IB
C 35
42.5N
330
18.1
29.8
38.4
10-01-10
1374
FC IB
C 35
42.5N
330
17.7
30.5
41.8
11-01-10
1380
FC IB
C 35
42.5N
330
18.3
29.6
38.0
12-01-10
1379
FC IB
C 35
42.5N
330
22.4
30.4
41.0
12-01-10
1378
FC IB
C 35
42.5N
330
23.3
31.3
43.0
51.4
APPRON SLAB
13-01-10
1384
FC IB
C 35
42.5N
330
19.6
28.8
36.5
44.4
PH Unit 5 Lift 15 - B4
13-01-10
1387
FC IB
C 35
42.5N
330
16.9
28.9
39.6
14-01-10
1395
FC IB
C 35
42.5N
330
17.1
27.6
36.4
14-01-10
1391
FC IB
C 35
42.5N
330
20.1
30.0
40.1
14-01-10
1394
FC IB
C 35
42.5N
330
17.7
31.3
38.8
14-01-10
1393
FC IB
C 35
42.5N
330
17.3
29.6
40.6
45.6
APPRON SLAB
15-01-10
1396
FC IB
C 35
42.5N
330
16.0
29.4
37.1
42.8
16-01-10
1399
FC IB
C 35
42.5N
330
18.2
29.5
40.0
16-01-10
1402
FC IB
C 35
42.5N
330
20.0
30.8
41.8
16-01-10
1403
FC IB
C 35
42.5N
330
19.0
32.2
44.5
17-01-10
1406
FC IB
C 35
42.5N
330
20.8
31.0
43.8
18-01-10
1410
FC IB
C 35
42.5N
330
15.9
26.5
37.8
19-01-10
1420
FC IB
C 35
42.5N
330
16.8
28.3
40.6
20-01-10
1425
FC IB
C 35
42.5N
330
18.9
27.8
35.0
2 days 7 days
28 days
90 days
45.6
45.3
44.8
50.5
40.5
APPRON SLAB
20-01-10
1424
FC IB
C 35
42.5N
330
17.3
26.7
38.2
21-01-10
1426
FC IB
C 35
42.5N
330
16.1
25.4
38.4
22-01-10
1434
FC IB
C 35
42.5N
330
17.5
30.6
41.9
22-01-10
1433
FC IB
C 35
42.5N
330
16.3
31.3
42.0
23-01-10
1435
FC IB
C 35
42.5N
330
20.2
28.5
38.9
23-01-10
1440
FC IB
C 35
42.5N
330
15.7
30.3
39.9
44.0
APPRON SLAB
GATED SPILLWAY SW - HL
23-01-10
1438
FC IB
C 35
42.5N
330
16.7
30.3
41.4
25-01-10
1451
FC IB
C 35
42.5N
330
17.0
28.5
37.4
GATED SPILLWAY SB - 11
Page 8
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Note
Date
Casted
Sample
Ref.
25-01-10
1449
FC IB
C 35
42.5N
330
17.4
29.1
40.6
26-01-10
1458
FC IB
C 35
42.5N
330
17.5
26.6
37.9
26-01-10
1456
FC IB
C 35
42.5N
330
18.9
31.1
39.1
27-01-10
1459
FC IB
C 35
42.5N
330
20.6
28.6
39.8
2 days 7 days
28 days
90 days
27-01-10
1461
FC IB
C 35
42.5N
330
15.7
27.5
36.3
S.SPILLWAY BARRELS 5 - 6 - 7, 7 - 8
LIFT 4B
28-01-10
1462
FC IB
C 35
42.5N
330
18.2
31.2
42.6
28-01-10
1467
FC IB
C 35
42.5N
330
15.4
28.2
37.4
40.1
APPRON SLAB
39.8
29-01-10
1468
FC IB
C 35
42.5N
330
17.6
28.7
36.6
29-01-10
1472
FC IB
C 35
42.5N
330
15.6
29.9
40.7
29-01-10
1471
FC IB
C 35
42.5N
330
16.3
27.1
37.6
30-01-10
1474
FC IB
C 35
42.5N
330
20.8
31.2
40.1
30-01-10
1476
FC IB
C 35
42.5N
330
17.3
29.4
40.8
01-02-10
1478
FC IB
C 35
42.5N
330
18.2
27.3
37.3
43.1
01-02-10
1480
FC IB
C 35
42.5N
330
17.4
28.6
37.1
42.1
01-02-10
1477
FC IB
C 35
42.5N
330
18.2
27.0
36.4
40.5
02-02-10
1485
FC IB
C 35
42.5N
330
17.2
29.6
40.4
45.2
02-02-10
1486
FC IB
C 35
42.5N
330
16.5
28.4
37.1
44.9
02-02-10
1484
FC IB
C 35
42.5N
330
16.7
28.6
38.6
43.3
02-02-10
1483
FC IB
C 35
42.5N
330
16.6
28.4
35.9
40.6
03-02-10
1487
FC IB
C 35
42.5N
330
17.3
29.7
37.4
41.8
43.7
APPRON SLAB
03-02-10
1488
FC IB
C 35
42.5N
330
16.2
28.7
38.3
42.8
03-02-10
1490
FC IB
C 35
42.5N
330
16.5
28.8
38.8
43.8
04-02-10
1493
FC IB
C 35
42.5N
330
17.8
26.8
37.1
41.9
04-02-10
1496
FC IB
C 35
42.5N
330
16.5
27.7
38.6
43.5
S.SPILLWAY BARRELS 2 - 3, 11 - 12
LIFT 4A
04-02-10
1495
FC IB
C 35
42.5N
330
16.5
25.7
36.4
39.8
05-02-10
1500
FC IB
C 35
42.5N
330
19.5
30.7
40.7
45.2
05-02-10
1502
FC IB
C 35
42.5N
330
16.5
27.9
36.5
40.6
05-02-10
1499
FC IB
C 35
42.5N
330
16.7
26.7
36.2
40.3
06-02-10
1508
FC IB
C 35
42.5N
330
17.4
27.3
36.6
42.9
06-02-10
1510
FC IB
C 35
42.5N
330
18.6
28.3
39.3
45.4
06-02-10
1507
FC IB
C 35
42.5N
330
17.4
27.5
38.9
45.8
Page 9
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
06-02-10
1509
FC IB
C 35
42.5N
330
17.9
06-02-10
1512
FC IB
C 35
42.5N
330
07-02-10
1514
FC IB
C 35
42.5N
07-02-10
1515
FC IB
C 35
42.5N
2 days 7 days
Note
28 days
90 days
27.9
38.1
46.8
APPRON SLAB
17.6
27.5
36.2
39.7
APPRON SLAB
330
23.6
30.1
40.6
46.6
330
17.8
29.6
40.8
47.3
07-02-10
1517
FC IB
C 35
42.5N
330
17.5
28.9
38.6
43.7
07-02-10
1516
FC IB
C 35
42.5N
330
16.9
28.8
39.6
45.4
08-02-10
1519
FC IB
C 35
42.5N
330
15.9
26.6
36.1
39.4
08-02-10
1521
FC IB
C 35
42.5N
330
17.3
29.4
40.8
46.1
08-02-10
1518
FC IB
C 35
42.5N
330
16.5
27.0
36.8
41.9
09-02-10
1526
FC IB
C 35
42.5N
330
16.3
28.0
36.3
41.8
09-02-10
1527
FC IB
C 35
42.5N
330
16.9
29.6
39.9
45.1
10-02-10
1531
FC IB
C 35
42.5N
330
16.8
27.2
38.0
44.6
10-02-10
1533
FC IB
C 35
42.5N
330
17.0
30.1
42.6
48.1
10-02-10
1534
FC IB
C 35
42.5N
330
18.2
30.6
43.2
46.8
10-02-10
1532
FC IB
C 35
42.5N
330
15.5
29.1
36.8
40.8
10-02-10
1530
FC IB
C 35
42.5N
330
17.0
28.8
39.2
46.3
APPRON SLAB
11-02-10
1537
FC IB
C 35
42.5N
330
18.1
27.0
35.5
41.6
11-02-10
1543
FC IB
C 35
42.5N
330
16.6
27.3
36.3
41.9
11-02-10
1541
FC IB
C 35
42.5N
330
16.2
28.9
37.0
41.2
S.SPILLWAY BARRELS 2 - 3, 3 - 4
LIFT 6B
11-02-10
1538
FC IB
C 35
42.5N
330
17.3
28.3
37.8
43.6
12-02-10
1544
FC IB
C 35
42.5N
330
18.6
26.9
36.4
41.1
12-02-10
1546
FC IB
C 35
42.5N
330
16.6
28.3
37.8
41.9
12-02-10
1545
FC IB
C 35
42.5N
330
17.6
27.4
37.6
42.0
13-02-10
1547
FC IB
C 35
42.5N
330
23.2
32.3
41.6
47.1
13-02-10
1553
FC IB
C 35
42.5N
330
17.8
28.6
38.7
44.9
S.SPILLWAY BARRELS 1 - 2, 3 - 4
LIFT 7A
13-02-10
1551
FC IB
C 35
42.5N
330
16.5
27.1
36.6
40.8
13-02-10
1552
FC IB
C 35
42.5N
330
15.6
25.4
34.4
38.6
13-02-10
1549
FC IB
C 35
42.5N
330
16.9
27.2
39.3
43.9
APPRON SLAB
14-02-10
1555
FC IB
C 35
42.5N
330
16.0
28.9
37.1
41.3
15-02-10
1557
FC IB
C 35
42.5N
330
17.3
28.1
39.6
45.2
15-02-10
1556
FC IB
C 35
42.5N
330
18.2
27.0
36.8
40.4
Page 10
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
16-02-10
1560
FC IB
C 35
42.5N
330
23.4
16-02-10
1562
FC IB
C 35
42.5N
330
17-02-10
1565
FC IB
C 35
42.5N
17-02-10
1567
FC IB
C 35
17-02-10
1569
FC IB
17-02-10
1566
17-02-10
18-02-10
2 days 7 days
Note
28 days
90 days
32.2
43.0
48.4
15.7
26.6
36.6
41.3
S.SPILLWAY BARRELS 4 - 5, 5 - 6
LIFT 6B
330
17.0
28.3
38.6
43.4
42.5N
330
17.9
27.1
37.7
41.6
C 35
42.5N
330
17.3
29.2
40.8
45.1
FC IB
C 35
42.5N
330
17.4
27.4
36.6
40.3
1570
FC IB
C 35
42.5N
330
17.4
30.6
43.7
46.4
APPRON SLAB
1572
FC IB
C 35
42.5N
330
23.4
32.3
42.8
49.7
18-02-10
1573
FC IB
C 35
42.5N
330
17.1
28.3
37.8
40.8
18-02-10
1574
FC IB
C 35
42.5N
330
16.9
27.6
37.1
41.6
19-02-10
1580
FC IB
C 35
42.5N
330
17.0
28.8
39.6
44.4
19-02-10
1582
FC IB
C 35
42.5N
330
16.0
26.4
38.4
42.1
19-02-10
1581
FC IB
C 35
42.5N
330
15.6
28.4
37.8
41.5
21-02-10
1590
FC IB
C 35
42.5N
330
18.7
28.2
37.6
44.6
21-02-10
1591
FC IB
C 35
42.5N
330
17.8
27.7
36.2
42.5
21-02-10
1588
FC IB
C 35
42.5N
330
20.4
32.9
43.3
50.8
21-02-10
1589
FC IB
C 35
42.5N
330
22.8
30.4
44.0
49.6
APPRON SLAB
22-02-10
1592
FC IB
C 35
42.5N
330
18.4
28.9
36.2
45.2
22-02-10
1595
FC IB
C 35
42.5N
330
16.5
27.3
37.4
40.3
22-02-10
1596
FC IB
C 35
42.5N
330
16.3
28.1
38.4
41.2
23-02-10
1597
FC IB
C 35
42.5N
330
17.4
30.5
39.5
45.3
23-02-10
1599
FC IB
C 35
42.5N
330
16.8
29.2
35.8
42.4
23-02-10
1598
FC IB
C 35
42.5N
330
15.7
28.5
36.9
40.2
23-02-10
1601
FC IB
C 35
42.5N
330
24.3
31.9
45.8
50.8
APPRON SLAB
S.SPILLWAY BARRELS 13 - 15 LIFT
5B
24-02-10
1604
FC IB
C 35
42.5N
330
17.0
28.8
37.5
43.4
25-02-10
1615
FC IB
C 35
42.5N
330
16.7
28.8
37.8
42.6
25-02-10
1610
FC IB
C 35
42.5N
330
16.7
27.9
37.8
44.3
25-02-10
1613
FC IB
C 35
42.5N
330
16.3
29.0
40.6
44.4
APPRON SLAB
26-02-10
1618
FC IB
C 35
42.5N
330
16.3
27.8
36.2
41.2
26-02-10
1619
FC IB
C 35
42.5N
330
17.5
26.0
38.3
41.1
26-02-10
1622
FC IB
C 35
42.5N
330
17.3
30.1
40.6
45.3
SIPHON SPILLWAY SS 1 - 4 C2
Page 11
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
26-02-10
1620
FC IB
C 35
42.5N
330
18.5
01-03-10
1628
FC IB
C 35
42.5N
330
02-03-10
1629
FC IB
C 35
42.5N
02-03-10
1637
FC IB
C 35
02-03-10
1634
FC IB
02-03-10
1635
02-03-10
1636
2 days 7 days
Note
28 days
90 days
26.8
35.8
38.5
17.7
28.2
37.8
41.5
330
20.7
29.2
41.3
45.6
42.5N
330
16.1
26.4
36.5
40.3
C 35
42.5N
330
16.7
27.3
36.9
40.8
FC IB
C 35
42.5N
330
17.2
28.4
38.6
43.4
FC IB
C 35
42.5N
330
16.3
27.1
36.8
39.9
02-03-10
1631
FC IB
C 35
42.5N
330
15.3
27.4
38.5
41.9
03-03-10
1639
FC IB
C 35
42.5N
330
17.3
28.9
39.2
44.3
03-03-10
1642
FC IB
C 35
42.5N
330
16.6
27.6
37.2
41.3
04-03-10
1645
FC IB
C 35
42.5N
330
17.0
29.1
40.6
44.8
05-03-10
1651
FC IB
C 35
42.5N
330
16.6
27.5
36.9
39.4
05-03-10
1653
FC IB
C 35
42.5N
330
15.9
28.6
39.2
42.7
05-03-10
1650
FC IB
C 35
42.5N
330
15.9
27.8
36.8
39.0
APPRON SLAB
06-03-10
1655
FC IB
C 35
42.5N
330
16.8
27.6
38.4
43.6
06-03-10
1657
FC IB
C 35
42.5N
330
16.8
27.1
37.6
42.2
06-03-10
1656
FC IB
C 35
42.5N
330
16.7
28.5
39.4
44.1
08-03-10
1662
FC IB
C 35
42.5N
330
17.3
28.3
37.8
43.1
09-03-10
1664
FC IB
C 35
42.5N
330
17.3
27.3
36.9
39.3
09-03-10
1667
FC IB
C 35
42.5N
330
16.2
28.1
38.8
41.1
09-03-10
1665
FC IB
C 35
42.5N
330
17.3
27.8
37.4
40.7
10-03-10
1668
FC IB
C 35
42.5N
330
20.3
27.8
36.2
39.9
10-03-10
1671
FC IB
C 35
42.5N
330
16.2
27.8
37.3
41.4
11-03-10
1674
FC IB
C 35
42.5N
330
16.7
28.0
37.6
40.7
11-03-10
1676
FC IB
C 35
42.5N
330
17.3
28.8
38.2
45.6
11-03-10
1679
FC IB
C 35
42.5N
330
15.6
28.7
38.6
41.4
11-03-10
1678
FC IB
C 35
42.5N
330
15.1
29.0
39.8
42.5
APPRON SLAB
12-03-10
1681
FC IB
C 35
42.5N
330
16.2
27.3
37.1
40.6
12-03-10
1684
FC IB
C 35
42.5N
330
16.6
27.3
39.4
43.8
14-03-10
1690
FC IB
C 35
42.5N
330
16.4
27.7
36.8
40.3
PH Unit 2 Lift P2
14-03-10
1691
FC IB
C 35
42.5N
330
15.3
27.2
37.6
41.8
Page 12
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
16-03-10
1697
FC IB
C 35
42.5N
330
18.0
17-03-10
1699
FC IB
C 35
42.5N
330
17-03-10
1702
FC IB
C 35
42.5N
17-03-10
1704
FC IB
C 35
42.5N
2 days 7 days
Note
28 days
90 days
27.0
36.7
38.7
20.7
28.1
36.3
39.1
330
16.8
27.1
39.2
44.3
330
15.4
26.0
36.6
39.4
APPRON SLAB
18-03-10
1707
FC IB
C 35
42.5N
330
17.0
26.4
36.1
39.9
19-03-10
1710
FC IB
C 35
42.5N
330
20.4
31.3
38.6
41.6
19-03-10
1714
FC IB
C 35
42.5N
330
20.7
30.8
38.7
41.2
APPRON SLAB
20-03-10
1718
FC IB
C 35
42.5N
330
21.5
32.8
40.8
44.8
20-03-10
1721
FC IB
C 35
42.5N
330
15.8
26.6
36.1
39.9
20-03-10
1719
FC IB
C 35
42.5N
330
17.0
28.3
36.9
40.3
20-03-10
1720
FC IB
C 35
42.5N
330
19.0
30.9
36.9
41.2
21-03-10
1723
FC IB
C 35
42.5N
330
16.9
28.4
37.2
41.6
23-03-10
1729
FC IB
C 35
42.5N
330
17.2
29.8
38.6
43.5
24-03-10
1734
FC IB
C 35
42.5N
330
18.5
28.9
37.4
39.0
24-03-10
1736
FC IB
C 35
42.5N
330
16.6
27.3
36.9
39.8
25-03-10
1741
FC IB
C 35
42.5N
330
15.9
26.8
37.0
40.5
PH Unit 4 Lift 84
25-03-10
1738
FC IB
C 35
42.5N
330
20.3
27.2
41.6
46.2
GATED SPILLWAY SB - S8
25-03-10
1743
FC IB
C 35
42.5N
330
16.0
28.7
38.2
41.9
26-03-10
1748
FC IB
C 35
42.5N
330
15.6
25.2
35.9
39.4
26-03-10
1749
FC IB
C 35
42.5N
330
18.2
30.1
39.2
41.8
26-03-10
1744
FC IB
C 35
42.5N
330
19.7
30.3
38.5
40.4
APPRON SLAB
26-03-10
1746
FC IB
C 35
42.5N
330
19.8
30.1
38.6
40.6
APPRON SLAB
27-03-10
1750
FC IB
C 35
42.5N
330
17.8
28.3
37.6
41.4
27-03-10
1755
FC IB
C 35
42.5N
330
16.4
26.9
36.2
39.2
27-03-10
1756
FC IB
C 35
42.5N
330
17.2
28.3
39.8
44.1
28-03-10
1758
FC IB
C 35
42.5N
330
16.6
28.6
37.0
42.4
APPRON SLAB
29-03-10
1761
FC IB
C 35
42.5N
330
17.9
26.4
36.4
40.1
30-03-10
1764
FC IB
C 35
42.5N
330
16.2
28.7
36.4
40.0
GATED SPILLWAY SB - S8
30-03-10
1767
FC IB
C 35
42.5N
330
16.2
27.1
36.8
40.3
GATED SPILLWAY SB - S8
30-03-10
1770
FC IB
C 35
42.5N
330
16.3
26.9
35.2
38.7
30-03-10
1766
FC IB
C 35
42.5N
330
16.9
27.3
36.8
39.9
Page 13
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
30-03-10
1768
FC IB
C 35
42.5N
330
16.1
31-03-10
1774
FC IB
C 35
42.5N
330
31-03-10
1772
FC IB
C 35
42.5N
01-04-10
1777
FC IB
C 35
01-04-10
1779
FC IB
02-04-10
1781
02-04-10
2 days 7 days
Note
28 days
90 days
27.1
35.2
39.2
14.6
26.8
35.7
39.7
S.SPILLWAY BARRELS 10 - 11 - 12
LIFT 3C
330
16.9
28.3
35.6
40.4
42.5N
330
20.3
29.8
40.3
44.5
C 35
42.5N
330
19.8
29.9
38.2
42.2
FC IB
C 35
42.5N
330
17.3
28.8
36.8
40.3
1783
FC IB
C 35
42.5N
330
16.9
27.4
36.2
40.1
06-04-10
1789
FC IB
C 35
42.5N
330
17.3
28.5
35.9
39.2
07-04-10
1791
FC IB
C 35
42.5N
330
15.5
27.1
36.6
39.1
07-04-10
1792
FC IB
C 35
42.5N
330
16.3
26.8
36.4
39.2
08-04-10
1795
FC IB
C 35
42.5N
330
17.2
27.8
35.8
39.9
09-04-10
1796
FC IB
C 35
42.5N
330
14.5
26.1
35.5
39.5
09-04-10
1801
FC IB
C 35
42.5N
330
15.0
28.5
35.4
39.8
10-04-10
1807
FC IB
C 35
42.5N
330
15.7
27.5
36.1
40.0
10-04-10
1806
FC IB
C 35
42.5N
330
15.9
26.7
36.0
39.2
APPRON SLAB
11-04-10
1808
FC IB
C 35
42.5N
330
16.0
27.1
36.6
39.4
12-04-10
1810
FC IB
C 35
42.5N
330
15.7
28.0
38.8
43.5
12-04-10
1812
FC IB
C 35
42.5N
330
16.3
27.9
36.3
40.3
12-04-10
1813
FC IB
C 35
42.5N
330
16.2
27.0
35.9
39.1
APPRON SLAB
13-04-10
1816
FC IB
C 35
42.5N
330
16.4
27.7
35.9
40.6
14-04-10
1817
FC IB
C 35
42.5N
330
17.6
25.9
35.8
37.6
14-04-10
1820
FC IB
C 35
42.5N
330
16.0
26.4
36.3
39.8
15-04-10
1823
FC IB
C 35
42.5N
330
16.8
27.3
37.1
41.3
15-04-10
1824
FC IB
C 35
42.5N
330
15.6
25.7
36.1
39.6
15-04-10
1826
FC IB
C 35
42.5N
330
16.9
25.7
37.1
40.3
15-04-10
1825
FC IB
C 35
42.5N
330
16.8
27.8
38.8
42.3
15-04-10
1828
FC IB
C 35
42.5N
330
16.8
28.9
39.1
43.3
16-04-10
1835
FC IB
C 35
42.5N
330
15.7
25.9
36.6
40.3
16-04-10
1831
FC IB
C 35
42.5N
330
15.5
25.3
37.1
41.0
16-04-10
1834
FC IB
C 35
42.5N
330
16.3
27.7
40.1
44.6
17-04-10
1839
FC IB
C 35
42.5N
330
15.3
26.2
38.6
41.4
Page 14
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
17-04-10
1838
FC IB
C 35
42.5N
330
18.2
19-04-10
1843
FC IB
C 35
42.5N
330
19-04-10
1842
FC IB
C 35
42.5N
20-04-10
1848
FC IB
C 35
20-04-10
1845
FC IB
20-04-10
1846
21-04-10
2 days 7 days
Note
28 days
90 days
28.8
35.8
39.0
APPRON SLAB
15.0
26.7
38.1
43.1
330
17.4
26.8
38.1
42.3
42.5N
330
17.3
28.3
38.3
42.5
PH Unit 1 Lift 26
C 35
42.5N
330
16.1
26.0
38.6
42.9
FC IB
C 35
42.5N
330
16.7
25.6
38.5
43.3
1850
FC IB
C 35
42.5N
330
16.8
27.8
35.9
39.6
22-04-10
1853
FC IB
C 35
42.5N
330
15.5
26.0
36.8
42.7
23-04-10
1856
FC IB
C 35
42.5N
330
15.1
26.2
36.5
39.3
23-04-10
1855
FC IB
C 35
42.5N
330
15.9
25.9
36.8
39.6
24-04-10
1858
FC IB
C 35
42.5N
330
15.9
25.1
37.2
41.1
24-04-10
1859
FC IB
C 35
42.5N
330
15.2
26.2
37.8
41.1
24-04-10
1860
FC IB
C 35
42.5N
330
16.3
27.1
36.9
40.6
24-04-10
1862
FC IB
C 35
42.5N
330
15.8
26.0
36.5
40.8
24-04-10
1861
FC IB
C 35
42.5N
330
16.6
27.8
38.7
41.6
24-04-10
1864
FC IB
C 35
42.5N
330
16.3
28.3
39.3
43.8
25-04-10
1867
FC IB
C 35
42.5N
330
16.1
30.3
42.4
45.4
25-04-10
1866
FC IB
C 35
42.5N
330
18.5
27.9
38.7
42.9
25-04-10
1868
FC IB
C 35
42.5N
330
15.3
26.3
36.7
39.4
S. SPILLWAY PRECAST
27-04-10
1872
FC IB
C 35
42.5N
330
20.7
31.5
38.1
41.2
27-04-10
1873
FC IB
C 35
42.5N
330
19.7
29.5
35.7
41.7
27-04-10
1874
FC IB
C 35
42.5N
330
17.8
27.0
35.4
39.9
28-04-10
1876
FC IB
C 35
42.5N
330
18.4
30.4
36.8
41.8
28-04-10
1878
FC IB
C 35
42.5N
330
18.0
30.0
37.7
41.8
29-04-10
1880
FC IB
C 35
42.5N
330
23.6
30.9
37.1
42.6
30-04-10
1881
FC IB
C 35
42.5N
330
17.6
27.1
36.5
37.8
30-04-10
1883
FC IB
C 35
42.5N
330
16.8
26.6
35.6
39.8
02-05-10
1885
FC IB
C 35
42.5N
330
15.8
26.1
36.0
39.8
04-05-10
1887
FC IB
C 35
42.5N
330
15.8
26.1
36.1
39.5
04-05-10
1890
FC IB
C 35
42.5N
330
17.3
28.0
39.2
43.4
05-05-10
1892
FC IB
C 35
42.5N
330
15.8
25.9
36.2
40.3
Page 15
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
05-05-10
1893
FC IB
C 35
42.5N
330
15.1
07-05-10
1898
FC IB
C 35
42.5N
330
07-05-10
1897
FC IB
C 35
42.5N
08-05-10
1905
FC IB
C 35
08-05-10
1906
FC IB
08-05-10
1901
09-05-10
2 days 7 days
Note
28 days
90 days
25.8
36.3
38.5
19.6
29.1
39.0
42.6
330
18.8
27.1
35.9
41.4
42.5N
330
15.4
25.2
35.8
37.9
C 35
42.5N
330
16.3
29.4
35.9
40.0
FC IB
C 35
42.5N
330
15.1
28.9
37.4
40.7
1907
FC IB
C 35
42.5N
330
16.8
27.7
36.9
40.4
10-05-10
1909
FC IB
C 35
42.5N
330
15.3
25.7
37.5
41.7
10-05-10
1910
FC IB
C 35
42.5N
330
15.8
25.9
36.4
40.4
10-05-10
1908
FC IB
C 35
42.5N
330
17.5
27.5
35.5
39.5
11-05-10
1912
FC IB
C 35
42.5N
330
16.4
27.3
36.8
39.3
11-05-10
1913
FC IB
C 35
42.5N
330
17.8
27.1
37.5
41.2
11-05-10
1915
FC IB
C 35
42.5N
330
15.9
26.2
35.9
40.7
11-05-10
1916
FC IB
C 35
42.5N
330
16.1
26.9
35.9
40.5
12-05-10
1919
FC IB
C 35
42.5N
330
15.8
26.9
37.1
43.2
13-05-10
1920
FC IB
C 35
42.5N
330
14.7
26.3
37.0
42.8
14-05-10
1924
FC IB
C 35
42.5N
330
15.6
28.3
36.7
38.7
14-05-10
1923
FC IB
C 35
42.5N
330
14.7
25.4
36.8
40.7
15-05-10
1926
FC IB
C 35
42.5N
330
19.2
27.5
35.7
38.8
15-05-10
1927
FC IB
C 35
42.5N
330
21.8
30.7
38.2
41.7
15-05-10
1928
FC IB
C 35
42.5N
330
18.5
27.1
39.2
44.8
16-05-10
1929
FC IB
C 35
42.5N
330
14.5
26.9
36.2
40.7
17-05-10
1933
FC IB
C 35
42.5N
330
18.8
32.7
40.1
45.6
17-05-10
1930
FC IB
C 35
42.5N
330
19.2
27.7
37.5
40.5
18-05-10
1935
FC IB
C 35
42.5N
330
20.6
31.0
43.8
51.7
18-05-10
1934
FC IB
C 35
42.5N
330
16.8
27.1
38.3
42.8
18-05-10
1936
FC IB
C 35
42.5N
330
19.4
27.9
35.7
38.2
18-05-10
1937
FC IB
C 35
42.5N
330
15.1
25.5
37.5
41.9
19-05-10
1940
FC IB
C 35
42.5N
330
17.2
28.5
37.0
42.1
20-05-10
1941
FC IB
C 35
42.5N
330
20.1
30.2
43.5
46.9
20-05-10
1943
FC IB
C 35
42.5N
330
15.0
25.1
36.7
40.5
Page 16
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
21-05-10
1945
FC IB
C 35
42.5N
330
15.9
21-05-10
1946
FC IB
C 35
42.5N
330
22-05-10
1947
FC IB
C 35
42.5N
22-05-10
1948
FC IB
C 35
23-05-10
1954
FC IB
24-05-10
1956
25-05-10
2 days 7 days
Note
28 days
90 days
25.8
35.8
39.5
15.4
27.3
35.8
40.2
330
20.5
27.5
36.4
40.4
42.5N
330
16.8
26.4
37.4
42.3
C 35
42.5N
330
16.4
27.2
37.4
42.8
FC IB
C 35
42.5N
330
20.7
29.9
37.7
42.3
1958
FC IB
C 35
42.5N
330
15.5
26.8
37.0
40.6
25-05-10
1961
FC IB
C 35
42.5N
330
15.8
26.8
37.3
41.8
25-05-10
1963
FC IB
C 35
42.5N
330
18.2
33.3
40.6
46.9
25-05-10
1962
FC IB
C 35
42.5N
330
19.8
30.9
40.6
48.1
26-05-10
1967
FC IB
C 35
42.5N
330
15.3
27.2
37.2
41.6
26-05-10
1965
FC IB
C 35
42.5N
330
20.5
30.6
40.2
44.9
27-05-10
1971
FC IB
C 35
42.5N
330
15.1
30.2
37.9
45.2
PH Unit 2 Slab 87
27-05-10
1969
FC IB
C 35
42.5N
330
18.8
30.1
37.6
39.6
27-05-10
1970
FC IB
C 35
42.5N
330
17.3
28.8
37.9
42.4
28-05-10
1972
FC IB
C 35
42.5N
330
20.0
30.9
39.2
46.5
28-05-10
1974
FC IB
C 35
42.5N
330
20.3
30.9
37.5
42.4
28-05-10
1975
FC IB
C 35
42.5N
330
18.3
27.4
38.8
42.4
29-05-10
1979
FC IB
C 35
42.5N
330
16.0
25.6
36.3
40.9
29-05-10
1976
FC IB
C 35
42.5N
330
16.3
25.9
35.9
40.5
29-05-10
1977
FC IB
C 35
42.5N
330
20.8
29.7
36.3
41.6
29-05-10
1978
FC IB
C 35
42.5N
330
16.8
27.6
39.5
44.6
01-06-10
1982
FC IB
C 35
42.5N
330
18.5
27.1
35.3
43.5
01-06-10
1984
FC IB
C 35
42.5N
330
19.8
31.2
43.2
47.0
02-06-10
1986
FC IB
C 35
42.5N
330
15.1
26.8
33.4
36.2
02-06-10
1987
FC IB
C 35
42.5N
330
15.4
28.3
36.9
39.9
03-06-10
1990
FC IB
C 35
42.5N
330
15.3
26.1
37.1
39.7
03-06-10
1989
FC IB
C 35
42.5N
330
19.8
30.5
37.1
41.6
04-06-10
1994
FC IB
C 35
42.5N
330
16.9
36.1
37.4
43.8
04-06-10
1995
FC IB
C 35
42.5N
330
20.3
32.0
40.7
44.0
04-06-10
1993
FC IB
C 35
42.5N
330
16.4
26.9
35.9
42.2
Page 17
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
04-06-10
1996
FC IB
C 35
42.5N
330
19.3
05-06-10
1998
FC IB
C 35
42.5N
330
06-06-10
1999
FC IB
C 35
42.5N
06-06-10
2002
FC IB
C 35
06-06-10
2003
FC IB
07-06-10
2004
07-06-10
2 days 7 days
Note
28 days
90 days
31.9
39.8
47.2
16.3
26.9
36.8
40.3
330
17.6
25.3
36.1
40.5
42.5N
330
20.6
28.2
35.1
41.0
C 35
42.5N
330
15.9
26.9
36.8
42.2
FC IB
C 35
42.5N
330
17.0
25.3
35.8
40.2
2005
FC IB
C 35
42.5N
330
16.4
25.3
35.5
38.2
09-06-10
2009
FC IB
C 35
42.5N
330
20.2
29.1
36.3
41.2
09-06-10
2011
FC IB
C 35
42.5N
330
17.6
29.3
38.6
44.1
10-06-10
2015
FC IB
C 35
42.5N
330
17.9
29.6
37.4
42.8
PH Unit 3 P5B
10-06-10
2014
FC IB
C 35
42.5N
330
18.0
28.1
35.5
43.2
10-06-10
2017
FC IB
C 35
42.5N
330
15.8
27.7
35.9
40.7
10-06-10
2016
FC IB
C 35
42.5N
330
16.0
25.6
37.4
41.3
11-06-10
2022
FC IB
C 35
42.5N
330
18.7
31.3
41.8
47.2
11-06-10
2020
FC IB
C 35
42.5N
330
15.4
27.6
35.9
42.0
11-06-10
2019
FC IB
C 35
42.5N
330
17.3
28.2
37.6
42.4
12-06-10
2026
FC IB
C 35
42.5N
330
17.4
27.2
37.9
40.1
12-06-10
2030
FC IB
C 35
42.5N
330
15.1
25.5
36.4
39.2
12-06-10
2025
FC IB
C 35
42.5N
330
16.5
27.2
38.8
43.6
12-06-10
2031
FC IB
C 35
42.5N
330
16.5
27.8
36.1
40.6
13-06-10
2032
FC IB
C 35
42.5N
330
16.5
26.5
35.5
40.0
15-06-10
2035
FC IB
C 35
42.5N
330
21.9
31.1
40.0
45.4
15-06-10
2037
FC IB
C 35
42.5N
330
15.2
26.0
37.6
41.4
15-06-10
2036
FC IB
C 35
42.5N
330
15.0
26.6
37.3
40.6
17-06-10
2044
FC IB
C 35
42.5N
330
23.8
31.0
39.9
46.3
18-06-10
2045
FC IB
C 35
42.5N
330
15.9
26.9
37.2
40.0
19-06-10
2048
FC IB
C 35
42.5N
330
21.9
31.0
38.8
45.4
19-06-10
2050
FC IB
C 35
42.5N
330
17.8
28.8
36.8
42.3
19-06-10
2053
FC IB
C 35
42.5N
330
17.9
28.8
39.1
44.6
19-06-10
2052
FC IB
C 35
42.5N
330
17.8
30.1
37.2
45.2
21-06-10
2056
FC IB
C 35
42.5N
330
16.9
28.4
37.0
41.8
Page 18
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
22-06-10
2060
FC IB
C 35
42.5N
330
17.2
22-06-10
2059
FC IB
C 35
42.5N
330
22-06-10
2061
FC IB
C 35
42.5N
22-06-10
2063
FC IB
C 35
22-06-10
2062
FC IB
23-06-10
2066
23-06-10
2 days 7 days
Note
28 days
90 days
25.9
35.8
40.0
PH Unit 4 Lift 87
18.7
26.5
35.4
41.6
330
15.9
25.7
37.4
39.9
42.5N
330
19.2
33.0
40.6
46.7
C 35
42.5N
330
18.3
29.5
38.8
44.5
FC IB
C 35
42.5N
330
15.3
28.1
35.6
40.0
2067
FC IB
C 35
42.5N
330
16.8
27.3
37.8
42.6
25-06-10
2071
FC IB
C 35
42.5N
330
19.8
29.9
39.0
46.1
25-06-10
2073
FC IB
C 35
42.5N
330
16.0
26.4
36.4
40.4
26-06-10
2075
FC IB
C 35
42.5N
330
16.3
25.6
38.0
41.2
26-06-10
2076
FC IB
C 35
42.5N
330
16.6
27.2
38.7
42.5
27-06-10
2079
FC IB
C 35
42.5N
330
19.5
27.8
35.9
42.3
27-06-10
2080
FC IB
C 35
42.5N
330
19.7
28.1
37.0
42.5
PH Unit 2 Lift 6B
27-06-10
2077
FC IB
C 35
42.5N
330
20.9
29.7
37.9
44.2
27-06-10
2078
FC IB
C 35
42.5N
330
20.7
29.7
37.8
42.4
28-06-10
2081
FC IB
C 35
42.5N
330
16.2
26.6
37.5
40.1
28-06-10
2082
FC IB
C 35
42.5N
330
16.8
26.8
35.1
39.9
29-06-10
2088
FC IB
C 35
42.5N
330
20.1
32.4
39.9
45.6
29-06-10
2086
FC IB
C 35
42.5N
330
17.4
26.4
35.1
41.5
29-06-10
2087
FC IB
C 35
42.5N
330
17.8
29.8
37.4
43.2
30-06-10
2095
FC IB
C 35
42.5N
330
18.7
31.5
36.2
44.9
30-06-10
2094
FC IB
C 35
42.5N
330
16.2
27.0
35.6
39.6
30-06-10
2090
FC IB
C 35
42.5N
330
20.2
28.9
36.3
43.2
02-07-10
2097
FC IB
C 35
42.5N
330
17.9
28.2
36.1
41.4
02-07-10
2098
FC IB
C 35
42.5N
330
15.4
25.9
35.2
40.1
02-07-10
2099
FC IB
C 35
42.5N
330
18.9
29.3
38.6
42.9
05-07-10
2103
FC IB
C 35
42.5N
330
17.1
32.2
41.4
48.2
06-07-10
2104
FC IB
C 35
42.5N
330
17.2
25.3
36.8
39.3
08-07-10
2108
FC IB
C 35
42.5N
330
16.0
25.9
35.4
40.7
08-07-10
2109
FC IB
C 35
42.5N
330
16.6
26.8
38.4
42.8
09-07-10
2110
FC IB
C 35
42.5N
330
15.9
27.5
36.1
42.6
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
10-07-10
2114
FC IB
C 35
42.5N
330
19.4
12-07-10
2119
FC IB
C 35
42.5N
330
12-07-10
2120
FC IB
C 35
42.5N
13-07-10
2121
FC IB
C 35
13-07-10
2122
FC IB
13-07-10
2123
14-07-10
2 days 7 days
Note
28 days
90 days
31.9
39.6
47.5
15.0
26.8
35.4
39.9
PH Unit 2 Lift 89
330
15.9
25.7
37.8
39.0
APPRON
42.5N
330
20.5
28.0
38.0
42.4
C 35
42.5N
330
17.7
29.5
35.2
38.9
FC IB
C 35
42.5N
330
16.8
29.3
38.4
43.1
2126
FC IB
C 35
42.5N
330
16.3
26.6
35.0
37.5
PH Unit 4 P5
14-07-10
2125
FC IB
C 35
42.5N
330
17.5
25.5
38.2
41.7
15-07-10
2127
FC IB
C 35
42.5N
330
15.5
26.8
35.9
39.6
PH Unit 2 Lift 26
15-07-10
2129
FC IB
C 35
42.5N
330
18.3
31.2
39.9
44.5
16-07-10
2133
FC IB
C 35
42.5N
330
16.9
32.8
42.7
48.4
17-07-10
2134
FC IB
C 35
42.5N
330
15.0
27.2
35.4
40.8
19-07-10
2137
FC IB
C 35
42.5N
330
16.7
25.5
35.5
37.6
19-07-10
2138
FC IB
C 35
42.5N
330
16.8
26.5
35.3
38.3
19-07-10
2136
FC IB
C 35
42.5N
330
15.4
27.0
35.7
42.9
20-07-10
2143
FC IB
C 35
42.5N
330
15.1
25.3
35.3
39.4
20-07-10
2141
FC IB
C 35
42.5N
330
18.2
29.2
36.9
40.9
21-07-10
2147
FC IB
C 35
42.5N
330
15.9
25.3
38.7
41.2
22-07-10
2148
FC IB
C 35
42.5N
330
16.6
27.8
36.3
39.9
22-07-10
2149
FC IB
C 35
42.5N
330
16.6
27.5
37.2
41.4
22-07-10
2150
FC IB
C 35
42.5N
330
17.3
29.6
38.0
42.7
23-07-10
2152
FC IB
C 35
42.5N
330
18.5
26.7
35.4
37.6
24-07-10
2155
FC IB
C 35
42.5N
330
19.1
28.1
36.4
41.9
24-07-10
2154
FC IB
C 35
42.5N
330
18.9
27.9
36.0
40.5
25-07-10
2161
FC IB
C 35
42.5N
330
15.2
26.1
37.1
40.8
25-07-10
2157
FC IB
C 35
42.5N
330
18.0
37.2
35.8
39.4
25-07-10
2158
FC IB
C 35
42.5N
330
18.2
26.0
36.7
39.6
25-07-10
2160
FC IB
C 35
42.5N
330
15.6
25.3
37.1
39.8
25-07-10
2159
FC IB
C 35
42.5N
330
15.2
25.0
35.5
38.6
27-07-10
2165
FC IB
C 35
42.5N
330
16.1
25.8
37.4
41.3
27-07-10
2166
FC IB
C 35
42.5N
330
16.0
26.9
38.2
41.8
Page 20
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
28-07-10
2172
FC IB
C 35
42.5N
330
15.0
28-07-10
2171
FC IB
C 35
42.5N
330
30-07-10
2177
FC IB
C 35
42.5N
30-07-10
2179
FC IB
C 35
31-07-10
2181
FC IB
03-08-10
2185
03-08-10
2 days 7 days
Note
28 days
90 days
29.0
36.5
39.2
15.2
29.2
36.1
40.5
330
19.5
27.3
35.1
40.5
42.5N
330
18.3
26.1
36.8
39.7
C 35
42.5N
330
20.9
25.3
36.8
40.6
FC IB
C 35
42.5N
330
16.1
25.7
36.2
40.4
2182
FC IB
C 35
42.5N
330
16.4
26.7
36.3
38.9
03-08-10
2184
FC IB
C 35
42.5N
330
15.9
25.6
35.4
39.3
04-08-10
2188
FC IB
C 35
42.5N
330
16.8
27.3
38.4
43.6
PH Unit 2 P9B
05-08-10
2190
FC IB
C 35
42.5N
330
15.3
26.5
35.7
40.6
05-08-10
2192
FC IB
C 35
42.5N
330
15.7
26.9
37.6
44.9
05-08-10
2193
FC IB
C 35
42.5N
330
16.6
29.8
36.4
43.0
06-08-10
2199
FC IB
C 35
42.5N
330
16.8
30.1
36.9
45.6
06-08-10
2200
FC IB
C 35
42.5N
330
15.9
26.5
35.8
40.9
08-08-10
2203
FC IB
C 35
42.5N
330
20.0
28.1
35.2
41.5
08-08-10
2202
FC IB
C 35
42.5N
330
19.2
27.4
35.1
40.4
10-08-10
2206
FC IB
C 35
42.5N
330
16.5
25.2
37.2
10-08-10
2207
FC IB
C 35
42.5N
330
19.9
25.4
37.6
12-08-10
2212
FC IB
C 35
42.5N
330
17.2
29.4
38.6
PH Unit 5 Lift P3
13-08-10
2215
FC IB
C 35
42.5N
330
15.3
25.7
37.5
13-08-10
2214
FC IB
C 35
42.5N
330
15.6
25.8
36.5
14-08-10
2219
FC IB
C 35
42.5N
330
15.1
25.4
35.6
17-08-10
2223
FC IB
C 35
42.5N
330
15.5
26.7
37.6
17-08-10
2224
FC IB
C 35
42.5N
330
16.8
31.5
36.7
19-08-10
2229
FC IB
C 35
42.5N
330
15.7
27.0
37.1
20-08-10
2232
FC IB
C 35
42.5N
330
15.7
29.4
37.7
PH Tailrace wall
20-08-10
2231
FC IB
C 35
42.5N
330
16.1
27.5
35.6
21-08-10
2235
FC IB
C 35
42.5N
330
15.9
25.1
36.2
21-08-10
2236
FC IB
C 35
42.5N
330
19.7
26.3
40.4
22-08-10
2240
FC IB
C 35
42.5N
330
23.8
31.1
41.0
PH Unit 3 Lift 92
23-08-10
2242
FC IB
C 35
42.5N
330
21.3
32.0
39.6
Page 21
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Note
Date
Casted
Sample
Ref.
23-08-10
2243
FC IB
C 35
42.5N
330
15.1
26.6
37.2
PH Unit 5 Lift 89
23-08-10
2244
FC IB
C 35
42.5N
330
15.7
27.2
36.2
24-08-10
2247
FC IB
C 35
42.5N
330
16.4
25.2
35.0
25-08-10
2248
FC IB
C 35
42.5N
330
16.2
27.3
35.4
26-08-10
2251
FC IB
C 35
42.5N
330
17.3
28.6
37.3
26-08-10
2253
FC IB
C 35
42.5N
330
16.3
26.9
36.2
26-08-10
2254
FC IB
C 35
42.5N
330
19.2
33.1
41.0
PH Unit 2 Lift 28
26-08-10
2256
FC IB
C 35
42.5N
330
16.5
29.5
36.2
27-08-10
2259
FC IB
C 35
42.5N
330
19.5
30.6
45.4
27-08-10
2260
FC IB
C 35
42.5N
330
19.7
30.7
45.5
28-08-10
2261
FC IB
C 35
42.5N
330
16.5
27.2
35.1
30-08-10
2267
FC IB
C 35
42.5N
330
15.8
26.9
37.2
30-08-10
2265
FC IB
C 35
42.5N
330
16.2
27.4
38.1
31-08-10
2269
FC IB
C 35
42.5N
330
17.6
28.3
39.2
31-08-10
2270
FC IB
C 35
42.5N
330
16.8
25.1
36.6
PH Unit 4 Lift 26
31-08-10
2268
FC IB
C 35
42.5N
330
18.5
27.9
35.8
31-08-10
2271
FC IB
C 35
42.5N
330
18.4
26.9
36.8
01-09-10
2272
FC IB
C 35
42.5N
330
16.7
27.3
38.1
PH Unit 4 Lift 26
01-09-10
2273
FC IB
C 35
42.5N
330
16.5
27.1
35.4
02-09-10
2276
FC IB
C 35
42.5N
330
20.4
32.5
40.0
2 days 7 days
28 days
90 days
02-09-10
2275
FC IB
C 35
42.5N
330
21.3
33.9
39.7
G. SPILLWAY SFW- (1 - 6)
EMERGENCY WHEEL GATE
02-09-10
2277
FC IB
C 35
42.5N
330
16.7
25.1
37.7
03-09-10
2280
FC IB
C 35
42.5N
330
15.3
29.9
39.6
04-09-10
2281
FC IB
C 35
42.5N
330
18.3
30.2
42.7
05-09-10
2283
FC IB
C 35
42.5N
330
21.3
31.4
41.7
05-09-10
2282
FC IB
C 35
42.5N
330
21.6
29.5
42.3
G. SPILLWAY SWD- K4 - H4 - L4 - J4
WALL
06-09-10
2287
FC IB
C 35
42.5N
330
15.4
31.1
38.3
07-09-10
2288
FC IB
C 35
42.5N
330
19.9
31.4
38.5
07-09-10
2290
FC IB
C 35
42.5N
330
21.5
29.5
42.4
PH Unit 3 Lift 27
07-09-10
2289
FC IB
C 35
42.5N
330
22.7
30.7
41.0
08-09-10
2291
FC IB
C 35
42.5N
330
22.7
30.1
42.2
Page 22
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Note
Date
Casted
Sample
Ref.
08-09-10
2292
FC IB
C 35
42.5N
330
23.1
31.0
41.8
08-09-10
2294
FC IB
C 35
42.5N
330
16.5
27.6
35.5
09-09-10
2296
FC IB
C 35
42.5N
330
21.8
31.2
39.7
09-09-10
2297
FC IB
C 35
42.5N
330
16.5
28.8
35.8
09-09-10
2295
FC IB
C 35
42.5N
330
21.7
30.6
41.4
11-09-10
2299
FC IB
C 35
42.5N
330
22.2
30.8
42.9
12-09-10
2300
FC IB
C 35
42.5N
330
19.8
28.0
36.3
PH Unit 2 Lift 29
12-09-10
2301
FC IB
C 35
42.5N
330
19.7
29.3
37.1
13-09-10
2302
FC IB
C 35
42.5N
330
22.2
30.5
43.0
PH Unit 2 Lift 23
13-09-10
2303
FC IB
C 35
42.5N
330
22.1
30.8
44.3
2 days 7 days
28 days
90 days
13-09-10
2304
FC IB
C 35
42.5N
330
16.8
27.5
38.7
15-09-10
2307
FC IB
C 35
42.5N
330
18.3
32.0
43.8
15-09-10
2310
FC IB
C 35
42.5N
330
17.0
26.2
37.3
15-09-10
2308
FC IB
C 35
42.5N
330
18.5
28.4
36.0
16-09-10
2311
FC IB
C 35
42.5N
330
16.7
27.7
36.6
18-09-10
2314
FC IB
C 35
42.5N
330
17.3
30.5
40.6
PH Unit 4 Lift 27
18-09-10
2315
FC IB
C 35
42.5N
330
18.0
31.8
43.9
18-09-10
2312
FC IB
C 35
42.5N
330
16.5
27.1
35.7
19-09-10
2316
FC IB
C 35
42.5N
330
22.1
31.4
42.7
20-09-10
2318
FC IB
C 35
42.5N
330
16.8
30.1
41.1
20-09-10
2319
FC IB
C 35
42.5N
330
17.1
30.5
41.2
21-09-10
2320
FC IB
C 35
42.5N
330
16.1
25.7
37.8
22-09-10
2321
FC IB
C 35
42.5N
330
16.6
26.9
35.3
PH Unit 3 Lift 23
22-09-10
2322
FC IB
C 35
42.5N
330
16.9
27.8
38.9
22-09-10
2323
FC IB
C 35
42.5N
330
17.4
30.6
41.9
22-09-10
2324
FC IB
C 35
42.5N
330
16.9
30.6
41.8
23-09-10
2325
FC IB
C 35
42.5N
330
20.9
32.4
37.6
23-09-10
2329
FC IB
C 35
42.5N
330
17.7
31.6
41.8
23-09-10
2326
FC IB
C 35
42.5N
330
21.0
30.6
37.2
23-09-10
2328
FC IB
C 35
42.5N
330
15.1
27.4
37.4
23-09-10
2329A
FC IB
C 35
42.5N
330
16.4
27.7
38.3
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Note
Date
Casted
Sample
Ref.
25-09-10
2332
FC IB
C 35
42.5N
330
16.3
29.7
39.2
PH Unit 5 Lift 91
25-09-10
2330
FC IB
C 35
42.5N
330
18.8
26.3
35.1
26-09-10
2335
FC IB
C 35
42.5N
330
22.4
31.9
43.1
PH Unit 3 P7B
26-09-10
2334
FC IB
C 35
42.5N
330
16.3
28.3
37.5
26-09-10
2338
FC IB
C 35
42.5N
330
15.2
31.3
40.2
26-09-10
2339
FC IB
C 35
42.5N
330
15.4
30.2
38.9
27-09-10
2340
FC IB
C 35
42.5N
330
21.4
30.6
42.1
28-09-10
2343
FC IB
C 35
42.5N
330
18.5
30.9
39.4
28-09-10
2341
FC IB
C 35
42.5N
330
15.3
25.1
35.8
28-09-10
2342
FC IB
C 35
42.5N
330
18.4
31.2
40.2
2 days 7 days
28 days
90 days
28-09-10
2344
FC IB
C 35
42.5N
330
16.6
25.2
37.8
28-09-10
2345
FC IB
C 35
42.5N
330
15.4
30.8
40.1
APPRON AWD - T1
28-09-10
2346
FC IB
C 35
42.5N
330
16.1
30.8
41.9
29-09-10
2348
FC IB
C 35
42.5N
330
16.6
31.6
41.2
30-09-10
2352
FC IB
C 35
42.5N
330
16.7
28.5
37.1
PH Unit 2 Lift 92
37.96
33.4
45.8
2.2
Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 25N/mm2
Actual Characteristic Strength of the mix =
Rck
= AVG - K x STDV
35.2 N/mm2
K = 1.28
Page 24
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
02-01-10
1332
FC IB-7
C 35
42.5N
300
17.3
29.3
38.5
41.9
03-01-10
1338
FC IB-7
C 35
42.5N
300
17.9
29.4
37.6
42.2
04-01-10
1341
FC IB-7
C 35
42.5N
300
15.4
29.1
37.1
41.8
05-01-10
1345
FC IB-7
C 35
42.5N
300
15.3
26.3
38.5
43.6
07-01-10
1357
FC IB-7
C 35
42.5N
300
16.8
29.2
38.1
43.0
08-01-10
1363
FC IB-7
C 35
42.5N
300
16.5
28.4
37.9
43.4
09-01-10
1366
FC IB-7
C 35
42.5N
300
14.6
26.5
36.9
39.2
11-01-10
1375
FC IB-7
C 35
42.5N
300
15.5
27.6
38.8
44.4
12-01-10
1381
FC IB-7
C 35
42.5N
300
15.7
27.8
37.4
44.1
13-01-10
1385
FC IB-7
C 35
42.5N
300
16.3
28.7
37.8
43.6
14-01-10
1390
FC IB-7
C 35
42.5N
300
15.8
28.3
38.4
42.8
15-01-10
1397
FC IB-7
C 35
42.5N
300
17.4
29.2
37.4
40.9
16-01-10
1401
FC IB-7
C 35
42.5N
300
16.8
26.7
38.5
40.2
17-01-10
1407
FC IB-7
C 35
42.5N
300
17.9
26.7
38.4
41.9
18-01-10
1408
FC IB-7
C 35
42.5N
300
19.7
28.0
38.3
44.8
19-01-10
1414
FC IB-7
C 35
42.5N
300
15.8
27.9
35.5
39.2
19-01-10
1413
FC IB-7
C 35
42.5N
300
16.8
28.8
39.6
44.9
APPRON SLAB
40.8
20-01-10
1421
FC IB-7
C 35
42.5N
300
16.3
28.4
38.5
21-01-10
1427
FC IB-7
C 35
42.5N
300
16.4
28.2
36.9
22-01-10
1431
FC IB-7
C 35
42.5N
300
17.8
28.6
39.0
44.3
22-01-10
1432
FC IB-7
C 35
42.5N
300
16.6
30.1
39.7
43.8
APPRON SLAB
23-01-10
1437
FC IB-7
C 35
42.5N
300
18.7
28.5
38.1
41.9
24-01-10
1443
FC IB-7
C 35
42.5N
300
16.5
27.5
37.8
43.4
24-01-10
1444
FC IB-7
C 35
42.5N
300
17.2
30.6
40.8
46.5
APPRON SLAB
25-01-10
1447
FC IB-7
C 35
42.5N
300
16.5
27.9
37.0
41.8
26-01-10
1454
FC IB-7
C 35
42.5N
300
18.1
28.6
39.2
48.6
27-01-10
1460
FC IB-7
C 35
42.5N
300
15.9
28.4
37.3
41.1
28-01-10
1463
FC IB-7
C 35
42.5N
300
16.6
27.5
37.0
40.1
28-01-10
1465
FC IB-7
C 35
42.5N
300
15.7
27.7
38.0
42.7
APPRON SLAB
29-01-10
1469
FC IB-7
C 35
42.5N
300
15.3
27.9
37.2
41.6
20-02-10
1585
FC IB-7
C 35
42.5N
300
23.8
30.5
44.6
48.0
Page 25
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
2 days 7 days
28 days
90 days
Note
20-02-10
1587
FC IB-7
C 35
42.5N
300
19.0
30.1
39.9
46.2
APPRON SLAB
24-02-10
1602
FC IB-7
C 35
42.5N
300
18.3
29.1
40.4
45.7
APPRON SLAB
25-02-10
1612
FC IB-7
C 35
42.5N
300
17.9
26.7
36.1
39.5
APPRON SLAB
25-02-10
1616
FC IB-7
C 35
42.5N
300
23.4
32.7
43.0
48.1
APPRON SLAB
04-03-10
1646
FC IB-7
C 35
42.5N
300
16.9
28.9
39.3
44.9
APPRON SLAB
18-03-10
1709
FC IB-7
C 35
42.5N
300
20.8
33.1
43.1
46.6
APPRON SLAB
19-03-10
1712
FC IB-7
C 35
42.5N
300
16.9
28.8
37.6
43.8
APPRON SLAB
25-03-10
1737
FC IB-7
C 35
42.5N
300
17.3
29.3
38.8
42.4
GATED SPILLWAY SB - S8
26-03-10
1745
FC IB-7
C 35
42.5N
300
18.2
29.6
40.3
44.4
APPRON SLAB
30-03-10
1765
FC IB-7
C 35
42.5N
300
16.7
27.0
37.3
40.1
GATED SPILLWAY SB - S8
10-04-10
1804
FC IB-7
C 35
42.5N
300
16.3
27.2
37.4
41.3
APPRON SLAB
17-04-10
1836
FC IB-7
C 35
42.5N
300
16.3
26.5
39.7
43.6
APPRON SLAB
25-04-10
1865
FC IB-7
C 35
42.5N
300
24.2
32.4
45.0
49.2
38.72
35.5
45.0
2.0
Average
Minimum
Maximum
Standard Deviation
Actual Characteristic Strength of the mix =
AVG - K x STDV
36.1 N/mm2
K = 1.28
Page 26
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
02-01-10
1333
FC IB-2
C 30
42.5N
300
14.4
25.4
34.4
40.3
PH Unit 1 Lift P4
03-01-10
1336
FC IB-2
C 30
42.5N
300
15.6
25.3
34.9
39.8
03-01-10
1337
FC IB-2
C 30
42.5N
300
20.7
28.5
37.7
48.3
03-01-10
1339
FC IB-2
C 30
42.5N
300
16.2
28.9
36.7
04-01-10
1342
FC IB-2
C 30
42.5N
300
17.8
29.1
36.2
43.4
PH Unit 3 Lift 61
04-01-10
1344
FC IB-2
C 30
42.5N
300
14.8
25.1
33.4
37.9
05-01-10
1346
FC IB-2
C 30
42.5N
300
14.3
25.8
33.2
38.1
05-01-10
1347
FC IB-2
C 30
42.5N
300
14.7
26.3
32.8
38.5
PH Unit 3 Lift 17
06-01-10
1349
FC IB-2
C 30
42.5N
300
14.7
24.9
33.1
38.5
06-01-10
1352
FC IB-2
C 30
42.5N
300
14.5
24.6
33.3
06-01-10
1350
FC IB-2
C 30
42.5N
300
14.5
25.6
33.7
38.3
APPRON SLAB
07-01-10
1354
FC IB-2
C 30
42.5N
300
15.1
25.6
35.1
40.4
07-01-10
1355
FC IB-2
C 30
42.5N
300
14.8
25.2
34.8
39.8
07-01-10
1356
FC IB-2
C 30
42.5N
300
14.8
25.4
33.0
36.3
07-01-10
1358
FC IB-2
C 30
42.5N
300
14.5
25.5
33.6
36.8
APPRON SLAB
08-01-10
1361
FC IB-2
C 30
42.5N
300
14.2
24.7
32.4
36.8
08-01-10
1364
FC IB-2
C 30
42.5N
300
15.4
26.7
33.1
37.5
08-01-10
1360
FC IB-2
C 30
42.5N
300
14.5
25.1
32.0
08-01-10
1365
FC IB-2
C 30
42.5N
300
14.8
25.8
34.6
08-01-10
1359
FC IB-2
C 30
42.5N
300
14.6
25.2
33.7
38.8
APPRON SLAB
09-01-10
1367
FC IB-2
C 30
42.5N
300
15.2
24.6
32.4
37.4
09-01-10
1368
FC IB-2
C 30
42.5N
300
14.4
25.6
33.7
39.4
PH Unit 3 Lift P2
09-01-10
1069
FC IB-2
C 30
42.5N
300
15.3
25.8
34.7
39.9
10-01-10
1372
FC IB-2
C 30
42.5N
300
15.6
24.6
33.7
40.1
12-01-10
1383
FC IB-2
C 30
42.5N
300
14.8
24.4
33.8
43.7
13-01-10
1388
FC IB-2
C 30
42.5N
300
14.5
26.6
33.4
38.3
PH Unit 1 Lift 88
14-01-10
1389
FC IB-2
C 30
42.5N
300
14.7
25.5
33.4
38.0
PH Unit 1 Lift 20
14-01-10
1392
FC IB-2
C 30
42.5N
300
15.3
25.8
33.1
37.5
PH Unit 5 Lift 81
16-01-10
1400
FC IB-2
C 30
42.5N
300
14.8
25.9
33.3
38.8
Page 27
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
16-01-10
1404
FC IB-2
C 30
42.5N
300
15.1
25.9
32.8
36.6
16-01-10
1405
FC IB-2
C 30
42.5N
300
14.2
29.6
38.0
43.6
APPRON SLAB
18-01-10
1411
FC IB-2
C 30
42.5N
300
15.4
25.7
32.9
36.1
18-01-10
1412
FC IB-2
C 30
42.5N
300
15.7
24.3
35.0
38.3
APPRON SLAB
19-01-10
1417
FC IB-2
C 30
42.5N
300
14.7
26.2
32.5
39.6
19-01-10
1418
FC IB-2
C 30
42.5N
300
15.3
24.4
33.3
35.8
19-01-10
1419
FC IB-2
C 30
42.5N
300
15.6
24.5
31.9
34.7
22-01-10
1429
FC IB-2
C 30
42.5N
300
13.0
25.3
33.1
39.1
22-01-10
1430
FC IB-2
C 30
42.5N
300
18.7
28.7
36.5
42.0
23-01-10
1436
FC IB-2
C 30
42.5N
300
17.6
27.4
36.7
39.0
PH UNIT 3 Lift 87
23-01-10
1441
FC IB-2
C 30
42.5N
300
14.8
25.1
34.7
40.6
24-01-10
1442
FC IB-2
C 30
42.5N
300
17.3
26.5
34.2
40.3
24-01-10
1446
FC IB-2
C 30
42.5N
300
15.3
24.8
33.5
39.2
PH Unit 1 Lift 88
24-01-10
1445
FC IB-2
C 30
42.5N
300
14.6
24.9
35.8
40.0
APPRON SLAB
25-01-10
1452
FC IB-2
C 30
42.5N
300
15.2
25.4
34.2
39.8
26-01-10
1455
FC IB-2
C 30
42.5N
300
14.7
25.5
33.4
35.6
26-01-10
1457
FC IB-2
C 30
42.5N
300
15.6
25.4
33.6
36.5
28-01-10
1464
FC IB-2
C 30
42.5N
300
15.6
25.2
31.8
35.6
28-01-10
1466
FC IB-2
C 30
42.5N
300
16.9
26.2
32.9
34.4
29-01-10
1470
FC IB-2
C 30
42.5N
300
14.7
24.2
33.7
37.9
29-01-10
1473
FC IB-2
C 30
42.5N
300
15.6
25.3
34.3
37.8
30-01-10
1475
FC IB-2
C 30
42.5N
300
13.9
25.1
33.7
37.5
PH Unit 1 Lift P5
01-02-10
1481
FC IB-2
C 30
42.5N
300
14.7
26.0
33.8
40.9
03-02-10
1491
FC IB-2
C 30
42.5N
300
14.6
24.7
32.6
36.5
03-02-10
1492
FC IB-2
C 30
42.5N
300
15.8
28.8
36.8
41.9
04-02-10
1498
FC IB-2
C 30
42.5N
300
15.4
25.1
34.3
39.8
05-02-10
1501
FC IB-2
C 30
42.5N
300
16.5
25.9
33.6
39.7
06-02-10
1504
FC IB-2
C 30
42.5N
300
20.0
29.6
36.0
43.1
PH Unit 2 Lift 58
06-02-10
1505
FC IB-2
C 30
42.5N
300
20.3
30.2
35.0
43.2
Page 28
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
06-02-10
1506
FC IB-2
C 30
42.5N
300
15.4
25.4
34.8
39.3
06-02-10
1503
FC IB-2
C 30
42.5N
300
20.3
29.9
35.7
42.9
APPRON SLAB
07-02-10
1513
FC IB-2
C 30
42.5N
300
15.9
26.4
35.3
40.3
APPRON SLAB
09-02-10
1522
FC IB-2
C 30
42.5N
300
18.8
27.1
34.3
37.6
09-02-10
1523
FC IB-2
C 30
42.5N
300
18.3
27.6
33.7
39.6
PH Unit 2 Lift P2
09-02-10
1524
FC IB-2
C 30
42.5N
300
16.9
26.3
34.6
39.8
09-02-10
1525
FC IB-2
C 30
42.5N
300
15.1
25.9
33.9
38.4
10-02-10
1529
FC IB-2
C 30
42.5N
300
18.5
28.6
37.0
41.4
10-02-10
1535
FC IB-2
C 30
42.5N
300
15.0
28.6
32.7
39.0
10-02-10
1528
FC IB-2
C 30
42.5N
300
19.3
28.1
36.6
42.3
APPRON SLAB
11-02-10
1536
FC IB-2
C 30
42.5N
300
18.4
25.8
32.7
37.1
11-02-10
1539
FC IB-2
C 30
42.5N
300
15.6
24.5
31.8
36.1
11-02-10
1540
FC IB-2
C 30
42.5N
300
15.0
24.7
32.5
41.7
13-02-10
1550
FC IB-2
C 30
42.5N
300
15.1
24.7
32.9
36.3
13-02-10
1548
FC IB-2
C 30
42.5N
300
18.1
25.6
32.1
35.3
APPRON SLAB
14-02-10
1554
FC IB-2
C 30
42.5N
300
15.1
24.5
32.7
36.2
16-02-10
1558
FC IB-2
C 30
42.5N
300
18.9
30.8
38.9
45.1
PH Unit 1 Lift 23
16-02-10
1561
FC IB-2
C 30
42.5N
300
18.7
31.3
38.5
44.3
17-02-10
1568
FC IB-2
C 30
42.5N
300
15.3
24.4
32.6
35.7
18-02-10
1576
FC IB-2
C 30
42.5N
300
14.2
24.0
33.2
37.8
PH Unit 2 Lift 59
18-02-10
1575
FC IB-2
C 30
42.5N
300
14.7
24.8
30.7
35.6
APPRON SLAB
18-02-10
1578
FC IB-2
C 30
42.5N
300
22.9
27.7
37.6
44.1
APPRON SLAB
19-02-10
1579
FC IB-2
C 30
42.5N
300
19.5
27.6
35.5
40.1
19-02-10
1583
FC IB-2
C 30
42.5N
300
16.0
24.7
31.0
34.6
20-02-10
1586
FC IB-2
C 30
42.5N
300
14.6
23.5
31.5
35.0
PH Unit 5 Lift 86
22-02-10
1593
FC IB-2
C 30
42.5N
300
15.8
24.9
32.8
36.4
22-02-10
1594
FC IB-2
C 30
42.5N
300
14.9
24.1
31.4
36.2
24-02-10
1603
FC IB-2
C 30
42.5N
300
16.7
27.1
36.6
43.4
24-02-10
1605
FC IB-2
C 30
42.5N
300
14.5
24.5
31.3
36.8
Page 29
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
24-02-10
1606
FC IB-2
C 30
42.5N
300
14.9
25.1
33.8
38.1
24-02-10
1607
FC IB-2
C 30
42.5N
300
15.6
25.8
35.7
40.5
25-02-10
1614
FC IB-2
C 30
42.5N
300
14.7
24.5
31.5
35.1
26-02-10
1621
FC IB-2
C 30
42.5N
300
15.9
22.5
30.9
33.9
PH Unit 1 Lift 89
26-02-10
1617
FC IB-2
C 30
42.5N
300
14.2
23.5
31.5
34.9
APPRON SLAB
27-02-10
1623
FC IB-2
C 30
42.5N
300
19.0
28.1
35.7
40.8
27-02-10
1624
FC IB-2
C 30
42.5N
300
19.0
28.9
35.9
40.5
01-03-10
1626
FC IB-2
C 30
42.5N
300
13.5
22.7
32.3
37.0
01-03-10
1625
FC IB-2
C 30
42.5N
300
14.8
24.9
31.6
37.3
02-03-10
1632
FC IB-2
C 30
42.5N
300
14.5
24.1
31.4
36.2
02-03-10
1633
FC IB-2
C 30
42.5N
300
18.3
28.1
37.2
40.1
03-03-10
1641
FC IB-2
C 30
42.5N
300
14.8
32.2
31.0
35.2
03-03-10
1643
FC IB-2
C 30
42.5N
300
15.2
24.8
33.0
37.3
03-03-10
1640
FC IB-2
C 30
42.5N
300
14.9
24.8
33.6
37.1
04-03-10
1647
FC IB-2
C 30
42.5N
300
14.9
24.6
33.6
36.8
05-03-10
1648
FC IB-2
C 30
42.5N
300
14.5
23.3
31.3
36.5
PH Unit 2 Lift 84
05-03-10
1652
FC IB-2
C 30
42.5N
300
14.9
25.2
33.8
37.3
PH Unit 2 Lift 84
06-03-10
1654
FC IB-2
C 30
42.5N
300
14.4
23.9
31.8
35.8
07-03-10
1658
FC IB-2
C 30
42.5N
300
14.3
23.8
32.6
36.6
07-03-10
1659
FC IB-2
C 30
42.5N
300
14.7
23.8
31.9
35.3
PH Unit 2 Lift 60
08-03-10
1660
FC IB-2
C 30
42.5N
300
13.7
22.2
31.8
33.5
08-03-10
1661
FC IB-2
C 30
42.5N
300
14.3
24.0
33.6
36.4
10-03-10
1669
FC IB-2
C 30
42.5N
300
16.5
22.9
33.3
36.0
10-03-10
1670
FC IB-2
C 30
42.5N
300
14.8
24.3
33.8
36.2
11-03-10
1675
FC IB-2
C 30
42.5N
300
17.5
25.8
31.7
38.8
APPRON SLAB
11-03-10
1677
FC IB-2
C 30
42.5N
300
15.3
24.7
34.1
39.8
APPRON SLAB
12-03-10
1680
FC IB-2
C 30
42.5N
300
14.2
23.8
32.4
35.2
12-03-10
1683
FC IB-2
C 30
42.5N
300
14.6
24.7
31.6
37.4
13-03-10
1686
FC IB-2
C 30
42.5N
300
15.1
23.1
32.4
36.7
Page 30
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
13-03-10
1688
FC IB-2
C 30
42.5N
300
17.6
28.2
34.4
38.7
15-03-10
1693
FC IB-2
C 30
42.5N
300
12.9
22.8
31.8
34.4
15-03-10
1694
FC IB-2
C 30
42.5N
300
12.0
22.5
33.1
36.8
16-03-10
1696
FC IB-2
C 30
42.5N
300
14.1
23.9
32.4
36.6
16-03-10
1698
FC IB-2
C 30
42.5N
300
18.8
26.0
33.3
36.1
17-03-10
1700
FC IB-2
C 30
42.5N
300
15.9
24.7
31.0
34.1
17-03-10
1705
FC IB-2
C 30
42.5N
300
13.6
23.1
32.1
34.2
17-03-10
1703
FC IB-2
C 30
42.5N
300
13.8
24.3
33.6
36.9
17-03-10
1701
FC IB-2
C 30
42.5N
300
17.2
24.0
30.7
33.7
APPRON SLAB
18-03-10
1706
FC IB-2
C 30
42.5N
300
15.5
24.7
31.1
33.9
19-03-10
1711
FC IB-2
C 30
42.5N
300
14.7
23.8
31.8
35.9
PH Unit 5 Lift 59
19-03-10
1713
FC IB-2
C 30
42.5N
300
16.1
25.3
31.4
35.4
PH Unit 2 Lift P4
20-03-10
1716
FC IB-2
C 30
42.5N
300
14.3
22.9
32.7
34.5
PH Unit 2 Lift 61
20-03-10
1717
FC IB-2
C 30
42.5N
300
15.3
23.4
30.2
33.5
21-03-10
1722
FC IB-2
C 30
42.5N
300
15.1
25.1
34.1
38.4
21-03-10
1725
FC IB-2
C 30
42.5N
300
14.3
22.8
32.4
36.8
22-03-10
1726
FC IB-2
C 30
42.5N
300
15.1
24.6
33.6
37.3
23-03-10
1730
FC IB-2
C 30
42.5N
300
13.9
23.1
33.2
37.2
PH Unit 2 Lift 85
23-03-10
1731
FC IB-2
C 30
42.5N
300
14.1
23.6
32.3
36.6
PH Unit 2 Lift 85
24-03-10
1732
FC IB-2
C 30
42.5N
300
15.5
24.4
31.2
34.1
24-03-10
1735
FC IB-2
C 30
42.5N
300
16.2
29.1
37.1
39.8
24-03-10
1733
FC IB-2
C 30
42.5N
300
13.5
22.2
31.4
34.9
25-03-10
1740
FC IB-2
C 30
42.5N
300
14.2
23.2
32.6
35.2
PH Unit 4 Lift 84
26-03-10
1747
FC IB-2
C 30
42.5N
300
14.2
23.9
32.8
42.4
27-03-10
1752
FC IB-2
C 30
42.5N
300
13.6
22.8
33.1
36.9
PH Unit 4 Lift 58
27-03-10
1753
FC IB-2
C 30
42.5N
300
14.4
23.7
33.4
36.3
28-03-10
1757
FC IB-2
C 30
42.5N
300
16.6
23.8
32.5
34.4
APPRON SLAB
29-03-10
1762
FC IB-2
C 30
42.5N
300
14.7
25.3
31.9
34.3
29-03-10
1759
FC IB-2
C 30
42.5N
300
14.8
22.8
32.9
35.8
Page 31
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
31-03-10
1775
FC IB-2
C 30
42.5N
300
14.3
24.8
31.9
33.4
PH Unit 2 Lift P5
31-03-10
1771
FC IB-2
C 30
42.5N
300
14.1
23.9
32.6
36.4
01-04-10
1776
FC IB-2
C 30
42.5N
300
17.9
26.8
34.8
37.5
01-04-10
1780
FC IB-2
C 30
42.5N
300
14.4
24.6
32.4
35.8
02-04-10
1782
FC IB-2
C 30
42.5N
300
16.1
22.6
31.1
34.3
PH Unit 4 Lift 85
02-04-10
1788
FC IB-2
C 30
42.5N
300
14.4
23.9
32.3
34.4
02-04-10
1784
FC IB-2
C 30
42.5N
300
14.6
24.8
33.3
37.8
07-04-10
1793
FC IB-2
C 30
42.5N
300
13.9
23.1
32.4
36.6
08-04-10
1794
FC IB-2
C 30
42.5N
300
14.6
23.7
31.8
35.5
PH Unit 3 Lift 88
09-04-10
1797
FC IB-2
C 30
42.5N
300
13.8
23.4
32.6
35.5
09-04-10
1799
FC IB-2
C 30
42.5N
300
14.6
25.2
33.6
37.1
10-04-10
1803
FC IB-2
C 30
42.5N
300
13.7
24.2
31.7
35.3
10-04-10
1805
FC IB-2
C 30
42.5N
300
13.8
23.7
31.1
35.0
APPRON SLAB
12-04-10
1809
FC IB-2
C 30
42.5N
300
13.7
23.2
30.0
34.6
12-04-10
1811
FC IB-2
C 30
42.5N
300
13.6
23.6
33.0
37.4
APPRON SLAB
13-04-10
1815
FC IB-2
C 30
42.5N
300
13.3
23.7
32.1
36.3
14-04-10
1818
FC IB-2
C 30
42.5N
300
14.3
23.6
34.8
38.8
16-04-10
1830
FC IB-2
C 30
42.5N
300
13.9
23.9
31.7
35.8
16-04-10
1833
FC IB-2
C 30
42.5N
300
13.8
24.1
35.3
39.8
17-04-10
1837
FC IB-2
C 30
42.5N
300
13.9
23.3
34.3
38.2
APPRON SLAB
18-04-10
1841
FC IB-2
C 30
42.5N
300
14.2
23.9
32.0
36.1
PH Unit 1 Lift 26
19-04-10
1841A
FC IB-2
C 30
42.5N
300
13.9
23.5
31.8
34.5
21-04-10
1849
FC IB-2
C 30
42.5N
300
13.9
23.8
32.4
35.3
23-04-10
1854
FC IB-2
C 30
42.5N
300
14.8
22.6
33.1
35.1
PH Unit 5 Lift 16
24-04-10
1863
FC IB-2
C 30
42.5N
300
14.2
22.0
32.9
35.8
PH Unit 2 Lift 86
26-04-10
1870
FC IB-2
C 30
42.5N
300
13.2
23.4
35.9
38.3
29-04-10
1879
FC IB-2
C 30
42.5N
300
17.0
25.0
33.2
35.3
PH Unit 5 Lift 87
30-04-10
1882
FC IB-2
C 30
42.5N
300
13.1
21.7
32.8
36.2
03-05-10
1884
FC IB-2
C 30
42.5N
300
13.5
24.5
31.7
34.6
PH Unit 4 Lift 59
Page 32
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
04-05-10
1891
FC IB-2
C 30
42.5N
300
13.6
23.4
30.5
34.9
06-05-10
1894
FC IB-2
C 30
42.5N
300
13.4
23.7
31.4
34.9
PH Unit 4 Lift 86
06-05-10
1895
FC IB-2
C 30
42.5N
300
14.8
24.8
32.6
35.3
PH Unit 4 Lift 18
07-05-10
1896
FC IB-2
C 30
42.5N
300
13.7
24.3
32.9
35.8
PH Unit 1 Lift 29
07-05-10
1899
FC IB-2
C 30
42.5N
300
14.8
25.4
36.8
41.3
PH Unit 1 Lift 27
08-05-10
1902
FC IB-2
C 30
42.5N
300
14.6
24.9
32.8
36.8
11-05-10
1911
FC IB-2
C 30
42.5N
300
13.4
24.9
31.2
36.3
PH Unit 4 Lift P2
12-05-10
1917
FC IB-2
C 30
42.5N
300
13.9
24.2
31.6
35.0
14-05-10
1921
FC IB-2
C 30
42.5N
300
14.3
24.8
33.3
36.8
14-05-10
1922
FC IB-2
C 30
42.5N
300
14.0
24.3
32.6
35.7
18-05-10
1938
FC IB-2
C 30
42.5N
300
16.1
28.7
35.0
40.6
19-05-10
1939
FC IB-2
C 30
42.5N
300
14.3
25.3
31.5
33.4
PH Unit 3 Lift 89
23-05-10
1953
FC IB-2
C 30
42.5N
300
14.9
22.4
33.1
35.5
25-05-10
1957
FC IB-2
C 30
42.5N
300
15.3
25.3
31.4
37.0
PH Unit 5 P2 slab
26-05-10
1964
FC IB-2
C 30
42.5N
300
18.0
27.7
32.5
38.6
26-05-10
1966
FC IB-2
C 30
42.5N
300
14.1
25.2
32.5
35.9
26-05-10
1968
FC IB-2
C 30
42.5N
300
14.3
24.9
33.7
37.2
28-05-10
1973
FC IB-2
C 30
42.5N
300
19.1
25.0
32.7
35.0
01-06-10
1981
FC IB-2
C 30
42.5N
300
14.5
24.3
33.9
36.8
PH Unit 3 P4
03-06-10
1988
FC IB-2
C 30
42.5N
300
14.8
23.2
33.5
37.1
04-06-10
1992
FC IB-2
C 30
42.5N
300
13.6
25.1
33.5
36.7
08-06-10
2008
FC IB-2
C 30
42.5N
300
14.3
24.4
33.1
36.6
11-06-10
2018
FC IB-2
C 30
42.5N
300
15.4
24.8
32.3
36.5
11-06-10
2021
FC IB-2
C 30
42.5N
300
14.4
24.7
30.2
34.7
12-06-10
2024
FC IB-2
C 30
42.5N
300
14.6
24.9
32.7
35.6
12-06-10
2027
FC IB-2
C 30
42.5N
300
14.8
25.1
34.3
38.8
12-06-10
2029
FC IB-2
C 30
42.5N
300
14.9
24.6
33.8
36.2
15-06-10
2040
FC IB-2
C 30
42.5N
300
14.1
26.2
34.7
38.8
18-06-10
2047
FC IB-2
C 30
42.5N
300
14.4
24.3
31.2
34.4
PH Unit 1 Lift 92
Page 33
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
19-06-10
2049
FC IB-2
C 30
42.5N
300
16.1
24.9
32.0
36.0
20-06-10
2055
FC IB-2
C 30
42.5N
300
15.6
24.2
30.6
35.9
PH Unit 3 Lift 20
23-06-10
2065
FC IB-2
C 30
42.5N
300
14.6
24.9
32.7
35.8
24-06-10
2069
FC IB-2
C 30
42.5N
300
15.3
24.9
32.6
36.6
25-06-10
2074
FC IB-2
C 30
42.5N
300
14.1
24.5
32.3
34.8
28-06-10
2083
FC IB-2
C 30
42.5N
300
15.0
24.5
33.7
36.2
28-06-10
2085
FC IB-2
C 30
42.5N
300
14.9
24.8
32.7
35.1
30-06-10
2091
FC IB-2
C 30
42.5N
300
14.6
24.8
32.6
36.3
30-06-10
2092
FC IB-2
C 30
42.5N
300
14.0
23.6
32.2
36.6
02-07-10
2100
FC IB-2
C 30
42.5N
300
14.2
24.3
33.3
37.3
03-07-10
2101
FC IB-2
C 30
42.5N
300
15.0
24.6
33.8
37.4
06-07-10
2105
FC IB-2
C 30
42.5N
300
14.9
24.5
30.7
36.6
PH Unit 3 Lift 90
08-07-10
2106
FC IB-2
C 30
42.5N
300
14.3
24.2
33.6
36.5
08-07-10
2107
FC IB-2
C 30
42.5N
300
13.9
23.4
32.3
34.7
PH Unit 4 Lift 61
11-07-10
2116
FC IB-2
C 30
42.5N
300
14.1
24.3
33.7
36.3
12-07-10
2118
FC IB-2
C 30
42.5N
300
14.9
24.0
33.7
36.8
15-07-10
2131
FC IB-2
C 30
42.5N
300
14.9
25.6
36.9
40.6
20-07-10
2140
FC IB-2
C 30
42.5N
300
14.5
24.8
31.3
33.6
20-07-10
2139
FC IB-2
C 30
42.5N
300
14.2
23.0
33.2
36.6
21-07-10
2144
FC IB-2
C 30
42.5N
300
15.3
24.3
32.2
34.9
21-07-10
2145
FC IB-2
C 30
42.5N
300
15.3
23.9
30.6
35.7
PH Unit 5 Lift 88
27-07-10
2167
FC IB-2
C 30
42.5N
300
14.1
24.0
31.6
35.6
27-07-10
2168
FC IB-2
C 30
42.5N
300
14.3
22.9
32.4
36.8
28-07-10
2169
FC IB-2
C 30
42.5N
300
16.0
25.1
32.7
37.3
30-07-10
2175
FC IB-2
C 30
42.5N
300
19.0
24.9
31.4
36.1
30-07-10
2176
FC IB-2
C 30
42.5N
300
19.2
25.1
31.1
35.7
PH Unit 2 Lift 27
30-07-10
2178
FC IB-2
C 30
42.5N
300
14.9
23.6
31.6
36.3
PH Unit 2 Lift 27
04-08-10
2186
FC IB-2
C 30
42.5N
300
14.5
24.5
31.8
37.0
06-08-10
2197
FC IB-2
C 30
42.5N
300
13.9
24.6
32.7
35.8
Page 34
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
28 days
Note
90 days
09-08-10
2205
FC IB-2
C 30
42.5N
300
13.2
23.0
30.1
11-08-10
2208
FC IB-2
C 30
42.5N
300
14.0
24.7
31.1
PH Unit 4 Lift 88
11-08-10
2209
FC IB-2
C 30
42.5N
300
14.2
24.4
30.6
13-08-10
2213
FC IB-2
C 30
42.5N
300
14.8
23.9
31.0
14-08-10
2217
FC IB-2
C 30
42.5N
300
14.2
24.2
32.5
14-08-10
2218
FC IB-2
C 30
42.5N
300
14.0
24.4
31.3
PH Unit 3 Lift 26
14-08-10
2220
FC IB-2
C 30
42.5N
300
14.9
25.3
32.8
PH Unit 3 Lift 26
21-08-10
2238
FC IB-2
C 30
42.5N
300
14.5
24.3
33.1
24-08-10
2246
FC IB-2
C 30
42.5N
300
14.8
23.0
32.7
25-08-10
2250
FC IB-2
C 30
42.5N
300
14.7
24.1
31.8
33.13
30.0
38.9
1.7
Average
Minimum
Maximum
Standard Deviation
Actual Characteristic Strength of the mix =
Rck
= AVG - K x STD
31.0 N/mm2
K = 1.28
Page 35
Summary of
SITE MATERIALS
LABORATORY
Sep-10
Date
Casted
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
type
(Kg/m3)
class
Ref.
28 days
90 days
Note
02-01-10
1335
FC JC
C 25
42.5N
300
14.9
23.8
31.6
36.8
10-01-10
1370
FC JC
C 25
42.5N
300
16.8
27.5
36.2
44.8
25-01-10
1450
FC JC
C 25
42.5N
300
14.3
24.8
32.3
36.0
06-02-10
1511
FC JC
C 25
42.5N
300
13.6
24.7
30.6
35.1
08-02-10
1520
FC JC
C 30
42.5N
300
13.6
24.5
31.2
36.5
11-02-10
1542
FC JC
C 25
42.5N
300
14.3
23.7
31.7
37.3
16-02-10
1564
FC JC
C 30
42.5N
300
13.3
24.0
30.4
38.5
25-02-10
1608
FC JC
C 30
42.5N
300
16.8
25.5
30.0
36.6
02-03-10
1630
FC JC
C 25
42.5N
300
13.9
22.9
30.1
35.9
S.YARD P5 (O - P - 5) No.1 (Q - R - 2)
No.4
04-03-10
1644
FC JC
C 25
42.5N
300
14.4
22.9
31.2
35.2
S.Y.H.V.FOUND
P5 (K - L - 4 - 5)
No.3
P2 (P - Q - 3) No.1
05-03-10
1649
FC JC
C 25
42.5N
300
13.6
22.5
30.6
35.1
S.Y.H.V.FOUND
P2 (P - Q - 3 )
No.1 P5 (P - Q - 3) No.3
09-03-10
1663
FC JC
C 25
42.5N
300
17.2
24.6
30.8
36.3
S.Y.H.V.FOUND
P3 (O - P - 4 - 5 )
No.3 P9 (O - P - 4 - 5) NR
11-03-10
1673
FC JC
C 30
42.5N
300
15.8
22.3
30.8
34.5
12-03-10
1682
FC JC
C 25
42.5N
300
13.6
21.8
31.9
35.6
12-03-10
1685
FC JC
C 30
42.5N
300
13.0
22.4
24.3
30.9
13-03-10
1687
FC JC
C 25
42.5N
300
13.6
21.9
30.8
35.6
S.Y.H.V.FOUND
P3 (Q - R - 4 - 5 )
No.3 P5 (Q - R - 4 - 5) No1
18-03-10
1708
FC JC
C 25
42.5N
300
13.7
22.8
30.1
32.6
20-03-10
1715
FC JC
C 25
42.5N
300
13.6
22.7
30.8
34.6
25-03-10
1739
FC JC
C 25
42.5N
300
13.1
21.8
30.7
33.9
27-03-10
1754
FC JC
C 25
42.5N
300
12.9
22.4
30.1
32.3
PH Unit 1 Lift 24
30-03-10
1769
FC JC
C 25
42.5N
300
13.4
25.1
32.2
37.6
31-03-10
1773
FC JC
C 25
42.5N
300
12.9
22.4
30.1
34.3
02-04-10
1787
FC JC
C 25
42.5N
300
13.8
22.6
30.7
34.1
09-04-10
1800
FC JC
C 25
42.5N
300
13.3
22.3
30.1
34.2
S.Y.H.V.FOUND
P2 (G - H - 1 - 2 )
No.3
09-04-10
1802
FC JC
C 25
42.5N
300
13.6
22.1
31.3
33.9
13-04-10
1814
FC JC
C 25
42.5N
300
12.5
21.9
30.5
34.6
14-04-10
1819
FC JC
C 25
42.5N
300
12.8
22.3
31.9
36.6
15-04-10
1822
FC JC
C 25
42.5N
300
13.6
21.9
29.9
34.4
15-04-10
1827
FC JC
C 25
42.5N
300
13.5
22.2
31.3
35.8
Page 36
Summary of
SITE MATERIALS
LABORATORY
Sep-10
Date
Casted
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
16-04-10
1832
FC JC
C 25
42.5N
300
12.7
24.4
30.0
34.3
19-04-10
1844
FC JC
C 25
42.5N
300
12.5
20.1
31.0
33.6
PH Unit 5 Lift 60
20-04-10
1847
FC JC
C 25
42.5N
300
12.4
21.9
30.8
33.8
22-04-10
1852
FC JC
C 25
42.5N
300
12.3
23.1
30.2
35.3
PH Unit 1 Lift 90
23-04-10
1857
FC JC
C 25
42.5N
300
12.8
22.1
30.6
34.8
03-05-10
1886
FC JC
C 25
42.5N
300
13.8
22.4
30.8
33.8
04-05-10
1889
FC JC
C 25
42.5N
300
16.2
28.7
36.1
40.1
08-05-10
1903
FC JC
C 25
42.5N
300
14.2
22.3
30.7
35.3
08-05-10
1904
FC JC
C 25
42.5N
300
14.5
24.0
31.6
34.2
11-05-10
1914
FC JC
C 25
42.5N
300
15.1
24.4
30.6
34.6
12-05-10
1918
FC JC
C 25
42.5N
300
14.4
22.2
30.2
34.0
14-05-10
1925
FC JC
C 25
42.5N
300
15.3
24.6
33.9
39.7
17-05-10
1932
FC JC
C 25
42.5N
300
13.0
22.4
29.9
33.6
20-05-10
1944
FC JC
C 25
42.5N
300
13.9
22.8
30.1
35.6
22-05-10
1950
FC JC
C 25
42.5N
300
13.8
22.3
30.3
34.2
PH Unit 1 Wall 62
23-05-10
1951
FC JC
C 25
42.5N
300
13.4
21.0
30.8
33.3
23-05-10
1952
FC JC
C 25
42.5N
300
13.3
21.1
29.9
32.1
24-05-10
1955
FC JC
C 25
42.5N
300
14.9
23.1
30.1
34.8
25-05-10
1959
FC JC
C 25
42.5N
300
13.3
22.2
30.1
34.6
PH Unit 5 Lift 61
25-05-10
1960
FC JC
C 25
42.5N
300
13.6
22.9
30.2
34.6
31-05-10
1980
FC JC
C 25
42.5N
300
13.7
22.3
30.3
35.4
01-06-10
1983
FC JC
C 25
42.5N
300
13.5
25.6
33.0
37.2
06-06-10
2001
FC JC
C 25
42.5N
300
14.1
23.8
30.2
34.8
07-06-10
2007
FC JC
C 25
42.5N
300
12.6
21.6
29.3
31.9
09-06-10
2010
FC JC
C 25
42.5N
300
14.6
26.4
33.5
39.4
09-06-10
2012
FC JC
C 25
42.5N
300
13.8
22.6
30.1
35.3
13-06-10
2033
FC JC
C 25
42.5N
300
14.8
23.6
29.8
34.3
14-06-10
2034
FC JC
C 25
42.5N
300
14.6
24.2
31.6
35.4
15-06-10
2039
FC JC
C 25
42.5N
300
13.8
23.6
30.1
34.3
Page 37
Summary of
SITE MATERIALS
LABORATORY
Sep-10
Date
Casted
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
28 days
90 days
Note
16-06-10
2043
FC JC
C 25
42.5N
300
15.2
22.4
29.2
31.5
19-06-10
2051
FC JC
C 25
42.5N
300
13.5
22.9
30.3
33.8
21-06-10
2058
FC JC
C 25
42.5N
300
14.8
23.6
30.0
36.8
28-06-10
2084
FC JC
C 25
42.5N
300
12.6
23.5
30.2
32.5
29-06-10
2089
FC JC
C 25
42.5N
300
13.3
26.6
33.4
36.3
05-07-10
2102
FC JC
C 25
42.5N
300
13.6
23.3
30.1
35.3
09-07-10
2112
FC JC
C 25
42.5N
300
15.4
26.3
35.8
40.0
11-07-10
2117
FC JC
C 25
42.5N
300
13.6
22.6
29.8
34.6
13-07-10
2124
FC JC
C 25
42.5N
300
12.9
21.2
29.3
33.3
15-07-10
2128
FC JC
C 25
42.5N
300
15.2
25.0
33.2
38.3
PH Unit 2 Lift 26
15-07-10
2130
FC JC
C 25
42.5N
300
14.3
23.1
31.3
35.6
16-07-10
2132
FC JC
C 25
42.5N
300
13.7
24.6
32.5
36.1
20-07-10
2142
FC JC
C 25
42.5N
300
13.5
23.1
29.7
33.7
21-07-10
2146
FC JC
C 25
42.5N
300
14.4
22.8
30.6
35.8
23-07-10
2153
FC JC
C 25
42.5N
300
12.9
22.5
29.1
32.7
24-07-10
2156
FC JC
C 25
42.5N
300
14.3
23.1
31.3
35.7
26-07-10
2164
FC JC
C 25
42.5N
300
13.8
22.6
30.0
35.8
03-08-10
2183
FC JC
C 25
42.5N
300
13.7
22.1
29.6
33.8
05-08-10
2194
FC JC
C 25
42.5N
300
14.2
22.8
30.6
34.9
17-08-10
2225
FC JC
C 25
42.5N
300
13.6
22.2
29.2
18-08-10
2226
FC JC
C 25
42.5N
300
16.2
26.6
33.7
20-08-10
2233
FC JC
C 25
42.5N
300
13.0
22.4
29.9
21-08-10
2237
FC JC
C 25
42.5N
300
13.3
21.9
29.9
21-08-10
2239
FC JC
C 25
42.5N
300
13.2
24.1
30.3
23-08-10
2245
FC JC
C 25
42.5N
300
13.9
23.6
30.3
25-08-10
2249
FC JC
C 25
42.5N
300
14.1
22.6
29.3
26-08-10
2255
FC JC
C 25
42.5N
300
13.8
24.8
34.8
27-08-10
2258
FC JC
C 25
42.5N
300
12.1
21.1
31.7
30-08-10
2262
FC JC
C 25
42.5N
300
14.0
25.6
33.0
Page 38
Summary of
SITE MATERIALS
LABORATORY
Sep-10
REV. 0
Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.
Date
Casted
PROJECT, UGANDA
28 days
Note
90 days
30-08-10
2263
FC JC
C 25
42.5N
300
13.9
22.4
30.6
30-08-10
2264
FC JC
C 25
42.5N
300
13.3
23.4
31.1
03-09-10
2279
FC JC
C 25
42.5N
300
14.1
22.2
30.3
05-09-10
2285
FC JC
C 25
42.5N
300
14.2
23.3
31.2
08-09-10
2293
FC JC
C 25
42.5N
300
12.3
24.5
32.0
PH Unit 2 Lift 91
09-09-10
2298
FC JC
C 25
42.5N
300
12.8
21.3
29.6
15-09-10
2309
FC JC
C 25
42.5N
300
12.5
23.4
30.6
S.Y. P3 INTERCONNECTION
FOUNDATION
18-09-10
2313
FC JC
C 25
42.5N
300
13.2
22.9
32.6
23-09-10
2327
FC JC
C 25
42.5N
300
14.3
23.6
32.1
25-09-10
2331
FC JC
C 25
42.5N
300
15.9
25.5
33.8
PH Unit 3 Lift 28
25-09-10
2333
FC JC
C 25
42.5N
300
13.8
22.1
30.2
PH Unit 3 Lift 28
26-09-10
2336
FC JC
C 25
42.5N
300
14.3
23.8
29.6
26-09-10
2337
FC JC
C 25
42.5N
300
12.2
22.9
29.6
29-09-10
2347
FC JC
C 25
42.5N
300
17.0
28.2
34.3
30-09-10
2349
FC JC
C 25
42.5N
300
12.8
21.9
29.4
30-09-10
2351
FC JC
C 25
42.5N
300
12.2
22.5
30.4
30.93
24.3
36.2
1.6
Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 25N/mm2
Actual Characteristic Strength of the mix =
Rck
= AVG - K x STD
28.8 N/mm2
K = 1.28
Page 39
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Sample
Concrete Cement Cement
Mix Type
(Kg/m3)
class
type
Ref.
7 days
28 days
90 days
Note
13-01-09
396
FC S
C 15
42.5N
250
12.3
24.2
33.3
38.0
DEN CON
17-01-09
401
FC S
C 15
42.5N
250
18.8
29.5
39.0
44.8
03-02-09
426
FC S
C 15
42.5N
250
9.7
24.9
34.1
40.7
SSW RRC
05-02-09
428
FC S
C 15
42.5N
250
11.2
26.6
35.5
38.9
07-02-09
432
FC S
C 15
42.5N
250
9.3
23.4
30.8
35.6
10-02-09
438
FC S
C 15
42.5N
250
11.1
24.2
32.6
34.4
14-02-09
446
FC S
C 15
42.5N
250
13.6
25.0
32.8
36.9
11-03-09
488
FC S
C 15
42.5N
250
11.6
23.1
30.6
35.5
20-03-09
501
FC S
C 15
42.5N
250
17.1
28.2
36.5
42.0
21-03-09
505
FC S
C 15
42.5N
250
18.0
23.8
28.4
32.2
24-03-09
508
FC S
C 15
42.5N
250
11.0
23.4
31.2
37.5
31-03-09
517
FC S
C 15
42.5N
250
10.2
21.1
28.0
32.0
31-03-09
516
FC S
C 15
42.5N
250
10.3
20.1
27.5
31.9
SSW RRC
07-04-09
530
FC S
C 15
42.5N
250
12.0
20.4
27.5
33.1
15-04-09
541A
FC S
C 15
42.5N
250
13.6
21.8
27.5
32.1
24-04-09
553
FC S
C 15
42.5N
250
10.5
22.8
28.6
33.2
28-04-09
563
FC S
C 15
42.5N
250
18.2
25.8
33.6
37.9
04-05-09
572
FC S
C 15
42.5N
250
12.7
22.7
31.1
36.0
14-05-09
597
FC S
C 15
42.5N
250
12.4
19.4
27.5
30.9
SSW RRC
20-05-09
607
FC S
C 15
42.5N
250
14.6
22.4
30.3
34.7
25-05-09
617
FC S
C 15
42.5N
250
14.3
23.7
29.5
33.7
26-05-09
619
FC S
C 15
42.5N
250
12.4
24.2
33.2
37.4
SSW RRC
02-06-09
631
FC S
C 15
42.5N
250
12.5
19.6
24.7
30.7
SSW RRC
11-06-09
649
FC S
C 15
42.5N
250
12.4
20.6
27.2
32.5
19-06-09
667
FC S
C 15
42.5N
250
11.5
22.2
29.7
36.3
SSW RRC
23-06-09
675
FC S
C 15
42.5N
250
12.0
22.1
30.6
34.1
SSW RRC
01-07-09
694
FC S
C 15
42.5N
250
11.6
22.5
27.5
30.5
11-11-09
1171
FC S
C 20
42.5N
250
12.8
20.7
27.1
32.0
12-11-09
1178
FC S
C 20
42.5N
250
12.9
20.8
27.9
33.8
16-11-09
1189
FC S
C 20
42.5N
250
11.1
19.5
26.6
30.8
18-11-09
1202
FC S
C 20
42.5N
250
11.9
19.5
28.0
33.4
21-11-09
1208
FC S
C 20
42.5N
250
11.7
21.0
26.3
30.7
02-12-09
1239
FC S
C 20
42.5N
250
11.4
18.1
25.5
28.1
11-01-10
1377
FC S
C 20
42.5N
250
12.6
20.9
26.5
30.3
23-01-10
1439
FC S
C 20
42.5N
250
11.3
20.8
26.7
APPRON BLINDING
G.SPILLWAY TAILRACE
APPRON BLINDING
G.SPILLWAY TAILRACE
APPRON BLINDING
G.SPILLWAY TAILRACE
APPRON BLINDIND
TEMPORARY BRIDGE LEFT
ABUTMENT
GATED SPILLWAY BLINDING
EXT.WALL A
Page 40
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
7 days
28 days
90 days
30.3
Note
11-01-10
1377
FC S
C 20
42.5N
250
12.6
20.9
27.0
23-01-10
1439
FC S
C 20
42.5N
250
11.3
20.8
27.0
04-02-10
1494
FC S
C 20
42.5N
250
12.3
19.8
26.0
29.6
16-02-10
1559
FC S
C 15
42.5N
250
12.6
20.8
26.0
30.6
23-02-10
1600
FC S
C 15
42.5N
250
9.8
16.6
21.0
24.0
10-03-10
1672
FC S
C 20
42.5N
250
11.3
19.6
25.0
29.8
APPRON BLINDING
13-03-10
1689
FC S
C 20
42.5N
250
12.1
23.4
27.0
33.9
APPRON SLAB
22-03-10
1727
FC S
C 20
42.5N
250
10.7
20.9
29.0
32.7
GATED SPILLWAY SB - S8
27-03-10
1751
FC S
C 20
42.5N
250
11.5
18.7
25.0
28.1
S.SPILLWAY BARRELS 10 - 11 - 12
PLAIN CONCRETE
29-03-10
1763
FC S
C 20
42.5N
250
10.4
18.8
24.0
29.9
APPRON SLAB
02-04-10
1786
FC S
C 20
42.5N
250
12.1
19.9
26.0
30.6
S.SPILLWAY BARRELS 13 - 14 - 15
06-08-10
2198
FC S
C 25
42.5N
250
12.0
19.2
25.0
29.6
21-08-10
2234
FC S
C 20
42.5N
250
9.8
18.3
25.0
G. SPILLWAY EXTENSION OF
GRANTRY BLINDING
20-09-10
2317
FC S
C 25
42.5N
250
9.3
16.7
23.0
25.43
21.0
29.0
1.9
Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 15N/mm2
Actual Characteristic Strength of the mix =
Rck AVG - K x STDV =
K = 1.28
<<Page 41>>
Summary of
SITE MATERIALS
LABORATORY
Sep-10
PROJECT, UGANDA
REV. 0
Date
Casted
Sample
Ref.
03-01-10
1340
FC R
C15
42.5N
250
15.8
06-01-10
1351
FC R
C 15
42.5N
250
07-01-10
1353
FC R
C 15
42.5N
11-01-10
1376
FC R
C 15
19-02-10
1584
FC R
25-02-10
1609
25-02-10
Mix Type
2 days 7 days
Note
28 days
90 days
26.6
34.0
40.0
11.7
19.9
26.0
250
13.8
21.2
26.0
42.5N
250
12.5
19.8
25.0
C 20
42.5N
250
12.8
22.8
31.0
37.3
FC R
C 20
42.5N
250
11.6
17.3
25.0
28.2
1611
FC R
C 20
42.5N
250
10.1
16.9
24.0
27.8
01-03-10
1627
FC R
C 20
42.5N
250
11.6
18.3
25.0
28.4
02-02-10
1482
FC R
C 20
42.5N
250
13.6
20.4
27.0
31.9
16-02-10
1563
FC R
C 20
42.5N
250
12.5
19.0
24.0
26.4
23-03-10
1728
FC R
C 20
42.5N
250
11.9
19.2
25.0
29.4
S.SPILLWAY BARRELS 4 - 5 - 6
02-04-10
1785
FC R
C 20
42.5N
250
10.8
17.9
25.0
29.3
APPRON RRC
06-04-10
1790
FC R
C 20
42.5N
250
10.6
19.0
27.0
29.3
S.Y.H.V.FOUND B. AXIS (O - P - 5 K)
(L - M - 2 - 3)
09-04-10
1798
FC R
C 20
42.5N
250
11.7
19.8
25.0
27.8
14-04-10
1821
FC R
C 20
42.5N
250
10.1
18.3
25.0
27.5
16-04-10
1829
FC R
C 20
42.5N
250
9.6
16.9
23.0
25.9
05-08-10
2191
FC R
C 20
42.5N
250
9.4
18.8
24.0
27.4
13-08-10
2216
FC R
C 20
42.5N
250
11.8
18.4
25.0
25.89
23.0
34.0
2.7
Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 15N/mm2
Actual Characteristic Strength of the mix =
Rck AVG - K x STD
22.5 N/mm2
K = 1.28
<<Page 42>>