WORKING AT HEIGHT
YES
STEP 2 (Attachment 2)
Is the risk acceptable?
Risk assess: refer to Height
Audit/Risk
Assessment
STEP 5
Implement elimination or
substitution hazard
NO
STEP 3
Can the hazard be eliminated
or substituted?
NO
YES
STEP 4
Is time a factor?
YES
NO
STEP 7 (Attachment 4)
Is the control measure a
NO
permanent solution?
Refer to Control Measure
Matrix
STEP 6 (Attachment 3)
Detailed study of alternatives
Refer to detailed analysis
question sheet
YES
YES
STEP 9
Install permanent Control
measure
NO
STEP 8
Are time/finances a factor?
YES
STEP 11
Alternative control measure
Use a suitable control
measure
STEP 10
Use temporary control
STEP 12
Complete a new JRA and
Safe Work Procedure