MTR CORPORATION LIMITED

SHATIN TO CENTRAL LINK (SCL)


CONTRACT NO. 1102 HIN KENG STATION AND APPROACH STRUCTURES
SUBMISSION REVIEW FORM
CONTRACTOR :

TYPE :

ITEM
NO.

1.

POC

ERFC

DELIVERABLE :

TRANSMITTAL NO. :

DOCUMENT
REFERENCE

REVIEWER

Safety Team

General

Method Statement for Construction of Drainage and


Manholes

REVISION :

ISSUE DATE:

1102-ERFC-CM(SCLC)-CS-000170

REVIEWERS COMMENT

PAGE :

16 December 2013

1 of 1

CONTRACTORS
RESPONSE

Hazards of the location of work should be


identified (e.g., close to HV equipment, working
at height, work in confined space, etc.) and
control measures developed should be specific.

No lifting work with 2.75m or above the level of OHL


cable shall be conducted. (Section 6 viii)
Manholes will be constructed in open cut method.
Safety measures for confined space work inside
manhole will be implemented. (Section 5 ix)

2.

Safety Team

General

Plant and equipment should state, related


hazards are identified and control measures
should be specific.

Excavator will be used. (Section 3) Banksman will


be appointed and stand outside the entrance of
fence off area. (Section 6 iii)

3.

Safety Team

General

Materials used, stored, handled and transported


should be stated, related hazards shall identify
and control measures are specific.

GI, concrete & clay pipes etc. will be used. (Section


3) All pipes shall be wedged in temporary storage
area (Appendix F), and lifted by mobile crane.
(Section 3)

4.

Safety Team

General

Requirements of supervision shall clearly be


stated (especially for confined space)

CP and foreman shall supervise the confined space


work, during dismantle of formwork of manhole.
(Section 9.2)

5.

Safety Team

General

Emergency plan or contingency arrangements


must be stated for confined space

Please see section 9.2 for the contingency


arrangement.

6.

Operations
Railway
Protection

General

For excavation deeper than two metres and


within 10 metres from the edge of the railway
furniture, please bring up the ELS for our
comments.

Metal shoring will be erected to both sides of


excavation. (Section 8 v)

7.

CM team

General

Please clearly show which portion of the works


would be within 10m from the edge of the railway
furniture.

See part plan marked.

<< End >>