You are on page 1of 43

SUMMARY OF CONCRETE STATISTICAL

SITE MATERIALS

(28 DAYS)

LABORATORY

CYLINDER

Cement Type: 42.5N

Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
380

C40

FC M6

64

CYLINDER

C35

FC IB

511

CYLINDER

C35

FC IB-7

44

CYLINDER

C30

STDV

Rck

N/mm2

N/mm2

N/mm2

45.28

2.6

42.0

AVERAGE STRENGTH STANDARD DEVATION CHARACTERISTIC STRENGTH


AVG

STDV

R k
Rck

N/mm2

N/mm2

N/mm2

38.01

2.2

35.2

AVERAGE STRENGTH STANDARD DEVATION CHARACTERISTIC STRENGTH


AVG

STDV

Rck

N/mm2

N/mm2

N/mm2

38 75
38.75

2.1

36.1

Cement Type: 42.5N

Cement
Number
Content Concrete
Mix Type
of
class
l
Samples
Kg/m3
300

AVG

y
Cement Type:
42.5N

Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
300

AVERAGE STRENGTH STANDARD DEVATION CHARACTERISTIC STRENGTH

Cement Type: 42.5N

Cement
Number
Content Concrete
Mi Type
T
Mix
off
class
Samples
Kg/m3
330

BUJAGALI HYDROELECTRIC POWER


PROJECT, UGANDA
REV. 0

FC IB-2

F
t t ELIAS H
For th
the contractor:
H.

242

AVERAGE STRENGTH STANDARD DEVATION CHARACTERISTIC STRENGTH


AVG

STDV

Rck

N/mm2

N/mm2

N/mm2

33.2

1.7

31.0

RcK = AVG - 1.28 x STDV

Page 2

SUMMARY OF CONCRETE STATISTICAL

SITE MATERIALS

(28 DAYS)

LABORATORY

CYLINDER

Cement Type: 42.5N

Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
310

C25

FC JC

103

CYLINDER

C20

FC S

14

CYLINDER

C20

AVG

STDV

Rck

N/mm2

N/mm2

N/mm2

30.9

1.6

28.9

AVERAGE STRENGTH STANDARD DEVIATION CHARACTERISTIC STRENGTH


AVG

STDV

Rck
R k

N/mm2

N/mm2

N/mm2

25.43

1.9

22.9

y
Cement Type:
42.5N

Cement
Number
Content Concrete
Mix Type
of
class
Samples
Kg/m3
250

AVERAGE STRENGTH STANDARD DEVATION CHARACTERISTIC STRENGTH

Cement Type: 42.5N

Cement
Number
Content Concrete
Mi Type
T
Mix
off
class
Samples
Kg/m3
250

BUJAGALI HYDROELECTRIC POWER


PROJECT, UGANDA
REV. 0

FC R

18

AVERAGE STRENGTH STANDARD DEVATION CHARACTERISTIC STRENGTH


AVG

STDV

Rck

N/mm2

N/mm2

N/mm2

25 89
25.89

2.7

22.5

R K = AVG - 1
RcK
1.28
28 x STDV

F the
For
th contractor:
t t ELIAS H.
H

Statistical Analysis From Jan 2010 to Sept 2010

60.0

50.0

40.0
St. Dev.

30.0

Minimum
Average

20.0

Maximum

10.0
Maximum
0.0

Average
FC S

FC IB 7

Minimum
FC IB 2
FC IB

St. Dev.

FC M6
FC JC
FC R

Page 4

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

Date
Casted

PROJECT, UGANDA
REV. 0

Sample
Concrete Cement Cement
Mix Type
type
(Kg/m3)
class
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days
54.8

Note

02-01-10

1334

FC M6

C 40

42.5N

380

25.4

38.6

47.8

PH Unit 1 Lift P4

12-01-10

1382

FC M6

C 40

42.5N

380

26.3

38.8

48.2

S.SPILLWAY BARRELS 1,2 LINING

15-01-10

1398

FC M6

C 40

42.5N

380

22.9

37.2

46.6

S.SPILLWAY BARRELS 7,8 LIFT 7

18-01-10

1409

FC M6

C 40

42.5N

380

23.6

39.2

50.9

S.SPILLWAY BARRELS 9,10 LIFT 7

19-01-10

1415

FC M6

C 40

42.5N

380

21.1

34.4

46.4

S.SPILLWAY BARRELS 11,12 LIFT 7

20-01-10

1423

FC M6

C 40

42.5N

380

24.0

38.6

47.4

S.SPILLWAY BARRELS 13,14 LIFT 7

21-01-10

1428

FC M6

C 40

42.5N

380

25.2

38.2

48.5

S.SPILLWAY BARRELS 15,16 LIFT 7

25-01-10

1453

FC M6

C 40

42.5N

380

24.6

33.7

46.0

25-01-10

1448

FC M6

C 40

42.5N

380

21.7

30.4

49.5

PH Unit 3 Lift P1

46.9

S.SPILLWAY PRECAST BEAM

01-02-10

1479

FC M6

C 40

42.5N

380

22.9

31.6

44.7

48.7

SIPHON SPILLWAY PRECAST


BEAM

18-02-10

1571

FC M6

C 40

42.5N

380

24.7

34.8

43.7

47.9

PH Unit 2 Lift P1

18-02-10

1577

FC M6

C 40

42.5N

380

25.0

35.1

44.0

50.6

PH Unit 2 Lift 16 Centre Wall

03-03-10

1638

FC M6

C 40

42.5N

380

22.2

34.6

44.0

51.4

GATED SPILLWAY SWC - A4 - C4

14-03-10

1692

FC M6

C 40

42.5N

380

22.9

34.8

43.5

47.0

PH Unit 2 Lift P3

15-03-10

1695

FC M6

C 40

42.5N

380

26.5

39.6

47.7

51.6

S.SPILLWAY BARRELS 1 - 4 LIFT 8

25-03-10

1742

FC M6

C 40

42.5N

380

22.2

36.3

42.5

48.8

S.SPILLWAY BARRELS 5 - 6 - 7 LIFT 8

01-04-10

1778

FC M6

C 40

42.5N

380

25.1

34.9

46.6

49.3

PH Unit 5 Lift 16C wall

17-04-10

1840

FC M6

C 40

42.5N

380

22.2

32.0

43.1

46.8

PH Unit 4 Lift P1

26-04-10

1869

FC M6

C 40

42.5N

380

23.5

33.4

42.7

46.8

PH Unit 4 Lift 18A

27-04-10

1871

FC M6

C 40

42.5N

380

27.1

36.9

44.6

49.8

PH Unit 3 Lift P3

27-04-10

1875

FC M6

C 40

42.5N

380

21.5

33.8

41.2

43.6

PH Unit 1 Lift P6

28-04-10

1877

FC M6

C 40

42.5N

380

22.2

35.6

43.2

46.2

PH Unit 3 Lift 17 Centre wall

04-05-10

1888

FC M6

C 40

42.5N

380

24.7

35.6

45.0

49.5

SIPHON SPILLWAY BARRELS 10, 11,


12, 13 LIFT 8

01-06-10

1985

FC M6

C 40

42.5N

380

23.8

33.6

44.4

49.8

PH Unit 3 Lift 18B

03-06-10

1991

FC M6

C 40

42.5N

380

25.8

36.7

50.6

57.2

PH Unit 1 Lift 8B

05-06-10

1997

FC M6

C 40

42.5N

380

24.5

36.3

41.6

50.9

PH Unit 2 P6A Centre

06-06-10

2000

FC M6

C 40

42.5N

380

27.0

37.2

46.1

53.2

PH Unit 1 Lift 9B

10-06-10

2013

FC M6

C 40

42.5N

380

24.1

33.1

42.1

50.8

PH Unit 3 Internal wall P3A, P4A &


P5A

15-06-10

2038

FC M6

C 40

42.5N

380

24.8

33.4

41.1

45.6

PH Unit 1 Lift P10

Page 5

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

Date
Casted

PROJECT, UGANDA
REV. 0

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

16-06-10

2041

FC M6

C 40

42.5N

380

25.8

37.5

47.3

55.3

PH Unit 5 P1

18-06-10

2046

FC M6

C 40

42.5N

380

24.6

32.2

43.7

47.6

PH Unit 1 Lift 92

19-06-10

2054

FC M6

C 40

42.5N

380

21.0

33.6

45.9

54.2

GATED SPILLWAY SWD- D1 WALL

21-06-10

2057

FC M6

C 40

42.5N

380

22.7

37.0

46.3

52.7

SIPHON SPILLWAY BARRELS 1 - 2 - 3


LIFT 18

25-06-10

2072

FC M6

C 40

42.5N

380

26.2

37.9

49.6

56.9

PH Unit 4 Lift P3B

30-06-10

2093

FC M6

C 40

42.5N

380

21.6

32.2

44.5

47.6

S.Y. CONTROL BUILDING DECK


A, B, C/1, 2, 3

01-07-10

2096

FC M6

C 40

42.5N

380

25.9

36.7

51.0

60.6

PH Unit 4 P4B

09-07-10

2111

FC M6

C 40

42.5N

380

23.4

32.8

44.0

50.3

PH Unit 2 lift P6

10-07-10

2113

FC M6

C 40

42.5N

380

24.8

33.3

42.7

48.5

PH Unit 3 P6A

18-07-10

2135

FC M6

C 40

42.5N

380

22.2

32.5

40.8

47.7

PH Unit 5 Lift 18A Centre wall

28-07-10

2170

FC M6

C 40

42.5N

380

25.1

37.6

48.6

59.9

PH Unit 2 Lift P8B

30-07-10

2180

FC M6

C 40

42.5N

380

23.9

32.1

43.3

50.4

PH Unit 1 Lift P12

04-08-10

2187

FC M6

C 40

42.5N

380

23.1

35.6

47.5

53.3

PH Unit 2 P9B

04-08-10

2189

FC M6

C 40

42.5N

380

24.8

33.7

44.9

48.7

PH Unit 1 Portion of Lift 29A

08-08-10

2201

FC M6

C 40

42.5N

380

25.5

35.6

43.7

50.9

PH Unit 1 Portion of Lift 29A

09-08-10

2204

FC M6

C 40

42.5N

380

24.3

37.1

48.0

GATED SPILLWAY SWC- WHEEL


GATE A4

11-08-10

2210

FC M6

C 40

42.5N

380

23.2

36.5

45.7

PH Unit 1 Lift 30A 3rd Portion

12-08-10

2211

FC M6

C 40

42.5N

380

23.4

32.7

43.3

PH Unit 5 Lift P3

14-08-10

2221

FC M6

C 40

42.5N

380

21.3

37.3

47.1

PH Unit 1 C/P for Lift 25A & wall 19


1st Portion

16-08-10

2222

FC M6

C 40

42.5N

380

23.8

34.6

42.6

G. SPILLWAY SWC- AS EMERGENCY


WHEEL GATE

18-08-10

2227

FC M6

C 40

42.5N

380

23.2

36.6

46.9

PH Unit 4 Lift 25A 1st Portion

19-08-10

2230

FC M6

C 40

42.5N

380

22.7

31.7

42.8

PH Unit 1 2nd Stage of contriliver


portion wall 18, 19 & Lift 29 - 30

19-08-10

2228

FC M6

C 40

42.5N

380

25.7

37.3

47.0

G. SPILLWAY SEW- 1 - 5
EMERGENCY WHEEL GATE

22-08-10

2241

FC M6

C 40

42.5N

380

25.3

36.1

44.5

PH Unit 1 Lift P13

25-08-10

2247A

FC M6

C 40

42.5N

380

23.8

34.6

41.6

PH Unit 1 Lift 30 AXIS 21

26-08-10

2252

FC M6

C 40

42.5N

380

21.3

31.4

41.8

PH Unit 1 3rd Stage of contrilever


portion Lift 29 & wall 19

27-08-10

2257

FC M6

C 40

42.5N

380

25.4

38.9

49.3

PH Unit 5 Lift P4B

30-08-10

2266

FC M6

C 40

42.5N

380

22.4

31.4

40.5

PH Unit 2 Lift P10

02-09-10

2274

FC M6

C 40

42.5N

380

27.8

35.7

44.8

PH Over gravity dam 3rd portion


cantilever wall 20 & Unit 1 lift 31A

Page 6

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

REV. 0

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Date
Casted

PROJECT, UGANDA

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

Note

90 days

02-09-10

2278

FC M6

C 40

42.5N

380

24.8

33.6

44.6

G. SPILLWAY SWD - A11 - B11 - C11

05-09-10

2284

FC M6

C 40

42.5N

380

24.2

34.6

43.0

PH Unit 1 Cantilever Portion lift 31


of Middle wall

06-09-10

2286

FC M6

C 40

42.5N

380

26.1

35.6

47.4

PH Unit 1Over gravity dam left wall

14-09-10

2305

FC M6

C 40

42.5N

380

23.4

33.9

43.2

PH Unit 5 Lift 20A

14-09-10

2306

FC M6

C 40

42.5N

380

21.3

37.4

47.5

PH Unit 3 P6

30-09-10

2350

FC M6

C 40

42.5N

380

27.0

36.2

44.9

PH Unit 2 Lift 29A Cantilever Lift C wall

45.18
40.5
51.0
2.6

Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 25N/mm2
Actual Characteristic Strength of the mix =
Rck

= AVG - K x STD

41.9 N/mm2

K = 1.28

If expected low percent value is 10%

For the contractor: ELIAS H.

Page 7

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Note

Date
Casted

Sample
Ref.

04-01-10

1343

FC IB

C 35

42.5N

330

17.2

30.1

39.1

GATED SPILLWAY SWB - A8, C8

06-01-10

1348

FC IB

C 35

42.5N

330

24.0

30.9

41.9

GATED SPILLWAY SWB - B2

08-01-10

1362

FC IB

C 35

42.5N

330

17.6

29.7

36.2

GATED SPILLWAY SWE - A7 - E7

10-01-10

1371

FC IB

C 35

42.5N

330

18.8

29.3

36.8

10-01-10

1373

FC IB

C 35

42.5N

330

18.1

29.8

38.4

GATED SPILLWAY SWB - D10

10-01-10

1374

FC IB

C 35

42.5N

330

17.7

30.5

41.8

S.SPILLWAY BARRELS 1,2 LIFT 4A

11-01-10

1380

FC IB

C 35

42.5N

330

18.3

29.6

38.0

12-01-10

1379

FC IB

C 35

42.5N

330

22.4

30.4

41.0

12-01-10

1378

FC IB

C 35

42.5N

330

23.3

31.3

43.0

51.4

APPRON SLAB

13-01-10

1384

FC IB

C 35

42.5N

330

19.6

28.8

36.5

44.4

PH Unit 5 Lift 15 - B4

13-01-10

1387

FC IB

C 35

42.5N

330

16.9

28.9

39.6

14-01-10

1395

FC IB

C 35

42.5N

330

17.1

27.6

36.4

14-01-10

1391

FC IB

C 35

42.5N

330

20.1

30.0

40.1

GATED SPILLWAY SWC - C2

14-01-10

1394

FC IB

C 35

42.5N

330

17.7

31.3

38.8

GATED SPILLWAY SLAB - NR.1

14-01-10

1393

FC IB

C 35

42.5N

330

17.3

29.6

40.6

45.6

APPRON SLAB

15-01-10

1396

FC IB

C 35

42.5N

330

16.0

29.4

37.1

42.8

PH Unit 3 Lift 15B4

16-01-10

1399

FC IB

C 35

42.5N

330

18.2

29.5

40.0

GATED SPILLWAY SWD - C1 - A

16-01-10

1402

FC IB

C 35

42.5N

330

20.0

30.8

41.8

S.S. BARREL 1 Lift 4A WALL

16-01-10

1403

FC IB

C 35

42.5N

330

19.0

32.2

44.5

S.SPILLWAY BARRELS 3,4 LIFT 4B

17-01-10

1406

FC IB

C 35

42.5N

330

20.8

31.0

43.8

18-01-10

1410

FC IB

C 35

42.5N

330

15.9

26.5

37.8

GATED SPILLWAY SWC - A2

19-01-10

1420

FC IB

C 35

42.5N

330

16.8

28.3

40.6

S.SPILLWAY BARRELS 3,4 LIFT 4A


WALL

20-01-10

1425

FC IB

C 35

42.5N

330

18.9

27.8

35.0

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

28 days

90 days

45.6

45.3

PH Unit 1 Lift 62 Wall Axis


17 - 18

PH Unit 1 Lift 64 Column axis 17


GATED SPILLWAY SWE - B7

S.S. BARRELS 1,2 LIFT 4A - 5A

44.8

50.5

40.5

PH Unit 1 Lift 64 Column axis 17

APPRON SLAB

PH UNIT 1 Lift 21A

20-01-10

1424

FC IB

C 35

42.5N

330

17.3

26.7

38.2

G.SPILLWAY SLAB UPSTREAM BTN.


WALL A&B

21-01-10

1426

FC IB

C 35

42.5N

330

16.1

25.4

38.4

G.SPILLWAY SLAB D/STREAM (SB SR)

22-01-10

1434

FC IB

C 35

42.5N

330

17.5

30.6

41.9

GATED SPILLWAY SWA - B11 - C11

22-01-10

1433

FC IB

C 35

42.5N

330

16.3

31.3

42.0

23-01-10

1435

FC IB

C 35

42.5N

330

20.2

28.5

38.9

23-01-10

1440

FC IB

C 35

42.5N

330

15.7

30.3

39.9

GATED SPILLWAY SWA - SBG

44.0

APPRON SLAB
GATED SPILLWAY SW - HL

23-01-10

1438

FC IB

C 35

42.5N

330

16.7

30.3

41.4

S.SPILLWAY BARRELS 1-2-5, 6, 2, 3 3, 4 LIFT 4A & 4B

25-01-10

1451

FC IB

C 35

42.5N

330

17.0

28.5

37.4

GATED SPILLWAY SB - 11

Page 8

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Note

Date
Casted

Sample
Ref.

25-01-10

1449

FC IB

C 35

42.5N

330

17.4

29.1

40.6

S.SPILLWAY BARRELS 7 - 8 LIFT 4A


& 5A

26-01-10

1458

FC IB

C 35

42.5N

330

17.5

26.6

37.9

GATED SPILLWAY SWA - BASE

26-01-10

1456

FC IB

C 35

42.5N

330

18.9

31.1

39.1

S.SPILLWAY BARRELS 4 - 5 & 9 - 10


LIFT 4A & 5A

27-01-10

1459

FC IB

C 35

42.5N

330

20.6

28.6

39.8

GATED SPILLWAY SWA - SBH

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

28 days

90 days

27-01-10

1461

FC IB

C 35

42.5N

330

15.7

27.5

36.3

S.SPILLWAY BARRELS 5 - 6 - 7, 7 - 8
LIFT 4B

28-01-10

1462

FC IB

C 35

42.5N

330

18.2

31.2

42.6

GATED SPILLWAY SWB - C9 - A9

28-01-10

1467

FC IB

C 35

42.5N

330

15.4

28.2

37.4

40.1

APPRON SLAB

39.8

PH UNIT 2 Lift 82B D/Stream


Slab

29-01-10

1468

FC IB

C 35

42.5N

330

17.6

28.7

36.6

29-01-10

1472

FC IB

C 35

42.5N

330

15.6

29.9

40.7

29-01-10

1471

FC IB

C 35

42.5N

330

16.3

27.1

37.6

30-01-10

1474

FC IB

C 35

42.5N

330

20.8

31.2

40.1

GATED SPILLWAY SWD - B1

30-01-10

1476

FC IB

C 35

42.5N

330

17.3

29.4

40.8

GATED SPILLWAY SWF - 7

01-02-10

1478

FC IB

C 35

42.5N

330

18.2

27.3

37.3

43.1

S.SPILLWAY BARRELS 1,2 LIFT 6A

01-02-10

1480

FC IB

C 35

42.5N

330

17.4

28.6

37.1

42.1

S.SPILLWAY BARRELS 11 - 12 LIFT


4A & 5A WALL

01-02-10

1477

FC IB

C 35

42.5N

330

18.2

27.0

36.4

40.5

CARPENTRY WORKSHOP PRECAST


BEAM

02-02-10

1485

FC IB

C 35

42.5N

330

17.2

29.6

40.4

45.2

GATED SPILLWAY SWH - 2

02-02-10

1486

FC IB

C 35

42.5N

330

16.5

28.4

37.1

44.9

GATED SPILLWAY SWA - SLAB


DOWNSTREAM

02-02-10

1484

FC IB

C 35

42.5N

330

16.7

28.6

38.6

43.3

S.SPILLWAY BARRELS 9 - 10, 10 - 11


LIFT 4B

02-02-10

1483

FC IB

C 35

42.5N

330

16.6

28.4

35.9

40.6

CARPENTRY WORKSHOP PRECAST


BEAM

03-02-10

1487

FC IB

C 35

42.5N

330

17.3

29.7

37.4

41.8

GATED SPILLWAY SWB - D10

GATED SPILLWAY SWA - SBH

43.7

APPRON SLAB

03-02-10

1488

FC IB

C 35

42.5N

330

16.2

28.7

38.3

42.8

CARPENTRY WORKSHOP PRECAST


BEAM

03-02-10

1490

FC IB

C 35

42.5N

330

16.5

28.8

38.8

43.8

SIPHON SPILLWAY PRECAST


BEAM

04-02-10

1493

FC IB

C 35

42.5N

330

17.8

26.8

37.1

41.9

GATED SPILLWAY SWA - A11

04-02-10

1496

FC IB

C 35

42.5N

330

16.5

27.7

38.6

43.5

S.SPILLWAY BARRELS 2 - 3, 11 - 12
LIFT 4A

04-02-10

1495

FC IB

C 35

42.5N

330

16.5

25.7

36.4

39.8

CARPENTRY WORKSHOP PRECAST


BEAM

05-02-10

1500

FC IB

C 35

42.5N

330

19.5

30.7

40.7

45.2

GATED SPILLWAY SWF - 8

05-02-10

1502

FC IB

C 35

42.5N

330

16.5

27.9

36.5

40.6

GATED SPILLWAY SWA - SB1

05-02-10

1499

FC IB

C 35

42.5N

330

16.7

26.7

36.2

40.3

CARPENTRY WORKSHOP PRECAST


BEAM

06-02-10

1508

FC IB

C 35

42.5N

330

17.4

27.3

36.6

42.9

GATED SPILLWAY SWE - A7 - C7

06-02-10

1510

FC IB

C 35

42.5N

330

18.6

28.3

39.3

45.4

S.SPILLWAY BARRELS 3-5 LIFT 6A

06-02-10

1507

FC IB

C 35

42.5N

330

17.4

27.5

38.9

45.8

CARPENTRY WORKSHOP PRECAST


BEAM

Page 9

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

06-02-10

1509

FC IB

C 35

42.5N

330

17.9

06-02-10

1512

FC IB

C 35

42.5N

330

07-02-10

1514

FC IB

C 35

42.5N

07-02-10

1515

FC IB

C 35

42.5N

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

27.9

38.1

46.8

APPRON SLAB

17.6

27.5

36.2

39.7

APPRON SLAB

330

23.6

30.1

40.6

46.6

PH Unit 1 Lift 22A&22B

330

17.8

29.6

40.8

47.3

S.SPILLWAY BARREL 1 LIFT 4B

07-02-10

1517

FC IB

C 35

42.5N

330

17.5

28.9

38.6

43.7

S.SPILLWAY BARRELS 11 - 12, 12 13 LIFT 4B

07-02-10

1516

FC IB

C 35

42.5N

330

16.9

28.8

39.6

45.4

CARPENTRY WORKSHOP PRECAST


BEAM

08-02-10

1519

FC IB

C 35

42.5N

330

15.9

26.6

36.1

39.4

GATED SPILLWAY SWF - 9-10

08-02-10

1521

FC IB

C 35

42.5N

330

17.3

29.4

40.8

46.1

S.SPILLWAY BARRELS 1 - 2 LIFT 6B


BAR. 7 - 5 LIFT 5

08-02-10

1518

FC IB

C 35

42.5N

330

16.5

27.0

36.8

41.9

CARPENTRY WORKSHOP PRECAST


BEAM

09-02-10

1526

FC IB

C 35

42.5N

330

16.3

28.0

36.3

41.8

GATED SPILLWAY SWE - B8

09-02-10

1527

FC IB

C 35

42.5N

330

16.9

29.6

39.9

45.1

S.SPILLWAY BARRELS 12 - 13, 14 15 LIFT 4A, 5A&4B

10-02-10

1531

FC IB

C 35

42.5N

330

16.8

27.2

38.0

44.6

GATED SPILLWAY SWA - J5

10-02-10

1533

FC IB

C 35

42.5N

330

17.0

30.1

42.6

48.1

S.SPILLWAY BARRELS 12 - 13 LIFT


4A & 5A

10-02-10

1534

FC IB

C 35

42.5N

330

18.2

30.6

43.2

46.8

S.SPILLWAY BARRELS 4 - 5 LIFT 6A

10-02-10

1532

FC IB

C 35

42.5N

330

15.5

29.1

36.8

40.8

CARPENTRY WORKSHOP PRECAST


BEAM

10-02-10

1530

FC IB

C 35

42.5N

330

17.0

28.8

39.2

46.3

APPRON SLAB

11-02-10

1537

FC IB

C 35

42.5N

330

18.1

27.0

35.5

41.6

GATED SPILLWAY SWA - SBJ

11-02-10

1543

FC IB

C 35

42.5N

330

16.6

27.3

36.3

41.9

GATED SPILLWAY SWB - A10-C10

11-02-10

1541

FC IB

C 35

42.5N

330

16.2

28.9

37.0

41.2

S.SPILLWAY BARRELS 2 - 3, 3 - 4
LIFT 6B

11-02-10

1538

FC IB

C 35

42.5N

330

17.3

28.3

37.8

43.6

CARPENTRY WORKSHOP PRECAST


BEAM

12-02-10

1544

FC IB

C 35

42.5N

330

18.6

26.9

36.4

41.1

GATED SPILLWAY SWH - H2

12-02-10

1546

FC IB

C 35

42.5N

330

16.6

28.3

37.8

41.9

S.SPILLWAY BARREL 1 LIFT 5A

12-02-10

1545

FC IB

C 35

42.5N

330

17.6

27.4

37.6

42.0

CARPENTRY WORKSHOP PRECAST


BEAM

13-02-10

1547

FC IB

C 35

42.5N

330

23.2

32.3

41.6

47.1

GATED SPILLWAY SWE - A9-C9

13-02-10

1553

FC IB

C 35

42.5N

330

17.8

28.6

38.7

44.9

S.SPILLWAY BARRELS 1 - 2, 3 - 4
LIFT 7A

13-02-10

1551

FC IB

C 35

42.5N

330

16.5

27.1

36.6

40.8

CARPENTRY WORKSHOP PRECAST


BEAM

13-02-10

1552

FC IB

C 35

42.5N

330

15.6

25.4

34.4

38.6

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

13-02-10

1549

FC IB

C 35

42.5N

330

16.9

27.2

39.3

43.9

APPRON SLAB

14-02-10

1555

FC IB

C 35

42.5N

330

16.0

28.9

37.1

41.3

GATED SPILLWAY SWA G - H1 WALL

15-02-10

1557

FC IB

C 35

42.5N

330

17.3

28.1

39.6

45.2

S. SPILLWAY BARRELS 13 - 14 LIFT


4A&5A

15-02-10

1556

FC IB

C 35

42.5N

330

18.2

27.0

36.8

40.4

CARPENTRY WORKSHOP PRECAST


BEAM

Page 10

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

16-02-10

1560

FC IB

C 35

42.5N

330

23.4

16-02-10

1562

FC IB

C 35

42.5N

330

17-02-10

1565

FC IB

C 35

42.5N

17-02-10

1567

FC IB

C 35

17-02-10

1569

FC IB

17-02-10

1566

17-02-10
18-02-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

32.2

43.0

48.4

GATED SPILLWAY SWC - A3-C3


WALL

15.7

26.6

36.6

41.3

S.SPILLWAY BARRELS 4 - 5, 5 - 6
LIFT 6B

330

17.0

28.3

38.6

43.4

GATED SPILLWAY SWA - H1

42.5N

330

17.9

27.1

37.7

41.6

GATED SPILLWAY SWA - D7-E7

C 35

42.5N

330

17.3

29.2

40.8

45.1

S.SPILLWAY BARREL 1 LIFT 5B

FC IB

C 35

42.5N

330

17.4

27.4

36.6

40.3

CARPENTRY WORKSHOP PRECAST


BEAM

1570

FC IB

C 35

42.5N

330

17.4

30.6

43.7

46.4

APPRON SLAB

1572

FC IB

C 35

42.5N

330

23.4

32.3

42.8

49.7

GATED SPILLWAY SWE - B9-1

18-02-10

1573

FC IB

C 35

42.5N

330

17.1

28.3

37.8

40.8

S.SPILLWAY BARRELS 9 - 10, 10 - 11


LIFT 5B

18-02-10

1574

FC IB

C 35

42.5N

330

16.9

27.6

37.1

41.6

CARPENTRY WORKSHOP PRECAST


BEAM

19-02-10

1580

FC IB

C 35

42.5N

330

17.0

28.8

39.6

44.4

GATED SPILLWAY SWA - C12

19-02-10

1582

FC IB

C 35

42.5N

330

16.0

26.4

38.4

42.1

S.SPILLWAY BARRELS 2 - 3 LIFT 6A

19-02-10

1581

FC IB

C 35

42.5N

330

15.6

28.4

37.8

41.5

CARPENTRY WORKSHOP PRECAST


BEAM

21-02-10

1590

FC IB

C 35

42.5N

330

18.7

28.2

37.6

44.6

GATED SPILLWAY SWE - D92

21-02-10

1591

FC IB

C 35

42.5N

330

17.8

27.7

36.2

42.5

GATED SPILLWAY SWB - C11

21-02-10

1588

FC IB

C 35

42.5N

330

20.4

32.9

43.3

50.8

S.SPILLWAY BARRELS 4C - 1 BAR. 1 2 LIFT 3C

21-02-10

1589

FC IB

C 35

42.5N

330

22.8

30.4

44.0

49.6

APPRON SLAB

22-02-10

1592

FC IB

C 35

42.5N

330

18.4

28.9

36.2

45.2

GATED SPILLWAY SWA - E&D LIFT 8

22-02-10

1595

FC IB

C 35

42.5N

330

16.5

27.3

37.4

40.3

GATED SPILLWAY SWA - K2

22-02-10

1596

FC IB

C 35

42.5N

330

16.3

28.1

38.4

41.2

S.SPILLWAY BARRELS 11 - 12, 13 14 LIFT 6A

23-02-10

1597

FC IB

C 35

42.5N

330

17.4

30.5

39.5

45.3

GATED SPILLWAY SWA - H1

23-02-10

1599

FC IB

C 35

42.5N

330

16.8

29.2

35.8

42.4

GATED SPILLWAY SWE - A & C10

23-02-10

1598

FC IB

C 35

42.5N

330

15.7

28.5

36.9

40.2

CARPENTRY WORKSHOP PRECAST


BEAM

23-02-10

1601

FC IB

C 35

42.5N

330

24.3

31.9

45.8

50.8

APPRON SLAB
S.SPILLWAY BARRELS 13 - 15 LIFT
5B

24-02-10

1604

FC IB

C 35

42.5N

330

17.0

28.8

37.5

43.4

25-02-10

1615

FC IB

C 35

42.5N

330

16.7

28.8

37.8

42.6

SIPHON SPILLWAY AXIS 13 LIFT 6A

25-02-10

1610

FC IB

C 35

42.5N

330

16.7

27.9

37.8

44.3

CARPENTRY WORKSHOP PRECAST


BEAM

25-02-10

1613

FC IB

C 35

42.5N

330

16.3

29.0

40.6

44.4

APPRON SLAB

26-02-10

1618

FC IB

C 35

42.5N

330

16.3

27.8

36.2

41.2

GATED SPILLWAY SWA - D9 - E9

26-02-10

1619

FC IB

C 35

42.5N

330

17.5

26.0

38.3

41.1

GATED SPILLWAY SWA - G3

26-02-10

1622

FC IB

C 35

42.5N

330

17.3

30.1

40.6

45.3

SIPHON SPILLWAY SS 1 - 4 C2

Page 11

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

26-02-10

1620

FC IB

C 35

42.5N

330

18.5

01-03-10

1628

FC IB

C 35

42.5N

330

02-03-10

1629

FC IB

C 35

42.5N

02-03-10

1637

FC IB

C 35

02-03-10

1634

FC IB

02-03-10

1635

02-03-10

1636

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

26.8

35.8

38.5

SIPHON SPILLWAY PRECAST


BEAM

17.7

28.2

37.8

41.5

SIPHON SPILLWAY AXIS 15 LIFT 6A

330

20.7

29.2

41.3

45.6

GATED SPILLWAY SWC - F1

42.5N

330

16.1

26.4

36.5

40.3

GATED SPILLWAY SWC - A4 - C4

C 35

42.5N

330

16.7

27.3

36.9

40.8

SIPHON SPILLWAY AXIS 21 LIFT 6A

FC IB

C 35

42.5N

330

17.2

28.4

38.6

43.4

SIPHON SPILLWAY AXIS 23 LIFT 5B

FC IB

C 35

42.5N

330

16.3

27.1

36.8

39.9

SIPHON SPILLWAY AXIS 27 LIFT 5B

02-03-10

1631

FC IB

C 35

42.5N

330

15.3

27.4

38.5

41.9

CARPENTRY WORKSHOP PRECAST


BEAM

03-03-10

1639

FC IB

C 35

42.5N

330

17.3

28.9

39.2

44.3

GATED SPILLWAY SWE - B10

03-03-10

1642

FC IB

C 35

42.5N

330

16.6

27.6

37.2

41.3

S.SPILLWAY BARRELS 3 - 4 LIFT 3C

04-03-10

1645

FC IB

C 35

42.5N

330

17.0

29.1

40.6

44.8

SIPHON SPILLWAY AXIS 27 LIFT 6A

05-03-10

1651

FC IB

C 35

42.5N

330

16.6

27.5

36.9

39.4

GATED SPILLWAY SWA - D10

05-03-10

1653

FC IB

C 35

42.5N

330

15.9

28.6

39.2

42.7

SIPHON SPILLWAY SS - 1 LIFT 5C

05-03-10

1650

FC IB

C 35

42.5N

330

15.9

27.8

36.8

39.0

APPRON SLAB

06-03-10

1655

FC IB

C 35

42.5N

330

16.8

27.6

38.4

43.6

GATED SPILLWAY SWA - K3

06-03-10

1657

FC IB

C 35

42.5N

330

16.8

27.1

37.6

42.2

GATED SPILLWAY SWA - F1

06-03-10

1656

FC IB

C 35

42.5N

330

16.7

28.5

39.4

44.1

CARPENTRY WORKSHOP PRECAST


BEAM

08-03-10

1662

FC IB

C 35

42.5N

330

17.3

28.3

37.8

43.1

SIPHON SPILLWAY AXIS 21 LIFT 7A

09-03-10

1664

FC IB

C 35

42.5N

330

17.3

27.3

36.9

39.3

GATED SPILLWAY SWC - B3

09-03-10

1667

FC IB

C 35

42.5N

330

16.2

28.1

38.8

41.1

SIPHON SPILLWAY AXIS 25 LIFT 6A

09-03-10

1665

FC IB

C 35

42.5N

330

17.3

27.8

37.4

40.7

CARPENTRY WORKSHOP PRECAST


BEAM

10-03-10

1668

FC IB

C 35

42.5N

330

20.3

27.8

36.2

39.9

GATED SPILLWAY G4 WALL

10-03-10

1671

FC IB

C 35

42.5N

330

16.2

27.8

37.3

41.4

SIPHON SPILLWAY AXIS 13 LIFT 6A

11-03-10

1674

FC IB

C 35

42.5N

330

16.7

28.0

37.6

40.7

GATED SPILLWAY SB - S9 SLAB

11-03-10

1676

FC IB

C 35

42.5N

330

17.3

28.8

38.2

45.6

GATED SPILLWAY SB - S9 SLAB

11-03-10

1679

FC IB

C 35

42.5N

330

15.6

28.7

38.6

41.4

SIPHON SPILLWAY AXIS 27 LIFT 6B

11-03-10

1678

FC IB

C 35

42.5N

330

15.1

29.0

39.8

42.5

APPRON SLAB

12-03-10

1681

FC IB

C 35

42.5N

330

16.2

27.3

37.1

40.6

GATED SPILLWAY SWE - A - C11


WALL

12-03-10

1684

FC IB

C 35

42.5N

330

16.6

27.3

39.4

43.8

SIPHON SPILLWAY AXIS 3 LIFT 7B 10B

14-03-10

1690

FC IB

C 35

42.5N

330

16.4

27.7

36.8

40.3

PH Unit 2 Lift P2

14-03-10

1691

FC IB

C 35

42.5N

330

15.3

27.2

37.6

41.8

SIPHON SPILLWAY SS - 1 LIFT 6A

Page 12

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

16-03-10

1697

FC IB

C 35

42.5N

330

18.0

17-03-10

1699

FC IB

C 35

42.5N

330

17-03-10

1702

FC IB

C 35

42.5N

17-03-10

1704

FC IB

C 35

42.5N

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

27.0

36.7

38.7

GATED SPILLWAY SWB - A - 11

20.7

28.1

36.3

39.1

GATED SPILLWAY SWB - B4

330

16.8

27.1

39.2

44.3

SIPHON SPILLWAY AXIS 13 LIFT 7A

330

15.4

26.0

36.6

39.4

APPRON SLAB

18-03-10

1707

FC IB

C 35

42.5N

330

17.0

26.4

36.1

39.9

SIPHON SPILLWAY SS - 1 LIFT 6B 6C

19-03-10

1710

FC IB

C 35

42.5N

330

20.4

31.3

38.6

41.6

GATED SPILLWAY SWA - D11 - E11

19-03-10

1714

FC IB

C 35

42.5N

330

20.7

30.8

38.7

41.2

APPRON SLAB

20-03-10

1718

FC IB

C 35

42.5N

330

21.5

32.8

40.8

44.8

GATED SPILLWAY SWC - D1

20-03-10

1721

FC IB

C 35

42.5N

330

15.8

26.6

36.1

39.9

GATED SPILLWAY SWA - H2

20-03-10

1719

FC IB

C 35

42.5N

330

17.0

28.3

36.9

40.3

SIPHON SPILLWAY AXIS 25 LIFT 6B

20-03-10

1720

FC IB

C 35

42.5N

330

19.0

30.9

36.9

41.2

SIPHON SPILLWAY AXIS 27 LIFT 7A

21-03-10

1723

FC IB

C 35

42.5N

330

16.9

28.4

37.2

41.6

GATED SPILLWAY SWB - B11

23-03-10

1729

FC IB

C 35

42.5N

330

17.2

29.8

38.6

43.5

PH Unit 4 Lift 58 Axis 5

24-03-10

1734

FC IB

C 35

42.5N

330

18.5

28.9

37.4

39.0

GATED SPILLWAY SWD - J1

24-03-10

1736

FC IB

C 35

42.5N

330

16.6

27.3

36.9

39.8

SIPHON SPILLWAY AXIS 29 LIFT 2A

25-03-10

1741

FC IB

C 35

42.5N

330

15.9

26.8

37.0

40.5

PH Unit 4 Lift 84

25-03-10

1738

FC IB

C 35

42.5N

330

20.3

27.2

41.6

46.2

GATED SPILLWAY SB - S8

25-03-10

1743

FC IB

C 35

42.5N

330

16.0

28.7

38.2

41.9

GATED SPILLWAY SWD - A2 - C2

26-03-10

1748

FC IB

C 35

42.5N

330

15.6

25.2

35.9

39.4

PH Unit 1 Lift 25B 1st Piece

26-03-10

1749

FC IB

C 35

42.5N

330

18.2

30.1

39.2

41.8

S.SPILLWAY BARRELS 5 - 6 - 7 LIFT


3C

26-03-10

1744

FC IB

C 35

42.5N

330

19.7

30.3

38.5

40.4

APPRON SLAB

26-03-10

1746

FC IB

C 35

42.5N

330

19.8

30.1

38.6

40.6

APPRON SLAB

27-03-10

1750

FC IB

C 35

42.5N

330

17.8

28.3

37.6

41.4

GATED SPILLWAY SWA - HA

27-03-10

1755

FC IB

C 35

42.5N

330

16.4

26.9

36.2

39.2

GATED SPILLWAY SWD - F - E - O

27-03-10

1756

FC IB

C 35

42.5N

330

17.2

28.3

39.8

44.1

SIPHON SPILLWAY AXIS 7 LIFT 7B 10B

28-03-10

1758

FC IB

C 35

42.5N

330

16.6

28.6

37.0

42.4

APPRON SLAB

29-03-10

1761

FC IB

C 35

42.5N

330

17.9

26.4

36.4

40.1

GATED SPILLWAY SWC - A5

30-03-10

1764

FC IB

C 35

42.5N

330

16.2

28.7

36.4

40.0

GATED SPILLWAY SB - S8

30-03-10

1767

FC IB

C 35

42.5N

330

16.2

27.1

36.8

40.3

GATED SPILLWAY SB - S8

30-03-10

1770

FC IB

C 35

42.5N

330

16.3

26.9

35.2

38.7

GATED SPILLWAY SWA - H3

30-03-10

1766

FC IB

C 35

42.5N

330

16.9

27.3

36.8

39.9

SIPHON SPILLWAY AXIS 31 LIFT 2A

Page 13

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

30-03-10

1768

FC IB

C 35

42.5N

330

16.1

31-03-10

1774

FC IB

C 35

42.5N

330

31-03-10

1772

FC IB

C 35

42.5N

01-04-10

1777

FC IB

C 35

01-04-10

1779

FC IB

02-04-10

1781

02-04-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

27.1

35.2

39.2

S. SPILLWAY PRECAST CLASS


A

14.6

26.8

35.7

39.7

S.SPILLWAY BARRELS 10 - 11 - 12
LIFT 3C

330

16.9

28.3

35.6

40.4

S. SPILLWAY PRECAST TYPE B

42.5N

330

20.3

29.8

40.3

44.5

GATED SPILLWAY SWD- B2

C 35

42.5N

330

19.8

29.9

38.2

42.2

GATED SPILLWAY SWA- K5 WALL

FC IB

C 35

42.5N

330

17.3

28.8

36.8

40.3

SIPHON SPILLWAY AXIS 19 LIFT 6B

1783

FC IB

C 35

42.5N

330

16.9

27.4

36.2

40.1

SIPHON SPILLWAY AXIS 11 LIFT 7B 10

06-04-10

1789

FC IB

C 35

42.5N

330

17.3

28.5

35.9

39.2

SIPHON SPILLWAY SS 1 LIFT 7A

07-04-10

1791

FC IB

C 35

42.5N

330

15.5

27.1

36.6

39.1

GATED SPILLWAY SWE- B11 WALL

07-04-10

1792

FC IB

C 35

42.5N

330

16.3

26.8

36.4

39.2

GATED SPILLWAY SWE- 1 - 2 WALL

08-04-10

1795

FC IB

C 35

42.5N

330

17.2

27.8

35.8

39.9

S.SPILLWAY BARRELS 7 - 8 SLAB

09-04-10

1796

FC IB

C 35

42.5N

330

14.5

26.1

35.5

39.5

GATED SPILLWAY SWA- 11 WALL

09-04-10

1801

FC IB

C 35

42.5N

330

15.0

28.5

35.4

39.8

S.SPILLWAY BARRELS 13 - 14 - 15,


3C SLAB

10-04-10

1807

FC IB

C 35

42.5N

330

15.7

27.5

36.1

40.0

GATED SPILLWAY SWA- A3 - C3

10-04-10

1806

FC IB

C 35

42.5N

330

15.9

26.7

36.0

39.2

APPRON SLAB

11-04-10

1808

FC IB

C 35

42.5N

330

16.0

27.1

36.6

39.4

GATED SPILLWAY SWA- H4

12-04-10

1810

FC IB

C 35

42.5N

330

15.7

28.0

38.8

43.5

GATED SPILLWAY SWB- D11 (STAGE


1)

12-04-10

1812

FC IB

C 35

42.5N

330

16.3

27.9

36.3

40.3

SIPHON SPILLWAY AXIS 31 LIFT 4A 5A

12-04-10

1813

FC IB

C 35

42.5N

330

16.2

27.0

35.9

39.1

APPRON SLAB

13-04-10

1816

FC IB

C 35

42.5N

330

16.4

27.7

35.9

40.6

S.SPILLWAY BARRELS 9 LIFT 3C

14-04-10

1817

FC IB

C 35

42.5N

330

17.6

25.9

35.8

37.6

GATED SPILLWAY SWC- B4 WALL


(STAGE 1)

14-04-10

1820

FC IB

C 35

42.5N

330

16.0

26.4

36.3

39.8

GATED SPILLWAY SWE- A & C)

15-04-10

1823

FC IB

C 35

42.5N

330

16.8

27.3

37.1

41.3

GATED SPILLWAY SWD- B3 WALL

15-04-10

1824

FC IB

C 35

42.5N

330

15.6

25.7

36.1

39.6

GATED SPILLWAY SWE- A & C)


WALL

15-04-10

1826

FC IB

C 35

42.5N

330

16.9

25.7

37.1

40.3

GATED SPILLWAY SWD- FE2 & F2


WALL

15-04-10

1825

FC IB

C 35

42.5N

330

16.8

27.8

38.8

42.3

SIPHON SPILLWAY AXIS 3 LIFT 7B 10B

15-04-10

1828

FC IB

C 35

42.5N

330

16.8

28.9

39.1

43.3

SIPHON SPILLWAY SS 1 LIFT 14A

16-04-10

1835

FC IB

C 35

42.5N

330

15.7

25.9

36.6

40.3

PH Unit 2 Lift 18B Slab

16-04-10

1831

FC IB

C 35

42.5N

330

15.5

25.3

37.1

41.0

GATED SPILLWAY SWA- L3

16-04-10

1834

FC IB

C 35

42.5N

330

16.3

27.7

40.1

44.6

GATED SPILLWAY SWD- B3 WALL

17-04-10

1839

FC IB

C 35

42.5N

330

15.3

26.2

38.6

41.4

SIPHON SPILLWAY AXIS 29 - 31 LIFT


5B - 6B

Page 14

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

17-04-10

1838

FC IB

C 35

42.5N

330

18.2

19-04-10

1843

FC IB

C 35

42.5N

330

19-04-10

1842

FC IB

C 35

42.5N

20-04-10

1848

FC IB

C 35

20-04-10

1845

FC IB

20-04-10

1846

21-04-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

28.8

35.8

39.0

APPRON SLAB

15.0

26.7

38.1

43.1

GATED SPILLWAY SWA- H5 WALL

330

17.4

26.8

38.1

42.3

SIPHON SPILLWAY AXIS 13 LIFT 7B 10B

42.5N

330

17.3

28.3

38.3

42.5

PH Unit 1 Lift 26

C 35

42.5N

330

16.1

26.0

38.6

42.9

SIPHON SPILLWAY AXIS 29 LIFT 17A

FC IB

C 35

42.5N

330

16.7

25.6

38.5

43.3

SIPHON SPILLWAY SS 1 LIFT 14C

1850

FC IB

C 35

42.5N

330

16.8

27.8

35.9

39.6

SIPHON SPILLWAY SWB - D11 2nd


PART WALL

22-04-10

1853

FC IB

C 35

42.5N

330

15.5

26.0

36.8

42.7

GATED SPILLWAY SWE- B12 WALL

23-04-10

1856

FC IB

C 35

42.5N

330

15.1

26.2

36.5

39.3

GATED SPILLWAY SWB- J4 WALL

23-04-10

1855

FC IB

C 35

42.5N

330

15.9

25.9

36.8

39.6

SIPHON SPILLWAY SS 1 LIFT 4D

24-04-10

1858

FC IB

C 35

42.5N

330

15.9

25.1

37.2

41.1

GATED SPILLWAY SWD- A4 - C4

24-04-10

1859

FC IB

C 35

42.5N

330

15.2

26.2

37.8

41.1

GATED SPILLWAY SWE-E & FF3

24-04-10

1860

FC IB

C 35

42.5N

330

16.3

27.1

36.9

40.6

GATED SPILLWAY SWB-B4 (2 POLE)


WALL

24-04-10

1862

FC IB

C 35

42.5N

330

15.8

26.0

36.5

40.8

GATED SPILLWAY SB- S8 SLAB

24-04-10

1861

FC IB

C 35

42.5N

330

16.6

27.8

38.7

41.6

SIPHON SPILLWAY SS 1 LIFT 14B

24-04-10

1864

FC IB

C 35

42.5N

330

16.3

28.3

39.3

43.8

SIPHON SPILLWAY SS 1 LIFT 10C 7B - 10B

25-04-10

1867

FC IB

C 35

42.5N

330

16.1

30.3

42.4

45.4

GATED SPILLWAY SB- S8 SLAB

25-04-10

1866

FC IB

C 35

42.5N

330

18.5

27.9

38.7

42.9

APPRON SLAB AWA - P1

25-04-10

1868

FC IB

C 35

42.5N

330

15.3

26.3

36.7

39.4

S. SPILLWAY PRECAST

27-04-10

1872

FC IB

C 35

42.5N

330

20.7

31.5

38.1

41.2

GATED SPILLWAY SWE- A & C 13


WALL

27-04-10

1873

FC IB

C 35

42.5N

330

19.7

29.5

35.7

41.7

GATED SPILLWAY SWC- J2 WALL

27-04-10

1874

FC IB

C 35

42.5N

330

17.8

27.0

35.4

39.9

SIPHON SPILLWAY SS 1 LIFT 14D

28-04-10

1876

FC IB

C 35

42.5N

330

18.4

30.4

36.8

41.8

GATED SPILLWAY SWD- B4 1 POUR


WALL

28-04-10

1878

FC IB

C 35

42.5N

330

18.0

30.0

37.7

41.8

SIPHON SPILLWAY SS 1 LIFT 5D

29-04-10

1880

FC IB

C 35

42.5N

330

23.6

30.9

37.1

42.6

APPRON SLAB AWA - P1

30-04-10

1881

FC IB

C 35

42.5N

330

17.6

27.1

36.5

37.8

GATED SPILLWAY SWE- A6 - C6


WALL

30-04-10

1883

FC IB

C 35

42.5N

330

16.8

26.6

35.6

39.8

GATED SPILLWAY SWE- B13 WALL

02-05-10

1885

FC IB

C 35

42.5N

330

15.8

26.1

36.0

39.8

GATED SPILLWAY SWD- FF4 - FE4

04-05-10

1887

FC IB

C 35

42.5N

330

15.8

26.1

36.1

39.5

PH Unit 4 Lift 18 left side wall

04-05-10

1890

FC IB

C 35

42.5N

330

17.3

28.0

39.2

43.4

SIPHON SPILLWAY AXIS 13 LIFT 10 1

05-05-10

1892

FC IB

C 35

42.5N

330

15.8

25.9

36.2

40.3

GATED SPILLWAY SWC- D1 WALL

Page 15

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

05-05-10

1893

FC IB

C 35

42.5N

330

15.1

07-05-10

1898

FC IB

C 35

42.5N

330

07-05-10

1897

FC IB

C 35

42.5N

08-05-10

1905

FC IB

C 35

08-05-10

1906

FC IB

08-05-10

1901

09-05-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

25.8

36.3

38.5

SIPHON SPILLWAY BARREL 1 SS 1


LIFT 14E, 14F, 14H

19.6

29.1

39.0

42.6

GATED SPILLWAY SWC- J3 WALL

330

18.8

27.1

35.9

41.4

SIPHON SPILLWAY BARREL SS 1-2


LIFT 6D

42.5N

330

15.4

25.2

35.8

37.9

GATED SPILLWAY SWE- A14 - C14


WALL

C 35

42.5N

330

16.3

29.4

35.9

40.0

GATED SPILLWAY SB- S1.2 SLAB


WALL

FC IB

C 35

42.5N

330

15.1

28.9

37.4

40.7

APPRON AWA - Q2 & AWA P2


WALL

1907

FC IB

C 35

42.5N

330

16.8

27.7

36.9

40.4

SIPHON SPILLWAY AXIS 31 LIFT 5A &


6A

10-05-10

1909

FC IB

C 35

42.5N

330

15.3

25.7

37.5

41.7

PH Unit 3 Lift 18B

10-05-10

1910

FC IB

C 35

42.5N

330

15.8

25.9

36.4

40.4

PH Unit 1 Lift P7B

10-05-10

1908

FC IB

C 35

42.5N

330

17.5

27.5

35.5

39.5

SIPHON SPILLWAY BARRELS 7 - 8


LIFT 4B & 5B

11-05-10

1912

FC IB

C 35

42.5N

330

16.4

27.3

36.8

39.3

GATED SPILLWAY SWA- I3 WALL

11-05-10

1913

FC IB

C 35

42.5N

330

17.8

27.1

37.5

41.2

GATED SPILLWAY SWD- A5 - C5


WALL

11-05-10

1915

FC IB

C 35

42.5N

330

15.9

26.2

35.9

40.7

GATED SPILLWAY SWB- J5

11-05-10

1916

FC IB

C 35

42.5N

330

16.1

26.9

35.9

40.5

GATED SPILLWAY SWB- B5

12-05-10

1919

FC IB

C 35

42.5N

330

15.8

26.9

37.1

43.2

SIPHON SPILLWAY AXIS 17 BARRELS


9 - 10 LIFT 4A & 5A

13-05-10

1920

FC IB

C 35

42.5N

330

14.7

26.3

37.0

42.8

GATED SPILLWAY SWE- B14 WALL

14-05-10

1924

FC IB

C 35

42.5N

330

15.6

28.3

36.7

38.7

SIPHON SPILLWAY BARREL 1 SS 1


LIFT 7D

14-05-10

1923

FC IB

C 35

42.5N

330

14.7

25.4

36.8

40.7

APPRON AWA - O1 & N1


WALL

15-05-10

1926

FC IB

C 35

42.5N

330

19.2

27.5

35.7

38.8

GATED SPILLWAY SWC- F2 WALL

15-05-10

1927

FC IB

C 35

42.5N

330

21.8

30.7

38.2

41.7

GATED SPILLWAY SWC- A7 - C7


WALL

15-05-10

1928

FC IB

C 35

42.5N

330

18.5

27.1

39.2

44.8

SIPHON SPILLWAY AXIS 17 BARRELS


9 - 10 LIFT 4B & 5B

16-05-10

1929

FC IB

C 35

42.5N

330

14.5

26.9

36.2

40.7

GATED SPILLWAY SWC- J4 WALL

17-05-10

1933

FC IB

C 35

42.5N

330

18.8

32.7

40.1

45.6

SIPHON SPILLWAY AXIS 17 BARRELS


7 - 8 LIFT 4A & 5A

17-05-10

1930

FC IB

C 35

42.5N

330

19.2

27.7

37.5

40.5

APPRON AWA - N2 & O2


WALL

18-05-10

1935

FC IB

C 35

42.5N

330

20.6

31.0

43.8

51.7

GATED SPILLWAY SWD- J2 - F2


WALL

18-05-10

1934

FC IB

C 35

42.5N

330

16.8

27.1

38.3

42.8

SIPHON SPILLWAY AXIS 21 LIFT 10

18-05-10

1936

FC IB

C 35

42.5N

330

19.4

27.9

35.7

38.2

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM SWD S5

18-05-10

1937

FC IB

C 35

42.5N

330

15.1

25.5

37.5

41.9

S. SPILLWAY PRECAST B2 2PQ

19-05-10

1940

FC IB

C 35

42.5N

330

17.2

28.5

37.0

42.1

APPRON AWA - N2 WALL

20-05-10

1941

FC IB

C 35

42.5N

330

20.1

30.2

43.5

46.9

GATED SPILLWAY SWA- L4 - 14


WALL

20-05-10

1943

FC IB

C 35

42.5N

330

15.0

25.1

36.7

40.5

GATED SPILLWAY SWB- B6 - WALL

Page 16

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

21-05-10

1945

FC IB

C 35

42.5N

330

15.9

21-05-10

1946

FC IB

C 35

42.5N

330

22-05-10

1947

FC IB

C 35

42.5N

22-05-10

1948

FC IB

C 35

23-05-10

1954

FC IB

24-05-10

1956

25-05-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

25.8

35.8

39.5

GATED SPILLWAY SWC- F3 - WALL

15.4

27.3

35.8

40.2

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 4

330

20.5

27.5

36.4

40.4

GATED SPILLWAY SWD- A6 - C6


WALL

42.5N

330

16.8

26.4

37.4

42.3

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 5

C 35

42.5N

330

16.4

27.2

37.4

42.8

GATED SPILLWAY SWD- FG1

FC IB

C 35

42.5N

330

20.7

29.9

37.7

42.3

GATED SPILLWAY SWD- J3 - F3


WALL

1958

FC IB

C 35

42.5N

330

15.5

26.8

37.0

40.6

GATED SPILLWAY SWB- F5 - WALL

25-05-10

1961

FC IB

C 35

42.5N

330

15.8

26.8

37.3

41.8

SIPHON SPILLWAY AXIS 17 LIFT 6A

25-05-10

1963

FC IB

C 35

42.5N

330

18.2

33.3

40.6

46.9

SIPHON SPILLWAY SS 1 LIFT 12C

25-05-10

1962

FC IB

C 35

42.5N

330

19.8

30.9

40.6

48.1

APPRON AWA - S1 & V1


WALL

26-05-10

1967

FC IB

C 35

42.5N

330

15.3

27.2

37.2

41.6

GATED SPILLWAY SWC- B4 - WALL

26-05-10

1965

FC IB

C 35

42.5N

330

20.5

30.6

40.2

44.9

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D1 - S5

27-05-10

1971

FC IB

C 35

42.5N

330

15.1

30.2

37.9

45.2

PH Unit 2 Slab 87

27-05-10

1969

FC IB

C 35

42.5N

330

18.8

30.1

37.6

39.6

GATED SPILLWAY SWC- D2 - WALL

27-05-10

1970

FC IB

C 35

42.5N

330

17.3

28.8

37.9

42.4

SIPHON SPILLWAY AXIS SS 1 LIFT


12C

28-05-10

1972

FC IB

C 35

42.5N

330

20.0

30.9

39.2

46.5

GATED SPILLWAY SWC- F4 - WALL

28-05-10

1974

FC IB

C 35

42.5N

330

20.3

30.9

37.5

42.4

GATED SPILLWAY SWD- FG2 - FH1

28-05-10

1975

FC IB

C 35

42.5N

330

18.3

27.4

38.8

42.4

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 4

29-05-10

1979

FC IB

C 35

42.5N

330

16.0

25.6

36.3

40.9

PH Unit 2 Lift 21B

29-05-10

1976

FC IB

C 35

42.5N

330

16.3

25.9

35.9

40.5

GATED SPILLWAY SWC- A8 - C8


WALL

29-05-10

1977

FC IB

C 35

42.5N

330

20.8

29.7

36.3

41.6

GATED SPILLWAY SWC- G1 - WALL

29-05-10

1978

FC IB

C 35

42.5N

330

16.8

27.6

39.5

44.6

SIPHON SPILLWAY SS 1 LIFT 8A & 10

01-06-10

1982

FC IB

C 35

42.5N

330

18.5

27.1

35.3

43.5

GATED SPILLWAY SWC- G2 - WALL

01-06-10

1984

FC IB

C 35

42.5N

330

19.8

31.2

43.2

47.0

APPRON AWA - A WALL

02-06-10

1986

FC IB

C 35

42.5N

330

15.1

26.8

33.4

36.2

GATED SPILLWAY SWC- J5 - WALL

02-06-10

1987

FC IB

C 35

42.5N

330

15.4

28.3

36.9

39.9

GATED SPILLWAY SWB- F6

03-06-10

1990

FC IB

C 35

42.5N

330

15.3

26.1

37.1

39.7

PH Unit 3 Balance 18B

03-06-10

1989

FC IB

C 35

42.5N

330

19.8

30.5

37.1

41.6

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 4

04-06-10

1994

FC IB

C 35

42.5N

330

16.9

36.1

37.4

43.8

GATED SPILLWAY SWD- J4 - F4


WALL

04-06-10

1995

FC IB

C 35

42.5N

330

20.3

32.0

40.7

44.0

GATED SPILLWAY SWD- A7 - C7


WALL

04-06-10

1993

FC IB

C 35

42.5N

330

16.4

26.9

35.9

42.2

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 5

Page 17

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

04-06-10

1996

FC IB

C 35

42.5N

330

19.3

05-06-10

1998

FC IB

C 35

42.5N

330

06-06-10

1999

FC IB

C 35

42.5N

06-06-10

2002

FC IB

C 35

06-06-10

2003

FC IB

07-06-10

2004

07-06-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

31.9

39.8

47.2

APPRON AWA - K2, V2, S2


WALL

16.3

26.9

36.8

40.3

SIPHON SPILLWAY SS 1 LIFT 8D

330

17.6

25.3

36.1

40.5

PH Unit 2 Lift 22 A&B

42.5N

330

20.6

28.2

35.1

41.0

GATED SPILLWAY SWC- F5 WALL

C 35

42.5N

330

15.9

26.9

36.8

42.2

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 4

FC IB

C 35

42.5N

330

17.0

25.3

35.8

40.2

GATED SPILLWAY SWA- L5 - I 5


WALL

2005

FC IB

C 35

42.5N

330

16.4

25.3

35.5

38.2

GATED SPILLWAY SWB- B7 - F7


WALL

09-06-10

2009

FC IB

C 35

42.5N

330

20.2

29.1

36.3

41.2

GATED SPILLWAY SWC- D3 WALL

09-06-10

2011

FC IB

C 35

42.5N

330

17.6

29.3

38.6

44.1

GATED SPILLWAY SWD- SB - S11


SLAB

10-06-10

2015

FC IB

C 35

42.5N

330

17.9

29.6

37.4

42.8

PH Unit 3 P5B

10-06-10

2014

FC IB

C 35

42.5N

330

18.0

28.1

35.5

43.2

GATED SPILLWAY SWC- A9 - C9


WALL

10-06-10

2017

FC IB

C 35

42.5N

330

15.8

27.7

35.9

40.7

GATED SPILLWAY SWC- K1 WALL

10-06-10

2016

FC IB

C 35

42.5N

330

16.0

25.6

37.4

41.3

APPRON AWA - W2, 12

11-06-10

2022

FC IB

C 35

42.5N

330

18.7

31.3

41.8

47.2

PH Unit 3 Lift 19B

11-06-10

2020

FC IB

C 35

42.5N

330

15.4

27.6

35.9

42.0

GATED SPILLWAY SWD- F5 WALL

11-06-10

2019

FC IB

C 35

42.5N

330

17.3

28.2

37.6

42.4

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 5

12-06-10

2026

FC IB

C 35

42.5N

330

17.4

27.2

37.9

40.1

GATED SPILLWAY SWC- B5 WALL

12-06-10

2030

FC IB

C 35

42.5N

330

15.1

25.5

36.4

39.2

GATED SPILLWAY SWD- B4 2nd


POURING WALL

12-06-10

2025

FC IB

C 35

42.5N

330

16.5

27.2

38.8

43.6

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 4

12-06-10

2031

FC IB

C 35

42.5N

330

16.5

27.8

36.1

40.6

APPRON AWA - X1, Z1

13-06-10

2032

FC IB

C 35

42.5N

330

16.5

26.5

35.5

40.0

GATED SPILLWAY SWC- K2

15-06-10

2035

FC IB

C 35

42.5N

330

21.9

31.1

40.0

45.4

GATED SPILLWAY SWB- B8 - F8

15-06-10

2037

FC IB

C 35

42.5N

330

15.2

26.0

37.6

41.4

GATED SPILLWAY SWD- A8 - C8


WALL

15-06-10

2036

FC IB

C 35

42.5N

330

15.0

26.6

37.3

40.6

CARPENTRY WORKSHOP GATED


SPILLWAY BEAM D/S - 4

17-06-10

2044

FC IB

C 35

42.5N

330

23.8

31.0

39.9

46.3

GATED SPILLWAY SWD- J5 WALL

18-06-10

2045

FC IB

C 35

42.5N

330

15.9

26.9

37.2

40.0

PH Unit 4 Lift 18B

19-06-10

2048

FC IB

C 35

42.5N

330

21.9

31.0

38.8

45.4

PH Unit 2 wall P7A

19-06-10

2050

FC IB

C 35

42.5N

330

17.8

28.8

36.8

42.3

GATED SPILLWAY SWB- G - 1

19-06-10

2053

FC IB

C 35

42.5N

330

17.9

28.8

39.1

44.6

SIPHON SPILLWAY BARRELS 7 - 8


LIFT 6A

19-06-10

2052

FC IB

C 35

42.5N

330

17.8

30.1

37.2

45.2

APPRON AWA - X2, Z2 WALL

21-06-10

2056

FC IB

C 35

42.5N

330

16.9

28.4

37.0

41.8

GATED SPILLWAY SWC- H1, L1, J1


WALL

Page 18

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

22-06-10

2060

FC IB

C 35

42.5N

330

17.2

22-06-10

2059

FC IB

C 35

42.5N

330

22-06-10

2061

FC IB

C 35

42.5N

22-06-10

2063

FC IB

C 35

22-06-10

2062

FC IB

23-06-10

2066

23-06-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

25.9

35.8

40.0

PH Unit 4 Lift 87

18.7

26.5

35.4

41.6

GATED SPILLWAY SWB- G2 WALL

330

15.9

25.7

37.4

39.9

GATED SPILLWAY SWC- G3 - K3

42.5N

330

19.2

33.0

40.6

46.7

GATED SPILLWAY SWC- A10 - C10


WALL

C 35

42.5N

330

18.3

29.5

38.8

44.5

SIPHON SPILLWAY BARREL 8 LIFT


6B

FC IB

C 35

42.5N

330

15.3

28.1

35.6

40.0

GATED SPILLWAY SWC- H2 - L2 - I 2

2067

FC IB

C 35

42.5N

330

16.8

27.3

37.8

42.6

S. SPILLWAY PRECAST TYPE A


2

25-06-10

2071

FC IB

C 35

42.5N

330

19.8

29.9

39.0

46.1

PH Unit 2 Lift 25B

25-06-10

2073

FC IB

C 35

42.5N

330

16.0

26.4

36.4

40.4

APPRON AWA - Q3, P3

26-06-10

2075

FC IB

C 35

42.5N

330

16.3

25.6

38.0

41.2

GATED SPILLWAY SWB- L1 - J1

26-06-10

2076

FC IB

C 35

42.5N

330

16.6

27.2

38.7

42.5

S. SPILLWAY PRECAST TYPE B

27-06-10

2079

FC IB

C 35

42.5N

330

19.5

27.8

35.9

42.3

PH Unit 2 Lift 25B 1st Piece

27-06-10

2080

FC IB

C 35

42.5N

330

19.7

28.1

37.0

42.5

PH Unit 2 Lift 6B

27-06-10

2077

FC IB

C 35

42.5N

330

20.9

29.7

37.9

44.2

GATED SPILLWAY SWC- A4

27-06-10

2078

FC IB

C 35

42.5N

330

20.7

29.7

37.8

42.4

GATED SPILLWAY SWC- B6 WALL

28-06-10

2081

FC IB

C 35

42.5N

330

16.2

26.6

37.5

40.1

GATED SPILLWAY SWD- A9 - C9


WALL

28-06-10

2082

FC IB

C 35

42.5N

330

16.8

26.8

35.1

39.9

GATED SPILLWAY SWC- G4 - K4

29-06-10

2088

FC IB

C 35

42.5N

330

20.1

32.4

39.9

45.6

PH Unit 2 Internal wall P8A, P9A,


P10A

29-06-10

2086

FC IB

C 35

42.5N

330

17.4

26.4

35.1

41.5

GATED SPILLWAY SWB- J2 - I 2

29-06-10

2087

FC IB

C 35

42.5N

330

17.8

29.8

37.4

43.2

GATED SPILLWAY SWC- F6

30-06-10

2095

FC IB

C 35

42.5N

330

18.7

31.5

36.2

44.9

PH Unit 1 Oil water seperator wall

30-06-10

2094

FC IB

C 35

42.5N

330

16.2

27.0

35.6

39.6

GATED SPILLWAY SWB- B9

30-06-10

2090

FC IB

C 35

42.5N

330

20.2

28.9

36.3

43.2

APPRON AWA - M3, O3

02-07-10

2097

FC IB

C 35

42.5N

330

17.9

28.2

36.1

41.4

GATED SPILLWAY SWD- B5

02-07-10

2098

FC IB

C 35

42.5N

330

15.4

25.9

35.2

40.1

GATED SPILLWAY SWC- H3 - L3 - I 3

02-07-10

2099

FC IB

C 35

42.5N

330

18.9

29.3

38.6

42.9

S. SPILLWAY PRECAST TYPE B

05-07-10

2103

FC IB

C 35

42.5N

330

17.1

32.2

41.4

48.2

APPRON AWA - Q4, P4

06-07-10

2104

FC IB

C 35

42.5N

330

17.2

25.3

36.8

39.3

GATED SPILLWAY SWD- D2

08-07-10

2108

FC IB

C 35

42.5N

330

16.0

25.9

35.4

40.7

GATED SPILLWAY SWC- D5 WALL

08-07-10

2109

FC IB

C 35

42.5N

330

16.6

26.8

38.4

42.8

GATED SPILLWAY SWC- G5 - K5

09-07-10

2110

FC IB

C 35

42.5N

330

15.9

27.5

36.1

42.6

APPRON AWA - R3, H3


Page 19

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

10-07-10

2114

FC IB

C 35

42.5N

330

19.4

12-07-10

2119

FC IB

C 35

42.5N

330

12-07-10

2120

FC IB

C 35

42.5N

13-07-10

2121

FC IB

C 35

13-07-10

2122

FC IB

13-07-10

2123

14-07-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

31.9

39.6

47.5

GATED SPILLWAY SWC- H4 - L4 - I 4

15.0

26.8

35.4

39.9

PH Unit 2 Lift 89

330

15.9

25.7

37.8

39.0

APPRON

42.5N

330

20.5

28.0

38.0

42.4

GATED SPILLWAY SWD- B6 - F6

C 35

42.5N

330

17.7

29.5

35.2

38.9

GATED SPILLWAY SWB- G3

FC IB

C 35

42.5N

330

16.8

29.3

38.4

43.1

GATED SPILLWAY SWD- A10 - C10

2126

FC IB

C 35

42.5N

330

16.3

26.6

35.0

37.5

PH Unit 4 P5

14-07-10

2125

FC IB

C 35

42.5N

330

17.5

25.5

38.2

41.7

GATED SPILLWAY SWB- L3 - J3

15-07-10

2127

FC IB

C 35

42.5N

330

15.5

26.8

35.9

39.6

PH Unit 2 Lift 26

15-07-10

2129

FC IB

C 35

42.5N

330

18.3

31.2

39.9

44.5

GATED SPILLWAY SWC- B7 - F7

16-07-10

2133

FC IB

C 35

42.5N

330

16.9

32.8

42.7

48.4

PH Unit 2 Lift P7B

17-07-10

2134

FC IB

C 35

42.5N

330

15.0

27.2

35.4

40.8

GATED SPILLWAY SWC- H5 - L5 - I 5

19-07-10

2137

FC IB

C 35

42.5N

330

16.7

25.5

35.5

37.6

GATED SPILLWAY SWC- A11 - C11


WALL

19-07-10

2138

FC IB

C 35

42.5N

330

16.8

26.5

35.3

38.3

APPRON AWA - S3, V3

19-07-10

2136

FC IB

C 35

42.5N

330

15.4

27.0

35.7

42.9

SLAB TEMPORARY BRIDGE 1st


POUR

20-07-10

2143

FC IB

C 35

42.5N

330

15.1

25.3

35.3

39.4

PH Unit 3 wall P7A

20-07-10

2141

FC IB

C 35

42.5N

330

18.2

29.2

36.9

40.9

GATED SPILLWAY SWB- G4 WALL


SLAB

21-07-10

2147

FC IB

C 35

42.5N

330

15.9

25.3

38.7

41.2

GATED SPILLWAY SWB- B10

22-07-10

2148

FC IB

C 35

42.5N

330

16.6

27.8

36.3

39.9

PH Unit 3 Lift 25B First Piece

22-07-10

2149

FC IB

C 35

42.5N

330

16.6

27.5

37.2

41.4

GATED SPILLWAY SWB- L4 - I 4

22-07-10

2150

FC IB

C 35

42.5N

330

17.3

29.6

38.0

42.7

APPRON AWA - N4, O4

23-07-10

2152

FC IB

C 35

42.5N

330

18.5

26.7

35.4

37.6

GATED SPILLWAY SWD- B7 - F7


WALL

24-07-10

2155

FC IB

C 35

42.5N

330

19.1

28.1

36.4

41.9

PH Unit 3 Lift 25B 2nd Piece

24-07-10

2154

FC IB

C 35

42.5N

330

18.9

27.9

36.0

40.5

GATED SPILLWAY SWB- G5 WALL

25-07-10

2161

FC IB

C 35

42.5N

330

15.2

26.1

37.1

40.8

ERECT BAY SLAB CONTROL


BUILDING LEVEL 1103

25-07-10

2157

FC IB

C 35

42.5N

330

18.0

37.2

35.8

39.4

GATED SPILLWAY SWD- G1 - K1

25-07-10

2158

FC IB

C 35

42.5N

330

18.2

26.0

36.7

39.6

GATED SPILLWAY SWC- D6 WALL

25-07-10

2160

FC IB

C 35

42.5N

330

15.6

25.3

37.1

39.8

APPRON AWA - R4, V4

25-07-10

2159

FC IB

C 35

42.5N

330

15.2

25.0

35.5

38.6

SLAB TEMPORARY BRIDGE 2nd


POUR

27-07-10

2165

FC IB

C 35

42.5N

330

16.1

25.8

37.4

41.3

GATED SPILLWAY SWB- L5 - I 5

27-07-10

2166

FC IB

C 35

42.5N

330

16.0

26.9

38.2

41.8

GATED SPILLWAY SWC- B5 - F8

Page 20

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Date
Casted

Sample
Ref.

28-07-10

2172

FC IB

C 35

42.5N

330

15.0

28-07-10

2171

FC IB

C 35

42.5N

330

30-07-10

2177

FC IB

C 35

42.5N

30-07-10

2179

FC IB

C 35

31-07-10

2181

FC IB

03-08-10

2185

03-08-10

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

29.0

36.5

39.2

ERECT BAY ACCESS AREA SLAB


AXIS 25 - 26

15.2

29.2

36.1

40.5

GATED SPILLWAY SWD- G2 - K2

330

19.5

27.3

35.1

40.5

GATED SPILLWAY SWD- F8 - B8

42.5N

330

18.3

26.1

36.8

39.7

APPRON AWA - A3, W3

C 35

42.5N

330

20.9

25.3

36.8

40.6

PH Unit 1 Lift P12

FC IB

C 35

42.5N

330

16.1

25.7

36.2

40.4

PH Unit 4 P5A Wall

2182

FC IB

C 35

42.5N

330

16.4

26.7

36.3

38.9

GATED SPILLWAY SWD- D3 WALL

03-08-10

2184

FC IB

C 35

42.5N

330

15.9

25.6

35.4

39.3

GATED SPILLWAY SWD- B11

04-08-10

2188

FC IB

C 35

42.5N

330

16.8

27.3

38.4

43.6

PH Unit 2 P9B

05-08-10

2190

FC IB

C 35

42.5N

330

15.3

26.5

35.7

40.6

GATED SPILLWAY SWC- B9

05-08-10

2192

FC IB

C 35

42.5N

330

15.7

26.9

37.6

44.9

GATED SPILLWAY SWD- H1 - I 1 - J1

05-08-10

2193

FC IB

C 35

42.5N

330

16.6

29.8

36.4

43.0

APPRON AWA - S3, Z3

06-08-10

2199

FC IB

C 35

42.5N

330

16.8

30.1

36.9

45.6

GATED SPILLWAY SWD- B9 WALL

06-08-10

2200

FC IB

C 35

42.5N

330

15.9

26.5

35.8

40.9

GATED SPILLWAY SWD- H2 - L2 - I 2

08-08-10

2203

FC IB

C 35

42.5N

330

20.0

28.1

35.2

41.5

PH Unit 3 wall P8A, P9A & P10A

08-08-10

2202

FC IB

C 35

42.5N

330

19.2

27.4

35.1

40.4

GATED SPILLWAY SWD- D7 WALL

10-08-10

2206

FC IB

C 35

42.5N

330

16.5

25.2

37.2

PH Unit 4 Lift 21B

10-08-10

2207

FC IB

C 35

42.5N

330

19.9

25.4

37.6

GATED SPILLWAY SWC- B10

12-08-10

2212

FC IB

C 35

42.5N

330

17.2

29.4

38.6

PH Unit 5 Lift P3

13-08-10

2215

FC IB

C 35

42.5N

330

15.3

25.7

37.5

PH Unit 1 Lift wall 31, 32, & 20 wall

13-08-10

2214

FC IB

C 35

42.5N

330

15.6

25.8

36.5

GATED SPILLWAY SWD- B10

14-08-10

2219

FC IB

C 35

42.5N

330

15.1

25.4

35.6

APPRON AWD - Q1, P1 WALL

17-08-10

2223

FC IB

C 35

42.5N

330

15.5

26.7

37.6

PH Unit 5 P5A Wall

17-08-10

2224

FC IB

C 35

42.5N

330

16.8

31.5

36.7

GATED SPILLWAY SWC- D8

19-08-10

2229

FC IB

C 35

42.5N

330

15.7

27.0

37.1

APPRON AWD - Q2, P2

20-08-10

2232

FC IB

C 35

42.5N

330

15.7

29.4

37.7

PH Tailrace wall

20-08-10

2231

FC IB

C 35

42.5N

330

16.1

27.5

35.6

GATED SPILLWAY SWD- D4

21-08-10

2235

FC IB

C 35

42.5N

330

15.9

25.1

36.2

PH Unit 4 Lift 22A & 22B

21-08-10

2236

FC IB

C 35

42.5N

330

19.7

26.3

40.4

GATED SPILLWAY SWC- B11

22-08-10

2240

FC IB

C 35

42.5N

330

23.8

31.1

41.0

PH Unit 3 Lift 92

23-08-10

2242

FC IB

C 35

42.5N

330

21.3

32.0

39.6

PH Unit 3 Lift P6B

Page 21

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Note

Date
Casted

Sample
Ref.

23-08-10

2243

FC IB

C 35

42.5N

330

15.1

26.6

37.2

PH Unit 5 Lift 89

23-08-10

2244

FC IB

C 35

42.5N

330

15.7

27.2

36.2

GATED SPILLWAY SWD- K3 - H3

24-08-10

2247

FC IB

C 35

42.5N

330

16.4

25.2

35.0

ERECT BAY ACCESS AREA

25-08-10

2248

FC IB

C 35

42.5N

330

16.2

27.3

35.4

APPRON KEY PART 1

26-08-10

2251

FC IB

C 35

42.5N

330

17.3

28.6

37.3

PH Unit 5 Lift 18B 1st Pouring

26-08-10

2253

FC IB

C 35

42.5N

330

16.3

26.9

36.2

PH Unit 5 Lift 18B

26-08-10

2254

FC IB

C 35

42.5N

330

19.2

33.1

41.0

PH Unit 2 Lift 28

26-08-10

2256

FC IB

C 35

42.5N

330

16.5

29.5

36.2

GATED SPILLWAY SWC- D9

27-08-10

2259

FC IB

C 35

42.5N

330

19.5

30.6

45.4

PH Unit 5 Lift 18B last Pouring

27-08-10

2260

FC IB

C 35

42.5N

330

19.7

30.7

45.5

APPRON KEY SLAB PART 2

28-08-10

2261

FC IB

C 35

42.5N

330

16.5

27.2

35.1

GATED SPILLWAY SWD- L3 - J3

30-08-10

2267

FC IB

C 35

42.5N

330

15.8

26.9

37.2

PH Unit 2 Lift P10

30-08-10

2265

FC IB

C 35

42.5N

330

16.2

27.4

38.1

APPRON KEY SLAB PART 2

31-08-10

2269

FC IB

C 35

42.5N

330

17.6

28.3

39.2

PH Unit 5 Lift 90 Column axis 5

31-08-10

2270

FC IB

C 35

42.5N

330

16.8

25.1

36.6

PH Unit 4 Lift 26

31-08-10

2268

FC IB

C 35

42.5N

330

18.5

27.9

35.8

GATED SPILLWAY SWD - D5

31-08-10

2271

FC IB

C 35

42.5N

330

18.4

26.9

36.8

GATED SPILLWAY SFW- 2 - 4

01-09-10

2272

FC IB

C 35

42.5N

330

16.7

27.3

38.1

PH Unit 4 Lift 26

01-09-10

2273

FC IB

C 35

42.5N

330

16.5

27.1

35.4

PH Tailrace wall lift 27, 28, 30, 31,


34, 36, & 37

02-09-10

2276

FC IB

C 35

42.5N

330

20.4

32.5

40.0

PH Unit 5 Lift P7A

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

28 days

90 days

02-09-10

2275

FC IB

C 35

42.5N

330

21.3

33.9

39.7

G. SPILLWAY SFW- (1 - 6)
EMERGENCY WHEEL GATE

02-09-10

2277

FC IB

C 35

42.5N

330

16.7

25.1

37.7

G. SPILLWAY SWD - A11 - B11 - C11

03-09-10

2280

FC IB

C 35

42.5N

330

15.3

29.9

39.6

GATED SPILLWAY SFW- 2 - 5

04-09-10

2281

FC IB

C 35

42.5N

330

18.3

30.2

42.7

PH Tailrace wall Foundation

05-09-10

2283

FC IB

C 35

42.5N

330

21.3

31.4

41.7

PH Unit 5 Lift 19B

05-09-10

2282

FC IB

C 35

42.5N

330

21.6

29.5

42.3

G. SPILLWAY SWD- K4 - H4 - L4 - J4
WALL

06-09-10

2287

FC IB

C 35

42.5N

330

15.4

31.1

38.3

APPRON AWD - M1, O1

07-09-10

2288

FC IB

C 35

42.5N

330

19.9

31.4

38.5

PH Unit 5 Lift P5B

07-09-10

2290

FC IB

C 35

42.5N

330

21.5

29.5

42.4

PH Unit 3 Lift 27

07-09-10

2289

FC IB

C 35

42.5N

330

22.7

30.7

41.0

GATED SPILLWAY SWD - D10

08-09-10

2291

FC IB

C 35

42.5N

330

22.7

30.1

42.2

PH Unit 1 P14 Wall & 2 Columns

Page 22

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Note

Date
Casted

Sample
Ref.

08-09-10

2292

FC IB

C 35

42.5N

330

23.1

31.0

41.8

GATED SPILLWAY SWD - L4 - I 4

08-09-10

2294

FC IB

C 35

42.5N

330

16.5

27.6

35.5

GATED SPILLWAY SFW- 1 - 7

09-09-10

2296

FC IB

C 35

42.5N

330

21.8

31.2

39.7

PH Unit 5 Lift P9A - P10A

09-09-10

2297

FC IB

C 35

42.5N

330

16.5

28.8

35.8

PH Tailrace wall lift 50, 64

09-09-10

2295

FC IB

C 35

42.5N

330

21.7

30.6

41.4

GATED SPILLWAY SWD - D6

11-09-10

2299

FC IB

C 35

42.5N

330

22.2

30.8

42.9

G. SPILLWAY GRANTRY CRANE RAIL


EXT. SLAB CENTRAL EMBANKMENT

12-09-10

2300

FC IB

C 35

42.5N

330

19.8

28.0

36.3

PH Unit 2 Lift 29

12-09-10

2301

FC IB

C 35

42.5N

330

19.7

29.3

37.1

APPRON AWA - M2, O2

13-09-10

2302

FC IB

C 35

42.5N

330

22.2

30.5

43.0

PH Unit 2 Lift 23

13-09-10

2303

FC IB

C 35

42.5N

330

22.1

30.8

44.3

GATED SPILLWAY SFW- 2 - 6

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

28 days

90 days

13-09-10

2304

FC IB

C 35

42.5N

330

16.8

27.5

38.7

GATED SPILLWAY SWD- K - G - L - I 5

15-09-10

2307

FC IB

C 35

42.5N

330

18.3

32.0

43.8

PH Unit 4 Lift P7A

15-09-10

2310

FC IB

C 35

42.5N

330

17.0

26.2

37.3

GATED SPILLWAY SFW- 1 - 7

15-09-10

2308

FC IB

C 35

42.5N

330

18.5

28.4

36.0

APPRON WALL LIFT Q, R


FOUNDATION

16-09-10

2311

FC IB

C 35

42.5N

330

16.7

27.7

36.6

APPRON LIFT AWD - S1, W1

18-09-10

2314

FC IB

C 35

42.5N

330

17.3

30.5

40.6

PH Unit 4 Lift 27

18-09-10

2315

FC IB

C 35

42.5N

330

18.0

31.8

43.9

GATED SPILLWAY SWD - D7

18-09-10

2312

FC IB

C 35

42.5N

330

16.5

27.1

35.7

APPRON LIFT AWD - R1


(PARTIAL) V1

19-09-10

2316

FC IB

C 35

42.5N

330

22.1

31.4

42.7

APPRON AWD - N2, R2

20-09-10

2318

FC IB

C 35

42.5N

330

16.8

30.1

41.1

G. SPILLWAY SFW- 2 - 7 FRONT


WALL

20-09-10

2319

FC IB

C 35

42.5N

330

17.1

30.5

41.2

APPRON WALL AWD

21-09-10

2320

FC IB

C 35

42.5N

330

16.1

25.7

37.8

GATED SPILLWAY GANTRY RAIL


EXTENTION

22-09-10

2321

FC IB

C 35

42.5N

330

16.6

26.9

35.3

PH Unit 3 Lift 23

22-09-10

2322

FC IB

C 35

42.5N

330

16.9

27.8

38.9

PH Unit 2 Lift 19A Cantilever 1st


Phase

22-09-10

2323

FC IB

C 35

42.5N

330

17.4

30.6

41.9

GATED SPILLWAY SWC - D11

22-09-10

2324

FC IB

C 35

42.5N

330

16.9

30.6

41.8

APPRON AWD - X2, T2

23-09-10

2325

FC IB

C 35

42.5N

330

20.9

32.4

37.6

PH Unit 1 Lift P15

23-09-10

2329

FC IB

C 35

42.5N

330

17.7

31.6

41.8

G/DAM BLOCK "A" LIFT 13

23-09-10

2326

FC IB

C 35

42.5N

330

21.0

30.6

37.2

G. SPILLWAY SFW- 1 - 7 & 8 PARTIAL

23-09-10

2328

FC IB

C 35

42.5N

330

15.1

27.4

37.4

GATED SPILLWAY EXTENTION


APRON

23-09-10

2329A

FC IB

C 35

42.5N

330

16.4

27.7

38.3

APPRON AWD - O3, M3


Page 23

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Rc, maturation at NORMAL WATER


CURING (MPa)

Note

Date
Casted

Sample
Ref.

25-09-10

2332

FC IB

C 35

42.5N

330

16.3

29.7

39.2

PH Unit 5 Lift 91

25-09-10

2330

FC IB

C 35

42.5N

330

18.8

26.3

35.1

GATED SPILLWAY SWD - D8

26-09-10

2335

FC IB

C 35

42.5N

330

22.4

31.9

43.1

PH Unit 3 P7B

26-09-10

2334

FC IB

C 35

42.5N

330

16.3

28.3

37.5

GATED SPILLWAY GRANTRY


EXTENTION 2nd PHASE

26-09-10

2338

FC IB

C 35

42.5N

330

15.2

31.3

40.2

G. SPILLWAY SWD - Z1 - U1 APRON

26-09-10

2339

FC IB

C 35

42.5N

330

15.4

30.2

38.9

APPRON AWD - S2, W2

27-09-10

2340

FC IB

C 35

42.5N

330

21.4

30.6

42.1

GATED SPILLWAY SFW- 1 - 10

28-09-10

2343

FC IB

C 35

42.5N

330

18.5

30.9

39.4

PH Unit 5 Lift 25B 1st POUR

28-09-10

2341

FC IB

C 35

42.5N

330

15.3

25.1

35.8

GATED SPILLWAY SFW- 2 - 8

28-09-10

2342

FC IB

C 35

42.5N

330

18.4

31.2

40.2

GATED SPILLWAY SWD - G3

Concrete Cement Cement


Mix Type
class
type
(Kg/m3)

2 days 7 days

28 days

90 days

28-09-10

2344

FC IB

C 35

42.5N

330

16.6

25.2

37.8

GATED SPILLWAY PRECAST DOWN


STREAM BRIDGE

28-09-10

2345

FC IB

C 35

42.5N

330

15.4

30.8

40.1

APPRON AWD - T1

28-09-10

2346

FC IB

C 35

42.5N

330

16.1

30.8

41.9

APPRON AWD - M2, L3

29-09-10

2348

FC IB

C 35

42.5N

330

16.6

31.6

41.2

PH Unit 5 Lift P8A - P9A

30-09-10

2352

FC IB

C 35

42.5N

330

16.7

28.5

37.1

PH Unit 2 Lift 92

37.96
33.4
45.8
2.2

Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 25N/mm2
Actual Characteristic Strength of the mix =
Rck

= AVG - K x STDV

35.2 N/mm2

K = 1.28

If expected low percent value is 10%

For the contractor: ELIAS H.

Page 24

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

02-01-10

1332

FC IB-7

C 35

42.5N

300

17.3

29.3

38.5

41.9

03-01-10

1338

FC IB-7

C 35

42.5N

300

17.9

29.4

37.6

42.2

CARPENTRY WORKSHOP BEAM

CARPENTRY WORKSHOP BEAM

04-01-10

1341

FC IB-7

C 35

42.5N

300

15.4

29.1

37.1

41.8

CARPENTRY WORKSHOP PRECAST


BEAM

05-01-10

1345

FC IB-7

C 35

42.5N

300

15.3

26.3

38.5

43.6

CARP. WORKSHOP PRECAST BEAM


& DUCT CABLE

07-01-10

1357

FC IB-7

C 35

42.5N

300

16.8

29.2

38.1

43.0

CARPENTRY WORKSHOP PRECAST


BEAM

08-01-10

1363

FC IB-7

C 35

42.5N

300

16.5

28.4

37.9

43.4

CARPENTRY WORKSHOP PRECAST


BEAM

09-01-10

1366

FC IB-7

C 35

42.5N

300

14.6

26.5

36.9

39.2

CARPENTRY WORKSHOP PRECAST


BEAM

11-01-10

1375

FC IB-7

C 35

42.5N

300

15.5

27.6

38.8

44.4

CARPENTRY WORKSHOP PRECAST


BEAM

12-01-10

1381

FC IB-7

C 35

42.5N

300

15.7

27.8

37.4

44.1

CARPENTRY WORKSHOP PRECAST


BEAM

13-01-10

1385

FC IB-7

C 35

42.5N

300

16.3

28.7

37.8

43.6

CARPENTRY WORKSHOP PRECAST


BEAM

14-01-10

1390

FC IB-7

C 35

42.5N

300

15.8

28.3

38.4

42.8

CARPENTRY WORKSHOP PRECAST


BEAM

15-01-10

1397

FC IB-7

C 35

42.5N

300

17.4

29.2

37.4

40.9

CARPENTRY WORKSHOP PRECAST


BEAM

16-01-10

1401

FC IB-7

C 35

42.5N

300

16.8

26.7

38.5

40.2

CARPENTRY WORKSHOP PRECAST


BEAM

17-01-10

1407

FC IB-7

C 35

42.5N

300

17.9

26.7

38.4

41.9

CARPENTRY WORKSHOP PRECAST


BEAM

18-01-10

1408

FC IB-7

C 35

42.5N

300

19.7

28.0

38.3

44.8

CARPENTRY WORKSHOP PRECAST


BEAM

19-01-10

1414

FC IB-7

C 35

42.5N

300

15.8

27.9

35.5

39.2

CARPENTRY WORKSHOP PRECAST


BEAM

19-01-10

1413

FC IB-7

C 35

42.5N

300

16.8

28.8

39.6

44.9

APPRON SLAB

40.8

CARPENTRY WORKSHOP PRECAST


BEAM

20-01-10

1421

FC IB-7

C 35

42.5N

300

16.3

28.4

38.5

21-01-10

1427

FC IB-7

C 35

42.5N

300

16.4

28.2

36.9

22-01-10

1431

FC IB-7

C 35

42.5N

300

17.8

28.6

39.0

44.3

CARPENTRY WORKSHOP PRECAST


BEAM

22-01-10

1432

FC IB-7

C 35

42.5N

300

16.6

30.1

39.7

43.8

APPRON SLAB

23-01-10

1437

FC IB-7

C 35

42.5N

300

18.7

28.5

38.1

41.9

CARPENTRY WORKSHOP PRECAST


BEAM

24-01-10

1443

FC IB-7

C 35

42.5N

300

16.5

27.5

37.8

43.4

CARPENTRY WORKSHOP PRECAST


BEAM

24-01-10

1444

FC IB-7

C 35

42.5N

300

17.2

30.6

40.8

46.5

APPRON SLAB

25-01-10

1447

FC IB-7

C 35

42.5N

300

16.5

27.9

37.0

41.8

CARPENTRY WORKSHOP PRECAST


BEAM

26-01-10

1454

FC IB-7

C 35

42.5N

300

18.1

28.6

39.2

48.6

CARPENTRY WORKSHOP PRECAST


BEAM

27-01-10

1460

FC IB-7

C 35

42.5N

300

15.9

28.4

37.3

41.1

CARPENTRY WORKSHOP PRECAST


BEAM

28-01-10

1463

FC IB-7

C 35

42.5N

300

16.6

27.5

37.0

40.1

CARPENTRY WORKSHOP PRECAST


BEAM

28-01-10

1465

FC IB-7

C 35

42.5N

300

15.7

27.7

38.0

42.7

APPRON SLAB

G.SPILLWAY SLAB DOWN STREAM


(SB - 15-12)

29-01-10

1469

FC IB-7

C 35

42.5N

300

15.3

27.9

37.2

41.6

CARPENTRY WORKSHOP PRECAST


BEAM

20-02-10

1585

FC IB-7

C 35

42.5N

300

23.8

30.5

44.6

48.0

PH Unit 2 Lift 82A

Page 25

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Rc, maturation at NORMAL WATER


CURING (MPa)

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

2 days 7 days

28 days

90 days

Note

20-02-10

1587

FC IB-7

C 35

42.5N

300

19.0

30.1

39.9

46.2

APPRON SLAB

24-02-10

1602

FC IB-7

C 35

42.5N

300

18.3

29.1

40.4

45.7

APPRON SLAB

25-02-10

1612

FC IB-7

C 35

42.5N

300

17.9

26.7

36.1

39.5

APPRON SLAB

25-02-10

1616

FC IB-7

C 35

42.5N

300

23.4

32.7

43.0

48.1

APPRON SLAB

04-03-10

1646

FC IB-7

C 35

42.5N

300

16.9

28.9

39.3

44.9

APPRON SLAB

18-03-10

1709

FC IB-7

C 35

42.5N

300

20.8

33.1

43.1

46.6

APPRON SLAB

19-03-10

1712

FC IB-7

C 35

42.5N

300

16.9

28.8

37.6

43.8

APPRON SLAB

25-03-10

1737

FC IB-7

C 35

42.5N

300

17.3

29.3

38.8

42.4

GATED SPILLWAY SB - S8

26-03-10

1745

FC IB-7

C 35

42.5N

300

18.2

29.6

40.3

44.4

APPRON SLAB

30-03-10

1765

FC IB-7

C 35

42.5N

300

16.7

27.0

37.3

40.1

GATED SPILLWAY SB - S8

10-04-10

1804

FC IB-7

C 35

42.5N

300

16.3

27.2

37.4

41.3

APPRON SLAB

17-04-10

1836

FC IB-7

C 35

42.5N

300

16.3

26.5

39.7

43.6

APPRON SLAB

25-04-10

1865

FC IB-7

C 35

42.5N

300

24.2

32.4

45.0

49.2

GATED SPILLWAY SB- S8 SLAB

38.72
35.5
45.0
2.0

Average
Minimum
Maximum
Standard Deviation
Actual Characteristic Strength of the mix =
AVG - K x STDV

36.1 N/mm2

K = 1.28

If expected low percent value is 10%

For the contractor: ELIAS H.

Page 26

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

02-01-10

1333

FC IB-2

C 30

42.5N

300

14.4

25.4

34.4

40.3

PH Unit 1 Lift P4

03-01-10

1336

FC IB-2

C 30

42.5N

300

15.6

25.3

34.9

39.8

PH Unit 1 Lift 63 Column axis 20

03-01-10

1337

FC IB-2

C 30

42.5N

300

20.7

28.5

37.7

48.3

PH Unit 4 Lift 56A

03-01-10

1339

FC IB-2

C 30

42.5N

300

16.2

28.9

36.7

04-01-10

1342

FC IB-2

C 30

42.5N

300

17.8

29.1

36.2

43.4

PH Unit 3 Lift 61

04-01-10

1344

FC IB-2

C 30

42.5N

300

14.8

25.1

33.4

37.9

PH Unit 2 Lift 15C

05-01-10

1346

FC IB-2

C 30

42.5N

300

14.3

25.8

33.2

38.1

PH Unit 5 Lift 15B/B2

05-01-10

1347

FC IB-2

C 30

42.5N

300

14.7

26.3

32.8

38.5

PH Unit 3 Lift 17

06-01-10

1349

FC IB-2

C 30

42.5N

300

14.7

24.9

33.1

38.5

06-01-10

1352

FC IB-2

C 30

42.5N

300

14.5

24.6

33.3

06-01-10

1350

FC IB-2

C 30

42.5N

300

14.5

25.6

33.7

G/DAM BLOCK "C"

PH Unit 1 Lift 62 Wall Axis 20 21


G/DAM BLOCK "A" & "D" LIFT
13A

38.3

APPRON SLAB

07-01-10

1354

FC IB-2

C 30

42.5N

300

15.1

25.6

35.1

40.4

PH Unit 1 Lift 64 Column axis 20 17

07-01-10

1355

FC IB-2

C 30

42.5N

300

14.8

25.2

34.8

39.8

PH Unit 1 Lift 20 axis 17 - 21

07-01-10

1356

FC IB-2

C 30

42.5N

300

14.8

25.4

33.0

36.3

PH Unit 2 Lift 57A

07-01-10

1358

FC IB-2

C 30

42.5N

300

14.5

25.5

33.6

36.8

APPRON SLAB

08-01-10

1361

FC IB-2

C 30

42.5N

300

14.2

24.7

32.4

36.8

PH Unit 1 Lift 81CENTER WALL

08-01-10

1364

FC IB-2

C 30

42.5N

300

15.4

26.7

33.1

37.5

PH Unit 2 Lift 82A LEFT SIDE


WALL

08-01-10

1360

FC IB-2

C 30

42.5N

300

14.5

25.1

32.0

G/DAM BLOCK "B" LIFT 13A

08-01-10

1365

FC IB-2

C 30

42.5N

300

14.8

25.8

34.6

GATED SPILLWAY SB - S11 - RRC

08-01-10

1359

FC IB-2

C 30

42.5N

300

14.6

25.2

33.7

38.8

APPRON SLAB

09-01-10

1367

FC IB-2

C 30

42.5N

300

15.2

24.6

32.4

37.4

PH Unit 1 Lift WALL 17

09-01-10

1368

FC IB-2

C 30

42.5N

300

14.4

25.6

33.7

39.4

PH Unit 3 Lift P2

09-01-10

1069

FC IB-2

C 30

42.5N

300

15.3

25.8

34.7

39.9

PH Unit 1 Lift 64 Column axis 20 18

10-01-10

1372

FC IB-2

C 30

42.5N

300

15.6

24.6

33.7

40.1

PH Unit 4 Lift 81 LEFT WALL

12-01-10

1383

FC IB-2

C 30

42.5N

300

14.8

24.4

33.8

43.7

PH Unit 5 Lift 87B

13-01-10

1388

FC IB-2

C 30

42.5N

300

14.5

26.6

33.4

38.3

PH Unit 1 Lift 88

14-01-10

1389

FC IB-2

C 30

42.5N

300

14.7

25.5

33.4

38.0

PH Unit 1 Lift 20

14-01-10

1392

FC IB-2

C 30

42.5N

300

15.3

25.8

33.1

37.5

PH Unit 5 Lift 81

16-01-10

1400

FC IB-2

C 30

42.5N

300

14.8

25.9

33.3

38.8

PH Unit 3 Lift 17CENTER WALL

Page 27

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

16-01-10

1404

FC IB-2

C 30

42.5N

300

15.1

25.9

32.8

36.6

PH UNIT 2 Lift 82H RRC Wall

16-01-10

1405

FC IB-2

C 30

42.5N

300

14.2

29.6

38.0

43.6

APPRON SLAB

18-01-10

1411

FC IB-2

C 30

42.5N

300

15.4

25.7

32.9

36.1

PH UNIT 1 Lift 16A

18-01-10

1412

FC IB-2

C 30

42.5N

300

15.7

24.3

35.0

38.3

APPRON SLAB

19-01-10

1417

FC IB-2

C 30

42.5N

300

14.7

26.2

32.5

39.6

PH UNIT 2 Lift 57B

19-01-10

1418

FC IB-2

C 30

42.5N

300

15.3

24.4

33.3

35.8

PH Unit 3 Lift 17CENTER WALL

19-01-10

1419

FC IB-2

C 30

42.5N

300

15.6

24.5

31.9

34.7

PH UNIT 2 Lift 82A Center wall

22-01-10

1429

FC IB-2

C 30

42.5N

300

13.0

25.3

33.1

39.1

PH UNIT 2 Lift 16 Left side

22-01-10

1430

FC IB-2

C 30

42.5N

300

18.7

28.7

36.5

42.0

PH UNIT 4 Lift 82 Wall left side

23-01-10

1436

FC IB-2

C 30

42.5N

300

17.6

27.4

36.7

39.0

PH UNIT 3 Lift 87

23-01-10

1441

FC IB-2

C 30

42.5N

300

14.8

25.1

34.7

40.6

PH UNIT 4 Lift 56B

24-01-10

1442

FC IB-2

C 30

42.5N

300

17.3

26.5

34.2

40.3

PH UNIT 4 Lift 15C Center Wall

24-01-10

1446

FC IB-2

C 30

42.5N

300

15.3

24.8

33.5

39.2

PH Unit 1 Lift 88

24-01-10

1445

FC IB-2

C 30

42.5N

300

14.6

24.9

35.8

40.0

APPRON SLAB

25-01-10

1452

FC IB-2

C 30

42.5N

300

15.2

25.4

34.2

39.8

TEMPORARY BRIDGE 1st STAGE


OF WALL ON LEFT ABUTMENT

26-01-10

1455

FC IB-2

C 30

42.5N

300

14.7

25.5

33.4

35.6

26-01-10

1457

FC IB-2

C 30

42.5N

300

15.6

25.4

33.6

36.5

28-01-10

1464

FC IB-2

C 30

42.5N

300

15.6

25.2

31.8

35.6

SWITCH YARD CABLE DUCT

28-01-10

1466

FC IB-2

C 30

42.5N

300

16.9

26.2

32.9

34.4

TEMPORARY BRIDGE MIDDLE


PIER (P1)

29-01-10

1470

FC IB-2

C 30

42.5N

300

14.7

24.2

33.7

37.9

PH Unit 1 Lift 21B

29-01-10

1473

FC IB-2

C 30

42.5N

300

15.6

25.3

34.3

37.8

PH UNIT 4 Lift 82A Center wall

30-01-10

1475

FC IB-2

C 30

42.5N

300

13.9

25.1

33.7

37.5

PH Unit 1 Lift P5

01-02-10

1481

FC IB-2

C 30

42.5N

300

14.7

26.0

33.8

40.9

PH Unit 2 Lift 58 Column axis


17&13

03-02-10

1491

FC IB-2

C 30

42.5N

300

14.6

24.7

32.6

36.5

PH Unit 2 Lift 16C WALL

03-02-10

1492

FC IB-2

C 30

42.5N

300

15.8

28.8

36.8

41.9

PH Unit 4 Lift 56C

04-02-10

1498

FC IB-2

C 30

42.5N

300

15.4

25.1

34.3

39.8

PH Unit 4 Lift 15C CENTRE WALL

05-02-10

1501

FC IB-2

C 30

42.5N

300

16.5

25.9

33.6

39.7

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

06-02-10

1504

FC IB-2

C 30

42.5N

300

20.0

29.6

36.0

43.1

PH Unit 2 Lift 58

06-02-10

1505

FC IB-2

C 30

42.5N

300

20.3

30.2

35.0

43.2

PH Unit 2 Lift 16 RALT SAIT

PH UNIT 4 Lift 82A Wall Left


side
PH UNIT 1 Retaining wall Lift 22
12

Page 28

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

06-02-10

1506

FC IB-2

C 30

42.5N

300

15.4

25.4

34.8

39.3

PH Unit 5 Lift 58 Column LEFT


SIDE

06-02-10

1503

FC IB-2

C 30

42.5N

300

20.3

29.9

35.7

42.9

APPRON SLAB

07-02-10

1513

FC IB-2

C 30

42.5N

300

15.9

26.4

35.3

40.3

APPRON SLAB

09-02-10

1522

FC IB-2

C 30

42.5N

300

18.8

27.1

34.3

37.6

PH Unit 4 Lift 15C Left WALL

09-02-10

1523

FC IB-2

C 30

42.5N

300

18.3

27.6

33.7

39.6

PH Unit 2 Lift P2

09-02-10

1524

FC IB-2

C 30

42.5N

300

16.9

26.3

34.6

39.8

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

09-02-10

1525

FC IB-2

C 30

42.5N

300

15.1

25.9

33.9

38.4

10-02-10

1529

FC IB-2

C 30

42.5N

300

18.5

28.6

37.0

41.4

TEMPORARY BRIDGE 2nd


STAGE OF WALL ON LEFT
ABUTMENT
PH Unit 5 Lift 58

10-02-10

1535

FC IB-2

C 30

42.5N

300

15.0

28.6

32.7

39.0

PH Unit 3 Lift 18A Centre Wall

10-02-10

1528

FC IB-2

C 30

42.5N

300

19.3

28.1

36.6

42.3

APPRON SLAB

11-02-10

1536

FC IB-2

C 30

42.5N

300

18.4

25.8

32.7

37.1

PH Unit 4 Lift 82B Slab

11-02-10

1539

FC IB-2

C 30

42.5N

300

15.6

24.5

31.8

36.1

PH Unit 3 Lift 18 Right Side Wall

11-02-10

1540

FC IB-2

C 30

42.5N

300

15.0

24.7

32.5

41.7

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

13-02-10

1550

FC IB-2

C 30

42.5N

300

15.1

24.7

32.9

36.3

PH Unit 4 Lift 15C Right Side Wall

13-02-10

1548

FC IB-2

C 30

42.5N

300

18.1

25.6

32.1

35.3

APPRON SLAB

14-02-10

1554

FC IB-2

C 30

42.5N

300

15.1

24.5

32.7

36.2

PH Unit 2 Lift 7 Left Wall

16-02-10

1558

FC IB-2

C 30

42.5N

300

18.9

30.8

38.9

45.1

PH Unit 1 Lift 23

16-02-10

1561

FC IB-2

C 30

42.5N

300

18.7

31.3

38.5

44.3

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

17-02-10

1568

FC IB-2

C 30

42.5N

300

15.3

24.4

32.6

35.7

PH Unit 3 Lift 18 Side Wall

18-02-10

1576

FC IB-2

C 30

42.5N

300

14.2

24.0

33.2

37.8

PH Unit 2 Lift 59

18-02-10

1575

FC IB-2

C 30

42.5N

300

14.7

24.8

30.7

35.6

APPRON SLAB

18-02-10

1578

FC IB-2

C 30

42.5N

300

22.9

27.7

37.6

44.1

APPRON SLAB

19-02-10

1579

FC IB-2

C 30

42.5N

300

19.5

27.6

35.5

40.1

PH Unit 5 Lift 15C

19-02-10

1583

FC IB-2

C 30

42.5N

300

16.0

24.7

31.0

34.6

TEMPORARY BRIDGE LIFT 1


MIDDLE PIER

20-02-10

1586

FC IB-2

C 30

42.5N

300

14.6

23.5

31.5

35.0

PH Unit 5 Lift 86

22-02-10

1593

FC IB-2

C 30

42.5N

300

15.8

24.9

32.8

36.4

PH Unit 4 Lift 16 Centre Wall

22-02-10

1594

FC IB-2

C 30

42.5N

300

14.9

24.1

31.4

36.2

PH Unit 1 Lift 25 Left Side Wall

24-02-10

1603

FC IB-2

C 30

42.5N

300

16.7

27.1

36.6

43.4

PH Unit 1 Lift 25A Centre Wall

24-02-10

1605

FC IB-2

C 30

42.5N

300

14.5

24.5

31.3

36.8

PH Unit 4 Lift 83A

Page 29

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

24-02-10

1606

FC IB-2

C 30

42.5N

300

14.9

25.1

33.8

38.1

24-02-10

1607

FC IB-2

C 30

42.5N

300

15.6

25.8

35.7

40.5

PH Unit 4 Lift 83A

PH Unit 4 Lift 83A

25-02-10

1614

FC IB-2

C 30

42.5N

300

14.7

24.5

31.5

35.1

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

26-02-10

1621

FC IB-2

C 30

42.5N

300

15.9

22.5

30.9

33.9

PH Unit 1 Lift 89

26-02-10

1617

FC IB-2

C 30

42.5N

300

14.2

23.5

31.5

34.9

APPRON SLAB

27-02-10

1623

FC IB-2

C 30

42.5N

300

19.0

28.1

35.7

40.8

PH Unit 2 Lift 83B

27-02-10

1624

FC IB-2

C 30

42.5N

300

19.0

28.9

35.9

40.5

PH Unit 1 Lift 25A Wall Axis 17

01-03-10

1626

FC IB-2

C 30

42.5N

300

13.5

22.7

32.3

37.0

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

01-03-10

1625

FC IB-2

C 30

42.5N

300

14.8

24.9

31.6

37.3

TEMPORARY BRIDGE FOUND.


RIGHT ABUTMENT

02-03-10

1632

FC IB-2

C 30

42.5N

300

14.5

24.1

31.4

36.2

PH Unit 2 Lift 17 Right side wall

02-03-10

1633

FC IB-2

C 30

42.5N

300

18.3

28.1

37.2

40.1

PH Unit 2 Lift 17 Right side wall

03-03-10

1641

FC IB-2

C 30

42.5N

300

14.8

32.2

31.0

35.2

PH Unit 4 Lift 57A

03-03-10

1643

FC IB-2

C 30

42.5N

300

15.2

24.8

33.0

37.3

PH Unit 1 Lift 64 Wall axis 20 - 21

03-03-10

1640

FC IB-2

C 30

42.5N

300

14.9

24.8

33.6

37.1

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

04-03-10

1647

FC IB-2

C 30

42.5N

300

14.9

24.6

33.6

36.8

PH Unit 1 Lift 64 Wall axis 17 - 18

05-03-10

1648

FC IB-2

C 30

42.5N

300

14.5

23.3

31.3

36.5

PH Unit 2 Lift 84

05-03-10

1652

FC IB-2

C 30

42.5N

300

14.9

25.2

33.8

37.3

PH Unit 2 Lift 84

06-03-10

1654

FC IB-2

C 30

42.5N

300

14.4

23.9

31.8

35.8

PH Unit 2 Lift 18 centre wall

07-03-10

1658

FC IB-2

C 30

42.5N

300

14.3

23.8

32.6

36.6

PH Unit 4 Lift 16 left Wall

07-03-10

1659

FC IB-2

C 30

42.5N

300

14.7

23.8

31.9

35.3

PH Unit 2 Lift 60

08-03-10

1660

FC IB-2

C 30

42.5N

300

13.7

22.2

31.8

33.5

PH Retaining wall lift 23&14

08-03-10

1661

FC IB-2

C 30

42.5N

300

14.3

24.0

33.6

36.4

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

10-03-10

1669

FC IB-2

C 30

42.5N

300

16.5

22.9

33.3

36.0

PH Unit 2 Lift 18A Left centre wall

10-03-10

1670

FC IB-2

C 30

42.5N

300

14.8

24.3

33.8

36.2

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

11-03-10

1675

FC IB-2

C 30

42.5N

300

17.5

25.8

31.7

38.8

APPRON SLAB

11-03-10

1677

FC IB-2

C 30

42.5N

300

15.3

24.7

34.1

39.8

APPRON SLAB

12-03-10

1680

FC IB-2

C 30

42.5N

300

14.2

23.8

32.4

35.2

PH Unit 4 Lift 57B

12-03-10

1683

FC IB-2

C 30

42.5N

300

14.6

24.7

31.6

37.4

PH Unit 5 Lift 16 SLAB

13-03-10

1686

FC IB-2

C 30

42.5N

300

15.1

23.1

32.4

36.7

PH Unit 2 Lift 18A Right side wall

Page 30

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

13-03-10

1688

FC IB-2

C 30

42.5N

300

17.6

28.2

34.4

38.7

PH Unit 1 Lift 90 Column axis 18

15-03-10

1693

FC IB-2

C 30

42.5N

300

12.9

22.8

31.8

34.4

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

15-03-10

1694

FC IB-2

C 30

42.5N

300

12.0

22.5

33.1

36.8

TEMPORARY BRIDGE 1st WALL


ABUTMENT

16-03-10

1696

FC IB-2

C 30

42.5N

300

14.1

23.9

32.4

36.6

PH Unit 5 Lift 15C centre wall

16-03-10

1698

FC IB-2

C 30

42.5N

300

18.8

26.0

33.3

36.1

PH Unit 4 Lift 83B

17-03-10

1700

FC IB-2

C 30

42.5N

300

15.9

24.7

31.0

34.1

PH Unit 1 Lift 90 Column axis 21

17-03-10

1705

FC IB-2

C 30

42.5N

300

13.6

23.1

32.1

34.2

PH Unit 4 Lift 58 Column left sait

17-03-10

1703

FC IB-2

C 30

42.5N

300

13.8

24.3

33.6

36.9

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

17-03-10

1701

FC IB-2

C 30

42.5N

300

17.2

24.0

30.7

33.7

APPRON SLAB

18-03-10

1706

FC IB-2

C 30

42.5N

300

15.5

24.7

31.1

33.9

PH Unit 4 Lift 16 Right side wall

19-03-10

1711

FC IB-2

C 30

42.5N

300

14.7

23.8

31.8

35.9

PH Unit 5 Lift 59

19-03-10

1713

FC IB-2

C 30

42.5N

300

16.1

25.3

31.4

35.4

PH Unit 2 Lift P4

20-03-10

1716

FC IB-2

C 30

42.5N

300

14.3

22.9

32.7

34.5

PH Unit 2 Lift 61

20-03-10

1717

FC IB-2

C 30

42.5N

300

15.3

23.4

30.2

33.5

PH Unit 4 Lift 17 centre wall

21-03-10

1722

FC IB-2

C 30

42.5N

300

15.1

25.1

34.1

38.4

21-03-10

1725

FC IB-2

C 30

42.5N

300

14.3

22.8

32.4

36.8

PH Unit 5 Lift 15C


TEMPORARY BRIDGE 2nd
STAGE OF WALL ON RIGHT
ABUTMENT

22-03-10

1726

FC IB-2

C 30

42.5N

300

15.1

24.6

33.6

37.3

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

23-03-10

1730

FC IB-2

C 30

42.5N

300

13.9

23.1

33.2

37.2

PH Unit 2 Lift 85

23-03-10

1731

FC IB-2

C 30

42.5N

300

14.1

23.6

32.3

36.6

PH Unit 2 Lift 85

24-03-10

1732

FC IB-2

C 30

42.5N

300

15.5

24.4

31.2

34.1

PH Unit 4 Lift 17 left side wall

24-03-10

1735

FC IB-2

C 30

42.5N

300

16.2

29.1

37.1

39.8

PH Unit 2 Lift 19A centre wall

24-03-10

1733

FC IB-2

C 30

42.5N

300

13.5

22.2

31.4

34.9

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

25-03-10

1740

FC IB-2

C 30

42.5N

300

14.2

23.2

32.6

35.2

PH Unit 4 Lift 84

26-03-10

1747

FC IB-2

C 30

42.5N

300

14.2

23.9

32.8

42.4

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

27-03-10

1752

FC IB-2

C 30

42.5N

300

13.6

22.8

33.1

36.9

PH Unit 4 Lift 58

27-03-10

1753

FC IB-2

C 30

42.5N

300

14.4

23.7

33.4

36.3

PH Unit 2 Lift 19 left centre wall

28-03-10

1757

FC IB-2

C 30

42.5N

300

16.6

23.8

32.5

34.4

APPRON SLAB

29-03-10

1762

FC IB-2

C 30

42.5N

300

14.7

25.3

31.9

34.3

PH Unit 1 Lift 25A

29-03-10

1759

FC IB-2

C 30

42.5N

300

14.8

22.8

32.9

35.8

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

Page 31

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

31-03-10

1775

FC IB-2

C 30

42.5N

300

14.3

24.8

31.9

33.4

PH Unit 2 Lift P5

31-03-10

1771

FC IB-2

C 30

42.5N

300

14.1

23.9

32.6

36.4

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

01-04-10

1776

FC IB-2

C 30

42.5N

300

17.9

26.8

34.8

37.5

PH Unit 5 Lift 15C left side wall

01-04-10

1780

FC IB-2

C 30

42.5N

300

14.4

24.6

32.4

35.8

PH Unit 1 Retaining wall Lift 16 &


24

02-04-10

1782

FC IB-2

C 30

42.5N

300

16.1

22.6

31.1

34.3

PH Unit 4 Lift 85

02-04-10

1788

FC IB-2

C 30

42.5N

300

14.4

23.9

32.3

34.4

PH Unit 2 Lift 19 Right side wall

02-04-10

1784

FC IB-2

C 30

42.5N

300

14.6

24.8

33.3

37.8

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

07-04-10

1793

FC IB-2

C 30

42.5N

300

13.9

23.1

32.4

36.6

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

08-04-10

1794

FC IB-2

C 30

42.5N

300

14.6

23.7

31.8

35.5

PH Unit 3 Lift 88

09-04-10

1797

FC IB-2

C 30

42.5N

300

13.8

23.4

32.6

35.5

PH Unit 4 Lift 17 Right side wall

09-04-10

1799

FC IB-2

C 30

42.5N

300

14.6

25.2

33.6

37.1

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

10-04-10

1803

FC IB-2

C 30

42.5N

300

13.7

24.2

31.7

35.3

PH Unit 3 Lift 19 centre wall

10-04-10

1805

FC IB-2

C 30

42.5N

300

13.8

23.7

31.1

35.0

APPRON SLAB

12-04-10

1809

FC IB-2

C 30

42.5N

300

13.7

23.2

30.0

34.6

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

12-04-10

1811

FC IB-2

C 30

42.5N

300

13.6

23.6

33.0

37.4

APPRON SLAB

13-04-10

1815

FC IB-2

C 30

42.5N

300

13.3

23.7

32.1

36.3

PH Unit 3 Lift 19 Right side wall

14-04-10

1818

FC IB-2

C 30

42.5N

300

14.3

23.6

34.8

38.8

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

16-04-10

1830

FC IB-2

C 30

42.5N

300

13.9

23.9

31.7

35.8

PH Unit 5 Lift 60 Centre wall

16-04-10

1833

FC IB-2

C 30

42.5N

300

13.8

24.1

35.3

39.8

CARPENTRY WORKSHOP PRECAST


CABLE DUCT

17-04-10

1837

FC IB-2

C 30

42.5N

300

13.9

23.3

34.3

38.2

APPRON SLAB

18-04-10

1841

FC IB-2

C 30

42.5N

300

14.2

23.9

32.0

36.1

PH Unit 1 Lift 26

19-04-10

1841A

FC IB-2

C 30

42.5N

300

13.9

23.5

31.8

34.5

ERECTION BAY WALL

21-04-10

1849

FC IB-2

C 30

42.5N

300

13.9

23.8

32.4

35.3

PH Unit 3 Lift 19 left side wall

23-04-10

1854

FC IB-2

C 30

42.5N

300

14.8

22.6

33.1

35.1

PH Unit 5 Lift 16

24-04-10

1863

FC IB-2

C 30

42.5N

300

14.2

22.0

32.9

35.8

PH Unit 2 Lift 86

26-04-10

1870

FC IB-2

C 30

42.5N

300

13.2

23.4

35.9

38.3

PH Unit 2 Lift 19B

29-04-10

1879

FC IB-2

C 30

42.5N

300

17.0

25.0

33.2

35.3

PH Unit 5 Lift 87

30-04-10

1882

FC IB-2

C 30

42.5N

300

13.1

21.7

32.8

36.2

PH Unit 1 Retaining wall

03-05-10

1884

FC IB-2

C 30

42.5N

300

13.5

24.5

31.7

34.6

PH Unit 4 Lift 59

Page 32

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

04-05-10

1891

FC IB-2

C 30

42.5N

300

13.6

23.4

30.5

34.9

PH Unit 5 Lift 16 right side wall

06-05-10

1894

FC IB-2

C 30

42.5N

300

13.4

23.7

31.4

34.9

PH Unit 4 Lift 86

06-05-10

1895

FC IB-2

C 30

42.5N

300

14.8

24.8

32.6

35.3

PH Unit 4 Lift 18

07-05-10

1896

FC IB-2

C 30

42.5N

300

13.7

24.3

32.9

35.8

PH Unit 1 Lift 29

07-05-10

1899

FC IB-2

C 30

42.5N

300

14.8

25.4

36.8

41.3

PH Unit 1 Lift 27

08-05-10

1902

FC IB-2

C 30

42.5N

300

14.6

24.9

32.8

36.8

PH Unit 2 Lift 20 1st Pouring

11-05-10

1911

FC IB-2

C 30

42.5N

300

13.4

24.9

31.2

36.3

PH Unit 4 Lift P2

12-05-10

1917

FC IB-2

C 30

42.5N

300

13.9

24.2

31.6

35.0

PH Unit 2 Lift 25C Wall

14-05-10

1921

FC IB-2

C 30

42.5N

300

14.3

24.8

33.3

36.8

PH Unit 2 Lift 25 Lift side Wall

14-05-10

1922

FC IB-2

C 30

42.5N

300

14.0

24.3

32.6

35.7

PH Unit 4 Lift 19 centre Wall

18-05-10

1938

FC IB-2

C 30

42.5N

300

16.1

28.7

35.0

40.6

PH Unit 2 Lift 25A right side wall

19-05-10

1939

FC IB-2

C 30

42.5N

300

14.3

25.3

31.5

33.4

PH Unit 3 Lift 89

23-05-10

1953

FC IB-2

C 30

42.5N

300

14.9

22.4

33.1

35.5

PH Contral building slab

25-05-10

1957

FC IB-2

C 30

42.5N

300

15.3

25.3

31.4

37.0

PH Unit 5 P2 slab

26-05-10

1964

FC IB-2

C 30

42.5N

300

18.0

27.7

32.5

38.6

PH Unit 3 Wall 25A Right

26-05-10

1966

FC IB-2

C 30

42.5N

300

14.1

25.2

32.5

35.9

PH Unit 1 Lift 28 & Wall Lift 18

26-05-10

1968

FC IB-2

C 30

42.5N

300

14.3

24.9

33.7

37.2

PH Unit 1 Lift 28 & Wall Lift 18

28-05-10

1973

FC IB-2

C 30

42.5N

300

19.1

25.0

32.7

35.0

PH Unit 5 Lift 16 Left Wall

01-06-10

1981

FC IB-2

C 30

42.5N

300

14.5

24.3

33.9

36.8

PH Unit 3 P4

03-06-10

1988

FC IB-2

C 30

42.5N

300

14.8

23.2

33.5

37.1

PH Unit 5 Lift 17 Right side wall

04-06-10

1992

FC IB-2

C 30

42.5N

300

13.6

25.1

33.5

36.7

PH Unit 3 Lift 25A Centre wall

08-06-10

2008

FC IB-2

C 30

42.5N

300

14.3

24.4

33.1

36.6

PH Unit 3 Lift 25A Left Side wall

11-06-10

2018

FC IB-2

C 30

42.5N

300

15.4

24.8

32.3

36.5

PH Unit 4 Lift 19A Right side wall

11-06-10

2021

FC IB-2

C 30

42.5N

300

14.4

24.7

30.2

34.7

PH Unit 4 Lift 60 center

12-06-10

2024

FC IB-2

C 30

42.5N

300

14.6

24.9

32.7

35.6

PH Unit 1 Lift 29 & wall lift 19

12-06-10

2027

FC IB-2

C 30

42.5N

300

14.8

25.1

34.3

38.8

PH Unit 1 Lift 29 & wall lift 19

12-06-10

2029

FC IB-2

C 30

42.5N

300

14.9

24.6

33.8

36.2

PH Unit 4 Lift 19A Left side wall

15-06-10

2040

FC IB-2

C 30

42.5N

300

14.1

26.2

34.7

38.8

PH Unit 4 Lift 25A center wall

18-06-10

2047

FC IB-2

C 30

42.5N

300

14.4

24.3

31.2

34.4

PH Unit 1 Lift 92

Page 33

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

19-06-10

2049

FC IB-2

C 30

42.5N

300

16.1

24.9

32.0

36.0

PH Unit 2 Lift 88 External wall

20-06-10

2055

FC IB-2

C 30

42.5N

300

15.6

24.2

30.6

35.9

PH Unit 3 Lift 20

23-06-10

2065

FC IB-2

C 30

42.5N

300

14.6

24.9

32.7

35.8

PH Unit 5 Lift 18A Left side wall

24-06-10

2069

FC IB-2

C 30

42.5N

300

15.3

24.9

32.6

36.6

PH Unit 3 Lift 63 Column axis 12

25-06-10

2074

FC IB-2

C 30

42.5N

300

14.1

24.5

32.3

34.8

PH Unit 1 Right wall Lift 28 wall 18


& left wall

28-06-10

2083

FC IB-2

C 30

42.5N

300

15.0

24.5

33.7

36.2

PH Unit 4 Lift 25A left side wall

28-06-10

2085

FC IB-2

C 30

42.5N

300

14.9

24.8

32.7

35.1

PH Unit 1 Lift wall 30 & 20 wall

30-06-10

2091

FC IB-2

C 30

42.5N

300

14.6

24.8

32.6

36.3

PH Unit 4 Lift 19B

30-06-10

2092

FC IB-2

C 30

42.5N

300

14.0

23.6

32.2

36.6

PH Unit 4 Lift 25A Left side wall

02-07-10

2100

FC IB-2

C 30

42.5N

300

14.2

24.3

33.3

37.3

PH Unit 3 Lift 21B & 21A

03-07-10

2101

FC IB-2

C 30

42.5N

300

15.0

24.6

33.8

37.4

PH Unit 3 Lift 21B & 21A

06-07-10

2105

FC IB-2

C 30

42.5N

300

14.9

24.5

30.7

36.6

PH Unit 3 Lift 90

08-07-10

2106

FC IB-2

C 30

42.5N

300

14.3

24.2

33.6

36.5

PH Unit 5 Lift 18 Right side wall

08-07-10

2107

FC IB-2

C 30

42.5N

300

13.9

23.4

32.3

34.7

PH Unit 4 Lift 61

11-07-10

2116

FC IB-2

C 30

42.5N

300

14.1

24.3

33.7

36.3

PH Unit 4 Lift 20A

12-07-10

2118

FC IB-2

C 30

42.5N

300

14.9

24.0

33.7

36.8

PH Unit 3 Lift 21B

15-07-10

2131

FC IB-2

C 30

42.5N

300

14.9

25.6

36.9

40.6

ERECT BAY ENTRANCE SLAB


BUILDING CONE

20-07-10

2140

FC IB-2

C 30

42.5N

300

14.5

24.8

31.3

33.6

PH Unit 5 Lift 19A Left side wall

20-07-10

2139

FC IB-2

C 30

42.5N

300

14.2

23.0

33.2

36.6

ERECTION BAY SLAB

21-07-10

2144

FC IB-2

C 30

42.5N

300

15.3

24.3

32.2

34.9

PH Unit 4 Lift 22A & 22B

21-07-10

2145

FC IB-2

C 30

42.5N

300

15.3

23.9

30.6

35.7

PH Unit 5 Lift 88

27-07-10

2167

FC IB-2

C 30

42.5N

300

14.1

24.0

31.6

35.6

PH Unit 5 Lift 19A Right side wall

27-07-10

2168

FC IB-2

C 30

42.5N

300

14.3

22.9

32.4

36.8

PH Unit 4 Lift 21B & 21A

28-07-10

2169

FC IB-2

C 30

42.5N

300

16.0

25.1

32.7

37.3

PH Unit 4 Lift 21B & 21A

30-07-10

2175

FC IB-2

C 30

42.5N

300

19.0

24.9

31.4

36.1

PH Unit 5 Lift 19A Centre wall

30-07-10

2176

FC IB-2

C 30

42.5N

300

19.2

25.1

31.1

35.7

PH Unit 2 Lift 27

30-07-10

2178

FC IB-2

C 30

42.5N

300

14.9

23.6

31.6

36.3

PH Unit 2 Lift 27

04-08-10

2186

FC IB-2

C 30

42.5N

300

14.5

24.5

31.8

37.0

PH Unit 5 Lift 25A Left side wall

06-08-10

2197

FC IB-2

C 30

42.5N

300

13.9

24.6

32.7

35.8

PH Unit 4 Lift 88 Internal wall

Page 34

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Date
Casted

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

Note

90 days

09-08-10

2205

FC IB-2

C 30

42.5N

300

13.2

23.0

30.1

11-08-10

2208

FC IB-2

C 30

42.5N

300

14.0

24.7

31.1

PH Unit 5 Lift 25A Right side wall

PH Unit 4 Lift 88

11-08-10

2209

FC IB-2

C 30

42.5N

300

14.2

24.4

30.6

PH Unit 1 Retaining wall lift 14 - 17 20 - 23

13-08-10

2213

FC IB-2

C 30

42.5N

300

14.8

23.9

31.0

PH Unit 1 Lift wall 31, 32, & 20 wall

14-08-10

2217

FC IB-2

C 30

42.5N

300

14.2

24.2

32.5

PH Unit 5 Central wall Lift 25A

14-08-10

2218

FC IB-2

C 30

42.5N

300

14.0

24.4

31.3

PH Unit 3 Lift 26

14-08-10

2220

FC IB-2

C 30

42.5N

300

14.9

25.3

32.8

PH Unit 3 Lift 26

21-08-10

2238

FC IB-2

C 30

42.5N

300

14.5

24.3

33.1

PH Tailrace Foundation lift 26, 29,


32, & 35

24-08-10

2246

FC IB-2

C 30

42.5N

300

14.8

23.0

32.7

PH Unit 5 Lift P6A

25-08-10

2250

FC IB-2

C 30

42.5N

300

14.7

24.1

31.8

APPRON KEY PART 1

33.13
30.0
38.9
1.7

Average
Minimum
Maximum
Standard Deviation
Actual Characteristic Strength of the mix =
Rck

= AVG - K x STD

31.0 N/mm2

K = 1.28

If expected low percent value is 10%

For the contractor: ELIAS H.

Page 35

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

Date
Casted

PROJECT, UGANDA
REV. 0

Sample
Concrete Cement Cement
Mix Type
type
(Kg/m3)
class
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

02-01-10

1335

FC JC

C 25

42.5N

300

14.9

23.8

31.6

36.8

S.Y. FOUNDATION CD & 4-5 DE & 4-5

10-01-10

1370

FC JC

C 25

42.5N

300

16.8

27.5

36.2

44.8

S.Y.BASE SLAB 1-2 CONTROL


BUILDING

25-01-10

1450

FC JC

C 25

42.5N

300

14.3

24.8

32.3

36.0

S.Y.DEEP FOUNDATION P10-1 (F - G I)

06-02-10

1511

FC JC

C 25

42.5N

300

13.6

24.7

30.6

35.1

S.Y.CONTROL BUILDING RECKING


AXIS 8-7 AB-CD

08-02-10

1520

FC JC

C 30

42.5N

300

13.6

24.5

31.2

36.5

PH Unit 5 Lift 15C Centre Wall

11-02-10

1542

FC JC

C 25

42.5N

300

14.3

23.7

31.7

37.3

S.Y.CONTROL BUILDING WALL AXIS


4-5 A-B

16-02-10

1564

FC JC

C 30

42.5N

300

13.3

24.0

30.4

38.5

PH Unit 1 Lift P7A

25-02-10

1608

FC JC

C 30

42.5N

300

16.8

25.5

30.0

36.6

PH Unit 1 Lift P8 & P9

02-03-10

1630

FC JC

C 25

42.5N

300

13.9

22.9

30.1

35.9

S.YARD P5 (O - P - 5) No.1 (Q - R - 2)
No.4

04-03-10

1644

FC JC

C 25

42.5N

300

14.4

22.9

31.2

35.2

S.Y.H.V.FOUND
P5 (K - L - 4 - 5)
No.3
P2 (P - Q - 3) No.1

05-03-10

1649

FC JC

C 25

42.5N

300

13.6

22.5

30.6

35.1

S.Y.H.V.FOUND
P2 (P - Q - 3 )
No.1 P5 (P - Q - 3) No.3

09-03-10

1663

FC JC

C 25

42.5N

300

17.2

24.6

30.8

36.3

S.Y.H.V.FOUND
P3 (O - P - 4 - 5 )
No.3 P9 (O - P - 4 - 5) NR

11-03-10

1673

FC JC

C 30

42.5N

300

15.8

22.3

30.8

34.5

PH Unit 2 Lift P3, P4&P5 Wall

12-03-10

1682

FC JC

C 25

42.5N

300

13.6

21.8

31.9

35.6

S.Y.CABLE DUCT CC2 AXIS G-H H9


AXIS (M - N - 4 - 5 ) No.2 P5 AXIS (P R - 4 - 5N)

12-03-10

1685

FC JC

C 30

42.5N

300

13.0

22.4

24.3

30.9

PH Unit 1 Lift 90 Column axis 17

13-03-10

1687

FC JC

C 25

42.5N

300

13.6

21.9

30.8

35.6

S.Y.H.V.FOUND
P3 (Q - R - 4 - 5 )
No.3 P5 (Q - R - 4 - 5) No1

18-03-10

1708

FC JC

C 25

42.5N

300

13.7

22.8

30.1

32.6

S.Y. CONTROL BUILDING DECK, AXIS


7 - 6 - 4 - 5 - 3, A,B,C,D

20-03-10

1715

FC JC

C 25

42.5N

300

13.6

22.7

30.8

34.6

S.Y.DEEP FOUNDATION P10-1 (M - W


- Z)

25-03-10

1739

FC JC

C 25

42.5N

300

13.1

21.8

30.7

33.9

27-03-10

1754

FC JC

C 25

42.5N

300

12.9

22.4

30.1

32.3

PH Unit 1 Lift 24

30-03-10

1769

FC JC

C 25

42.5N

300

13.4

25.1

32.2

37.6

S.Y.DEEP FOUNDATION P10-1 (N - O 2 - 3)

31-03-10

1773

FC JC

C 25

42.5N

300

12.9

22.4

30.1

34.3

PH Unit 2 Lift 62 Column axis

02-04-10

1787

FC JC

C 25

42.5N

300

13.8

22.6

30.7

34.1

EB CONTRAL BUILDING 3 COLUMN

09-04-10

1800

FC JC

C 25

42.5N

300

13.3

22.3

30.1

34.2

EB CONTRAL BUILDING 2 COLUMN

S.Y.H.V.FOUND

P2 (G - H - 1 - 2 )
No.3

09-04-10

1802

FC JC

C 25

42.5N

300

13.6

22.1

31.3

33.9

S.Y. DUCT CHANNEL CONECTION 1-2


CC1

13-04-10

1814

FC JC

C 25

42.5N

300

12.5

21.9

30.5

34.6

PH Unit 5 Lift 60 Column axis 5

14-04-10

1819

FC JC

C 25

42.5N

300

12.8

22.3

31.9

36.6

S.Y.H.V.FOUND P16 (M - N - 5 )No.1


(L - M - 2 - 3)

15-04-10

1822

FC JC

C 25

42.5N

300

13.6

21.9

29.9

34.4

PH Unit 3 Lift 88 Column C/S wall

15-04-10

1827

FC JC

C 25

42.5N

300

13.5

22.2

31.3

35.8

PH Unit 2 Lift 62 - 63 Column axis


17

Page 36

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

Date
Casted

PROJECT, UGANDA
REV. 0

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

S.Y. CONTROL BUILDING AXIS S2 A,B,C,D

16-04-10

1832

FC JC

C 25

42.5N

300

12.7

24.4

30.0

34.3

19-04-10

1844

FC JC

C 25

42.5N

300

12.5

20.1

31.0

33.6

PH Unit 5 Lift 60

20-04-10

1847

FC JC

C 25

42.5N

300

12.4

21.9

30.8

33.8

PH Unit 2 Lift 63 Column axis 14 P6

22-04-10

1852

FC JC

C 25

42.5N

300

12.3

23.1

30.2

35.3

PH Unit 1 Lift 90

23-04-10

1857

FC JC

C 25

42.5N

300

12.8

22.1

30.6

34.8

PH Unit 2 Lift 63 Column axis 13 17

03-05-10

1886

FC JC

C 25

42.5N

300

13.8

22.4

30.8

33.8

S.YARD DPF P10-1 M - O - 2

04-05-10

1889

FC JC

C 25

42.5N

300

16.2

28.7

36.1

40.1

PH Unit 3 Lift 62 Column axis 10 12

08-05-10

1903

FC JC

C 25

42.5N

300

14.2

22.3

30.7

35.3

S.Y. CONTROL BUILDING WALL AXIS


C-1-2

08-05-10

1904

FC JC

C 25

42.5N

300

14.5

24.0

31.6

34.2

PH Unit 2 Lift 62 Column axis 17

11-05-10

1914

FC JC

C 25

42.5N

300

15.1

24.4

30.6

34.6

PH Unit 2 Lift 63 Column axis 14 &


16

12-05-10

1918

FC JC

C 25

42.5N

300

14.4

22.2

30.2

34.0

S.Y. CONTROL BUILDING DECK


4.5 - 2.3 A, B, C

14-05-10

1925

FC JC

C 25

42.5N

300

15.3

24.6

33.9

39.7

PH Unit 2 Lift 63 Column axis 13

17-05-10

1932

FC JC

C 25

42.5N

300

13.0

22.4

29.9

33.6

PH Unit 3 Lift 62 axis 10 & 12

20-05-10

1944

FC JC

C 25

42.5N

300

13.9

22.8

30.1

35.6

PH Unit 2 Lift 64 Column axis 17 &


16

22-05-10

1950

FC JC

C 25

42.5N

300

13.8

22.3

30.3

34.2

PH Unit 1 Wall 62

23-05-10

1951

FC JC

C 25

42.5N

300

13.4

21.0

30.8

33.3

PH Unit 2 Lift 20 & 21

23-05-10

1952

FC JC

C 25

42.5N

300

13.3

21.1

29.9

32.1

PH Unit 2 Column Lift 64

24-05-10

1955

FC JC

C 25

42.5N

300

14.9

23.1

30.1

34.8

PH Unit 2 Lift 20 & 21

25-05-10

1959

FC JC

C 25

42.5N

300

13.3

22.2

30.1

34.6

PH Unit 5 Lift 61

25-05-10

1960

FC JC

C 25

42.5N

300

13.6

22.9

30.2

34.6

PH Unit 2 Lift 64 2 Column axis 14


& 16

31-05-10

1980

FC JC

C 25

42.5N

300

13.7

22.3

30.3

35.4

PH Unit 2 Lift 63 Wall

01-06-10

1983

FC JC

C 25

42.5N

300

13.5

25.6

33.0

37.2

PH Tailrace wall Lift 15

06-06-10

2001

FC JC

C 25

42.5N

300

14.1

23.8

30.2

34.8

PH Unit 3 Lift 90 Column axis 9

07-06-10

2007

FC JC

C 25

42.5N

300

12.6

21.6

29.3

31.9

PH Unit 3 Lift 90 Column axis 11

09-06-10

2010

FC JC

C 25

42.5N

300

14.6

26.4

33.5

39.4

PH Unit 3 Lift 62 Column axis 10 12

09-06-10

2012

FC JC

C 25

42.5N

300

13.8

22.6

30.1

35.3

PH Unit 3 Lift 90 Column axis 13

13-06-10

2033

FC JC

C 25

42.5N

300

14.8

23.6

29.8

34.3

PH Unit 4 Lift 60 Column axis 5

14-06-10

2034

FC JC

C 25

42.5N

300

14.6

24.2

31.6

35.4

PH Unit 3 Lift 63 Column axis 13

15-06-10

2039

FC JC

C 25

42.5N

300

13.8

23.6

30.1

34.3

PH Unit 3 Lift 62 Column axis 9

Page 37

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

Date
Casted

PROJECT, UGANDA
REV. 0

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

90 days

Note

16-06-10

2043

FC JC

C 25

42.5N

300

15.2

22.4

29.2

31.5

PH Unit 2 Lift 88 Column & small


wall

19-06-10

2051

FC JC

C 25

42.5N

300

13.5

22.9

30.3

33.8

PH Unit 3 Lift 63 axis 10

21-06-10

2058

FC JC

C 25

42.5N

300

14.8

23.6

30.0

36.8

PH Unit 4 Lift 60 Column axis 9

28-06-10

2084

FC JC

C 25

42.5N

300

12.6

23.5

30.2

32.5

PH Unit 3 Lift 63 Column axis 13

29-06-10

2089

FC JC

C 25

42.5N

300

13.3

26.6

33.4

36.3

PH Unit 3 Lift 64 Column axis 10

05-07-10

2102

FC JC

C 25

42.5N

300

13.6

23.3

30.1

35.3

PH Unit 1 Lift 28 wall 18 wall

09-07-10

2112

FC JC

C 25

42.5N

300

15.4

26.3

35.8

40.0

PH Unit 3 Lift 64 Column axis 13


last part

11-07-10

2117

FC JC

C 25

42.5N

300

13.6

22.6

29.8

34.6

ERECT BAY OIL SEPERATOR

13-07-10

2124

FC JC

C 25

42.5N

300

12.9

21.2

29.3

33.3

PH Unit 4 Lift 62 Column axis 6

15-07-10

2128

FC JC

C 25

42.5N

300

15.2

25.0

33.2

38.3

PH Unit 2 Lift 26

15-07-10

2130

FC JC

C 25

42.5N

300

14.3

23.1

31.3

35.6

PH Unit 4 Lift 62 Column axis 5

16-07-10

2132

FC JC

C 25

42.5N

300

13.7

24.6

32.5

36.1

PH Unit 4 Lift 62 Column axis 6

20-07-10

2142

FC JC

C 25

42.5N

300

13.5

23.1

29.7

33.7

PH Unit 4 Lift 62 Column axis 5

21-07-10

2146

FC JC

C 25

42.5N

300

14.4

22.8

30.6

35.8

PH Unit 4 Lift 62 Column axis 8

23-07-10

2153

FC JC

C 25

42.5N

300

12.9

22.5

29.1

32.7

PH Unit 4 Lift 62 Column axis 9

24-07-10

2156

FC JC

C 25

42.5N

300

14.3

23.1

31.3

35.7

PH Unit 4 Lift 63 Column axis 6 & 5

26-07-10

2164

FC JC

C 25

42.5N

300

13.8

22.6

30.0

35.8

PH Unit 4 Lift 63 Column axis 8

03-08-10

2183

FC JC

C 25

42.5N

300

13.7

22.1

29.6

33.8

PH Unit 4 Lift 62 wall axis 5 - 6

05-08-10

2194

FC JC

C 25

42.5N

300

14.2

22.8

30.6

34.9

PH Unit 4 Lift 63 Column axis 9

17-08-10

2225

FC JC

C 25

42.5N

300

13.6

22.2

29.2

PH Unit 4 Lift 64 Column axis 9

18-08-10

2226

FC JC

C 25

42.5N

300

16.2

26.6

33.7

PH Rail race wall lift 15, 16, 18, &


19

20-08-10

2233

FC JC

C 25

42.5N

300

13.0

22.4

29.9

PH Unit 4 Lift P6A

21-08-10

2237

FC JC

C 25

42.5N

300

13.3

21.9

29.9

PH Unit 1 Centre wall Lift 29 Partial


wall

21-08-10

2239

FC JC

C 25

42.5N

300

13.2

24.1

30.3

PH Unit 1 Right wall Lift 31A

23-08-10

2245

FC JC

C 25

42.5N

300

13.9

23.6

30.3

PH Unit 4 Lift 62 wall axis 8 - 9

25-08-10

2249

FC JC

C 25

42.5N

300

14.1

22.6

29.3

PH Unit 2 Lift 90 Column axis 17

26-08-10

2255

FC JC

C 25

42.5N

300

13.8

24.8

34.8

PH Unit 2 Lift 90 Column axis 13

27-08-10

2258

FC JC

C 25

42.5N

300

12.1

21.1

31.7

30-08-10

2262

FC JC

C 25

42.5N

300

14.0

25.6

33.0

PH Tailrace wall lift 3, 4, 6, 7, 9, 10


& 13
PH Tailrace Foundation wall lift 38,
41, 44, & 47

Page 38

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

REV. 0

Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Date
Casted

PROJECT, UGANDA

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days 7 days

28 days

Note

90 days

30-08-10

2263

FC JC

C 25

42.5N

300

13.9

22.4

30.6

PH Unit 4 Lift 63 wall axis 5 - 6

30-08-10

2264

FC JC

C 25

42.5N

300

13.3

23.4

31.1

PH Unit 5 Lift 90 Column axis 3

03-09-10

2279

FC JC

C 25

42.5N

300

14.1

22.2

30.3

PH Unit 5 Lift 62 Column axis 5

05-09-10

2285

FC JC

C 25

42.5N

300

14.2

23.3

31.2

PH Unit 5 Lift 62 Column axis 4

08-09-10

2293

FC JC

C 25

42.5N

300

12.3

24.5

32.0

PH Unit 2 Lift 91

09-09-10

2298

FC JC

C 25

42.5N

300

12.8

21.3

29.6

PH Unit 5 Lift 62 Column axis 4

15-09-10

2309

FC JC

C 25

42.5N

300

12.5

23.4

30.6

S.Y. P3 INTERCONNECTION
FOUNDATION

18-09-10

2313

FC JC

C 25

42.5N

300

13.2

22.9

32.6

ERECT BAY AREA ALSTOM


TEMPORARY SLAB

23-09-10

2327

FC JC

C 25

42.5N

300

14.3

23.6

32.1

PH Unit 1 W. Block Lift 32 W21,


U.B.W

25-09-10

2331

FC JC

C 25

42.5N

300

15.9

25.5

33.8

PH Unit 3 Lift 28

25-09-10

2333

FC JC

C 25

42.5N

300

13.8

22.1

30.2

PH Unit 3 Lift 28

26-09-10

2336

FC JC

C 25

42.5N

300

14.3

23.8

29.6

PH Unit 5 Lift 63 Column axis 4

26-09-10

2337

FC JC

C 25

42.5N

300

12.2

22.9

29.6

PH Contral building slab at EL:1109


- 29

29-09-10

2347

FC JC

C 25

42.5N

300

17.0

28.2

34.3

PH Unit 5 Lift 20B - 21A

30-09-10

2349

FC JC

C 25

42.5N

300

12.8

21.9

29.4

PH Unit 5 Lift 20B - 21A

30-09-10

2351

FC JC

C 25

42.5N

300

12.2

22.5

30.4

PH Unit 5 Lift 64 Column axis 2

30.93
24.3
36.2
1.6

Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 25N/mm2
Actual Characteristic Strength of the mix =
Rck

= AVG - K x STD

28.8 N/mm2

K = 1.28

If expected low percent value is 10%

For the contractor: ELIAS H.

Page 39

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Date
Casted

Sample
Concrete Cement Cement
Mix Type
(Kg/m3)
class
type
Ref.

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days

7 days

28 days

90 days

Note

13-01-09

396

FC S

C 15

42.5N

250

12.3

24.2

33.3

38.0

DEN CON

17-01-09

401

FC S

C 15

42.5N

250

18.8

29.5

39.0

44.8

G/DAM LEFT BANK

03-02-09

426

FC S

C 15

42.5N

250

9.7

24.9

34.1

40.7

SSW RRC

05-02-09

428

FC S

C 15

42.5N

250

11.2

26.6

35.5

38.9

GATED SPILLWAY RRC

07-02-09

432

FC S

C 15

42.5N

250

9.3

23.4

30.8

35.6

GATED SPILLWAY RRC

10-02-09

438

FC S

C 15

42.5N

250

11.1

24.2

32.6

34.4

GATED SPILLWAY RRC

14-02-09

446

FC S

C 15

42.5N

250

13.6

25.0

32.8

36.9

GATED SPILLWAY RRC

11-03-09

488

FC S

C 15

42.5N

250

11.6

23.1

30.6

35.5

GATED SPILLWAY RRC

20-03-09

501

FC S

C 15

42.5N

250

17.1

28.2

36.5

42.0

GATED SPILLWAY RRC

21-03-09

505

FC S

C 15

42.5N

250

18.0

23.8

28.4

32.2

GATED SPILLWAY RRC

24-03-09

508

FC S

C 15

42.5N

250

11.0

23.4

31.2

37.5

GATED SPILLWAY RRC

31-03-09

517

FC S

C 15

42.5N

250

10.2

21.1

28.0

32.0

GATED SPILLWAY RRC

31-03-09

516

FC S

C 15

42.5N

250

10.3

20.1

27.5

31.9

SSW RRC

07-04-09

530

FC S

C 15

42.5N

250

12.0

20.4

27.5

33.1

GATED SPILLWAY RRC

15-04-09

541A

FC S

C 15

42.5N

250

13.6

21.8

27.5

32.1

GATED SPILLWAY RRC

24-04-09

553

FC S

C 15

42.5N

250

10.5

22.8

28.6

33.2

GATED SPILLWAY RRC

28-04-09

563

FC S

C 15

42.5N

250

18.2

25.8

33.6

37.9

EB BLIND. LINE 25 EL-1090

04-05-09

572

FC S

C 15

42.5N

250

12.7

22.7

31.1

36.0

GATED SPILLWAY RRC

14-05-09

597

FC S

C 15

42.5N

250

12.4

19.4

27.5

30.9

SSW RRC

20-05-09

607

FC S

C 15

42.5N

250

14.6

22.4

30.3

34.7

GATED SPILLWAY RRC

25-05-09

617

FC S

C 15

42.5N

250

14.3

23.7

29.5

33.7

GATED SPILLWAY SB-S6A

26-05-09

619

FC S

C 15

42.5N

250

12.4

24.2

33.2

37.4

SSW RRC

02-06-09

631

FC S

C 15

42.5N

250

12.5

19.6

24.7

30.7

SSW RRC

11-06-09

649

FC S

C 15

42.5N

250

12.4

20.6

27.2

32.5

GATED SPILLWAY SB-S10B

19-06-09

667

FC S

C 15

42.5N

250

11.5

22.2

29.7

36.3

SSW RRC

23-06-09

675

FC S

C 15

42.5N

250

12.0

22.1

30.6

34.1

SSW RRC

01-07-09

694

FC S

C 15

42.5N

250

11.6

22.5

27.5

30.5

GATED SPILLWAY SB-310 RRC

TEMPORARY BRIDGE LEFT


ABUTMENT

11-11-09

1171

FC S

C 20

42.5N

250

12.8

20.7

27.1

32.0

12-11-09

1178

FC S

C 20

42.5N

250

12.9

20.8

27.9

33.8

16-11-09

1189

FC S

C 20

42.5N

250

11.1

19.5

26.6

30.8

18-11-09

1202

FC S

C 20

42.5N

250

11.9

19.5

28.0

33.4

21-11-09

1208

FC S

C 20

42.5N

250

11.7

21.0

26.3

30.7

02-12-09

1239

FC S

C 20

42.5N

250

11.4

18.1

25.5

28.1

11-01-10

1377

FC S

C 20

42.5N

250

12.6

20.9

26.5

30.3

23-01-10

1439

FC S

C 20

42.5N

250

11.3

20.8

26.7

APPRON BLINDING
G.SPILLWAY TAILRACE
APPRON BLINDING
G.SPILLWAY TAILRACE

TEMPORARY BRIDGE LEFT


ABUTMENT

APPRON BLINDING
G.SPILLWAY TAILRACE
APPRON BLINDIND
TEMPORARY BRIDGE LEFT
ABUTMENT
GATED SPILLWAY BLINDING
EXT.WALL A

Page 40

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Sample
Concrete Cement Cement
Mix Type
class
type
(Kg/m3)
Ref.

Date
Casted

Rc, maturation at NORMAL WATER


CURING (MPa)
2 days

7 days

28 days

90 days
30.3

Note

TEMPORARY BRIDGE LEFT


ABUTMENT

11-01-10

1377

FC S

C 20

42.5N

250

12.6

20.9

27.0

23-01-10

1439

FC S

C 20

42.5N

250

11.3

20.8

27.0

04-02-10

1494

FC S

C 20

42.5N

250

12.3

19.8

26.0

29.6

GATED SPILLWAY SWH - PLAIN


CONCRETE

16-02-10

1559

FC S

C 15

42.5N

250

12.6

20.8

26.0

30.6

SIPHON SPILLWAY RRC

23-02-10

1600

FC S

C 15

42.5N

250

9.8

16.6

21.0

24.0

GATED SPILLWAY SB-SB9 ( PART 2)

10-03-10

1672

FC S

C 20

42.5N

250

11.3

19.6

25.0

29.8

APPRON BLINDING

13-03-10

1689

FC S

C 20

42.5N

250

12.1

23.4

27.0

33.9

APPRON SLAB

22-03-10

1727

FC S

C 20

42.5N

250

10.7

20.9

29.0

32.7

GATED SPILLWAY SB - S8

GATED SPILLWAY BLINDING


EXT.WALL A

27-03-10

1751

FC S

C 20

42.5N

250

11.5

18.7

25.0

28.1

S.SPILLWAY BARRELS 10 - 11 - 12
PLAIN CONCRETE

29-03-10

1763

FC S

C 20

42.5N

250

10.4

18.8

24.0

29.9

APPRON SLAB

02-04-10

1786

FC S

C 20

42.5N

250

12.1

19.9

26.0

30.6

S.SPILLWAY BARRELS 13 - 14 - 15

06-08-10

2198

FC S

C 25

42.5N

250

12.0

19.2

25.0

29.6

APPRON SLAB BLINDING

21-08-10

2234

FC S

C 20

42.5N

250

9.8

18.3

25.0

G. SPILLWAY EXTENSION OF
GRANTRY BLINDING

20-09-10

2317

FC S

C 25

42.5N

250

9.3

16.7

23.0

APPRON SLAB BLINDING

25.43
21.0
29.0
1.9

Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 15N/mm2
Actual Characteristic Strength of the mix =
Rck AVG - K x STDV =

K = 1.28

If expected low percent value is 10%

For the contractor:

<<Page 41>>

Summary of

BUJAGALI HYDROELECTRIC POWER

SITE MATERIALS

Cylinder Compressive Strengh Results

LABORATORY

Sep-10

PROJECT, UGANDA
REV. 0

Power House UNITS


Rc, maturation at NORMAL WATER
CURING (MPa)

Date
Casted

Sample
Ref.

03-01-10

1340

FC R

C15

42.5N

250

15.8

06-01-10

1351

FC R

C 15

42.5N

250

07-01-10

1353

FC R

C 15

42.5N

11-01-10

1376

FC R

C 15

19-02-10

1584

FC R

25-02-10

1609

25-02-10

Mix Type

Concrete Cement Cement


class
type
(Kg/m3)

2 days 7 days

Note

28 days

90 days

26.6

34.0

40.0

11.7

19.9

26.0

GATED SPILLWAY RRC

250

13.8

21.2

26.0

GATED SPILLWAY SB12 RRC

42.5N

250

12.5

19.8

25.0

GATED SPILLWAY SB - S11 - RRC

C 20

42.5N

250

12.8

22.8

31.0

37.3

GATED SPILLWAY SB9 BLINDING


DOWNSTREAM

FC R

C 20

42.5N

250

11.6

17.3

25.0

28.2

GATED SPILLWAY BLINDING SB - S8

1611

FC R

C 20

42.5N

250

10.1

16.9

24.0

27.8

GATED SPILLWAY SWD - FH-1

01-03-10

1627

FC R

C 20

42.5N

250

11.6

18.3

25.0

28.4

GATED SPILLWAY BLINDING SB - S9

02-02-10

1482

FC R

C 20

42.5N

250

13.6

20.4

27.0

31.9

PH Unit 5 UPSTREAM SLAB

16-02-10

1563

FC R

C 20

42.5N

250

12.5

19.0

24.0

26.4

S. SPILLWAY NEW PRECAST


SLAB

23-03-10

1728

FC R

C 20

42.5N

250

11.9

19.2

25.0

29.4

S.SPILLWAY BARRELS 4 - 5 - 6

02-04-10

1785

FC R

C 20

42.5N

250

10.8

17.9

25.0

29.3

APPRON RRC

TEMPORARY BRIDGE LEFT


ABUTMENT

06-04-10

1790

FC R

C 20

42.5N

250

10.6

19.0

27.0

29.3

S.Y.H.V.FOUND B. AXIS (O - P - 5 K)
(L - M - 2 - 3)

09-04-10

1798

FC R

C 20

42.5N

250

11.7

19.8

25.0

27.8

SIPHON SPILLWAY SS 1 RRC

14-04-10

1821

FC R

C 20

42.5N

250

10.1

18.3

25.0

27.5

SIPHON SPILLWAY RRC

16-04-10

1829

FC R

C 20

42.5N

250

9.6

16.9

23.0

25.9

SIPHON SPILLWAY SS 1 RRC

05-08-10

2191

FC R

C 20

42.5N

250

9.4

18.8

24.0

27.4

PH Unit 1 Tail race wall blinding

13-08-10

2216

FC R

C 20

42.5N

250

11.8

18.4

25.0

25.89
23.0
34.0
2.7

Average
Minimum
Maximum
Standard Deviation
Design Characteristic Strength = 15N/mm2
Actual Characteristic Strength of the mix =
Rck AVG - K x STD

22.5 N/mm2

GATED SPILLWAY BLINDING


GRANTRY CRANE

K = 1.28

If expected low percent value is 10%

For the contractor: ELIAS H.

<<Page 42>>

You might also like