DESCRIPTION
4. CARPENTRY AND JOINERY
Supply and fix 40mm thick hollw
core flush type wooden doors
both side covered with approved
quality 4mm thick ply wood . Price
includes approved quality
cylindrical lock, hinges,door
stopper, three coats of varnish
paint and all other necessary
accessories to complete the
work.All work shall be in
accorance with the Architectural
detail drawing and approval.

2
2
2
2

1
7

1
7

1
7

24
24

4
4

2
2

24
168
192
4
28
32
2
14
16

ground -7th floor


a) Type D1 =Size 90x256cm
Pcs(Gound Floor)
Pcs(1st-4thFloor)
Pcs Total
b) Type D2 =Size 80x215cm
Pcs(Gound Floor)
Pcs(1st-4thFloor)
Pcs Total
c) Type D3 =Size 100x215cm
Pcs(Gound Floor)
Pcs(1st-4thFloor)
Pcs Total

4
4
2

1
1

Prepared by

Checked by

3.20
3.45
0.75
1.00
1.95
1.70
3.15
1.10
5.35
4.75
4.68
1.10
2.00
1.00
2.95
2.15
1.00
3.15
6.45
1.15
5.15
1.00
5.00
4.70

DATE:-___
PAGE:-___________
BLOCK:-____APAR
3

22.08
1.50
6.63
6.93

101.65
10.30

8.00
25.37
6.30

14.84

5.15
23.50

sign.______________

sign.______________

TAKE OFF SHEET


PROJECT :- DEFENSE ENGINEERING COLLAGE
LOCATION :- DEBRE ZEIT
TAKE OFF SHEET NO :1
2
3
DESCRIPTION
AXIS -B-D & F-H
2
2
2

2
2
2
2
2

3.15
4.25
1.80
1.25
1.50
1.25
3.45
3.50
3.50
1.95
2.55
0.95
1.95
1.60
5.30
0.95

26.78 B/N-2-4(Bed Room)


4.50 B/N-2-3(Store)
3.75 B/N-3-4(Store)
AXIS -A-B & H-J
24.15 B/N 3-5(Bed Room)
13.65 B/N-4-5(Bed Room)
4.85 B/N-4-5(Bed Room)
6.24 B/N-4-5'(Bath Room)
10.07 B/N-3-5(Corridor)
AXIS -B-D & F-H

5.70
1.10
3.25
0.95

12.54 B/N-3-4(Corridor)
AXIS -C-D & F-G
6.18 B/N-3-4(Corridor)

253.96 m2

Total

DATE:-_
PAGE:-___
BLOCK:-____APAR
3

Prepared by

Checked by

sign.______________

sign.______________

DATE:-___
PAGE:-____________.
4.02 Supply & fix 8mm thick Chip
BLOCK:-____APARTEMENT____
wood Ceiling
on & including
DESCRIPTION

40x50mm structural wood battens


placed c/c 600mm both ways
suspended to Steel truss lower
member.
AXIS -A'-B & H-I

B/N-1-3(Bed Room)
B/N-1-3(Bed Room)
B/N-1-3(Bath Room)
B/N-1'-1(Balcony)
AXIS -B-C & G-H

B/N-1'-2 & 4-5'(Living Room)


B/N-5-5'(Balcony)
AXIS -C-D & F-G
5.65

B/N-1-2 & 4-5(Balcony)

2.7

B/N-1-2 & 4-5(Kitchen Room)


B/N-2-3(Lobby)
AXIS -A'-D & F-I

0.075
3.325

B/N-2-3(Corridor)
AXIS -D- F

B/N-1-2(Balcony)
B/N-1-3(Lobby)
8.3

DATE:-___
PAGE:-____________.
BLOCK:-____APARTEMENT____
DESCRIPTION

7.3
6.95

Approved by

sign.______________

6.95

5.11

3.07

6.95
4.45

TAKE OFF SHEE


PROJECT: DEFENCE ENGINEERING COLLEGE
LOCATION:- DEBRE ZEIT
TAKE OFF SHEET NO:-

No of bars
IN

Description

Type

Shape

Length

No. of Bars

Total (M)
Unit weight
Page Total (KG)

Prepared by

Checked

Fitsum Abayneh
Quantity Surveyor
sign.______________

Belay Ket

Site Engi

sign._____

TAKE OFF SHEET


DATE PAGE: _____
BLOCK:-

No of bars
No. of
elem. Total

6
mm

8
mm

10
mm

Total Length (m)


12
14
mm
mm

16
mm

0.00
0.00
0.00

"
"
"

"
"
"

"
"
"

"
"
"

"
"
"

"
"
"

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

0.00
Total (M)

0.00

0.00

0.00

0.00

0.00

0.00

Unit weight
Page Total (KG)

0.222
0.00

0.395
0.00

0.617
0.00

0.888
0.00

1.21
0.00

1.58
0.00

Checked by

Approved by

Belay Ketema

Mesfin Teferi
Office Engineer
sign.______________

Site Engineer
sign.______________

20
mm

24
mm

"
"
"

"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
0.00

0.00

2.47
0.00