ELEMENTS
Part 1 : Structure Elements
In-situ column and beams using reusable
system formwork + precast concrete slab
Floor Area : 134.90m2
Roof truss using prefab roof truss
Roof Area : 134.90m2
Total Part 1
Part 2 : Wall System
AREA (m2)
IBS FACTOR
COVERAGE
134.90
0.7
(134.9/269.8)
0.50
1.0
(134.9/269.8)
0.50
134.90
269.80
63.00
Total Part 2
Part 3 : Other simplified construction
solutions
i) 100% beam size follow MS1064 Part 10 :2001
ii) 80% of door sizes follow MS1064 Part 4 :2001
iii) 80% of window sizes follow MS1064 Part 4 :2001
Total Part 3
IBS CONTENTS SCORE OF PROJECT
(Part 1 + Part 2 + Part 3)
63.00
1.0
(63/63)
1.00
1
100%
80%
80%
IBS SCORE
0.50 x 0.7 x 50 =
17.5
0.50 x 1.00 x 50 =
25.0
42.5
1.0 x 1.0 x 30 =
30.0
30.0
2.0
2.0
2.0
6.0
78.50
81.30
17.40
36.20
134.90